B08_W912EK27QA0040001.pdf

PDF 4 MB Posted

Attached to
Shady Creek Ranger Facility - Construction Supplies
Solicitation number
W912EK27QA004
Issued by

About this file

This is an Amendment to a Solicitation (Standard Form 30, Amendment 0001) issued by the U.S. Army Corps of Engineers (USACE), Rock Island District, effective November 24, 2026, for solicitation W912EK27QA004.

The amendment revises the Purchase Description and updates Attachment J-0001 Detailed Price Breakdown for CLIN 0001 related to the Shady Creek Ranger Facility Construction Supplies project. The procurement requires contractors to provide and deliver construction materials and services for a new ranger facility located at Shady Creek Recreation Area, Muscatine, Iowa. Key deliverables include: (1) construction materials per detailed specifications including structural lumber, wood trusses engineered to IBC 2024 standards with specific load ratings and dimensions, and Huber Zip System exterior/interior sheeting; (2) mineral wool or dense pack cellulose insulation installation (5,500 sq. ft.) with minimum R49-R60 ceiling values; (3) two 10' x 10' insulated steel overhead garage doors with R-17 minimum thermal resistance and motorized operation; and (4) 20-yard roll-off dumpster service with maximum four dumps. The Background section was revised to indicate construction will be completed with Government funds and a mixture of Government and Contractor labor (previously Government labor only). Contractors must complete acquisition and delivery of materials within two weeks of award, with all supplies and services completed by April 30, 2027. Deliveries require 24-hour notice and must occur Monday-Thursday, 8:00 AM-4:00 PM. The technical point of contact is Jillian Harms (Jillian.J.Harms@USACE.Army.MIL, 563-213-9776). Questions must be submitted to Bradley J. Grothus at bradley.j.grothus@usace.army.mil by 2:00 PM CT on November 23, 2026. The amendment notes applicability of the Revolutionary FAR Overhaul (Class Deviation 2026-O0028, effective February 1, 2026) for future procurements, though legacy contracts continue under existing FAR provisions. Security requirements include background checks via NCIC-III screening, E-Verify employment eligibility verification, and suspicious activity reporting training for all contract personnel with facility access.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Reference Description

Header only - Purchase Requisition Number

Reference Value

96514762955612

Miscellaneous text in this section has been modified from:

MVR.03 - QUESTION AND ANSWER VIA EMAIL

Technical inquiries and questions relating to this solicitation are to be submitted to Mr. Bradley J.

Grothus at bradley.j.grothus@usace.army.mil no later than 2:00 PM CT on 23 November 2026.

MVR.14 REVOLUTIONARY FAR OVERHAUL

Pursuant to Executive Order (EO) 14275, Restoring Common Sense to Federal Procurement; EO 14265, Modernizing Defense Acquisition and Spurring Innovation in the Defense Industrial Base and Office of Management and Budget Memorandum M-25-26, Overhauling the Federal Acquisition Regulation (May 2, 2025), Class Deviation 2026-O0028 was issued by the Department of War effective February 1, 2026 announcing the U.S. Government is operating under the Revolutionary FAR Overhaul (RFO), which specifically mandates the use of the RFO for FAR Part 52 and its applicable clauses. All legacy contracts will follow the legacy FAR through completion, unless specifically modified. All future procurements will align with the streamlined RFO. It is incumbent upon any potential offerors to verify the current status of the RFO clauses and meet the revised criteria under the deviation.

PURCHASE DESCRIPTION

W912EK27QA0040001

U.S Army Corps of Engineers Rock Island District

Shady Creek Ranger Facility – Construction Supplies

1. Project Title:

2. Introduction:

The U.S Army Corps of Engineers (USACE) requires the purchase and delivery of various building supplies and services as outlined in this Purchase Description (PD).

3. Background:

USACE has determined the need for an independent Ranger Facility on USACE Fee title land at Shady Creek Recreation Area. Design and construction of the new Ranger Facility will be completed with Government funds and labor. Construction supplies for the Ranger Facility shall be procured through a supply contract.

4. Objective:

The objective of this PD is to procure building supplies and services needed to construct the new Shady Creek Ranger Facility. All supplies and materials shall be delivered to Shady Creek Recreation Area (see attached Image One) unless directed otherwise in the attached excel worksheet – Detailed Price Breakdown -

CLIN 0001.

5. Scope:

5.1 0001: Provide and deliver construction materials meeting the specifications outlined in the attached Excel worksheet – Detail Price Breakdown - CLIN 0001. Offerors must complete the Detailed Price Breakdown – CLIN 0001 as part of their submission.

I. The contractor shall verify details (color, texture, etc.) of all supply items with the Government prior to purchase.

II. All sourced lumber shall be structural grade #2 or better construction/framing lumber.

III. Wood trusses have a heel height of 17". Truss top chord shall be rated at 12psf and bottom chord at 24psf. Trusses shall accommodate 24" overhang at eaves and gable ends. Truss spacing shall be 24" on center.

Truss design shall adhere to IBC 2024; Risk Category is III, Exposure Category is C. Truss basis design wind velocity is 115 mph, and the ground snow load is 53 psf. Trusses shall have a 4/12 pitch and be 30ft from heel to heel. Truss drawings shall be submitted for approval prior to fabrication. Trusses shall be delivered within a two-week request from The Government; trusses shall not be delivered before requested.

IV. All interior and exterior sheeting shall be Huber Zip System or equivalent.

Sheeting and tape must provide a continuous air barrier, an integrated water-resistive barrier, structural durability, and consist of a two-step insulation process that eliminates the need for house-wrap and felt.

5.2

0002: Provide and install 7 ¼” Mineral Wool Batt or equivalent OR dense pack cellulose insulation for walls and ceiling (5,500 sq. ft). Ceiling insulation shall have an installed height of 19” and a minimum R49 – R60 insulation value. Spray foam insulation and fiberglass batt insulation are not acceptable. All measurements to be verified by the contractor.

5.3

0003: Provide and install two 10’ x 10’ insulated steel overhead garage doors.

Each overhead door shall meet the following minimum requirements:

I. Doors shall be tan in color with one row of windows within the top half of each door.

II. Insulated panel-type door, electrically motorized.

III. Minimum 2-inch-thick door panels.

IV. Minimum thermal resistance of R-17.

V. Exterior steel skin no less than 0.015 inch thick, galvanized, with fluoropolymer coating.

VI. Heavy-duty springs and 3-inch door track.

VII. All wiring, controls, hardware, accessories, and installation materials required for a complete and operational installation.

VIII. Single-phase automatic opener for each door.

IX. Provide no fewer than two (2) automatic door openers/remotes total.

X. Contractor shall verify all field dimensions and operating clearances before ordering or fabrication.

Offerors must submit manufacturer product data identifying the door size, panel thickness, R-value, exterior steel gauge, coating, track size, spring type, glazing configuration, opener, electrical requirements, and color pallet as part of their submission.

5.4

0004: Provide, deliver, and service a 20-yard roll-off dumpster. The dumpster shall be serviced as requested by the Government with a maximum of four dumps.

6. Key Deliverables, Milestones and Schedule:

6.1 Contractor Point of Contract (POC) shall contact Government POC no later than two calendar days after award to verify all key deliverables and give an estimate of the delivery schedule.

6.2 Contractor shall start the acquisition and delivery of materials no later than two weeks post award. Delivery of all supplies and execution of all services shall be completed by 30 April, 2027.

6.3 Government inspections of all deliverables will be conducted for flaws and/or defects that may have occurred from manufacture or delivery. Units will be evaluated to ensure they meet all the specifications within this PD. USACE reserves the right to decline any product that doesn’t meet the specifications in this PD.

6.7 Contractor shall schedule deliveries with a minimum of 24-hour notice to Government POC. Delivery shall be made Monday – Thursday, 8am – 4pm.

Not including federal holidays.

7. Government Furnished Equipment/Information (GFE/CFI):

N/A

8. Contractor Furnished Equipment/Information (CFE/CFI):

The contractor shall provide and/or furnish all personnel, equipment, supplies, tools, material, supervision, and other items necessary to complete the requirement.

9. Place of Performance/Delivery:

Shady Creek Recreation Area 3550 Highway 22 Muscatine, IA. 52761

10. Invoicing/Payment Processing: One monthly invoice shall be submitted via email to, Jillian.J.Harms@USACE.Army.MIL Please ensure that your invoice reflects the company name(s) and address exactly as listed on your System for Award Management (SAM) registration.

11. Technical POC:

Jillian Harms Engineering Technician Office Ph. #: 563-213-9776 Jillian.J.Harms@USACE.Army.MIL US Army Corps of Engineers, Mississippi River Project Office 25549 182nd Street, Pleasant Valley, IA 52767

12. Security

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime

Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters

W912EK27QA0040001

mailto:Jillian.J.Harms@USACE.Army.MIL shall be addressed to the designated Government representative (e.g., Contracting

Officer Representative (COR), Requiring Activity (RA) representative, or Contracting

Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers

(USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements;

all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health

Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or

HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

a. Overview. All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security

Office using the National Crime Information Center-Interstate Identification Index

(commonly referred to as “NCIC-III”) and Terrorist Screening Database

(commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the

Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

b. Definitions. For the purposes of this contract USACE facilities are defined as any USACE owned or leased property for which entry is controlled and limited to authorized USACE employees, contractors, and official visitors.

c. Procedures.

(1) Contract employees may have unescorted access within these controlled areas upon completion of an adjudication of fitness by the USACE Rock Island District

Security Office and entry onto an access control list (ACL) for the facility/project. The contractor will submit background checks that have been conducted by a bonded third party within the last six months of the notice to proceed date and authorize reports to be provided to the Rock Island District Security Office by the third party.

The mailing address for background checks is:

U.S. Army Corps of Engineer, Rock Island District

ATTN: Security Office

P.O. Box 2004

Rock Island, IL 61204-2004

Background checks will consist of a check of the National Crime Information

Center(NCIC) Interstate Identification Index (NCIC-III), and the Terrorist Screening

Data Base when available. Individuals may be denied access to Rock Island District controlled facilities and/or property if the results of the third party NCIC-III equivalent background check gives and indication that a person may present a threat to the good order, discipline, safety, or security of the facility. This information includes, but is not limited to a person who has:

(a) The background investigation contains criminal arrest information about the individual that causes the senior commander to determine that the person presents a threat to the good order, discipline, or health and safety on the installation.

(b) A claimed identity that cannot be verified based on the reasonable belief that the person submitted fraudulent identity information in the attempt to gain access.

(c) Current arrest warrant in NCIC, regardless of the offense or violation.

(d) Current bar from entry or access to another Federal installation or facility.

(e) Conviction of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, or drug possession with intent to sell or distribute.

(f) Conviction for espionage, sabotage, sedition, treason, terrorism, or murder.

(g) Being registered as a sex offender.

(h) Felony conviction within the last 10 years regardless of the offense or violation.

(i) Felony conviction for a firearms or explosives violation regardless of when the conviction occurred.

(j) Engaged in acts or activities designed to overthrow the U.S. Government by force.

(k) Been identified as known to be, or is suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

(2) Short term contractor/subcontractor employees working at the USACE facility/project for less than 15 calendar days may be escorted at the USACE facility by a USACE employee or other contract employee that is on the ACL for the facility/project. Names and the dates of work for short term contractor/subcontractors must be submitted to the Rock Island District Security Office at cemvr-sl@usace.army.mil in order to be added to the ACL for the period they will be working at the facility.

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The

Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the

Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results.

Contract employees denied access based upon derogatory information from the

NCIC-III or equivalent check may apply to the District Commander for a waiver. In order to obtain a waiver the contract employee must:

a. Obtain a certified copy of their complete criminal history to include all arrests and convictions.

b. Obtain a letter of support from their USACE sponsor. The letter must indicate that the sponsor requests that the person be granted unescorted access to accomplish a specific purpose as well as the anticipated frequency and duration of such visits. If a contractor employee is terminated, the sponsor must inform the District Security Office so that unescorted access is no longer authorized.

W912EK27QA0040001

mailto:cemvr-sl@usace.army.mil

c. Submit a letter requesting the access denial be waived, to the USACE sponsor who will be responsible for submitting it to the District Commander.

The letter must include all offenses, plus an explanation why the conduct should not result in denial of access. Other factors that the sponsor/ the requesting individual should address are the:

(1) Nature and seriousness of the conduct.

(2) Specific circumstances surrounding the conduct.

(3) Length of time elapsed since the conduct.

(4) Age of the person at the time of the incident or conduct, and

(5) Proof of efforts toward rehabilitation.

(6) Current mailing address or email address for Army communications.

d. The USACE sponsor will review the person’s information for completeness and determine whether to endorse the request for a waiver.

e. If the USACE sponsor endorses the waiver letter, he/she will provide a letter of recommendation for the person. The letter must address the relevant conduct that caused the denial and indicate why the conduct should not prohibit the person from being granted unescorted access. The USACE sponsor will submit the letters to the District Commander.

f. The District Commander will render a determination in line with good order, discipline, and health and safety of the facility. The District Commander will provide a copy of the determination to the person.

g. The results of the District Commander’s decision will be provided to the District Security Office to update the Access Control List for the project.

h. Persons who had a waiver request denied may request reconsideration from the District Commander 1 year after the date of the Commander’s decision.

Persons may request reconsideration earlier if they can present significant information that was not available at the time of the original request or show that the basis for the original denial was overturned, rescinded, or expired.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the

Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security

Office no later than ten days from written notice of approval. The Rock Island

District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a

Personnel Change Request Form will be submitted to and approved by the Security

Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See

Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/)

(website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility

Verification, and submit it to the Contracting Officer to become part of the contracting file.

W912EK27QA0040001

https://www.e-verify.gov/

To:

MVR.03 - QUESTION AND ANSWER VIA EMAIL

Technical inquiries and questions relating to this solicitation are to be submitted to Mr. Bradley J.

Grothus at bradley.j.grothus@usace.army.mil no later than 2:00 PM CT on 23 November 2026.

MVR.14 REVOLUTIONARY FAR OVERHAUL

Pursuant to Executive Order (EO) 14275, Restoring Common Sense to Federal Procurement; EO 14265, Modernizing Defense Acquisition and Spurring Innovation in the Defense Industrial Base and Office of Management and Budget Memorandum M-25-26, Overhauling the Federal Acquisition Regulation (May 2, 2025), Class Deviation 2026-O0028 was issued by the Department of War effective February 1, 2026 announcing the U.S. Government is operating under the Revolutionary FAR Overhaul (RFO), which specifically mandates the use of the RFO for FAR Part 52 and its applicable clauses. All legacy contracts will follow the legacy FAR through completion, unless specifically modified. All future procurements will align with the streamlined RFO. It is incumbent upon any potential offerors to verify the current status of the RFO clauses and meet the revised criteria under the deviation.

PURCHASE DESCRIPTION

U.S Army Corps of Engineers Rock Island District

1. Project Title:

2. Introduction:

The U.S Army Corps of Engineers (USACE) requires the purchase and delivery of various building supplies and services as outlined in this Purchase Description (PD).

3. Background:

USACE has determined the need for an independent Ranger Facility on USACE Fee title land at Shady Creek Recreation Area. Design and construction of the new Ranger Facility will be completed with Government funds and mixture of Government and Contractor labor. Construction supplies for the Ranger Facility shall be procured through a supply contract.

4. Objective:

The objective of this PD is to procure building supplies and services needed to construct the new Shady Creek Ranger Facility. All supplies and materials shall be delivered to Shady Creek Recreation Area (see attached Image One) unless directed otherwise in the attached excel worksheet – Detailed Price Breakdown -

CLIN 0001.

5. Scope:

5.1 0001: Provide and deliver construction materials meeting the specifications outlined in the attached Excel worksheet – Detail Price Breakdown - CLIN 0001. Offerors must complete the Detailed Price Breakdown – CLIN 0001 as part of their submission.

I. The contractor shall verify details (color, texture, etc.) of all supply items with the Government prior to purchase.

II. All sourced lumber shall be structural grade #2 or better construction/framing lumber.

III. Wood trusses have a heel height of 17". Truss top chord shall be rated at 12psf and bottom chord at 24psf. Trusses shall accommodate 24" overhang at eaves and gable ends. Truss spacing shall be 24" on center.

Truss design shall adhere to IBC 2024; Risk Category is III, Exposure Category is C. Truss basis design wind velocity is 115 mph, and the ground snow load is 53 psf. Trusses shall have a 4/12 pitch and be 30ft from heel to heel. Truss drawings shall be submitted for approval prior to fabrication. Trusses shall be delivered within a two-week request from The Government; trusses shall not be delivered before requested.

IV. All interior and exterior sheeting shall be Huber Zip System or equivalent.

Sheeting and tape must provide a continuous air barrier, an integrated water-resistive barrier, structural durability, and consist of a two-step insulation process that eliminates the need for house-wrap and felt.

5.2

0002: Provide and install 7 ¼” Mineral Wool Batt or equivalent OR dense pack cellulose insulation for walls and ceiling (5,500 sq. ft). Ceiling insulation shall have an installed height of 19” and a minimum R49 – R60 insulation value. Spray foam insulation and fiberglass batt insulation are not acceptable. All measurements to be verified by the contractor.

5.3

0003: Provide and install two 10’ x 10’ insulated steel overhead garage doors.

Each overhead door shall meet the following minimum requirements:

I. Doors shall be tan in color with one row of windows within the top half of each door.

II. Insulated panel-type door, electrically motorized.

III. Minimum 2-inch-thick door panels.

IV. Minimum thermal resistance of R-17.

V. Exterior steel skin no less than 0.015 inch thick, galvanized, with fluoropolymer coating.

VI. Heavy-duty springs and 3-inch door track.

VII. All wiring, controls, hardware, accessories, and installation materials required for a complete and operational installation.

VIII. Single-phase automatic opener for each door.

IX. Provide no fewer than two (2) automatic door openers/remotes total.

X. Contractor shall verify all field dimensions and operating clearances before ordering or fabrication.

Offerors must submit manufacturer product data identifying the door size, panel thickness, R-value, exterior steel gauge, coating, track size, spring type, glazing configuration, opener, electrical requirements, and color pallet as part of their submission.

5.4

0004: Provide, deliver, and service a 20-yard roll-off dumpster. The dumpster shall be serviced as requested by the Government with a maximum of four dumps.

6. Key Deliverables, Milestones and Schedule:

6.1 Contractor Point of Contract (POC) shall contact Government POC no later than two calendar days after award to verify all key deliverables and give an estimate of the delivery schedule.

6.2 Contractor shall start the acquisition and delivery of materials no later than two weeks post award. Delivery of all supplies and execution of all services shall be completed by 30 April, 2027.

6.3 Government inspections of all deliverables will be conducted for flaws and/or defects that may have occurred from manufacture or delivery. Units will be evaluated to ensure they meet all the specifications within this PD. USACE reserves the right to decline any product that doesn’t meet the specifications in this PD.

6.7 Contractor shall schedule deliveries with a minimum of 24-hour notice to Government POC. Delivery shall be made Monday – Thursday, 8am – 4pm.

Not including federal holidays.

7. Government Furnished Equipment/Information (GFE/CFI):

N/A

8. Contractor Furnished Equipment/Information (CFE/CFI):

The contractor shall provide and/or furnish all personnel, equipment, supplies, tools, material, supervision, and other items necessary to complete the requirement.

9. Place of Performance/Delivery:

Shady Creek Recreation Area 3550 Highway 22 Muscatine, IA. 52761

10. Invoicing/Payment Processing: One monthly invoice shall be submitted via email to, Jillian.J.Harms@USACE.Army.MIL Please ensure that your invoice reflects the company name(s) and address exactly as listed on your System for Award Management (SAM) registration.

11. Technical POC:

Jillian Harms Engineering Technician Office Ph. #: 563-213-9776 Jillian.J.Harms@USACE.Army.MIL US Army Corps of Engineers, Mississippi River Project Office 25549 182nd Street, Pleasant Valley, IA 52767

12. Security

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime

Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters

W912EK27QA0040001

shall be addressed to the designated Government representative (e.g., Contracting

Officer Representative (COR), Requiring Activity (RA) representative, or Contracting

Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers

(USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements;

all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health

Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or

HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

a. Overview. All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security

Office using the National Crime Information Center-Interstate Identification Index

(commonly referred to as “NCIC-III”) and Terrorist Screening Database

(commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the

Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

b. Definitions. For the purposes of this contract USACE facilities are defined as any USACE owned or leased property for which entry is controlled and limited to authorized USACE employees, contractors, and official visitors.

c. Procedures.

(1) Contract employees may have unescorted access within these controlled areas upon completion of an adjudication of fitness by the USACE Rock Island District

Security Office and entry onto an access control list (ACL) for the facility/project. The contractor will submit background checks that have been conducted by a bonded third party within the last six months of the notice to proceed date and authorize reports to be provided to the Rock Island District Security Office by the third party.

The mailing address for background checks is:

U.S. Army Corps of Engineer, Rock Island District

ATTN: Security Office

P.O. Box 2004

Rock Island, IL 61204-2004

Background checks will consist of a check of the National Crime Information

Center(NCIC) Interstate Identification Index (NCIC-III), and the Terrorist Screening

Data Base when available. Individuals may be denied access to Rock Island District controlled facilities and/or property if the results of the third party NCIC-III equivalent background check gives and indication that a person may present a threat to the good order, discipline, safety, or security of the facility. This information includes, but is not limited to a person who has:

(a) The background investigation contains criminal arrest information about the individual that causes the senior commander to determine that the person presents a threat to the good order, discipline, or health and safety on the installation.

(b) A claimed identity that cannot be verified based on the reasonable belief that the person submitted fraudulent identity information in the attempt to gain access.

(c) Current arrest warrant in NCIC, regardless of the offense or violation.

(d) Current bar from entry or access to another Federal installation or facility.

(e) Conviction of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, or drug possession with intent to sell or distribute.

(f) Conviction for espionage, sabotage, sedition, treason, terrorism, or murder.

(g) Being registered as a sex offender.

(h) Felony conviction within the last 10 years regardless of the offense or violation.

(i) Felony conviction for a firearms or explosives violation regardless of when the conviction occurred.

(j) Engaged in acts or activities designed to overthrow the U.S. Government by force.

(k) Been identified as known to be, or is suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

(2) Short term contractor/subcontractor employees working at the USACE facility/project for less than 15 calendar days may be escorted at the USACE facility by a USACE employee or other contract employee that is on the ACL for the facility/project. Names and the dates of work for short term contractor/subcontractors must be submitted to the Rock Island District Security Office at cemvr-sl@usace.army.mil in order to be added to the ACL for the period they will be working at the facility.

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The

Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the

Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results.

Contract employees denied access based upon derogatory information from the

NCIC-III or equivalent check may apply to the District Commander for a waiver. In order to obtain a waiver the contract employee must:

a. Obtain a certified copy of their complete criminal history to include all arrests and convictions.

b. Obtain a letter of support from their USACE sponsor. The letter must indicate that the sponsor requests that the person be granted unescorted access to accomplish a specific purpose as well as the anticipated frequency and duration of such visits. If a contractor employee is terminated, the sponsor must inform the District Security Office so that unescorted access is no longer authorized.

W912EK27QA0040001

c. Submit a letter requesting the access denial be waived, to the USACE sponsor who will be responsible for submitting it to the District Commander.

The letter must include all offenses, plus an explanation why the conduct should not result in denial of access. Other factors that the sponsor/ the requesting individual should address are the:

(1) Nature and seriousness of the conduct.

(2) Specific circumstances surrounding the conduct.

(3) Length of time elapsed since the conduct.

(4) Age of the person at the time of the incident or conduct, and

(5) Proof of efforts toward rehabilitation.

(6) Current mailing address or email address for Army communications.

d. The USACE sponsor will review the person’s information for completeness and determine whether to endorse the request for a waiver.

e. If the USACE sponsor endorses the waiver letter, he/she will provide a letter of recommendation for the person. The letter must address the relevant conduct that caused the denial and indicate why the conduct should not prohibit the person from being granted unescorted access. The USACE sponsor will submit the letters to the District Commander.

f. The District Commander will render a determination in line with good order, discipline, and health and safety of the facility. The District Commander will provide a copy of the determination to the person.

g. The results of the District Commander’s decision will be provided to the District Security Office to update the Access Control List for the project.

h. Persons who had a waiver request denied may request reconsideration from the District Commander 1 year after the date of the Commander’s decision.

Persons may request reconsideration earlier if they can present significant information that was not available at the time of the original request or show that the basis for the original denial was overturned, rescinded, or expired.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the

Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security

Office no later than ten days from written notice of approval. The Rock Island

District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a

Personnel Change Request Form will be submitted to and approved by the Security

Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See

Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/)

(website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility

Verification, and submit it to the Contracting Officer to become part of the contracting file.

W912EK27QA0040001

https://www.e-verify.gov/

List of Attachments

The following contract documents were modified:

Detailed Price Breakdown - CLIN 0001

INFORMATION FROM TO

OtherAttachme nt

Detailed Price Breakdown - CLIN

Detailed Price Breakdown - CLIN 0001 Rev. 2026Nov24

AttachmentDat e

10 Nov 2026 24 Nov 2026

B08_W912EK27QA0040001_2-20.pdf
Blank Page
IDCode: J
Page: 1
Pages: 20
AmendNo: 0001
EffDate: 24 NOV 2026
ReqNo:
ProjNo:
IssCode: W912EK
AdmCode:
IssuedBy: W07V ENDIST ROCK ISLAND

KO CONTRACTING DIVISION, 1 ROCK ISLAND ARSENAL

ROCK ISLAND, IL 61299-5001

UNITED STATES

BRADLEY GROTHUS, EMAIL: BRADLEY.J.GROTHUS@USACE.ARMY.MIL TELEPHONE: (563) 726-1136 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912EK27QA004
SolDate: 16 NOV 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is as follows:

1) Revise the Purchase Description

2) Revise Attachment J-0001 Detailed Price Breakdown CLIN 0001

ContNameTitle:
CoNameTitle: MAJ KINDIG, MATTHEW
ContDate:
CODate: 24 NOV 2026

File details come from the government source that posted it. Updated .