B01 BID SUMMARY SHEET.pdf
PDF 117 KB Posted
- Solicitation number
- W912EK24B0011
About this file
This document is a Bid Summary Sheet for Solicitation W912EK-24-B-0011, which is for the Mississippi River Basin, Locks 16-18-20, Illinois City, IL - Gladstone, IL - Canton, MO, Kevel Rail Replacement and L20 CCS Floodproofing project.
The Bid Summary Sheet shows the bid amounts from three bidders: Highpoint Partners, LLC ($8,220,000.00), Michels Construction, Inc. ($8,318,000.00), and Northwind Engineering, LLC ($9,949,525.00). The Government Estimate for the project is $6,645,708.85. The solicitation has two amendments and the bid opening is scheduled for July 10, 2024 at 2:00 PM via virtual means. The contracting agency is the Department of the Army Corps of Engineers Engineering District Rock Island.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
W912EK-24-B-0011 Mississippi River Basin, Locks 16-18-20, Illinois City, IL – Gladstone, IL – Canton, MO, Kevel Rail Replacement and L20 CCS Floodproofing
TWO AMENDMENTS
IFB NO:
DATE:
TIME:
PLACE:
W912EK-24-B-0011
July 10, 2024
2:00 PM
Virtual
NO: BIDDER & ADDRESS AMOUNT
1. Highpoint Partners, LLC $8,220,000.00 6000 E. Fork Rd Newkirk, Oklahoma 74647
2. Michels Construction, Inc. $8,318,000.00 817 Main Street Brownsville, Wisconsin 53006
3. Northwind Engineering, LLC $9,949,525.00 105 Main Street Shelocta, Pennsylvania 15774
GOVERNMENT ESTIMATE: $6,645,708.85
Bid Opening Officer:
Signature Date
File details come from the government source that posted it. Updated .