B08_Amendment_0001.pdf
PDF 943 KB Posted
- Attached to
- ILWW ODIA Elevator Inspection and Maintenance
- Solicitation number
- W912EK26QA040
About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for elevator maintenance services at the Illinois Waterway Visitor Center. The amendment was issued on August 12, 2026, by the U.S. Army Corps of Engineers, Rock Island District, and modifies solicitation W912EK26QA040 (originally dated July 16, 2026). The response due date has been extended from July 30, 2026, to August 19, 2026.
The amendment revises the Performance Work Statement, evaluation criteria (FAR 52.212-2), and submission instructions to reflect updated requirements for a non-personal services contract providing hydraulic passenger elevator maintenance and inspection services. The contract covers quarterly preventative maintenance, emergency entrapment response (one-hour on-site requirement), urgent service calls (four to eight hours depending on time), and flood inspection/cleaning on a separate billable basis. The contractor must possess minimum five years of commercial elevator maintenance experience, employ certified technicians (NEIEP, CET, or OEM training), and maintain required insurance including general liability of $500,000 per occurrence and employer's liability of $100,000. The pricing schedule includes a base period award through September 30, 2026 (one quarterly service), followed by four one-year option periods (October 1, 2026 through September 30, 2030) requiring four quarterly services annually per period. Quoters must submit a technical volume (maximum ten pages) demonstrating company experience and personnel qualifications, plus a price volume with fully burdened labor rates for regular, overtime, and holiday hours. The Government will award on a Lowest Price Technically Acceptable (LPTA) basis, evaluating technical acceptability on a pass/fail standard against three sub-elements and price based on the grand total of all CLINs. The amendment emphasizes that labor rate schedules will not be evaluated for award but will be incorporated into the contract for pricing future in-scope repair work and authorized premium billing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Solicitation_W912EK26QA040_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 18
0001 12 AUG 2026
W912EK
W07V ENDIST ROCK ISLAND
KO CONTRACTING DIVISION, 1 ROCK ISLAND ARSENAL
ROCK ISLAND, IL 61299-5001
UNITED STATES
KATHERINE BEHRENS, EMAIL: KATHERINE.D.BEHRENS@USACE.ARMY.MIL
TELEPHONE: (309) 794-5909
SCD: PAS:
W912EK26QA040
16 JUL 2026
SEE CONTINUATION
The purpose of this amendment is to revise the Performance Work Statement, provision 52.212-2 - Evaluation, and the Addendum to 52.212-1 - Instructions. Changes are highlighted in yellow. Text highlighted in green reiterates the requirement for quoters to submit a Labor Rate Schedule with their Price volume.
All other terms and conditions remain the same.
JEFFREY R. VOSS
12 AUG 2026
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
Miscellaneous text in this section has been modified to:
SCHEDULE OF PRICES
CORPS OF ENGINEERS
ROCK ISLAND DISTRICT
ILLINOIS WATERWAY VISITOR CENTER ELEVATOR MAINTENANCE BID SCHEDULE
Base Period Award to 9-30-2026
Line Item Duties Quantity Unit Unit Price Total Amount
0001AA
Hydraulic Passenger Elevator
Quarterly service
Job
0001AB
Hydraulic Passenger Elevator
Flood Inspection and cleaning
1 Job
Total Amount for BASE BID PERIOD (Sum of Items 0001)
Option Period I 10-1-2026 to 9-30-2027
0002AA
0002AB
Flood Inspection and cleaning
Total Amount for OPTION PERIOD I (Sum of Items 0002)
Option Period II 10-1-2027 to 9-30-2028
0003AA
0003AB
Flood Inspection and cleaning
Total Amount for OPTION PERIOD II (Sum of Items 0003)
Option Period III 10-1-2028 to 9-30-2029
0004AA
Elevator
4 Job
0004AB
Flood Inspection and cleaning
Total Amount for OPTION PERIOD III (Sum of Items 0004)
Option Period IV 10-1-2029 to 9-30-2030
0005AA
Elevator
Quarterly service
4 Job
Hydraulic Passenger Elevator 1 Job
0005AB Flood Inspection and cleaning
Total Amount for OPTION PERIOD IV (Sum of Items 0004)
GRAND TOTAL for BASE & OPTION PERIODS (Sum of 0001 to 0005)
PERFORMANCE WORK STATEMENT
1.0 GENERAL SCOPE & OBJECTIVES
This is a non-personal services contract to provide an elevator maintenance and inspection program for a single hydraulic passenger elevator located at the NRM Office/Illinois Waterway Visitor Center between Utica and Ottawa, IL. The objective of this contract is to ensure the continuous safe operation of the elevator and adherence to all applicable State of Illinois safety regulations. This elevator facilitates access to the NRM Office area and the upper deck of the Visitor Center for all personnel and visitors, thereby supporting the organization's mission in flood damage reduction, recreation, and environmental stewardship.
2.0 DESCRIPTION OF SERVICES
The contractor is required to provide all personnel, equipment, tools, supervision, other items, and services necessary to ensure that elevators serving the Visitor Center remain operable.
Elevator Location:
3.0 QUALIFICATIONS
The contractor must meet and maintain the following minimum(prime or major subcontractor) qualifications and capabilities throughout the duration of the contract:
a) Experience: A minimum of five (5) years of corporate experience as an established entity performing commercial elevator maintenance.
b) Equipment: Possess, maintain, and provide all necessary tools, safety gear, and specialized diagnostic software/equipment required to perform maintenance on Schindler elevator control systems.
c) Specialization: Utilize technicians who possess the required industry certifications (e.g., NEIEP, Certified Elevator Technician [CET], or OEM factory training) to safely and effectively service Schindler elevator systems.
d) Lubricants: Utilize lubricants as recommended by the equipment manufacturer.
e) Compliance: Ensure all equipment, materials, installation, and record keeping conform to all applicable State of Illinois requirements.
4.0 ELEVATOR MAINTENANCE & TASKS
4.1 General Scope & Normal Wear and Tear
The contractor shall, as part of its firm-fixed-price for routine maintenance, provide all parts, labor, diagnostic tools, and supervision necessary to repair or replace any components listed in Section
4.2 of this PWS that fail or degrade due to normal operational use. This firm-fixed-price coverage explicitly excludes major repairs necessitated by vandalism, malicious destruction, building-wide electrical power surges, or Acts of God (such as fire, lightning, or flood damage). Repairs required due to flooding will be handled via the separate Flood CLINs.
4.2 Hydraulic Elevators Components Covered
Microprocessor Hydraulic Elevator System Control System: Controller cabinet, connection boards, CPU, relays, power supply, etc.
Power Unit: Enclosure, pump, motor, valves, strainers, etc.
Hydraulic System Accessories: Piping, fittings, jack packing, vibration dampeners, hydraulic fluid, heating/cooling elements, etc.
Car Equipment: Car panel, floor leveling unit, switch tree, floor controllers, etc.
Electrical: Wiring, conduit, traveling cables.
Hoistway and Pit Equipment: Landing/slowdown switches, limits, buffers.
Rails and Guides: Guide rails, shoe gibs, rollers (properly lubricated).
Door Equipment: Operators, hangers, contacts, interlocks, gibs.
Signals and Accessories: Operating panels, push buttons, lanterns, emergency lighting, fireman's service equipment, etc.
4.3 Housekeeping
The contractor will be responsible for cleaning elevator machine rooms, pit areas, hoistway equipment (including rails, interlocks, tracks, switches), buffers, and car tops. Responsible for cleanup of spilled or leaked lubricants using absorbent material and removal of litter/debris from pit areas.
5.0 Call Outs and Response Times
5.1 Emergency Response (Entrapment)
In the event of a passenger entrapment, the contractor must have a qualified technician arrive on-site within one (1) hour of notification, regardless of the time of day, weekend, or holiday status.
5.2 Urgent Service Calls (Elevator Out of Service)
For any failure that renders the elevator completely inoperable (but involves no entrapped passengers), the contractor must have a qualified technician arrive on-site within:
5.3 Routine Service Calls
For minor issues where the elevator remains safely operational (e.g., noisy door operation, burnt-out indicator lights), the contractor shall respond within twenty-four (24) hours or schedule the repair to coincide with the next routine preventative maintenance visit, as directed and approved by the Contracting Officer's Representative (COR).
5.4 Billing for After-Hours Calls
For urgent or emergency calls required outside of regular business hours (Mon-Fri, 0800-1700), the firm-fixed-price covers the technician's standard hourly rate. The Government will only be billed for the difference between the contractor's regular hourly rate and their overtime/holiday hourly rate (as established in the contract).
Federal Holidays: The Visitor Center is closed on New Year's Day, Independence Day, Thanksgiving Day, and Christmas Day.
6.0 TESTS AND INSPECTIONS
6.1 Required Testing
A pressure relief test and a yearly leakage test will be performed by the contractor at their expense as required by Code.
6.2 Qualified Elevator Inspector (QEI)
The contractor is required at their expense to provide an independent Elevator inspector with A.M.
S.E QEI-1 qualification for all periodic one-year and five-year certifications.
6.3 Arrangement for Inspection
7.0 ADDITIONAL SERVICES: FLOOD INSPECTION AND CLEANING
The Visitor Center is subject to flooding. In the event of a flood, the contractor will clean and return the elevator to safe operating condition after each flood event. This will be considered a separate billable event and will be paid on a per-needed basis through the designated flood CLINs.
8.0 SECURITY & CYBERSECURITY REQUIREMENTS
8.1 Physical Security
To protect the privacy of the Contractor, all Contractor employees, and sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number, title, and POC info in a sealed envelope to:
8.2 Cybersecurity (CMMC Level 1)
The awarded vendor must comply with CMMC Level 1 (Foundational) protocols for handling Federal Contract Information (FCI). Vendors must demonstrate implementation of the 17 basic cyber hygiene practices (FAR 52.204-21) and submit an annual self-assessment to the DoD Supplier Performance Risk System (SPRS).
9.0 REQUIRED INSURANCE
In accordance with FAR Clause 52.228-5 "Insurance-Work on a Government Installation", the Contractor shall obtain and maintain during the period of performance the following minimum amounts of insurance:
Workmen's Compensation: Coverage complying with applicable State statute
Employer's Liability: Minimum $100,000
General Liability/Bodily Injury: Minimum $500,000 per occurrence
Automobile Liability: Minimum $200,000 per person / $500,000 per occurrence / $20,000 property per occurrence
The contractor is required to hold and save the Government, its officers and agents free and harmless from liability of any nature or kind, arising from any use, trespass, or damage occasioned by his/her operation.
Security Clause 1.
AT Level 1 Training. All Contractor and sub-contractor employees requiring access to non-public or private Government property must complete Anti-Terrorism (AT) Level 1 Training within 30 calendar days after notice to proceed date. AT Level 1 Training is available at the following website: https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam. The required training is under the heading "JS-US007-14: Level 1 Antiterrorism Awareness Training." Contractor employees who have a Common Access Card (CAC) may log in with their CAC. Contractor employees without a CAC shall log into the "Non-CAC users" link and need to complete the training all at once, as no record of training shall be maintained aside from the certificate that is printed upon completion. All AT Level 1 Training certificates must be submitted to the Contracting Officer within 5 calendar days of completion.
Security Clause 15.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed.
*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: This Quality Assurance Surveillance Plan (QASP) is to provide the Government a basis for evaluation of contractor performance. The QASP is a government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards required by this contract.
1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in the Scope of Work (SOW). The contractor is required to provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with the SOW.
Additionally, the contractor is required to be accountable for all auditable documents, establish /maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.
2. Performance Standards
a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.
b. Service. The services required to be performed will be assessed against the SOW detailed in the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR Subpart 42.15, the Government will assess the contractor's record of conforming to contract requirements and to standards of good workmanship The contractor's adherence to contract schedules including the .
administrative aspects of performance, history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor's business-like concern for the interest of the customer.
3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic inspection, Contractor Self Reporting, and validated customer complaints.
a. Random and/or scheduled monitoring will be Random/Scheduled Monitoring.
conducted when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.
b. The contractor will provide, as needed, status reports that Contractor Self-Reporting.
document significant problems/issues and potential resolutions.
c. Customer feedback will be obtained and maintained on file. Customer Feedback.
Customer complaints will be considered valid if they clearly detail the nature of complaint in writing, sign and submit the complaint to the COR. The COR will provide any and all complaints to the Contractor. The Contractor shall maintain a record of the complaints.
4, Performance Measurement. Performance will be measured in accordance with the following table:
Performance-Based Matrix, Performan ce
Element
Performanc e Requireme nt
Surveillance Method
Frequency Acceptable Quality Level
Contract Services
Contract Services furnished as prescribed in the SOW as applicable.
Inspection by the COR
Random inspection of all sampling of contract services.
>95% of services inspected performed timely and without rework required.
Overall Contract P erformance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR's annual report on contractor performance
Assessment by the COR
Annual All service elements rated Satisfactory (or higher) Satisfactory = 95% or above average contract acceptable random sampling
Contractor Self Reporting
Contract Services furnished as prescribed in the SOW as applicable.
Contractor Self Reports
Quarterly >95% of services reported performed timely and without rework required.
Customer Feedback
Customer complaints reviewed by
COR
Inspection by the COR
Per Occurrence
100% of valid customer complaints resolved
Invoicing Quarterly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice by
COR
Quarterly 100% accuracy
Disincentives:
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor's past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products in a timely manner since the Government can require the contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
MVR.03
QUESTIONS AND ANSWERS VIA EMAIL
Technical inquiries and questions relating to this solicitation are to be submitted to the Contract Specialist, Kate Behrens, at Katherine.D.Behrens@usace.army.mil no later than 24 July 2026 at 2:
00 PM Central Time.
MVR.14
REVOLUTIONARY FAR OVERHAUL (RFO)
Pursuant to Executive Order (EO) 14275, Restoring Common Sense to Federal Procurement; EO 14275, Modernizing Defense Acquisitions and Spurring Innovation in the Defense Industrial Base and Office of Management and Budget Memorandum M-25-26, Overhauling the Federal Acquisition Regulation (May 2, 2025), Class Deviation 2026-O0038 was issued by the Department of War effective February 1, 2026 announcing the US Government is operating under the
Revolutionary FAR Overhaul (RFO), which specifically mandates the use of the RFO for FAR Part 52 and its applicable clauses. All legacy contracts will follow the legacy FAR through completion, unless specifically modified. All future procurements will align with the streamlined RFO. It is incumbent upon any potential offerors to verify the current status of the RFO clauses and meet the revised criteria under the deviation.
Addendum to Contract Clauses
Additional Information/Notes
The following clauses were modified:
Evaluation-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038)
(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conform to the solicitation s ing will be most advantageous and to the Governmentrepresents the Lowest Price Technically Acceptable (LPTA) , price and other .factors considered Technical acceptability and past performance will be evaluated on an
Quotes will be evaluated using the following two (2) factors:Acceptable/Unacceptable basis.
FACTOR 1: Technical Acceptability (Acceptable / Unacceptable)
Technical will be evaluated on a Pass/Fail basis. To Acceptability (Acceptable/Unacceptable) pass under this factor the quoter's Technical Volume must clearly receive a rating of "Acceptable," demonstrate compliance with all three (3) of the following sub-elements. A failure to meet any single element will result in the quoter failing this factor and being ineligible for contract award. an overall rating of "Unacceptable."
Sub-element 1: Company Experience. The quote demonstrates that the prime contractor (or its possesses a minimum of five (5) consecutive years of experience in the major subcontractor) maintenance, repair, and inspection of commercial hydraulic passenger elevators.
Sub-element 2: Personnel Qualifications & Certifications. The quote provides valid, active copies of acceptable professional certifications (NEIEP, CET, or equivalent OEM training) for all technicians proposed to perform work under this contract.
Sub-element 3: Capability for Timely Response and Repair. The quote provides a viable, realistic narrative demonstrating the contractor's capability to minimize elevator downtime through timely response and effective repairs. NOTE: Mere statements of acquiescence or blanket promises to comply with the stated timelines are insufficient and will result in a rating of Unacceptable.
2. Price
The Government will evaluate the price based on the Grand Total for the base period and all four option periods. The total evaluated price will be the sum of CLINs 0001 through 0005 as listed in the Schedule of Prices. Prices will be evaluated for completeness and reasonableness.
The requested schedule of fully burdened labor rates will NOT be evaluated as part of the LPTA award decision. The Government will review these rates solely for reasonableness prior to incorporating them into the resulting contract for the purpose of pricing future in-scope repair work or authorized premium billing.
(b) . The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).
(c) . A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services
Miscellaneous text in this section has been modified to:
Submission Requirements:
To be considered for award, quoters must submit a complete quote package divided into two (2) distinct parts corresponding to the evaluation factors. Failure to submit any of the required information may result in the quote being determined non-compliant and excluded from evaluation.
Part I: Technical (Factor 1)Acceptability
The quoter must submit a Technical Volume (not to exceed ten [10] pages, excluding certifications) containing:
1. : Proof of Company Experience Provide a corporate profile or narrative demonstrating that the prime contractor has a minimum of five (5) consecutive years of experience or major subcontractor in the maintenance, repair, and inspection of commercial hydraulic passenger elevators. If relying on major subcontractor experience, the quote must include a signed Letter of Intent or binding agreement between the prime contractor and major subcontractor.
2. : Personnel Qualifications & Certifications Submit copies of active professional certifications for all technicians proposed to perform work under this contract. Acceptable certifications include:
- National Elevator Industry Educational Program (NEIEP) certification,
- Certified Elevator Technician (CET) status, or
- Equivalent OEM (Original Equipment Manufacturer) training certification (e.g., Schindler, Otis, Kone, Thyssenkrupp) applicable to hydraulic passenger elevators.
3. : Provide aCapability for Timely Response and Repair narrative detailing the contractor's capability to: (a) meet the routine quarterly preventative maintenance schedule, (b) respond to call-outs as specified in section 5.0 of the PWS, and (c) complete all necessary repairs in a timely manner.
Part II: Price (Factor 2)
The quoter must submit a Price Volume containing:
1. Regular Hourly Rate (Mon-Fri, 0800-1700
2. Overtime Hourly Rate (Evenings and Saturdays)
3. Premium/Holiday Hourly Rate (Sundays and Federal Holidays)