A22 - W912EK24R0007 Amend 0003 FINAL.pdf
PDF 2 MB Posted
- Solicitation number
- W912EK24R0007_LD22_FPIP_RFP
About this file
This document is Amendment 0003 to Solicitation W912EK24R0007 for the Lock & Dam 22 Fish Passage Improvement Project. The purpose of this amendment is to capture updates to the Specifications and Drawings for the project. The amendment deletes the Source Selection Plan, Schedule of Prices, and MVR.02 Questions & Answers from the solicitation, but clarifies that these documents remain incorporated and in full force and effect. The key changes in this amendment are revisions to Sections 01 20 00 Price and Payment Procedures, 01 33 00 Submittal Register, 09 97 02, and 35 31 19, as well as the issuance of revised drawings. This amendment extends the solicitation period, with offers required to acknowledge receipt prior to the new specified date and time.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Lock and Dam 22 - Fish Passage Improvement Project
The purpose of this amendment is to capture updates in the Specif ications and Draw ings.
The follow ing continuation page lists the Source Selection Plan, Schedule of Prices, and MVR.02 Questions & Answ ers as being deleted from the solicitation. This is in error due to a contract w riting system limitation. These documents remain incorporated as part of the solicitation and are in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK24R0007
X 9B. DATED (SEE ITEM 11)
22-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jul-2024
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK24R0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been deleted:
SCHEDULE OF PRICES
SOURCE SELECTION PLAN
MVR.02 QUESTION AND ANSWER VIA PROJNET APR 2020
(End of Summary of Changes)
AMEND. 0003
1 JULY 2024
The following modifications are made to SECTION 01 20 00, SECTION 01 33 00 Submittal Register, SECTION 09 97 02, and Section 35 31 19.
SECTION 01 20 00
a. PAGES 5, 30, AND 31. Delete Section 01 20 00 Page 5 in its entirety, and substitute therefore revised Section 01 20 00 Page 5. Delete Section 01 20 00 Page 30 in its entirety, and substitute therefore revised Section 01 20 00 Page 30. Delete Section 01 20 00 Page 31 in its entirety, and substitute therefore revised Section 01 20 00 Page 31, Amendment 0003, dated 01 July 2024.
SECTION 01 33 00 Submittal Register
b. PAGES 29 TO 60. Delete Section 01 33 00 Submittal Register Pages
29 to 60 in their entirety and substitute therefore revised Section 01 33 00 Submittal Register Pages 29 to 60, Amendment 0003, dated 01 July 2024.
SECTION 09 97 02
c. PAGES 1, 4, AND 5. Delete Section 09 97 02 Para 1.2, and substitute therefore revised Section 09 97 02 Para 1.2. Delete Section 09 97 02 Para 1.3.1, and substitute therefore revised Section 09 97 02 Para 1.3.1, Amendment 0003, dated 01 July 2024.
SECTION 35 31 19
d. PAGES 9 AND 10. Delete Section 35 31 19 Para 1.6, and substitute therefore revised Section 35 31 19 Para 1.6, Amendment 0003, dated 01 July 2024.
DRAWINGS (SUPERSEDED)
e. Revised drawings listed below are being issued with this Amendment.
Such revised drawings supersede those of the same sheet identification numbers listed in the INDEX OF DRAWINGS included in the set of drawings furnished with Solicitation No. W912EK24R007, dated June 2024.
SHEET ECRD EP-601
Lock and Dam 22 Fish Passage Saverton, Missouri
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.2 Concrete Demolition
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.3 Riprap Removal
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.4 Cofferbox Enclosure
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.5 Cofferbox Enclosure Dewatering
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.6 Cofferbox Enclosure Temporary Erosion Protection
1.1.6.1 Payment
1.1.6.2 Unit of Measure
1.1.7 Remove Struts and Wales
1.1.7.1 Payment
1.1.7.2 Unit of Measure
1.1.8 Remove Sheetpiles
1.1.8.1 Payment
1.1.8.2 Unit of Measure
1.1.9 Intake Demolition
1.1.9.1 Payment
1.1.9.2 Unit of Measure
1.1.10 Intake Excavation
1.1.10.1 Payment
1.1.10.2 Unit of Measure
1.1.11 Intake Cell Seal Slabs
1.1.11.1 Payment
1.1.11.2 Unit of Measure
1.1.12 Reinforced Concrete
1.1.12.1 Payment
1.1.12.2 Unit of Measure
1.1.13 Concrete Seepage Plugs
1.1.13.1 Payment
1.1.13.2 Unit of Measure
1.1.14 Backfill - Common Earth
1.1.14.1 Payment
1.1.14.2 Unit of Measure
1.1.15 Backfill - Controlled Low Strength Material
ms2274 SECTION 01 20 00 Page 1 AMEND. 0003
26 JUNE 2024
Lock and Dam 22 Fi sh Passage Saver t on, Mi ssour i
1. 1. 15. 1 Payment
1. 1. 15. 2 Uni t of Measur e
1. 1. 16 Debr i s Boom Dr i l l ed Pi er Coat i ng or Remove Casi ng
1. 1. 16. 1 Payment
1. 1. 16. 2 Uni t of Measur e
1. 1. 17 East and West Access - Mi scel l aneous
1. 1. 17. 1 Payment
1. 1. 17. 2 Uni t of Measur e
1. 1. 18 Excavat i on - Fi shway
1. 1. 18. 1 Payment
1. 1. 18. 2 Uni t of Measur e
1. 1. 19 Excavat i on - Gr out ed Ri pr ap
1. 1. 19. 1 Payment
1. 1. 19. 2 Uni t of Measur e
1. 1. 20 Er osi on Cont r ol
1. 1. 20. 1 Payment
1. 1. 20. 2 Uni t of Measur e
1. 1. 21 Fenci ng f or St agi ng Ar ea
1. 1. 21. 1 Payment
1. 1. 21. 2 Uni t of Measur e
1. 1. 22 Si t e Rest or at i on
1. 1. 22. 1 Payment
1. 1. 22. 2 Uni t of Measur e
1. 1. 23 Si gnage
1. 1. 23. 1 Payment
1. 1. 23. 2 Uni t of Measur e
1. 1. 24 Pr ef abr i cat ed Toi l et Bui l di ng
1. 1. 24. 1 Payment
1. 1. 24. 2 Uni t of Measur e
1. 1. 25 Excavat i on - St agi ng Ar ea
1. 1. 25. 1 Payment
1. 1. 25. 2 Uni t of Measur e
1. 1. 26 Si t e El ect r i cal
1. 1. 26. 1 Payment
1. 1. 26. 2 Uni t of Measur e
1. 1. 27 ECRD St r uct ur e
1. 1. 27. 1 Payment
1. 1. 27. 2 Uni t of Measur e
1. 1. 28 Moor i ng St ai r s and Ramp
1. 1. 28. 1 Payment
1. 1. 28. 2 Uni t of Measur e
1. 2 UNI T PRI CE PAYMENT I TEMS
1. 2. 1 Tempor ar y Const r uct i on Faci l i t i es
1. 2. 1. 1 Payment
1. 2. 1. 2 Measur ement
1. 2. 1. 3 Uni t of Measur e
1. 2. 2 Excavat i on f or Equi pment Access
1. 2. 2. 1 Payment
1. 2. 2. 2 Measur ement
1. 2. 2. 3 Uni t of Measur e
1. 2. 3 Cof f er box Encl osur e Wal es
1. 2. 3. 1 Payment
1. 2. 3. 2 Measur ement
1. 2. 3. 3 Uni t of Measur e
1. 2. 4 Cof f er box Encl osur e St r ut s
1. 2. 4. 1 Payment
1. 2. 4. 2 Measur ement
1. 2. 4. 3 Uni t of Measur e
1. 2. 5 I nt ake St eel H- Pi l es ms2274 SECTI ON 01 20 00 Page 2 AMEND. 0003
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.6 Guard Rails
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
1.2.7 Deck Grating and Grating Frames
1.2.7.1 Payment
1.2.7.2 Measurement
1.2.7.3 Unit of Measure
1.2.8 Bulkhead Slide Plates
1.2.8.1 Payment
1.2.8.2 Measurement
1.2.8.3 Unit of Measure
1.2.9 Steel Bulkheads
1.2.9.1 Payment
1.2.9.2 Measurement
1.2.9.3 Unit of Measure
1.2.10 Bulkhead Storage Frames
1.2.10.1 Payment
1.2.10.2 Measurement
1.2.10.3 Unit of Measure
1.2.11 Strip Seals
1.2.11.1 Payment
1.2.11.2 Measurement
1.2.11.3 Unit of Measure
1.2.12 Approach Ramps and Pavement
1.2.12.1 Payment
1.2.12.2 Measurement
1.2.12.3 Unit of Measure
1.2.13 Grouted Riprap
1.2.13.1 Payment
1.2.13.2 Measurement
1.2.13.3 Unit of Measure
1.2.14 Bird Deterrent System
1.2.14.1 Payment
1.2.14.2 Measurement
1.2.14.3 Unit of Measure
1.2.15 Security Gate
1.2.15.1 Payment
1.2.15.2 Measurement
1.2.15.3 Unit of Measure
1.2.16 Debris Boom Drilled Pier
1.2.16.1 Payment
1.2.16.2 Measurement
1.2.16.3 Unit of Measure
1.2.17 Debris Boom Drilled Pier Rock Socket
1.2.17.1 Payment
1.2.17.2 Measurement
1.2.17.3 Unit of Measure
1.2.18 Debris Boom Drilled Pier Access Ladder
1.2.18.1 Payment
1.2.18.2 Meaurement
1.2.18.3 Unit of Measure
1.2.19 Debris Boom Precast Concrete Beam Fabrication
1.2.19.1 Payment
1.2.19.2 Measurement
1.2.19.3 Unit of Measure
ms2274 SECTION 01 20 00 Page 3 AMEND. 0003
1.2.20 Debris Boom Precast Concrete Beam Installation
1.2.20.1 Payment
1.2.20.2 Measurement
1.2.20.3 Unit of Measure
1.2.21 Underlayer Stone Fill (Upstream of Dam)
1.2.21.1 Payment
1.2.21.2 Measurement
1.2.21.3 Unit of Measure
1.2.22 Type A Armor Stone (Upstream of Dam)
1.2.22.1 Payment
1.2.22.2 Measurement
1.2.22.3 Unit of Measure
1.2.23 Underlayer Stone Fill (Downstream of Dam)
1.2.23.1 Payment
1.2.23.2 Measurement
1.2.23.3 Unit of Measure
1.2.24 Filter Layer
1.2.24.1 Payment
1.2.24.2 Measurement
1.2.24.3 Unit of Measure
1.2.25 Type A Armor Stone (Downstream of Dam)
1.2.25.1 Payment
1.2.25.2 Measurement
1.2.25.3 Unit of Measure
1.2.26 Type B Armor Stone (Downstream of Dam)
1.2.26.1 Payment
1.2.26.2 Measurement
1.2.26.3 Unit of Measure
1.2.27 Riprap Void-Fill Stone
1.2.27.1 Payment
1.2.27.2 Measurement
1.2.27.3 Unit of Measure
1.2.28 Camera Mounting Piles
1.2.28.1 Payment
1.2.28.2 Measurement
1.2.28.3 Unit of Measure
1.2.29 Aggregate Road Repairs
1.2.29.1 Payment
1.2.29.2 Measurement
1.2.29.3 Unit of Measure
1.2.30 Dam Access Gate
1.2.30.1 Payment
1.2.30.2 Measurement
1.2.30.3 Unit of Measure
1.2.31 Site Demolition
1.2.31.1 Payment
1.2.31.2 Unit of Measure
1.2.32 Garbage Can
1.2.32.1 Payment
1.2.32.2 Measurement
1.2.32.3 Unit of Measure
1.2.33 Traffic Barrier Posts
1.2.33.1 Payment
1.2.33.2 Measurement
1.2.33.3 Unit of Measure
1.2.34 Weir Stone and Random Boulders
1.2.34.1 Payment
1.2.34.2 Measurement
1.2.34.3 Unit of Measure
ms2274 SECTION 01 20 00 Page 4 AMEND. 0003
1.2.35 Contractor Construction Verification and Adjustments
1.2.35.1 Payment
1.2.35.2 Measurement
1.2.35.3 Unit of Measure
1.2.36 Drilled Pier for ECRD
1.2.36.1 Payment
1.2.36.2 Measurement
1.2.36.3 Unit of Measure
1.2.37 Mooring Dolphin
1.2.37.1 Payment
1.2.37.2 Measurement
1.2.37.3 Unit of Measure
1.2.38 Mooring Bollards on Fishway Access Road
1.2.38.1 Payment
1.2.38.2 Measurement
1.2.38.3 Unit of Measure
1.2.39 Mooring Bollards on Submersible Dike
1.2.39.1 Payment
1.2.39.2 Measurement
1.2.39.3 Unit of Measure
1.3 PAYMENT FOR MATERIALS DELIVERED OFF-SITE
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --ms2274 SECTION 01 20 00 Page 5 AMEND. 0003
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, surveys, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization and Demobilization
1.1.1.1 Payment
Mobilization and demobilization for all plant and equipment, materials, tools, and supplies necessary to complete the work, will be paid for in Item No. 0001, "Mobilization and Demobilization." Mobilization consists of all work required to prepare plant and equipment for shipment, moving plant, equipment, supplies, and incidentals to the work site.
Mobilization will be paid once on site construction on project features begin. Demobilization consists of all work required to prepare plant and equipment for removal and for removing all plant, equipment, unused supplies, and incidentals from the work site, including restoration of staging areas used for construction operations. Failure to justify such price to the satisfaction of the Contracting Officer may result in:
payment of actual mobilization costs, as determined payment by the Contracting Officer at the completion of mobilization; actual demobilization costs, as determined by the Contracting Officer at the completion of demobilization; and payment of the remainder of this item in the final payment under this Contract. Construction bonds, with proof of a paid invoice, may be paid under this payment item.
1.1.1.2 Unit of Measure
Unit of measure: Job.
1.1.2 Concrete Demolition
1.1.2.1 Payment
Payment for costs associated with or incidental to the demolition of concrete for the cofferbox, intake, and fishway to include, but is not limited to, concrete sawing, concrete removal, rebar removal and incidentals for Item No. 0004, "Concrete Demolition" of the Base Bid when work is complete.
ms2274 SECTION 01 20 00 Page 6 AMEND. 0003
1.1.2.2 Unit of Measure
Unit of measure: Job.
1.1.3 Riprap Removal
1.1.3.1 Payment
Payment for costs associated with or incidental to riprap removal for construction of the cofferbox, intake, and fishway, but is not limited to, riprap and debris removal. Payment will be made for Item No. 0005 "Riprap Removal," of the Base Bid.
1.1.3.2 Unit of Measure
Unit of measure: Job.
1.1.4 Cofferbox Enclosure
1.1.4.1 Payment
Payment for costs associated with or incidental to the construction of the cofferbox enclosure, but is not limited to, surveys, equipment rentals, labor, furnish, fabricate, prep for installation of cofferbox enclosure, and physical installation of cofferbox enclosure. Final payment will be made for: Item No. 0006, "Cofferbox Enclosure". Payment will be made for:
Base Bid Item No. 0006AA, "Cofferbox Enclosure, Sheetpile." Payment for costs associated with or incidental to the construction of the sheetpiles, but is not limited to, equipment rentals, labor, furnish, fabricate, prep for installation of sheetpiles, and physical installation of sheetpiles.
Base Bid Item No. 0006AB, "Cofferbox Enclosure, End Closures at Existing Cells." Payment for costs associated with or incidental to the construction of the end closures but is not limited to, equipment rentals, labor, prep for installation of panels, furnish, fabricate and physical installation of panels.
Base Bid Item No. 0006AC, "Cofferbox Enclosure, Permeation Grouting;"
of the Base Bid. Payment for costs associated with or incidental to the construction of the Permeation grouting.
1.1.4.2 Unit of Measure
Unit of measure: Job.
1.1.5 Cofferbox Enclosure Dewatering
1.1.5.1 Payment
Payment for costs associated with or incidental to dewatering, but is not limited to, equipment rentals, labor, prep for dewatering, and dewatering activities. Payment will be made for Item No. 0009, "Cofferbox Enclosure Dewatering" of the Base Bid.
1.1.5.2 Unit of Measure
Unit of measure: Job.
ms2274 SECTION 01 20 00 Page 7 AMEND. 0003
1.1.6 Cofferbox Enclosure Temporary Erosion Protection
1.1.6.1 Payment
Payment for costs associated with or incidental to temporary erosion protection, but is not limited to, equipment rentals, labor, prep for temporary erosion protection activities. Payment will be made for Item No. 0010, "Cofferbox Enclosure Temporary Erosion Protection," of the Base Bid.
1.1.6.2 Unit of Measure
Unit of measure: Job.
1.1.7 Remove Struts and Wales
1.1.7.1 Payment
Payment for costs associated with or incidental to the removal of the Struts and Wales, but is not limited to, equipment rentals, labor, prep for removal of Struts and Wales. Payment will be made for Item No. 0011, "Remove Struts and Wales" of the Base Bid.
1.1.7.2 Unit of Measure
Unit of measure: Job.
1.1.8 Remove Sheetpiles
1.1.8.1 Payment
Payment for costs associated with or incidental to the removal of the sheetpiles, but is not limited to, equipment rentals, labor, prep for removal of sheetpiles. Payment will be made for Item No. 0012, "Remove Sheetpiles" of the Base Bid.
1.1.8.2 Unit of Measure
Unit of measure: Job.
1.1.9 Intake Demolition
1.1.9.1 Payment
Payment for costs associated with or incidental to the construction of the Intake Demolition includes, cutting and removal of submersible dike sheetpile to the elevations shown but is not limited to, equipment rentals, labor, sheetpile removal. Payment will be made for Item No.
0013, "Intake Demolition" of the Base Bid.
1.1.9.2 Unit of Measure
Unit of measure: Job.
ms2274 SECTION 01 20 00 Page 8 AMEND. 0003
1. 1. 10 I nt ake Excavat i on
1. 1. 10. 1 Payment
The excavat i on f or t he i nt ake i ncl udes sur veys, t he r emoval and di sposal of r i ver bot t om and submer si bl e di ke aggr egat e or ot her mat er i al s t o al l ow f or t he pl acement and i nst al l at i on of t he i nt ake st r uct ur e. I f meet i ng t he speci f i cat i ons and r equi r ement s of t he per mi t , mat er i al may be di sposed of onsi t e i n t he scour hol e beneat h t he f oot pr i nt of t he r ock r amp f i shway up t o El evat i on 430, but shoul d not t ake pr ecedence f or pl acement on si t e over Excavat i on f or Equi pment Access or Fi shway Excavat i on quant i t i es. Al l r emai ni ng excavat ed mat er i al must be di sposed of of f s i t e. Thi s wor k wi l l be measur ed as a j ob. Payment wi l l be made f or I t em No. 0014, " I nt ake Excavat i on" of t he Base Bi d.
1. 1. 10. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 11 I nt ake Cel l Seal Sl abs
1. 1. 11. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he Cel l Seal Sl abs, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he Cel l Seal Sl abs. Payment wi l l be made f or I t em No.
0016, " I nt ake Cel l Seal Sl abs" of t he Base Bi d.
1. 1. 11. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 12 Rei nf or ced Concr et e
1. 1. 12. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of r ei nf or ced concr et e, but i s not l i mi t ed t o equi pment r ent al s, sur veys, l abor , pr ep f or i nst al l at i on of r ei nf or ced concr et e and dr ai ns, and physi cal i nst al l at i on of r ei nf or ced concr et e and dr ai ns. Fi nal payment wi l l be made f or : I t em No. 0017 " Rei nf or ced Concr et e of t he base bi d. "
1. 1. 12. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 13 Concr et e Seepage Pl ugs
1. 1. 13. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he Concr et e seepage pl ugs, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he concr et e seepage pl ugs. Payment wi l l be made f or I t em No. 0024, " Concr et e Seepage Pl ugs" of t he Base Bi d.
1. 1. 13. 2 Uni t of Measur e
Uni t of measur e: Job.
ms2274 SECTI ON 01 20 00 Page 9 AMEND. 0003
1.1.14 Backfill - Common Earth
1.1.14.1 Payment
Payment for costs associated with or incidental to the construction of the Backfill around intake features including but not limited to features such as fencing foundations, wingwalls, and abutments with common earth (clean aggregate with less than 20 percent fines passing the #230 sieve), but is not limited to equipment rentals, labor, prep for installation of the backfill with common earth. Payment will be made for Item No. 0025, "Backfill - Common Earth" of the Base Bid.
1.1.14.2 Unit of Measure
Unit of measure: Job.
1.1.15 Backfill - Controlled Low Strength Material
1.1.15.1 Payment
Payment for costs associated with or incidental to the construction of the Backfill around intake abutments with controlled low strength material, but is not limited to equipment rentals, labor, prep for installation of the backfill with controlled low strength material. Payment will be made for Item No. 0026, "Backfill - Controlled Low Strength Material" of the Base Bid.
1.1.15.2 Unit of Measure
Unit of measure: Job.
1.1.16 Debris Boom Drilled Pier Coating or Remove Casing
1.1.16.1 Payment
Payment for costs associated with or incidental to the drilled pier coating or removal of the casing, but is not limited to equipment rentals, labor, prep for drilled pier coating or removal of the casing, and physical drilled pier coating or removal of the casing. Payment will be made for Item No. 0033, "Debris Boom Drilled Pier Coating or Remove Casing" of the Base Bid.
1.1.16.2 Unit of Measure
Unit of measure: Job.
1.1.17 East and West Access - Miscellaneous
1.1.17.1 Payment
Payment for costs associated with or incidental to the debris boom east and west access, but is not limited to equipment rentals, labor, prep for debris boom east and west access, and physical installation of debris boom east and west access and west end gate. The Government will pay based on job. Payment will be made for Item No. 0037, "East and West Access - Miscellaneous," of the Base Bid.
ms2274 SECTION 01 20 00 Page 10 AMEND. 0003
1. 1. 17. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 18 Excavat i on - Fi shway
1. 1. 18. 1 Payment
The excavat i on f or f i shway i ncl udes t he r emoval and di sposal of soi l or ot her mat er i al s t o al l ow f or t he pl acement and oper at i on of necessar y machi ner y and const r uct i on of t he f i shway i t sel f ; t hi s i t em i ncl udes excavat i on f or t oe- i n of f i shway st one ar ound t he per i met er of t he f i shway as shown on Dr awi ngs; t hi s does not i ncl ude access dr edgi ng. I f meet i ng t he speci f i cat i ons and r equi r ement s of t he per mi t , mat er i al may be di sposed of onsi t e i n t he scour hol e beneat h t he f oot pr i nt of t he r ock r amp f i shway up t o El evat i on 430. Al l r emai ni ng excavat ed mat er i al must be di sposed of of f s i t e. Thi s wor k wi l l be measur ed per j ob. Payment wi l l be made f or I t em No. 0046, " Excavat i on - Fi shway" of t he Base Bi d.
1. 1. 18. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 19 Excavat i on - Gr out ed Ri pr ap
1. 1. 19. 1 Payment
The excavat i on f or f i shway i ncl udes t he r emoval and di sposal of gr out ed r i p r ap or ot her mat er i al s t o al l ow f or t he pl acement and oper at i on of necessar y machi ner y and const r uct i on of t he f i shway i t sel f ; t hi s does not i ncl ude access dr edgi ng and i s speci f i cal l y f or r emoval of gr out ed r i pr ap. Thi s wor k wi l l be measur ed per j ob. Payment wi l l be made f or I t em No. 0047, " Excavat i on - Gr out ed Ri pr ap" of t he Base Bi d.
1. 1. 19. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 20 Er osi on Cont r ol
1. 1. 20. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he er osi on cont r ol i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of er osi on cont r ol , and physi cal i nst al l at i on of er osi on cont r ol . Payment wi l l be made f or I t em No. 0048, " Er osi on Cont r ol " of t he Base Bi d.
1. 1. 20. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 21 Fenci ng f or St agi ng Ar ea
1. 1. 21. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of f enci ng f or st agi ng ar ea, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of f enci ng f or st agi ng ar ea, and physi cal ms2274 SECTI ON 01 20 00 Page 11 AMEND. 0003 i nst al l at i on of f enci ng f or st agi ng ar ea, t o i ncl ude f enci ng f or any f uel or gener at or s i f needed. Payment wi l l be made f or I t em No. 0050, " Fenci ng f or St agi ng Ar ea" of t he Base Bi d.
1. 1. 21. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 22 Si t e Rest or at i on
1. 1. 22. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of s i t e r est or at i on, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or s i t e r est or at i on, and physi cal s i t e r est or at i on t o i ncl ude t opsoi l , seedi ng, and mul chi ng. Payment wi l l be made f or I t em No. 0051, " Si t e Rest or at i on" of t he Base Bi d.
1. 1. 22. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 23 Si gnage
1. 1. 23. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of s i gnage, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of s i gnage, and physi cal i nst al l at i on of s i gnage. Payment wi l l be made f or I t em No. 0052, " Si gnage" of t he Base Bi d.
1. 1. 23. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 24 Pr ef abr i cat ed Toi l et Bui l di ng
1. 1. 24. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of new pr ef abr i cat ed t oi l et bui l di ng ( vaul t t oi l et ) , but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of new vaul t t oi l et , and physi cal i nst al l at i on of new vaul t t oi l et , t o i ncl ude por ous aggr egat e r ock beddi ng and pr ocur ement of t he pr ef ab t oi l et bui l di ng. Payment wi l l be made f or I t em No. 0055, " Pr ef abr i cat ed Toi l et Bui l di ng, " of t he Base Bi d.
1. 1. 24. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 25 Excavat i on - St agi ng Ar ea
1. 1. 25. 1 Payment
The excavat i on f or t he st agi ng ar ea i ncl udes t he r emoval and di sposal of soi l or ot her mat er i al s t o al l ow f or t he pl acement and oper at i on of necessar y machi ner y and excavat i on of t he pr ef ab t oi l et bui l di ng. Thi s wor k wi l l be measur ed as a j ob. Payment wi l l be made f or I t em No. 0058, ms2274 SECTI ON 01 20 00 Page 12 AMEND. 0003
" Excavat i on - St agi ng Ar ea" of t he Base Bi d.
1. 1. 25. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 26 Si t e El ect r i cal
1. 1. 26. 1 Payment
The si t e el ect r i cal i ncl udes t he new gener at or , br i ngi ng power f r om t he Mi ssour i s i de t o t he f i shway, cabl es/ connect i ons f or t he i nt egr at ed moni t or i ng equi pment , and ensur i ng enough cabl e i s coi l ed f or ext ensi on i nt o t he ECRD. Thi s wor k wi l l be measur ed as a j ob. Payment wi l l be made f or I t em No. 0059, " Si t e El ect r i cal " of t he Base Bi d.
1. 1. 26. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 27 ECRD St r uct ur e
1. 1. 27. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he ECRD St r uct ur e i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he ECRD St r uct ur e, and physi cal i nst al l at i on of t he st r uct ur e, f i ni shes, el ect r i cal i n t he ECRD and t o t he ECRD, communi cat i ons i n t he ECRD and t o t he ECRD, condui t f or adapt i ve management syst ems f r om t he ECRD t o t he f i shway and debr i s boom, cont r ol panel s and el ect r i cal equi pment as shown i n t he dr awi ngs f or f i sh moni t or i ng syst ems, mechani cal syst ems and al l r equi r ement s t o make t he ECRD compl et e and usabl e t o i ncl ude t he 36 i nch dr i l l ed pi er s. Fi nal payment wi l l be made f or : I t em No. 0202, " ECRD St r uct ur e" . Payment wi l l be made f or :
Bi d I t em No. 0202AA, " ECRD St r uct ur e, El evat ed St r uct ur e; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he ECRD St r uct ur e i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he ECRD St r uct ur e whi ch i ncl udes dr i l l ed pi er s, cast i n pl ace concr et e beam and f l oor deck, st r uct ur al pl at es, gal vani zed l adder , f r ami ng, r oof j oi st s, and masonr y.
Bi d I t em No. 0202AB, " ECRD St r uct ur e, Bui l di ng Envel ope; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he ECRD Bui l di ng Envel ope i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he ECRD Bui l di ng Envel ope whi ch i ncl udes r oof i ng, f l ashi ng, sof f i t s , and weat her bar r i er s .
Bi d I t em No. 0202AC, " ECRD St r uct ur e, Door s and Wi ndows; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he door s and wi ndows i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of al l door s and wi ndows.
Bi d I t em No. 0202AD, " ECRD St r uct ur e, Fi ni shes; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he ECRD f i ni shes i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of al l , sheet r ock, pai nt s, coat i ngs, and f l oor seal ant .
ms2274 SECTI ON 01 20 00 Page 13 AMEND. 0003
Bi d I t em No. 0202AE, " ECRD St r uct ur e, Ar chi t ect ur al Speci al t i es; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he ECRD ar chi t ect ur al speci al t i es but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of al l r ai l i ngs, bi r d det er r ent syst ems, f l ammabl e st or age cabi net , r ef r i ger at or , and ar chi t ect ur al speci al t i es not cover ed i n t he bui l di ng envel ope, door s and wi ndows, or f i ni shes.
Bi d I t em No. 0202AF, " ECRD St r uct ur e, Mechani cal Syst ems; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he mechani cal syst ems i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of al l , spl i t s HVAC uni t s, duct i ng, and f ans.
Bi d I t em No. 0202AG, " ECRD St r uct ur e, El ect r i cal Syst ems; " i ncl udes cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he el ect r i cal syst ems i ncl ude but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of al l , l i ght s, i nt er nal el ect r i cal wi r i ng of t he ECRD, el ect r i cal connect i ons f r om t he ECRD t o t he near est handhol es t o power t he ECRD and pr ovi de power f r om t he ECRD t o t he f i shway, ARI S camer as, st anchi ons, PI T Tag Ar r ay, f ender s f or t he moni t or i ng equi pment , and davi t cr anes f or t he moni t or i ng equi pment .
1. 1. 27. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 28 Moor i ng St ai r s and Ramp
1. 1. 28. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he moor i ng st ai r s and r amp, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of moor i ng st ai r s and r amp, and physi cal i nst al l at i on of moor i ng st ai r s and r amp. Payment wi l l be made f or I t em No. 0302, " Moor i ng St ai r s and Ramp" of Opt i on C.
1. 1. 28. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch Cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he SCHEDULE OF PRI CES and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar uni t pr i ce i t em, ar e i ncl uded i n t he l i st ed uni t pr i ce i t em most c l osel y associ at ed wi t h t he wor k i nvol ved.
The uni t pr i ce and payment made f or each i t em l i st ed wi l l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, sur veys, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
ms2274 SECTI ON 01 20 00 Page 14 AMEND. 0003
1.2.1 Temporary Construction Facilities
1.2.1.1 Payment
Payment for all costs associated with providing temporary construction facilities are required to support the construction team, including but not limited to offices, sanitary facilities, storage areas, and utility connections. The provision of these facilities will be measured in months (MO). Payment will be made for:
Base Bid Item No. 0002AA, " Temporary Construction Facilities, First 24 Months;" and
Base Bid Item No. 0002AB, "Temporary Construction Facilities, Over 24 Months;" of the Base Bid.
1.2.1.2 Measurement
The Contractor will be paid by month and is considered complete when the Contractor has removed temporary construction facilities from the site to the satisfaction of the Contracting Officer.
1.2.1.3 Unit of Measure
Unit of measure: Months.
1.2.2 Excavation for Equipment Access
1.2.2.1 Payment
The excavation for equipment access includes the removal and disposal of river bottom aggregate or other materials to allow for the placement and operation of necessary machinery. This item includes excavation for access to the east side of the completed fishway to construct the fishway and mooring area. If meeting the specifications and requirements of the permit, material may be disposed of onsite in the scour hole beneath the footprint of the rock ramp fishway up to Elevation 430. This work will be measured as cubic yards. Payment will be made for:
Base Bid Item No. 0003AA, "Excavation for Equipment Access, First 4,200 CY;" and
Base Bid Item No. 0003AB, "Excavation for Equipment Access, Over 4,200 CY;" of the Base Bid.
1.2.2.2 Measurement
Excavation for equipment access will be measured for payment by the cubic yard and quantities will be determined by the Contractor. The quantities for final pay purposes will be calculated using the preliminary survey cross sections of the access alignment taken prior to excavation operations and the design cross sections of the excavation limits, as proposed by the KTR. Take final cross sections of the excavated footprint immediately following excavation operations to verify that the lines and grades indicated on the design cross sections are achieved.
1.2.2.3 Unit of Measure
Unit of measure: Cubic Yard.
ms2274 SECTION 01 20 00 Page 15 AMEND. 0003
1. 2. 3 Cof f er box Encl osur e Wal es
1. 2. 3. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o wal es, but i s not l i mi t ed t o, equi pment r ent al s, l abor , f ur ni sh, f abr i cat e, pr ep f or i nst al l at i on of wal es, and physi cal i nst al l at i on of wal es. The Gover nment wi l l pay based on l i near f eet of wal er i nst al l at i on. Payment wi l l be made f or I t em No. 0007, " Cof f er box Encl osur e Wal es" of t he Base Bi d.
1. 2. 3. 2 Measur ement
The l i near f oot age wi l l be det er mi ned by t he measur ed l engt h i nst al l ed as i ndi cat ed. Measur ement wi l l be made by t he Cont r act or i n t he f i el d f or t he near est f ul l l i near f oot accept abl y i nst al l ed and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 3. 3 Uni t of Measur e
Uni t of measur e: Li near Feet .
1. 2. 4 Cof f er box Encl osur e St r ut s
1. 2. 4. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he st r ut s, but i s not l i mi t ed t o, equi pment r ent al s, l abor , f ur ni sh, f abr i cat e, pr ep f or i nst al l at i on of st r ut s, physi cal i nst al l at i on of st r ut s, and i nst al l at i on of knee br aces as a f unct i on of st r ut i nst al l at i on. The Gover nment wi l l pay f or t ons of i nst al l at i on of st r ut s. Payment wi l l be made f or I t em No. 0008, " Cof f er box Encl osur e St r ut s" of t he Base Bi d.
1. 2. 4. 2 Measur ement
St r ut s wi l l be i n number of t ons accept ed i n t he compl et ed wor k. St r ut s ar e t o be i nst al l ed as r equi r ed f or br aci ng. Wei ght cer t i f i cat es f ur ni shed by a publ i c wei gh mast er wi l l be accept abl e i n l i eu of wei ghi ng as speci f i ed when aut hor i zed by t he Cont r act i ng Of f i cer . No payment wi l l be pai d f or any mat er i al wast ed, used f or t he conveni ence of t he Cont r act or , unused or r ej ect ed.
1. 2. 4. 3 Uni t of Measur e
Uni t of measur e: Ton.
1. 2. 5 I nt ake St eel H- Pi l es
1. 2. 5. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he St eel H- pi l es i ncl ude, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of st eel H- Pi l es, and physi cal i nst al l at i on of H- pi l es. Payment wi l l be made f or I t em No. 0015, " I nt ake St eel H- Pi l es" of t he Base Bi d.
ms2274 SECTI ON 01 20 00 Page 16 AMEND. 0003
1. 2. 5. 2 Measur ement
The gover nment wi l l pay f or each H- Pi l e i nst al l ed and appr oved by t he Cont r act i ng Of f i cer
1. 2. 5. 3 Uni t of Measur e
Uni t of measur e: Each.
1. 2. 6 Guar d Rai l s
1. 2. 6. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of guar d r ai l s, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of guar d r ai l s, and physi cal i nst al l at i on of guar d r ai l s.
Payment wi l l be made f or I t em No. 0018, " Guar d Rai l s" of t he Base Bi d.
1. 2. 6. 2 Measur ement
The Gover nment wi l l pay per l i near f oot of i nst al l at i on as measur ed i n t he f i el d by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 6. 3 Uni t of Measur e
Uni t of measur e: Li near f eet .
1. 2. 7 Deck Gr at i ng and Gr at i ng Fr ames
1. 2. 7. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of deck gr at i ng, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or f ur ni shi ng, f abr i cat i on, and i nst al l at i on of deck gr at i ng and gr at i ng f r ames wi t h st uds, and physi cal i nst al l at i on of deck gr at i ng and gr at i ng f r ames wi t h st uds. Payment wi l l be made f or I t em No. 0019, " Deck Gr at i ng and Gr at i ng Fr ames" of t he Base Bi d.
1. 2. 7. 2 Measur ement
The Gover nment wi l l pay f or each sect i on i nst al l ed and appr oved by t he Cont r act i ng Of f i cer whi ch i ncl udes t he gr at i ng panel s and gr at i ng f r ames.
Each sect i on nomi nal l y measur es 8 f oot x 4 f oot and i ncl udes bot h t he gr at i ng f r ame and t he gr at i ng panel s.
1. 2. 7. 3 Uni t of Measur e
Uni t of measur e: Each.
1. 2. 8 Bul khead Sl i de Pl at es
1. 2. 8. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of bul khead sl i de pl at es, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or f ur ni shi ng, f abr i cat i on, and f or i nst al l at i on of bul khead sl i de pl at es, and physi cal i nst al l at i on of bul khead sl i de pl at es. Payment wi l l be made f or I t em No. 0020, " Bul khead Sl i de Pl at es" of t he Base Bi d.
ms2274 SECTI ON 01 20 00 Page 17 AMEND. 0003
1.2.8.2 Measurement
The Government will pay for each slide plate installed and approved by the Contracting Officer.
1.2.8.3 Unit of Measure
Unit of measure: Each.
1.2.9 Steel Bulkheads
1.2.9.1 Payment
Payment for costs associated with or incidental to the construction of steel bulkheads, but is not limited to equipment rentals, labor, prep for furnishing, fabrication, and installation of steel bulkheads, and physical installation of steel bulkheads. Payment will be made for Item No. 0021, "Steel Bulkheads" of the Base Bid.
1.2.9.2 Measurement
The Government will pay for each steel bulkhead delivered and approved by the Contracting Officer.
1.2.9.3 Unit of Measure
Unit of measure: Each.
1.2.10 Bulkhead Storage Frames
1.2.10.1 Payment
Payment for costs associated with or incidental to the construction of bulkhead storage frames, but is not limited to equipment rentals, labor, prep for furnishing, fabrication, and installation of bulkhead storage frames, and physical installation of bulkhead storage frames. Payment will be made for Item No. 0022, "Bulkhead Storage Frames" of the Base Bid.
1.2.10.2 Measurement
The Government will pay for each bulkhead storage frame installed and approved by the Contracting Officer.
1.2.10.3 Unit of Measure
Unit of measure: Each.
1.2.11 Strip Seals
1.2.11.1 Payment
Payment for costs associated with or incidental to the construction of strip seals, but is not limited to equipment rentals, labor, prep for installation of strip seals, and physical installation of strip seals.
The Government will pay for each linear foot bulkhead strip seal installation. Payment will be made for Item No. 0023, "Strip Seals" of the Base Bid.
ms2274 SECTION 01 20 00 Page 18 AMEND. 0003
1. 2. 11. 2 Measur ement
The l i near f oot age wi l l be det er mi ned by t he measur ed l engt h accept abl y i nst al l ed of each st r i p seal as i ndi cat ed. Measur ement wi l l be made i n t he f i el d by t he Cont r act or f or t he near est f ul l l i near f oot accept abl y i nst al l ed and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 11. 3 Uni t of Measur e
Uni t of measur e: Li near f eet .
1. 2. 12 Appr oach Ramps and Pavement
1. 2. 12. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he Appr oach r amps and pavement , but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he appr oach r amps and pavement . Payment wi l l be made f or I t em No. 0027, " Appr oach Ramps and Pavement " of t he Base Bi d.
1. 2. 12. 2 Measur ement
Concr et e pl acement wi l l be measur ed i n cubi c yar ds and ver i f i ed by del i ver y t i cket s.
1. 2. 12. 3 Uni t of Measur e
Concr et e pl acement wi l l be measur ed i n cubi c yar ds and ver i f i ed by del i ver y t i cket s.
1. 2. 13 Gr out ed Ri pr ap
1. 2. 13. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of appr oach gr out ed r i pr ap, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of gr out ed r i pr ap, and physi cal i nst al l at i on of gr out ed r i pr ap t o i ncl ude bot h t he r i pr ap and gr out . The Gover nment wi l l pay f or each t on i nst al l ed. Fi nal payment wi l l be made f or : I t em No.
0028, " Gr out ed Ri pr ap. " Payment wi l l be made f or :
Base Bi d I t em No. 0028AA, " Gr out ed Ri pr ap, Fi r st 205 TN; " and
Base Bi d I t em No. 0028AB, " Gr out ed Ri pr ap, Over 205 TN; " of t he Base Bi d.
1. 2. 13. 2 Measur ement
Rock wi l l be i n number of t ons ( 2, 000 pounds) , wei ghed on appr oved I l l i noi s or Mi ssour i scal es i n t he pr esence of a Gover nment i nspect or .
Wei ght cer t i f i cat es f ur ni shed by a publ i c wei ghmast er wi l l be accept abl e i n l i eu of wei ghi ng as speci f i ed when aut hor i zed by t he Cont r act i ng Of f i cer . Gr out i s consi der ed i nci dent al and wi l l not be measur ed f or payment . No payment wi l l be made f or any mat er i al wast ed, used f or t he conveni ence of t he Cont r act or , unused or r ej ect ed.
ms2274 SECTI ON 01 20 00 Page 19 AMEND. 0003
1. 2. 13. 3 Uni t of Measur e
Uni t of measur e: Ton.
1. 2. 14 Bi r d Det er r ent Syst em
1. 2. 14. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of a bi r d det er r ent syst em, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of a bi r d det er r ent syst em, and physi cal i nst al l at i on of a bi r d det er r ent syst em t hat r uns al ong t he t op of al l r ai l i ng on t he f i shway. Thi s does not i ncl ude any bi r d det er r ent syst ems i nst al l ed on t he ECRD. The Gover nment wi l l pay f or each l i near f oot i nst al l ed. Payment wi l l be made f or I t em No. 0029, " Bi r d Det er r ent Syst em" of t he Base Bi d.
1. 2. 14. 2 Measur ement
The l i near f oot age wi l l be det er mi ned by t he measur ed f oot of each l engt h of bi r d det er r ent i nst al l ed as f i el d measur ed by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 14. 3 Uni t of Measur e
Uni t of measur e: Li near Feet .
1. 2. 15 Secur i t y Gat e
1. 2. 15. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he Secur i t y gat es, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he secur i t y gat e and wi l l be pai d based on t he each gat e i nst al l ed. Payment wi l l be made f or I t em No. 0030, " Secur i t y Gat e" of t he Base Bi d.
1. 2. 15. 2 Measur ement
The number of gat es i nst al l ed wi l l be det er mi ned vi a v i sual i nspect i on by t he Cont r act i ng Of f i cer .
1. 2. 15. 3 Uni t of Measur e
Uni t of measur e: Each.
1. 2. 16 Debr i s Boom Dr i l l ed Pi er
1. 2. 16. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he dr i l l ed pi er i ncl ude, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of dr i l l ed pi er s, and physi cal i nst al l at i on of dr i l l ed pi er s i ncl udi ng r ei nf or ci ng st eel , st eel pi pe, and concr et e bel ow t he bot t om of t he pr ecast beam and sur veys. Payment wi l l be made f or I t em No.
0031, " Debr i s Boom Dr i l l ed Pi er " of t he Base Bi d.
ms2274 SECTI ON 01 20 00 Page 20 AMEND. 0003
1. 2. 16. 2 Measur ement
The Gover nment wi l l pay based on ver t i cal f eet i nst al l ed as f i el d measur ed by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 16. 3 Uni t of Measur e
Uni t of Measur e: Ver t i cal Feet .
1. 2. 17 Debr i s Boom Dr i l l ed Pi er Rock Socket
1. 2. 17. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he dr i l l ed pi er r ock socket s i ncl ude, but i s not l i mi t ed t o, 10 f oot l ong r ock socket s per dr i l l ed pi er , equi pment r ent al s, l abor , pr ep f or i nst al l at i on of dr i l l ed pi er r ock socket s, and physi cal i nst al l at i on of dr i l l ed pi er r ock socket s. Payment wi l l be made f or I t em No. 0032, " Debr i s Boom Dr i l l ed Pi er Rock Socket " of t he Base Bi d.
1. 2. 17. 2 Measur ement
The Gover nment wi l l pay based on ver t i cal f eet i nst al l ed as f i el d measur ed by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 17. 3 Uni t of Measur e
Uni t of measur e: Ver t i cal Feet .
1. 2. 18 Debr i s Boom Dr i l l ed Pi er Access Ladder
1. 2. 18. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he dr i l l ed pi er access l adder , but i s not l i mi t ed t o, t he l i near f oot i nst al l at i on l engt h of al l l adder s i nst al l ed, equi pment r ent al s, l abor , pr ep f or i nst al l at i on of dr i l l ed pi er access l adder , and physi cal i nst al l at i on of dr i l l ed pi er access l adder . Payment wi l l be made f or I t em No. 0034, " Debr i s Boom Dr i l l ed Pi er Access Ladder " of t he Base Bi d.
1. 2. 18. 2 Meaur ement
The Gover nment wi l l pay based on ver t i cal f eet i nst al l ed as f i el d measur ed by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 18. 3 Uni t of Measur e
Uni t of measur e: Ver t i cal Feet .
1. 2. 19 Debr i s Boom Pr ecast Concr et e Beam Fabr i cat i on
1. 2. 19. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he const r uct i on of t he pr ecast concr et e beams, wal l on t op of t he beams and cast - i n- pl ace ( CI P) j oi nt s, but i s not l i mi t ed t o equi pment r ent al s, l abor , f or mwor k, and t r anspor t at i on t o s i t e of t he pr ecast concr et e beam and CI P j oi nt const r uct i on. Physi cal i nst al l at i on of t he pr ecast concr et e beam i s excl uded f r om t hi s l i ne i t em. Payment wi l l be made f or I t em No. 0035, ms2274 SECTI ON 01 20 00 Page 21 AMEND. 0003
" Debr i s Boom Pr ecast Concr et e Beam Fabr i cat i on" of t he Base Bi d.
1. 2. 19. 2 Measur ement
The Gover nment wi l l pay based on each sect i on compl et ed and del i ver ed i f beams ar e cast of f s i t e and appr oved by t he Cont r act i ng Of f i cer .
1. 2. 19. 3 Uni t of Measur e
Uni t of measur e: Each.
1. 2. 20 Debr i s Boom Pr ecast Concr et e Beam I nst al l at i on
1. 2. 20. 1 Payment
Payment f or cost s associ at ed wi t h or i nci dent al t o t he i nst al l at i on of t he pr ecast concr et e beams, but i s not l i mi t ed t o equi pment r ent al s, l abor , pr ep f or i nst al l at i on of t he pr ecast concr et e beams, and physi cal i nst al l at i on of t he pr ecast concr et e beam. Payment wi l l be made f or I t em No. 0036, " Debr i s Boom Pr ecast Concr et e Beam I nst al l at i on, " of t he Base Bi d.
1. 2. 20. 2 Measur ement
The Gover nment wi l l pay based on each sect i on i nst al l ed t o t he el evat…
This is the start of the file's text. The full file is on GovTribe.