A22 W912EK22B0011 Solicitation Drawings.pdf
PDF 37 MB Posted
- Solicitation number
- W912EK24B0011
About this file
This document appears to be a set of solicitation drawings related to the federal contract opportunity for the Lock and Dam 16, 18, and 20 Kevel Rail Replacement project with Solicitation Number W912EK24B0011.
The key details are:
- The solicitation is being issued by the Department of the Army Corps of Engineers Engineering District Rock Island.
- The scope of work involves the replacement of the kevel rails at Lock and Dam 16, 18, and 20.
- The solicitation specifications, drawings, and other referenced documents are provided as attachments.
- The solicitation does not appear to include information on response dates, award dates, pricing terms, set asides, or incumbents.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
R O
C K
I S
L A
N D
IL
L
IN
O
IS
R O
C K
I S
L A
N D
D
IS
T R
IC
T
APPROVAL RECOMMENDED BY:
DATE
DATE
DATE
DATE
DATE
GEOTECHNICAL BRANCHCHIEF,
DESIGN BRANCHCHIEF,
TECHNICAL SERVICES BRANCHCHIEF,
ENGINEERING & CONSTRUCTION DIVISIONCHIEF,
HYDROLOGY & HYDRAULICS BRANCHCHIEF, OF ALL DRAWINGS IN THIS SET.
SIGNATURES INDICATE OFFICIAL RECOMMENDATION
EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
DOCUMENTS WITHIN THE SCOPE OF THEIR
INDIVIDUALS APPEAR ON THESE PROJECT
SIGNATURES AND REGISTRATION DESIGNATIONS OF
DISTRICT CORPS OF ENGINEERS. THE INITIALS OR
THIS PROJECT WAS DESIGNED BY THE ROCK ISLAND
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
/2
Z T
U R
N E
R
C
V E
R S
H E
E T
G-001
C S
C H
U M
A C
H E
R
B A
N D
E R
S
N
B M
R P
R O
J
D B
O D
M
ISSUE DATE:
CONTRACT/TASK ORDER NO:
SOLICITATION/MATOC/SATOC NO:
KEVEL RAIL REPLACEMENT AND L20 CCS FLOODPROOFING
ILLINOIS CITY, IL - GLADSTONE, IL - CANTON, MO
LOCKS 16-18-20
MISSISSIPPI RIVER BASIN
ROCK ISLAND DISTRICT
W
E K
B
W912EK24B0011
of Engineers
US Army Corps
LOCK 16 KEVEL RAIL REPLACEMENT - OPTION ALOCK16
LOCK 20 CENTRAL CONTROL STATION (CCS) FLOODPROOFINGL20CCS
KEVEL RAIL COMPONENT FABRICATIONKEVEL
LOCK 20 KEVEL RAIL REPLACEMENTLOCK20
LOCK 18 KEVEL RAIL REPLACEMENTLOCK18
PLAN SET TITLEPLAN SET ID
PLAN SET INDEX
GENERAL ELECTRICAL NOTESE-002
GENERAL ELECTRICAL NOTESE-001
GENERAL STRUCTURAL NOTESS-001
SURVEY CONTROL - LOCK 20V-003
SURVEY CONTROL - LOCK 18V-002
SURVEY CONTROL - LOCK 16V-001
GENERAL PLAN - LOCK 20G-006
GENERAL PLAN - LOCK 18G-005
GENERAL PLAN - LOCK 16G-004
ABBREVIATIONSG-003
DRAWING PACKAGE LAYOUTG-002
COVER SHEETG-001
SHEET TITLESHEET ID
SHEET INDEX
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
G
N E
R A
L N
O T
E S
A N
D L
E G
E N
D
D R
A W
IN
G
P A
C K
A G
E L
A Y
O U
T
G-002
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S-101
Sheet ID
PLAN SET ID
SHEET NUMBER WITHIN PLAN SET
SEQUENCIAL NUMBER
SHEET TYPE DESIGNATIONS
PLAN SET ID
ELECTRICAL, CIVIL, ARCHITECTURAL, ETC)
DISCIPLINE (STRUCTURAL, MECHANICAL,
INDICATES AN AREA OF GRASS
INDICATES AGGREGATE BASE
INDICATES MONOLITH NUMBER
LOCK STATIONING IS IN REFERENCE TO THE DOWNSTREAM PINTLE, STA. 0.00.5.
INDICATES TO REUSE EXISTING.
"REPLACE" INDICATES REMOVE AND NOT REUSE EXISTING. "REINSTALL"4.
AND MATERIAL FABRICATION.
CONFIRMING ALL DIMENSIONS PRIOR TO SHOP DRAWING PREPARATION
BEFORE WORK BEGINS. THE CONTRACTOR IS RESPONSIBLE FOR
ALL ELEVATIONS AND DIMENSIONS SHALL BE VERIFIED IN THE FIELD3.
TO CONDUCT LOCK OPERATIONS.
CLEARING OF WORK AREAS, ETC., TO ALLOW GOVERNMENT PERSONNEL
TEMPORARY COVERS FOR OPEN TRENCHES, TEMPORARY HANDRAILS,
CONTRACTOR SHALL MAKE ALL PROVISIONS NECESSARY, INCLUDING
CONSTRUCTION PERIOD EXCEPT AS NOTED IN THE SPECIFICATIONS.
THE LOCK AND DAM SHALL REMAIN IN OPERATION DURING THE2.
THE LOCKMASTER.
QUEUING PROCEDURES IS REQUIRED UNLESS OTHERWISE PERMITTED BY
USERS FOR LOCKAGE THROUGH THE LOCK. OBSERVATION OF NORMAL
THE CONTRACTOR WILL NOT BE GIVEN PRIORITY OVER OTHER WATERWAY1.
GENERAL NOTES
SHEET.
THE FINAL TWO PLACEHOLDERS ARE THE SEQUENCIAL NUMBER OF THE E.
FOLLOWS THE NATIONAL CAD STANDARDS.
THE THIRD PLACEHOLDER IS THE SHEET TYPE DESIGNATOR, WHICH D.
DISCIPLINE WHICH THE SHEET WAS DEVELOPED BY.
THE FIRST PLACEHOLDER WITHIN THE SHEET NUMBER IS THE ENGINEERING C.
ATTENTION MUST BE PAID TO THE PLAN SET ID REFERENCE.
NUMBERS MAYBE DUPLICATED BETWEEN PLAN SET IDS, SO PARTICULAR
WITH EACH PLACEHOLDER HAVING A SPECIFIC MEANING. NOTE - SHEET
EACH SHEET WITHIN THE PLAN SET WILL HAVE A UNIQUE SHEET NUMBER, B.
COVER SHEET.
THE DRAWING PACKAGE. PLAN SET IDS ARE LISTED IN THE TABLE ON THE
THE PLAN SET ID INDICATES THE MAJOR COMPONENT OF WORK DETAILED IN A.
INFORMATION:
CORNER OF EACH SHEET. THE SHEET ID BLOCK CONTAINS THE FOLLOWING
SHOULD FOCUS ON THE SHEET ID BLOCK IN THE LOWER RIGHT HAND
IN ORDER TO NAVIGATE THE DRAWING PACKAGE, THE CONTRACTOR 3.
SHEETS UNDER EACH PLAN SET.
DIFFERENT SCOPES OF WORK IN THE PROJECT, WITH SUBCOMPONENT
THE DRAWING PACKAGE IS DIVIDED INTO PLAN SETS ASSOCIATED WITH 2.
NAVIGATE THROUGH THE PLAN SET.
THE DRAWING PACKAGE TO ALLOW THE CONTRACTOR TO MORE EASILY
THE INTENT OF THIS SHEET IS TO PROVIDE A DESCRIPTIVE OVERVIEW OF
THIS SHEET EXPLAINS THE GENERAL LAYOUT OF THE DRAWING PACKAGE. 1.
DRAWING PACKAGE LAYOUT
LEGEND
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
B R
E V
IA
T
IO
N
S
G-003
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
VERIFY IN FIELDVIF
VERTICALVERT
WELDED WIRE REINFORCEMENTWWR
WEIGHTWT
WORK POINTWP
WITHOUTW/O
WITHW/
WIDTHW
SYMBOLS
NUMBER#
DIAMETERØ
AT@
RIGHT OF WAYROW
RIVER MILERM
RIGHT HAND OR ROOF HATCHRH
REVISION OR REVISEDREV
REQUIREDREQ'D
REINFORCING, -ED, -MENTREINF
REFERENCEREF
RECESSEDREC
REINFORCED CONCRETE PIPERCP
UNIT
REINFORCED CONCRETE MASONRYRCMU
RECYCLED ASPHALT PAVEMENTRAP
RADIUSR OR RAD
EACH WAYEW
EXTERIOREXT
EXPANSION OR EXPOSEDEXP
EXISTINGEXIST
EXCAVATEEXC
ETCETERAETC
EQUIPMENTEQUIP
EQUAL SPACEEQ SPA
EQUALEQ
ENVIROMENTAL PROTECTION AGENCYEPA
EDGE OF SLABEOS
EDGE OF DECKEOD
ENCLOSUREENCL
EMBEDDEDEMBED
ELEVATIONEL OR ELEV
EXPANSION JOINTEJ OR EXP JT
EACH FACEEF
EACHEA
EXISTING STRUCTURAL MEMBER(E)
UTILITYUTIL
US ARMY CORPS OF ENGINEERSUSACE
UPSTREAMUS
UNLESS NOTED OTHERWISEUNO
UNIFIED FACILITIES CRITERIAUFC
HEIGHT OR HEAT TREATHT
HORIZONTALHORIZ
HOT MIX ASPHALTHMA
HEADERHDR
HEADED ANCHOR BOLTHDAB
HEADED CONCRETE ANCHORHCA
MARK NUMBERMK
MONOLITH JOINTMJ
MISCELLANEOUSMISC
MINIMUMMIN
ONE THOUSANDTH OF AN INCHMIL
MAN HOLEMH
MANUFACTURERMFR
MILITARY EQUIPMENT PARKINGMEP
MEMBRANEMEMB
MECHANICALMECH
MISCELLANEOUS CHANNELMC
MAXIMUMMAX
MATERIALMATL
MANUALMAN
MOLECULAR ORIENTED POLYVINYL CHLORIDEPVCO
POLYVINYL CHLORIDEPVC
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PROJECTPROJ
PRELIMINARYPRELIM
POINT OF TANGENCYPOT
POINT OF ENDPOE
POINT OF CONTACTPOC
POINT OF BEGINNINGPOB
PRE-MOLDED JOINT FILLERPMJF
PLATEPL
POUNDS PER CUBIC FOOTPCF
PORTLAND CEMENT CONCRETEPCC
AMERICAN WELD SOCIETYAWS
AVERAGEAVG
AND MATERIALS
AMERICAN SOCIETY OF TESTING ASTM
MAINTENANCE-OF-WAY ASSOCIATION
AMERICAN RAILWAY ENGINEERING ANDAREMA
ARCHITECT, -URAL, -UREARCH
APPROXIMATE, APPROXIMATELYAPPROX
ALUMINUMALUM
ALTERNATEALT
STEEL CONSTRUCTION
AMERICAN INSTITUTE OF AISC
ADJUSTABLE OR ADJACENTADJ
ADDITIONALADDL
AMERICAN CONCRETE INSTITUTEACI
ASPHALTACC
ANCHOR BOLTAB
CONTRACTORKTR
KIPS PER SQUARE INCHKSI
CONTRACTING OFFICERKO
ISOLATION JOINTISO JNT
ILLINOIS STAT GEOLIGICAL SURVEYISGS
INTERIORINT
INCHIN
ILLINOIS DEPARTMENT OF TRANSPORTATIONILDOT
INSIDE FACEIF
INSIDE DIAMETERID
IDENTIFICATIONID
INSULATED CONCRETE FORMSICF
INTERNATIONAL BUILDING CODEIBC
IN ACCORDANCE WITHIAW
OPPOSITEOPP
OPENINGOPNG
OUTSIDE FACEOF
OUTSIDE DIAMETEROD
ON CENTEROC
TYPICALTYP
TOP OF STEELTOS
TOP OFTO
TEMPORARYTEMP
TEMPERATURETEMP
ABBREVIATIONS
CUBIC YARDCY
COUNTERSINKCTSK
COUNTERBORECTB
CONCRETE REINFORCING STEEL INSTITUTECRSI
CORROSION RESISTANT STEELCRES
CONTINUE OR CONTINUOUSCONT
CONSTRUCTION JOINTCONST JT
CONSTRUCTIONCONST
CONCRETECONC
COLUMNCOL
CORPS OF ENGINEERSCOE
CONCRETE MASONRY UNITCMU
CONTROLLED LOW STRENGTH MATERIALCLSM
CLEAR, -ANCECLR
CENTER LINE
CJP COMPLETE JOINT PENETRATION
CONTROL/CONSTRUCTION JOINTCJ
CAST IN PLACE CONCRETECIPC
CAST IRONCI
CENTRAL CONTROL STATIONCCS
CONCRETE EXPANSION ANCHORCEA
CAPACITYCAP
CHANNELC OR CH
CENTER TO CENTERC/C
CL
E
V
BETWEENBTWN
BTM BOTTOM
BEARINGBRG
BP BASE PLATE
BO BOTTOM OF
BEAMBM
BUILDINGBLDG
BHN BRINNELL HARDNESS
BC BOLT CENTER
BENTB
DOWELDWL
DRAWINGDWG
DETAILDTL
DOWNSTREAMDS
DEAD LOADDL
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA OR Ø
DEMOLISH OR DEMOLITIONDEMO
DOUBLEDBL
DEFORMED ANCHOR STUDDAS
DEPTHD
REBAR YIELD STRESSFY
FOOTINGFTG
FOOTFT
FRAMINGFR
FACE OF WALLFOW
FACE OF BUILDINGFOB
FOUNDATIONFND
FLOORFLR
FINISHFIN
FLOOR DRAINFD
FRACTURE CRITICAL MEMBERFCM
CONCRETE COMPRESSIVE STRENGTHf'c
GYPSUM BOARDGYP
GRADEGR
GENERAL OR GENERATORGEN
GENERAL CONTRACTORGC
GRADE BEAMGB
GALVANIZEDGALV
GAUGEGA
JOINTJT
JOISTJST
JUNCTION BOXJBOX
LOCATIONLOC
LONG LEG VERTICALLLV
LONG LEG HORIZONTALLLH
LIVE LOADLL
LINEARLIN
LEFT HANDLH
POUND(S)LB, LBS OR #
NOT TO SCALENTS
NOMINALNOM
NUMBERNO
NATIONAL LEVEE DATABASENLD
NOT IN CONTRACTNIC
NOT APPLICABLEN/A
NEW STRUCTURAL MEMBER(N)
SYMMETRICALSYM
STRUCTURALSTRUCT
STEELSTL
STIFFENERSTIFF
STANDARDSTD
STATIONSTA
SOCIETY FOR PROTECTIVE COATINGSSSPC
SQUARE YARDSQ YD
SQUARESQ
SPECIFIEDSPEC'D
SPECIFICATION(S)SPEC
SPACE(S)SP
SLEEVE ANCHORSLV ANCH
SEALANTSLNT
SIMILARSIM
SHEETSHT
SQUARE FOOTSF
SECTIONSEC
SCHEDULESCHED
A
B
C
F
G
H
J
K
L
M
N
O
P
Q
R
S
T
U
W
Y
YARDYD
I
QUANTITYQTY
D
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
L
C K
G E
N E
R A
L P
L A
N
G-004
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
A1
SCALE: 1" = 80'-0"
GENERAL PLAN - LOCK 16
RIVER WALL
LAND WALL
WORK LIMIT
UPSTREAM GUIDEWALL
INTERMEDIATE WALL
STATION
CENTRAL CONTROL
MAINTENANCE BUILDINGS
SECURITY GATE
ACCESS ROAD
102ND AVE. W.
E: 2065751.21
N: 1734157.34
E:2066184.48
N: 1734259.87
TO UPSTREAM GUIDEWALL
STORAGE AREA EXTENDS
CONTRACTOR STAGING &
'-0
'-0"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SPECIFICATION SECTION 01 14 00.
GUIDEWALLS OUTSIDE OF THE LOCK CLOSURE PERIOD, EXCEPT AS NOTED IN
CONTRACTOR WILL NOT BE ALLOWED USE OF THE LOCK CHAMBER OR 1.
GENERAL SHEET NOTES
FLOW
MISSISSIPPI RIVER
AUXILIARY LOCK
MOORING AREA
CONTRACTOR
MAIN LOCK
PARKING AREA
STORAGE, AND
STAGING,
CONTRACTOR
NORTH
PLAN
80' 160'0
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
C K
G E
N E
R A
L P
L A
N
G-005
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
GENERAL PLAN - LOCK 18
GATE
SECURITY
BUILDINGS
MAINTENANCE
STATION
CENTRAL CONTROL
WORK LIMIT
UPSTREAM GUIDEWALL
WALL
INTERMEDIATE
WALL
LAND
RIVER WALL
110'-0"
'-0
120'-0"
'-0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SPECIFICATION SECTION 01 14 00.
GUIDEWALLS OUTSIDE OF THE LOCK CLOSURE PERIOD, EXCEPT AS NOTED IN
CONTRACTOR WILL NOT BE ALLOWED USE OF THE LOCK CHAMBER OR 1.
GENERAL SHEET NOTES
F L O
W
TWP RD 900 E.
ROAD
ACCESS
AND PARKING AREA
STAGING, STORAGE,
CONTRACTOR
MOORING AREA
CONTRACTOR
LOCK
MAIN
LOCK
AUXILIARY
ROAD
EAGLE WATCH
MISSISSIPPI RIVER
80' 160'0
NORTH
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
C K
G E
N E
R A
L P
L A
N
G-006
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
GENERAL PLAN - LOCK 20
WALL
INTERMEDIATE
WALL
LAND
BUILDING
MAINTENANCE
STATION
CONTROL
NEW CENTRAL
FLOOD PROOFING WORK LIMIT
CENTRAL CONTROL STATION (CCS)
RIVER WALL
WORK LIMIT
UPSTREAM GUIDEWALL
N. FRONT ST
STATION
CONTROL
CENTRAL
ORIGINAL
240'-0"
'-0
110'-0"
'-0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SPECIFICATION SECTION 01 14 00.
GUIDEWALLS OUTSIDE OF THE LOCK CLOSURE PERIOD, EXCEPT AS NOTED IN
CONTRACTOR WILL NOT BE ALLOWED USE OF THE LOCK CHAMBER OR 1.
GENERAL SHEET NOTES
F L
O W
AND PARKING AREA
STAGING, STORAGE,
CONTRACTOR
MOORING AREA
CONTRACTOR
LOCK
AUXILIARY
LOCK
MAIN
MISSISSIPPI RIVER
80' 160'0
NORTH
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
C K
S U
R V
E Y
C O
N T
R O
L
V-001
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
SURVEY CONTROL PLAN - LOCK 16
ROD INSIDE CASING558.11557.392066157.751734185.91LD16US
ROD INSIDE CASING560.92560.202064629.941733744.07LD16DS
ROD INSIDE CASING552.69551.972065259.051734008.8209-77-16
DESCRIPTIONMSL 1912NAVD 88EASTINGNORTHINGPOINT
SURVEY CONTROL POINTS
LD16US
LD16DS
09-77-16
RIVER WALL
INTERMEDIATE WALL
AUXILIARY LOCK
MAIN LOCK
LAND WALL
BUILDING
MAINTENANCE
BUILDING
MAINTENANCE
SECURITY GATE ACCESS ROAD
STATION
CENTRAL CONTROL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
INSTRUMENTATION TABLES.
BASED ON LEVEL RUNS, OPUS SOLUTION, AND 2021 USACE
3. CONVERT FROM NAVD88 TO MSL 1912 BY ADDING 0.72'. CONVERSION
VERTICAL: MSL 1912. UNITS USED: US SURVEY FEET.
HORIZONTAL: NAD83(2011) STATE PLANE ILLINOIS WEST(1202); GEOID 18
PROJECT DATUM2.
SURVEY CONTROL WORK COMPLETED JANUARY 2024 FIELD BOOK FC-23-41.
GENERAL SHEET NOTES
MISSISSIPPI RIVER
FLOW
NORTH
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
C K
S U
R V
E Y
C O
N T
R O
L
V-002
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
SURVEY CONTROL PLAN - LOCK 18
LEAD PLUG537.62536.532059581.131536250.81L4
ALUMINUM ROD IN CASE537.66536.572059922.991536564.83LD 18
ALUMINUM ROD IN CASE537.66536.572059374.541535914.6209-77-18
DESCRIPTIONMSL 1912NAVD 88EASTINGNORTHINGPOINT
SURVEY CONTROL POINTS
09-77-18
LD 18
L4
RIVER WALL
INTERMEDIATE WALL
AUXILIARY LOCK
MAIN LOCK
LAND WALL
BUILDING
MAINTENANCE
BUILDING
MAINTENANCE
SECURITY GATE
ACCESS ROAD
STATION
CENTRAL CONTROL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
INSTRUMENTATION TABLES.
BASED ON LEVEL RUNS, OPUS SOLUTION, AND 2021 USACE
3. CONVERT FROM NAVD88 TO MSL 1912 BY ADDING 1.09 FEET. CONVERSION
VERTICAL: MSL 1912. UNITS USED: US SURVEY FEET.
HORIZONTAL:NAD83 (2011) ILLINOIS WEST (1202) STATE PLANE; GEOID 18
PROJECT DATUM2.
PAGES 69-79 VERIFIED DEC 2023.
SURVEY CONTROL WORK COMPLETED OCT 2021. FIELD BOOK N18-PS-27 1.
GENERAL SHEET NOTES
MISSISSIPPI RIVER
FLOW
NORTH
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
C K
S U
R V
E Y
C O
N T
R O
L
V-003
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M
E K
B
SURVEY CONTROL PLAN - LOCK 20
LEAD PLUG488.07487.291919484.711269114.01L3
LEAD PLUG488.12487.341919632.801268611.4816A
BAR IN CASE489.14488.361919443.951269810.82CANTON 1
DESCRIPTIONMSL 1912NAVD 88EASTINGNORTHINGPOINT
SURVEY CONTROL POINTS
CANTON 1
16A
L3
RIVER WALL
INTERMEDIATE WALL
LOCK
AUXILIARY
LOCK
MAIN
LAND WALL
BUILDING
MAINTENANCE
BUILDING
MAINTENANCE
ACCESS ROAD
CONTROL STATION
ORIGINAL CENTRAL
CONTROL STATION
NEW CENTRAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
FLOW
INSTRUMENTATION TABLES.
BASED ON LEVEL RUNS, OPUS SOLUTION, AND 2021 USACE
3. CONVERT FROM NAVD88 TO MSL 1912 BY ADDING 0.78 FEET. CONVERSION
VERTICAL: MSL 1912. UNITS USED: US SURVEY FEET.
HORIZONTAL: NAD83(2011) STATE PLANE ILLINOIS WEST(1202)GEOID 18;
PROJECT DATUM2.
SURVEY CONTROL WORK COMPLETED JULY 2021 FB N20-PS-32 PG. 53-751.
GENERAL SHEET NOTES
MISSISSIPPI RIVER
NORTH
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
N E
R A
L S
T R
U C
T U
R A
L N
O T
E S
S-001
C S
C H
U M
A C
H E
R
B
B O
Y D
S T
M
R P
R O
J
D B
O D
M
E K
B
HOLES
WELD ACCESS PLATES TYP
END OF ALL WELDED
WRAP WELD AROUND
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
GENERAL STRUCTURAL NOTES STRUCTURAL STEEL NOTES CONCRETE NOTES REINFORCING NOTES
SLAB JOINTS SHALL BE WATERTIGHT.
CONTRACTING OFFICER. CONSTRUCTION JOINTS FOR WALL TO
CONSTRUCTION JOINT LOCATIONS SHALL BE APPROVED BY THE
INTEGRITY OF THE CONCRETE STRUCTURE. THESE ADDITIONAL
SHALL BE PLACED AT LOCATIONS LEAST LIKELY TO IMPAIR THE
DRAWINGS. WHERE NOT SHOWN, CONSTRUCTION JOINTS
PROVIDE CONSTRUCTION JOINTS WHERE SHOWN ON THE6.
TO SPECIFICATION 03 31 00.
FOR CONCRETE COMPRESSIVE STRENGTH (f'c), REFER 5.
NOTED OTHERWISE.
CHAMFER ALL EXPOSED CONCRETE CORNERS 3/4" UNLESS 4.
AND DURING CONCRETE PLACEMENT.
ACCURATELY POSITIONED AND SECURELY IN PLACE PRIOR TO
PROPERLY PLACE ALL EMBEDDED ITEMS SUCH THAT THEY ARE 3.
SURFACES AS INDICATED.
GRADE ABUT CONCRETE, MASONRY, OR STEEL VERTICAL
PROVIDE 1/4" THICK JOINT FILLER MATERIAL WHERE SLABS ON2.
ACCORDANCE WITH ACI 318.
DESIGN PERFORMED BY THE CONTRACTOR SHALL BE IN
(ACI 301) EXCEPT AS OTHERWISE INDICATED. ALL CONCRETE
INSTITUTE (ACI) SPECIFICATIONS FOR STRUCTURAL CONCRETE
WITH THE PROVISIONS OF THE AMERICAN CONCRETE
ALL CONCRETE CONSTUCTION SHALL BE IN ACCORDANCE1.
CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES.
DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH
CONSTRUCTION. NOTIFY THE CONTRACTING OFFICER IF ANY
THE BENCHMARK SHALL BE FIELD-VERIFIED PRIOR TO
FIELD-VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE 8.
OF THIS WORK.
UNDOCUMENTED CONDITIONS THAT MAY EFFECT THE COMPLETION
NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES OR 7.
EQUIPMENT.
SLEEVES OR HOLES REQUIRED FOR MECHANICAL OR ELECTRICAL
LOCATION AND PLACEMENT OF ANY INSERTS, HANGERS, PIPE
UNLESS OTHERWISE SHOWN OR NOTED, COORDINATE THE 6.
SHOP DRAWINGS UNDER ANY CIRCUMSTANCE.
REPRODUCTION OF CONTRACT DRAWINGS SHALL NOT BE USED AS 5.
COMPLETION OF THE PROJECT.
REMAIN THE PROPERTY OF THE CONTRACTOR AFTER
TEMPORARY BRACING, GUYS OR TIEDOWNS. SUCH MATERIAL SHALL
INCLUDES THE ADDITION OF NECESSARY SHORING, SHEETING,
COMPONENTS AND OCCUPANTS DURING CONSTRUCTION. THIS
AND SEQUENCE TO ENSURE THE SAFETY OF THE STRUCTURE, ITS
DRAWINGS IS COMPLETED. DETERMINE ERECTION PROCEDURES
STABLE ONLY AFTER THE STRUCTURAL WORK CONTAINED IN THE
THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND 4.
WORK IN AREAS THAT WILL BE AFFECTED.
DRAWINGS TO THE CONTRACTING OFFICER PRIOR TO BEGINNING
REPORT DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT 3.
HOLES, HANGERS, AND ANCHORS.
BUT NOT LIMITED TO, THE REQUIREMENTS FOR SLEEVES, INSERTS,
DRAWINGS. COORDINATE THE WORK OF OTHER TRADES INCLUDING,
USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER 2.
NOTES, THE SPECIFICATIONS TAKE PRECEDENCE.
IN CASE OF CONFLICT BETWEEN THE SPECIFICATIONS AND THESE 1.
WITH THE EXCEPTION OF GALVANIZED SURFACES.
COAT ALL FAYING SURFACES WITH PRIMER PRIOR TO ASSEMBLY, 15.
ACCORDANCE WITH THE REQUIREMENTS OF AWS D1.1, AS SPECIFIED.
TESTING AND INSPECTION OF WELDS SHALL BE IN14.
THE SPECIFICATIONS.
STRUCTURAL STEEL MEMBERS TO BE IN ACCORDANCE WITH
THE DIMENSIONAL TOLERANCES OF ALL WELDED FABRICATED13.
(STAINLESS STEEL), SEE SPECIFICATIONS.
ITEMS MARKED CRES SHALL BE CORROSION RESISTANT STEEL12.
THE MATERIAL BEING WELDED, UNLESS NOTED OTHERWISE.
SURFACE EQUAL TO OR SMOOTHER THAN THE MILL FINISH OF
ALL WELDS THAT ARE TO BE GROUND SHALL HAVE A FINISHED11.
TREATMENT FROM MANUFACTURER/FABRICATOR.
CONTAINING NO ASBESTOS FIBERS) OR PRESCRIBED
WITH TWO COATS OF BITUMINOUS PAINT (SSPC - PAINT 12,
COAT ALL ALUMINUM IN CONTACT WITH CONCRETE10.
GRIND AREAS, ETC. AS SPECIFIED.
PAINT OR COAT ALL BARE OR EXPOSED STEEL, WELD, SCRATCHES, 9.
OF WELDS UTILIZING THE SAME WELD PROCESS AND FILLET SIZE.
HOLES TO PERMIT WELD WRAPPING TO PREVENT THE INTERSECTION
AS SHOWN IN DETAIL S-001-A1. SUFFICIENTLY SIZE WELD ACCESS
FULLY WRAP ALL FILLET WELDS AROUND THE ENDS OF THE PLATE8.
DIMENSIONS; ALLOWANCES MUST BE MADE FOR MACHINING
DIMENSIONS SHOWN OR CALLED FOR ARE THE FINAL7.
APPROVAL.
DRAWINGS AND SUBMITTED BY THE CONTRACTOR FOR
DETAILED INFORMATION SHALL BE SHOWN ON THE SHOP
AND INDICATE ONLY SIZE AND TYPE OF WELDS REQUIRED.
WELDING SYMBOLS SHOWN ARE THOSE ADOPTED BY THE AWS 6.
70 KSI FILLER METALS.
SHALL BE CONDUCTED USING LOW HYDROGEN PROCESSES AND
EDITION OF AWS D1.1, AS SPECIFIED. ALL WELDING
ALL WELDING TO BE IN ACCORDANCE WITH THE LATEST5.
FABRICATION.
COATED IN ACCORDANCE WITH ASTM A123 AFTER
WITH ASTM A153. GALVANIZED STEEL SHAPES SHALL BE
GALVANIZED HARDWARE SHALL BE COATED IN ACCORDANCE4.
OTHERWISE SPECIFIED.
ALL BOLTED CONNECTIONS SHALL BE PRETENSIONED UNLESS 3.
SPECIFICATIONS.
PROVIDE MATERIAL IN ACCORDANCE WITH THESE PLANS AND THE 2.
FIFTEENTH EDITION.
ACCORDANCE WITH THE AISC STEEL CONSTRUCTION MANUAL,
STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN1.
2. 2.5 TIMES THE MAXIMUM DIAMETER OF THE REINFORCEMENT.
1. 1.5 TIMES THE NOMINAL MAXIMUM SIZE OF THE AGGREGATE.
B. IN NO CASE SHALL THE COVER BE LESS THAN:
AS INDICATED ON DRAWINGS..............................................6"
5. SURFACES EXPOSED TO ABRASION
4. UNFORMED SURFACE IN CONTACT WITH SUBGRADE.....4"
3. EQUAL TO OR GREATER THAN 24" THICK..........................4"
2. GREATER THAN 12" AND LESS THAN 24" THICK...............3"
1. 12" OR LESS IN THICKNESS.............................PER ACI 318
A. FORMED AND SCREEDED SURFACES:
REINFORCEMENT EXCEPT AS OTHERWISE INDICATED SHALL BE:
11. MINIMUM CLEAR COVER TO THE NEAREST SURFACE FOR
THE DRAWINGS.
DICTATED BY THE GEOMETRY AND DIMENSIONS SHOWN ON
MAXIMUM. ACTUAL SPACING OF REINFORCEMENT SHALL BE
BAR SPACING INDICATED ON REINFORCING DRAWINGS IS A10.
SHALL COMPLY WITH AWS D1.4.
UNLESS OTHERWISE SHOWN ON THE DRAWINGS. WELDING
NO WELDING SHALL BE PERMITTED ON REINFORCEMENT9.
CONTRACTING OFFICER.
CONCRETE IS NOT ALLOWED UNLESS APPROVED BY THE
FIELD BENDING OF REINFORCEMENT PARTIALLY EMBEDDED IN8.
APPROVED BY THE CONTRACTING OFFICER.
MADE WHERE ESSENTIAL FOR CONSTRUCTABILITY AND
BASED ON THE SMALLER BAR BEING LAPPED. SPLICES MAY BE
LENGTH CANNOT BE OBTAINED. SPLICE LENGTH SHALL BE
PROVIDE HOOKS IF THE REQUIRED STRAIGHT EMBEDDED
ARE BARS HAVING MORE THAN 12" OF CONCRETE CAST BELOW.
THIS TABLE APPLIES TO UNCOATED BARS ONLY. TOP BARS
TABLE ON THIS SHEET, EXCEPT AS SHOWN OR NOTED ON THE DRAWINGS.
MINIMUM SPLICE AND EMBEDMENT LENGTHS ARE SHOWN IN THE 7.
NOTED.
TO BE IN ACCORDANCE WITH ACI 318-14, UNLESS OTHERWISE
OFFICER. CLEAR COVER, EMBEDMENT, AND SPLICE LENGTHS
BENT OR SHIFTED AS DIRECTED BY THE CONTRACTING
ITEMS AND OTHER OBSTRUCTIONS, REINFORCEMENT SHALL BE
WHERE NECESSARY TO AVOID OPENINGS, PIPES, EMBEDDED6.
CONTINUOUS ACROSS EXPANSION JOINTS.
CONSTRUCTION JOINTS. REINFORCEMENT SHALL NOT BE
REINFORCEMENT SHALL BE CONTINUOUS ACROSS 5.
REINFORCEMENT SHALL BE CONTINUOUS AT CORNERS.4.
INSTITUTE.
NUMBERING SYSTEM OF THE CONCRETE REINFORCING STEEL
REINFORCING BAR DESIGNATION NUMBERS CONFORM TO THE3.
(FY = 60,000 PSI).
REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 602.
CONCRETING RESPECTIVELY.
ACI 306 AND ACI 305 FOR COLD AND HOT WEATHERC.
FORCING BARS.
CRSI RECOMMENDED PRACTICE OF PLACING REIN-B.
ACI 301, ACI 315R, AND ACI 318-14A.
UNLESS OTHERWISE NOTED, OF:
CONCRETE SHALL BE GOVERNED BY THE LATEST REVISIONS,
FABRICATION, AND PLACING OF REINFORCING BARS AND
UNLESS NOTED OTHERWISE, ALL CONCRETE WORK, DETAILING,1.
8 59 45 77 59
7 51 40 67 52
6 35 27 46 36
5 30 23 39 30
4 24 18 32 24
3 18 14 24 19
TOP OTHER TOP OTHER
SIZE LENGTH, IN. LENGTH, IN.
BAR MIN. DEVELOPMENT MIN. CLASS B LAP
REINFORCEMENT EMBEDMENT AND SPLICE TABLE
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
.T
U R
N
G E
N D
A N
D A
B B
R E
V
IA
T
IO
N S
E-001
M .J
O H
N S
O N
D .T
E P
M
R P
R O
J
D .W
IL
S
E K
B
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
HP
VM
AM
VS
AS
WP
S
SITE LEGEND
COATED RIGID STEELPVC
PVC CONDUIT CONCRETE ENCASED
JUNCTION BOX
120V DUPLEX RECEPTACLE
CABLE TRENCH W/ REMOVABLE COVER
DPMM DIGITAL POWER MULTI-METER
8/C
2"C
COMBINATION MOTOR STARTER
POWER PANEL
EXPOSED STEEL CONDUIT
LIGHTING SWITCH-SPDT
EXAMPLE FOR 8 CONDUCTORS
EXAMPLE FOR 2 INCH CONDUIT
CONTROL, GROUNDING & LIGHTING)
ELECTRICAL PLAN LEGEND (POWER,
OS
EMERGENCY LIGHTING FIXTURE
WALL MOUNT EXIT SIGN
CEILING MOUNT EXIT SIGN
OS WALL MOUNT OCCUPANCY SENSOR
(ARROW DETERMINES DIRECTION OF EGRESS)
CEILING MOUNT EXIT SIGN
(ARROW DETERMINES DIRECTION OF EGRESS)
WALL MOUNT SIGN EXIT
S3
WALL MOUNT EXTERIOR LIGHTING FIXTURE
CEILING MOUNT EXTERIOR LIGHTING FIXTURE
FUSE
FIXTURE
CEILING MOUNT EMERGENCY EXTERIOR LIGHTING
WALL MOUNT EMERGENCY EXTERIOR LIGHTING FIXTURE
DISCONNECT
120V DUPLEX RECEPTACLE
500 KVA
3 PH, 60 HZ
13.2 KV
480/277V
THREE WAY SWITCH
a DENOTES CONTROL CIRCUIT (IF APL)
CEILING MOUNT OCCUPANCY SENSORa
CONTROL CIRCUIT (IF APL)
A DENOTES FIXTURE LABEL, a DENOTES
LIGHTING FIXTURE
a
A
HOME RUN TO PANEL MDP, BREAKER 46
MDP-46
120V WEATHERPROOF GFCI RECEPTACLE
AND TYPE AS INDICATED
SPECIAL RECEPTACLE, VOLTAGE
240V RECEPTACLE
XFMR
WP
V
UH-X
UR
UL
TYP
TVSS
TRBL
TL-X
THU
TEMP
SWBD
SS
SPD
S/N
S
RW
RGS
RECP
PRGS
PNL
PLC
PL
PH
PDS
PB
OL
OH
NRTL
MS
MH
MG
MCC
LW
LTS
LOR
TRANSFORMER
WEATHERPROOF
VOLTS
UNIT HEATER NO. X
UPSTREAM RIGHT
UPSTREAM LEFT
TYPICAL
TRANSIENT VOLTAGE SURGE SUPPRESSION
TROUBLE
TRAFFIC SIGNAL LIGHT NO. X
TOW HAULAGE UNIT
TEMPERATURE
SWITCHBOARD
USAGE DEPENDENT
SELECTOR SWITCH or STAINLESS STEEL, SURGE PROTECTION DEVICE
SOLID NEUTRAL
TOGGLE SWITCH
RIVERWALL
RIGID GALVANIZED STEEL (CONDUIT)
RECEPTACLE
PVC COATED RIGID GALVANIZED STEEL CONDUIT
PANEL
PROGRAMMABLE LOGIC CONTROLLER
PILOT LIGHT
PHASE
POSITION DISPLACEMENT SENSOR
PUSHBUTTON
OVERLOAD
OVERHEAD
NATIONALLY RECOGNIZED TESTING LABORATORY
MOTOR STARTER
MANHOLE
MITER GATE
MOTOR CONTROL CENTER
LANDWALL
LIGHTS
LOCAL-OFF-REMOTE
KW
KVA
KV
KCMIL
JB
ICE-PIER
HZ
HP
HMI
H-O-A
GND
GFE
GEN-X
FX
FO
FLR
EF
DR
DL
DISTR
DD
CT
CS
COR
CKT
CCS
C
BKR
ATS
AT
AF
A
KILOWATTS
KILOVOLT - AMPERES
KILOVOLTS
THOUSAND CIRCULAR MILS
JUNCTION BOX
HIGH-MAST LIGHTING PIER (OR TRANSFORMER PIER)
HERTZ
HORSEPOWER
(PC OR HARDWIRED DEVICES)
HUMAN-MACHINE INTERFACE
HAND-OFF-AUTO SELECTOR SWITCH
GROUND
GOVERNMENT FURNISHED EQUIPMENT
GENERATOR NO. X
LIGHT FIXTURE NO. X
FIBER OPTIC
FLOOR
EXHAUST VENT FAN
DOWNSTREAM RIGHT
DOWNSTREAM LEFT
DISTRIBUTION
DIGITAL DISPLAY
CURRENT TRANSFORMER
CONTROL STAND
CONTRACTING OFFICER'S REPRESENTATIVE
CIRCUIT
CENTRAL CONTROL STATION
SEE PLAN LEGEND THIS SHEET
CONDUCTORS OR CONDUIT, USAGE DEPENDENT;
BREAKER
AUTOMATIC TRANSFER SWITCH
AMPERES - TRIP
AMPERES - FRAME
AMPERES
X
X
DISCONNECT SWITCH
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
SIZE AS INDICATED
MAGNETIC CIRCUIT BREAKER,
FIXED MOLDED-CASE THERMAL
WIRING CONNECTION
DISCONNECTING DEVICE PLUG
WITH RATINGS AS INDICATED
POWER TRANSFORMER
MOTOR, HP INDICATED
GENERATOR SET NO. 1
COMBINATION
DRAWOUT FUSE/CONTACTOR
DELTA TRANSFORMER
WYE TRANSFORMER
BREAKER,SIZE AS INDICATED
PLUG-IN MOLDED-CASE CIRCUIT
STARTER, AIZE AS INDICATED
MOTOR SHORT CIRCUIT PROTECTOR
PLUG-IN COMBINATION MOLDED CASE
THERMAL OVERLOAD DEVICE
IDENTIFICATION
CONDUIT AND CONDUCTOR
LENSE COLOR INDICATED
INDICATING LIGHT
PUSHBUTTON W/ MOMENTARY CONTACT
STARTER SELECTOR SWITCH
THREE POSITION MAINTAINED
LOCAL
OFF
REMOTE
UNIT 2UNIT 1
UNIT SELECTOR SWITCH
TWO POSITION MAINTAINED
BLUEBL
AMBERA
WHITEW
GREENG
REDR
FIELD WIRING SHOWN ON SCHEMATIC
MOTOR CONTACTOR
VOLTMETER
AMMETER
VOLTMETER SWITCH
UTILITY METER
AMMETER SWITCH
RECEPTACLE CONNECTION
LOCK MACHINERY
400AF
GEN-1
H1
H2H3
Y3
Y2
Y1
20A
100A
R
ABBREVIATIONSONE-LINE DIAGRAM & SCHEMATIC LEGEND
480V RECEPTACLE
120V QUADPLEX RECEPTACLE
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
LIMIT SWITCH NORMALLY OPEN
LIMIT SWITCH NORMALLY CLOSED
POWER RECEPTACLE
480V NEMA 4 INTEGRALLY INTERLOCKED
GROUNDING ROD
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
.T
U R
N
N E
R A
L E
L E
C T
R
IC
A L
N O
T E
S
E-002
M .J
O H
N S
O N
D .T
E P
M
R P
R O
J
D .W
IL
S
E K
B
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
NOTE 29 ABOVE.
NUTS) UNLESS NOTED OTHERWISE REQUIRED TO BE STAINLESS STEEL. SEE ALSO GENERAL
PROVIDE HOT-DIPPED GALVANIZED FASTENING HARWARE (SCREWS, BOLTS, WASHERS, AND 30.
METALS SO THEY ARE NOT INSTALLED ADJACENT TOUCHING EACH OTHER.
MATERIALS. AVOID AND PREVENT CONTACT OF DISSIMILAR METALS. ISOLATE DISSIMILAR
GENERAL MATERIALS: PROVIDE EQUIPMENT, FASTENINGS, AND FASTENERS OF COMPATIBLE 29.
WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.
JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND CONDUIT AND
EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A 28.
CONDITIONS.
CABLE, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR MUST VERIFY EXISTING
THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY BOX, CONDUIT, FITTING,
REMOVED AND REPLACED WITH NEW. THE NOTES AND DRAWINGS ARE INTENDED TO INDICATE
THE ELECTRICAL DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS WHICH MUST BE 27.
ON RED-LINE AS-BUILT DRAWINGS. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS.
AS-BUILT DRAWINGS: CONTRACTOR MUST INCLUDE LOCATIONS OF ALL CONDUITS AND CABLES 26.
ALL CONDUCTORS MUST BE INSTALLED IN RACEWAY, EXCEPT WHERE NOTED OTHERWISE.25.
ROUTING.
THE GOVERNMENT HAS FINAL APPROVAL ON ALL EQUIPMENT, LOCATIONS AND CONDUIT 24.
CONCRETE ANCHORS AND POWDER-ACTUATED CONCRETE ANCHORS ARE NOT PERMITTED.
EPOXY TYPE STAINLESS STEEL CONCRETE ANCHOR BOLTS ARE REQUIRED. WEDGE-TYPE 23.
TO ELECTRICAL JUNCTION BOXES.
GROUNDING TYPE, INSULTATED-THROAT CONDUIT HUBS SHALL BE USED TO FASTEN CONDUIT 22.
PROVIDE INSULATED THROAT GROUNDING BOSSINGS, PULLBOXES AND MANHOLES.21.
GALVANIZED STEEL CONDUIT.
CONDUCTOR SIZE SHALL BE #12 AWG, AND MINIMUM CONDUIT SIZE SHALL BE 3/4 INCH RIGID
SOLID FOR #10 AWG AND SMALLER, AND STRANDED FOR #8 AWG AND LARGER. MINIMUM
WIRING FOR POWER, LIGHTING, AND BRANCH CIRCUITS MUST BE COPPER, TYPE XHHW. USE 20.
GALVANIZED STEEL (RGS) CONDUIT.
UNLESS OTHERWISE NOTED, ALL CONDUIT MUST BE UL LISTED PVC-COATED RIGID 19.
STANDARDS (NEMA, ANSI, ETC.).
TERMINATORS, AND WIRE LABELS MUST COMPLY WITH RELEVANT AMERICAN INDUSTRY
ENCLOSURES, COVERS, RECEPTACLES, SWITCHES, GROUNDING EQUIPMENT, TERMINALS,
ALL NEW INSTALLED EQUIPMENT INCLUDING, BUT NOT LIMITED TO: CONDUIT, WIRE, CABLES, 18.
ALL NEW ELECTRICAL EQUIPMENT MUST BE UL LISTED. 17.
ACTUAL ELECTRICAL INSTALLATION.
THE CONTRACTOR MUST COORDINATE ALL EQUIPMENT LOCATIONS PRIOR TO MAKING THE 16.
INSULATED GROUND WIRE.
ALL BRANCH, FEEDER, AND LIGHTING CIRCUITS MUST BE PROVIDED WITH A SEPARATE 15.
FACILITATE STRUCTURAL CONSTRUCTION. SEE STRUCTURAL DRAWINGS.
THE ELECTRICAL WORK MUST BE COORDINATED WITH THE STRUCTURAL CONCRETE WORK TO 14.
LATEST EDITION OF NFPA 70, NATIONAL ELECTRICAL CODE.
ALL FEATURES OF ELECTRICAL WORK AND INSTALLATION MUST BE IN ACCORDANCE WITH THE 13.
THE RIVER MAY FLOOD AND WATER MAY OVERTOP THE LOCK WALL.
THE CONTRACTOR SHOULD BE AWARE AND CONSIDER THAT THERE ARE OCCASIONS WHEN 12.
AND DAM OPERATING PERSONNEL.
WITH THE CONTRACTING OFFICER TO ALLOW ACCESS TO NECESSARY SPACES BY THE LOCK
STAGING OF EQUIPMENT REMOVAL, RELOCATION, AND INSTALLATION MUST BE COORDINATED 11.
PRIOR TO REMOVING ANY CABLES OR DEMOLISHING ANY CONCRETE.
THE CONTRACTOR MUST VERIFY DUCT AND EMBEDDED CONDUITS LOCATION OF EACH CABLE 10.
CABLES.
INTRUSION. SPLICE CAPS MUST BE INSTALLED TO PROTECT THE END OF A NON-TERMINATED
ELECTRIC SHOCK AND TO PROTECT THE CABLE AND CONDUCTOR ENDS FROM WATER
PLACED OVER THE END OF THE BARE CONDUCTORS AND A CABLE END TO INSULATE FROM
A SPLICE CAP IS A TERM USED TO DESCRIBE BLIND ENDED SHRINK MATERIAL WHICH CAN BE 9.
ENTIRETY FROM SOURCE TO LOAD AT THE CONTRACTOR'S EXPENSE.
ANY PERMANENT CABLES DAMAGED BY THE CONTRACTOR MUST BE REPLACED IN ITS 8.
AS INDICATED IN PLANS) MUST BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
ANY DAMAGE TO DUCT BANK OR EMBEDDED CONDUITS BY THE CONTRACTOR (OTHER THAN 7.
CABLES WILL BE ALLOWED TO BE EXPOSED ON THE LOCK WALL.
TEMPORARY CABLE SPLICES SHALL BE MADE IN THE MANHOLES AND ONLY THE TEMPORARY 6.
DEPOSITED SEDIMENT AND SILT IN EXISTING MANHOLES AND DUCT BANKS.
WALL HAS BEEN OVERTOPPED BY FLOOD WATER ON MULTIPLE OCCASIONS WHICH MAY HAVE
CLEANING PRIOR TO RE-INSTALLATION OF CABLES IN DUCT BANKS. THE TOP OF THE LOCK
SEE SPECIFICATION SECTION 33 70 02 FOR SPLICES OF TEMPORARY CABLES AND DUCT 5.
2014, SECTION 12.
WITH THE SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1 DATED 30 NOVEMBER,
CONTRACTOR MUST ADHERE TO PROPER LOCKOUT/TAG OUT PROCEDURES IN ACCORDANCE 4.
SECTION 11, SUBSECTION J.
THE SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1 DATED 30 NOVEMBER, 2014,
CONTRACTOR MUST PROVIDE PROTECTION FROM OPEN MANHOLES IN ACCORDANCE WITH 3.
ELECTRICAL CABLES IDENTIFIED.
CABLE SCHEDULES REGARDING CIRCUIT DESCRIPTIONS ASSOCIATED WITH THE
THIS SYMBOL IDENTIFIES ELECTRICAL CABLES. SEE REFERENCE DRAWINGS AND 2.
OFFICER PRIOR TO ANY ELECTRICAL POWER OUTAGES.
CONTRACTOR MUST COORDINATE WITH AND RECEIVE APPROVAL FROM THE CONTRACTING 1.
SYSTEM.
REINSTALL THE PERMANENT ELECTRICAL CABLES TO RESTORE THE ELECTRICAL
CONSTRUCTION FEATURES ARE ADEQUATELY COMPLETED TO ALLOW AND FACILITATE.
DEMOLISH THE EXISTING TEMPORARY ELECTRICAL CABLE SYSTEM WHEN 6.
2000 POUND TOTAL LOAD OR 1000 POUND SINGLE AXLE LOAD.
TEMPORARY CABLE PATHWAY BRIDGES MUST BE ABLE TO WITHSTAND NOT LESS THAN
CUSHMAN CARTS TO TRAVERSE THEM WITHOUT GETTING IMPEDED ("HUNG UP").
BRIDGE MUST BE PROVIDED WITH PROPER RAMP PITCH TO ALLOW EXISTING LOCK
BRIDGE TYPE CROSSING INSTALLED ACROSS CABLES. TEMPORARY CABLE PATHWAY
ANOTHER ELEVATION IF APPROVED OR MUST BE A TEMPORARY RAMPED PROTECTIVE
CABLE CROSSINGS MUST BE EITHER OVERHEAD TYPE AT NOT LESS THAN 8 FEET OR AT
FOR THE SAFE ROUTING OF TEMPORARY ELECTRICAL CABLES. TEMPORARY PATHWAY
PROVIDED AND INSTALLED IN ACCORDANCE WITH EM 385-1-1, NFPA 70, AND IEEE/ANSI C2
MAXIMUM LOAD OF 2,000 POUNDS. TEMPORARY PATHWAY CABLE CROSSINGS MUST BE
LOADED CUSHMAN TUG TYPE CARTS. CUSHMAN TUG CARTS CAN HAVE A TOTAL
CABLES ARE PHYSICALLY PROTECTED FROM BOTH PEDESTRIAN TRAFFIC AND FROM
ROUTE TEMPORARY ELECTRICAL CABLES ACROSS PATHWAYS SO THAT TEMPORARY
WITH CONTRACTOR OPERATIONS AND ADJACENT ACTIVITIES. THE CONTRACTOR SHALL
CABLES ON THE TOP OF THE LOCK WALL AT A LOCATION THAT DOES NOT INTERFERE
FROM MANHOLE NO. C1, MH10, MH11, C2, OR MH13 AS APPLICABLE. ROUTE TEMPORARY
NO. C1, MH10, MH11, C2, OR MH13 RESPECTIVELY. SURFACE ROUTE TEMPORARY CABLES
SPLICE LOCK LIGHT POLES TEMPORARY CABLES TO EXISTING CABLES NEAR MANHOLE 5.
MOTORIZED CART AS NEEDED FOR LOCK PERSONNEL TO ACCESS WORK PATHS.
TO BE SAFELY CROSSED BY PEDESTRIANS AND WITH A 4-WHEEL CUSHMAN BRAND
CABLES SO THEY WILL NOT BE DAMAGED, NOT CAUSE TRIPPING HAZARD, AND ARE ABLE
CONTROL, AND INSTRUMENTATION TO REQUIRED EQUIPMENT. INSTALL TEMPORARY
REMOVED PERMANENT ELECTRICAL CABLES TO PROVIDE TEMPORARY POWER,
TEMPORARY SPLICE THE TEMPORARY ELECTRICAL CABLES AS REQUIRED TO THE 4.
MAINTAIN SYSTEM OPERABILITY.
TEMPORARY CABLES AND PROVIDE REPAIRS TO DAMAGED TEMPORARY CABLES TO
FROM ALL TRAFFIC AND CONTRACTOR OPERATIONS. THE CONTRACTOR MUST MAINTAIN
OR WITH LOCK AND DAM OPERATIONS. CABLES MUST BE ADEQUATELY PROTECTED
DETERMINED BY CONTRACTOR NOT TO INTERFERE WITH CONSTRUCTION OPERATIONS
TEMPORARY CABLES MUST BE ROUTED ON TOP OF LOCK WALL AT A LOCATION 3.
ROPE. SEE REFERENCE DRAWINGS AND CABLE SCHEDULES FOR EXISTING CABLE SIZES.
CIRCUIT CABLE MUST BE BUNDLED AND TIED TOGETHER WITH CABLE TIES OR NYLON
THE PERMANENT CABLE BEING SPLICED TO. THE CONDUCTORS OF EACH TEMPORARY
DEGREE COPPER. CONDUCTOR SIZE MUST NOT BE LESS THAN THE CONDUCTORS OF
TEMPORARY CABLES MUST BE SINGLE OR MULTIPLE CONDUCTOR 600 VAC, XHHW 90 2.
WARNING LIGHTS, AND SMALL BOAT SIGNALS AS APPLICABLE.
GUIDE WALL LIGHT POLES, NAVIGATION LIGHTS, OUTDRAFT LIGHTS, FISHERMAN'S
UPSTREAM GUIDE WALL, LOCK 21 DOWNSTREAM GUIDEWALL, AND LOCK 22 UPSTREAM
SEE PLAN SHEETS TO DETERMINE TEMPORARY WIRING REQUIREMENTS FOR LOCK 21 1.
3M HDBB) TO COVER AND FINALLY SEAL THE RUN AND TAP END OF SPLICE.
PROVIDE 2-WAY OUTLET HEAT SHRINK HEAVY DUTY BREAKOUT BOOTS (BASIS OF DESIGN IS 11.
ON THE OTHER END OF THE SPLICE.
SPLICED CONDUCTORS ON ONE END AND JUST THE RUN CABLE AND SPLICED CONDUCTORS
ITCSN SERIES) OF PROPER SIZE APPLIED TO COVER BOTH THE RUN CABLE, TAP CABLE, AND
PROVIDE HEAVY-WALL (ADHESIVE-LINED) HEAT SHRINK TUBING (BASIS OF DESIGN IS 3M 10.
CABLE TO FILL AND DAM GAP BETWEEN THE CABLES.
PROVIDE MASTIC SPLICE TAPE AROUND AND BETWEEN MAIN RUN CABLE AND ADJACENT TAP 9.
APPLY LIQUID ELECTRICAL TAPE TO SEAL EXPOSED EDGES.8.
TUBES.
PROVIDE MASTIC SPLICE TAPE AROUND CONDUCTOR CONNECTIONS OVER HEAT SHRINK 7.
CONDUCTOR SPLICE.
MODEL ITCSN SERIES HEAT SHRINK TUBE) OF PROPER SIZE APPLIED TO EACH INDIVIDUAL
PROVIDE HEAVY- WALL (ADHESIVE-LINED) HEAT SHRINK TUBING (BASIS OF DESIGN IS 3M 6.
LINEARLY STAGGER COMPRESSION CONNECTORS TO MINIMIZE WIDTH OF CABLE SPLICE.5.
ROUTED THROUGH, BUT NOT TAPPED.
PROVIDE ONE INLINE BUTT-TYPE COMPRESSION CONNECTOR FOR EACH CONDUCTOR 4.
CONDUCTOR REQUIRED TO BE TAP SPLICED.
PROVIDE ONE INLINE BUTT TYPE COMPRESSION CONNECTOR FOR EACH RUN AND TAP 3.
PERMANENT CABLE SPLICES USING THE FIELD FABRICATED SPLICES.
THE SUBMERSED SPLICE STAYED DRY, THEN THE CONTRACTOR MAY INSTALL THE
DISASSEMBLED TO SEE IF WATER INFILTRATED THE SPLICE. IF THE PAPER TISSUE INSIDE
FOR 24 HOURS AT WHICH TIME THE SPLICE MUST BE REMOVED FROM THE WATER AND
TEST CABLE THAT IS SUBMERSED IN 8-10 FEET OF WATER (SUBMERSE IN LOCK CHAMBER)
PART OF THE SPLICE ASSEMBLY. THE TEST SPLICE MUST BE FABRICATED ON AN ASSEMBLED
CABLE SPLICE EXCEPT THAT ALSO A PAPER TISSUE MUST BE INSTALLED ON THE INNERMOST
CONTRACTOR MUST ASSEMBLE AND TEST THE FOLLOWING CUSTOM FIELD-FABRICATED 2.
SPLIT-BOLT CONNECTORS ARE NOT ACCEPTABLE. 1.
GENERAL ELECTRICAL NOTES
NON-RE-ENTERABLE ELECTRICAL CABLE SPLICE:
CUSTOM DESIGN/FIELD ASSEMBLED TEMPORARY WIRE AND CABLE REQUIREMENTS:
L23
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N E
R
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T
L O
C K
C O
V E
R S
H E
E T
G-001
C S
C H
U M
A C
H E
R
B
B O
Y D
S T
M
R P
R O
J
D B
O D
M E
R
LOCK18
ILLINOIS CITY, IL - GLADSTONE, IL - CANTON, MO
LOCKS 16-18-20
MISSISSIPPI RIVER BASIN
ROCK ISLAND DISTRICT
E K
B
PLAN - UPSTREAM GUIDEWALL DEMOLITION - MONOLITHS 1-8ED101
CABLE SCHEDULEE-601
DETAILSE-501
PLAN - UPSTREAM GUIDEWALL - MONOLITHS 18-20E-101
SECTION - UPSTREAM GUIDEWALL DEMOLITIONSD302
SECTION - UPSTREAM GUIDEWALL DEMOLITIONSD301
PLAN - UPSTREAM GUIDEWALL DEMOLITION - MONOLITHS 18-20SD103
PLAN - UPSTREAM GUIDEWALL DEMOLITION - MONOLITHS 9-17SD102
PLAN - UPSTREAM GUIDEWALL DEMOLITION - MONOLITHS 1-8SD101
DETAILS - WALKWAY SUPPORTSS-513
DETAILS - WALKWAY SUPPORTSS-512
DETAILS - WALKWAY SUPPORTSS-511
DETAILS - WALKWAY SUPPORTSS-510
DETAILS - JOINTSS-505
SECTION - UPSTREAM GUIDEWALL WALKWAYS-310
SECTION - KEVEL RAIL AND BASE PLATES-305
SECTIONS - UPSTREAM GUIDEWALLS-304
SECTIONS - UPSTREAM GUIDEWALLS-303
SECTIONS - UPSTREAM GUIDEWALLS-302
SECTIONS - UPSTREAM GUIDEWALLS-301
PLAN - CONTRACTION JOINT LAYOUT - MONOLITHS 18-20S-112
PLAN - CONTRACTION JOINT LAYOUT - MONOLITHS 9-17S-111
PLAN - CONTRACTION JOINT LAYOUT - MONOLITHS 1-8S-110
PLANS - KEVEL RAIL GROUNDING CONDUITS-107
PLANS - UPSTREAM GUIDEWALL WALKWAYS-106
PLANS - END STOPS AND BASE PLATESS-105
PLAN - UPSTREAM GUIDEWALL REPAIRS - MONOLITHS 18-20S-103
PLAN - UPSTREAM GUIDEWALL REPAIRS - MONOLITHS 9-17S-102
PLAN - UPSTREAM GUIDEWALL REPAIRS - MONOLITHS 1-8S-101
SURVEY MONUMENT PLACEMENTV-101
SUGGESTED INSTALLATION PROCEDURE - KEVEL RAILG-002
COVER SHEET - LOCK 18 - KEVEL RAIL REPLACEMENTG-001
SHEET TITLESHEET ID
SHEET INDEX
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
S of Engineers
US Army Corps
KEVEL RAIL REPLACEMENT AND L20 CCS FLOODPROOFING
PLAN SET: LOCK 18 UPSTREAM GUIDEWALL KEVEL RAIL REPLACEMENT
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
K
V E
L R
A
IL
S U
G G
E S
T E
D I
N S
T A
L L
A T
IO
N
P R
O C
E D
U R
E
G-002
J
A R
IA
S
B
B O
Y D
S T
M
R P
R O
J
D B
O D
M E
R
LOCK18
W
E K
B
B D
C
SURVEY BEST FIT REFERENCE LINE
CHAMFER FACE OF ARMORRAIL PLATE
Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SET BACK OF BASE PLATES ALONG LINE 3. 12.
CHECKPOSTS, WILL ALLOW BITT TO PASS CHECKPOSTS (DIMENSION D). MINIMUM OF 1'-1".
VERIFY THE DISTANCE BETWEEN THE CHECKPOST CENTERLINES AND THE CENTERLINE OF THE KEVEL RAIL, FOR ALL 11.
RAIL PLATES.
USE DISTANCE C, FROM THE CONTROLLING RAIL PLATE, TO ESTABLISH LINE 3, WHICH ESTABLISHES THE LAND SIDE OF THE 10.
PLACE ALL PLATES ALONG THE WALL.
ESTABLISH DISTANCE C, BASED ON THE BASE PLATE SET AT THE NARROWEST LOCATION. THIS DIMENSION IS USED TO 9.
SATISFACTORY FOR ESTABLISHING THE CHAMBER SIDE OF THE RAIL PLATE LOCATIONS.
IF PLATES ENGAGE ARMOR IN SUFFICIENT LENGTH TO WELD TO ARMOR, PER CONTRACT REQUIREMENTS, LOCATION Y IS 8.
2), TO VERIFY THE REMAINING BASE PLATES WILL CONTACT THE ARMOR FOR WELDING
ESTABLISH A LINE ALONG THE ENTIRE LENGTH OF THE WALL, PARALLEL TO THE REFERENCE LINE (LINE 1) AT POINT Y (LINE 7.
CONTROLLING CHECKPOST.
PLATE AT POINT Y, ENSURING POINT Y IS PERPENDICULAR TO LINE 1, AND 1'-7" FROM THE CENTERLINE OF THE
FROM THE CENTERLINE OF THE CONTROLLING CHECKPOST, ESTABLISH THE CHAMBER SIDE OF THE CONTROLLING RAIL 6.
WILL DRIVE THE LOCATION OF THE KEVEL RAIL CENTERLINE.
DETERMINE WHICH CHECKPOST IS CLOSEST TO LINE 4, THEREBY ESTABLISHING THE CONTROLLING CHECKPOST, WHICH 5.
ESTABLISH A LINE PARALLEL TO LINE 1 ON THE RIVER SIDE OF THE EXISTING CHECKPOSTS, LABELED AS LINE 4.4.
THAT WILL NOT GET DISTURBED.
FROM. SET SURVEY NAILS (PKS) AT END POINTS OF LINE 1 (AS WELL AS OTHER AREAS, AS DETERMINED BY CONTRACTOR)
LINE 1 WILL ESTABLISH A REFERENCE LINE TO WHICH ALL COMPONENT PLACEMENT LOCATIONS WILL BE REFERENCED 3.
THE LENGTH.
MULTIPLE SURVEY POINTS ALONG THE LENGTH OF THE WALL TO DETERMINE HOW THE WALL FACE FLUCTUATES ALONG
ESTABLISH THE BEST FIT LINE ALONG THE UPSTREAM GUIDEWALL (LINE 1), LABELED AS THE REFERENCE LINE, BY TAKING 2.
PART OF THE RAIL INSTALLATION PROCEDURE REQUIRED IN THE SPECIFICATIONS.
RAIL INSTALLATION SEQUENCE IS PROVIDED AS ONLY A SUGGESTION. DEVELOP AND SUBMIT A PROPOSED PROCEDURE AS
THE NEW KEVEL RAIL IS TO RUN STRAIGHT ALONG THE WALL. EXISTING WALL MAY NOT BE STRAIGHT. THE FOLLOWING 1.
SUGGESTED RAIL INSTALLATION PROCEDURE
CL CP
CL RAIL
LINE 3
LINE 2
LINE 1
J O
IN
T
M O
N O
L
IT
H
J
IN
T
M O
N O
L
A11
SUGGESTED INSTALLATION PROCEDURE - KEVEL RAIL
SCALE: NTS
N O
M
IN
A
LINE 4
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
R O
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
/0
T
U R
N
U
R V
E Y
M O
N U
M E
N T
P L
A C
E M
E N
T
V-101
C S
C H
U M
A C
H E
R
B A
N D
E R
S
M
R P
R O
J
D B
O D
M E
R
LOCK18
W
E K
B
SCALE: 3/8"=1'-0"
SURVEY MONUMENT PLACEMENT - LOCK 18
R
O U
G H
E N
E D
S U
R F
A C
E O
F R
O D
1"
H7
SCALE: NTS
SURVEY DATADETAIL - SURVEY MONUMENT
SCALE: 6" = 1'-0"
H1
15'-0"
E
E N
O T
E S
A
N D
F
A C
E O
F W
A L
L F
R O
M C
H A
M B
E R
O
F F
S E
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
EXISTING CONCRETE
NEW EPOXY GROUT
MANUFACTURER RECOMMENDATIONS
DRILLED HOLE DIAMETER PER EPOXY
ALIGNMENT SURVEY
MARK PIN FOR
WITH TOP OF CONCRETE)
BRASS ROD (FLUSH
1" DIA. X 10"
0.02" RADIUS
ROUND CORNER
UNDER THIS CONTRACT.
ITEMS MARKED AS "TBD" INDICATE MEASUREMENTS REQUIRED TO BE TAKEN 7.
ALL INFORMATION SHALL BE SUPPLIED IN MSL 1912 DATUM AND NAVD88.6.
DRAWINGS FOR INFORMATION ON EXISTING MONUMENTS.
MONUMENTS IN LINE WITH EXISTING MONUMENTS. SEE REFERENCE
THE 3'-0" OFFSET DIMENSION IS NOMINAL. CONTRACTOR SHALL SET NEW 5.
MONUMENT SHALL BE SET 1'-0" FROM THE EDGE OF THAT COMPONENT.
COMPONENT IS LOCATED AT THE CENTER OF THE MONOLITH, THE
OFFSET OF 3'-0" FROM THE CHAMBER FACE OF THE WALL. IF A LOCK
MONUMENTS SHALL BE SET AT THE CENTER OF THE MONOLITH, WITH AN 4.
MONUMENTS AND PERFORM THE SURVEY.
THE CONTRACTOR SHALL HAVE A REGISTERED SURVEYOR SET THE 3.
SPECIFICATIONS FOR DETAILS.
THE CONTRACTOR SHALL PERFORM AN ALIGNMENT SURVEY, SEE 2.
THE DIAGRAM SHOWN.
UPSTREAM GUIDEWALL. NEW BRASS RODS SHALL BE USED ACCORDING TO
THE CONTRACTOR SHALL PLACE SURVEY POSITION MONUMENTS ON THE 1.
GENERAL SHEET NOTES
MARKER
UG1
UG2
UG3
UG4
UG5
UG6
UG7
UG8
UG9
UG10
UG11
UG12
UG13
UG14
UG15
UG16
UG17
UG16
UG17
TBD
TBD
TBD
STA. ELEV.DIST.
TBD
TBD
TBD
THIS CONTRACT
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD
TBDTBD
TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
TBD TBD
M J
M J
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
UG18 TBD
TBD
TBD
UG19 TBD TBD
FLOW
4'0 2' 8'
TBD
NORTH
4'0 2' 8'
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
IC
T
T
U R
N E
R
M O
N O
L
IT
H S
-8
U P
S T
R E
A M
G U
ID
E
W A
L L
R E
P A
IR
S
P L
A N
S-101
C S
C H
U M
A C
H E
R
B
B O
Y D
S T
M
R P
R O
J
D B
O D
M E
R
LOCK18
W
E K
B
SCALE: 1/4"=1'-0"
PLAN - MONOLITHS 6-8
E1
SCALE: 1/4"=1'-0"
PLAN - MONOLITHS 3-5
K1
SCALE: 1/4"=1'-0"
PLAN - MONOLITHS 1-2
BY OTHERS
SHELTER TO BE INSTALLED
EL.~535.5
EXISTING PULLBOX
TYP
REINSTALL HANDRAIL
TYP
REINSTALL HANDRAIL
TYP
REINSTALL HANDRAIL
TYP
MONUMENT
INSTALL SURVEY
TYP
MONUMENT
INSTALL SURVEY
TYP
MONUMENT
INSTALL SURVEY
NEW WALKWAY
NEW WALKWAY
NEW WALKWAY
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E N
T A
N D
L C
C S
F L
O O
D P
R O
O F
IN
G
IL
L
IN
O
IS
C
IT
Y
IL
G
L A
D S
T O
N E
IL
C
A N
T O
N
M O
L O
C K
S
-1
-2
M
IS
S
IS
S
IP
P I
R
IV
E R
B A
S
IN
W
E K
B
/0
3'-10 1/2 " 4 SPACES @ 6'-0" = 24'-0" 1'-2"4'-10"
1'-2"5'-0"6'-0"3'-7"6'-3"4'-0"4'-0"1'-2"4'-10"4 SPACES @ 6'-0" = 24'-0"1'-2"4'-10"4 SPACES @ 6'-0" = 24'-0"
1'-2"4'-10"4 SPACES @ 6'-0" = 24'-0"1'-2"4'-10"4 SPACES @ 6'-0" = 24'-0"1'-2"4'-10"4 SPACES @ 6'-0" = 24'-0"
6'-0"
JUNCTION BOX
3 SPACES @ 6'-0" = 18'-0" 4'-10" 1'-2"
PLATES, TYP
RAIL AND BASE
INSTALL KEVEL
PLATES, YTP
RAIL AND BASE
INSTALL KEVEL
PLATES, TYP
RAIL AND BASE
INSTALL KEVEL
TRANSITION
FENCING
HANDRAILING TO
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C O
N T
R A
C T
/T .O
N
O
P R
O J E
C T
C O
D E
M A
T O
C /I
D
IQ
C O
N T
R A
C T
N O
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
0 4' 8'2'
0 4' 8'2'
0 4' 8'2'
S T
A
.0
A
M J
S T
A
.0
A
E N
D O
F W
A L
L
S T
A
.7
A
L E
X
IS
T L
A D
D E
R
CS
T A
.0 A
L E
X
IS
T C
H E
C K
P O
S T
C S T
A
.0
A
E N
D O
F K
E V
E L
R A
IL
S T
A
.0
A
M J
S T
A
.0
A
M J
S T
A
.0
A
L E
X
IS
T C
H E
C K
P O
S T
CS
T
A
.0
A
M J
S T
A
.0
A
M J
S T
A
.3
A
L E
X
IS
T L
IG
H
T P
O L
E C
S T
A
.0
A
M J
S T
A
.0
A
L E
X
IS
T C
H E
C K
P O
S T
CS
T
A
.0
A
M J
S T
A
.0
A
M J
S T
A
.5
A
L E
X
IS
T W
A R
N
IN
G L
IG
FLOW
S T
A
.0
A
S
IG
N L
E X
IS
T
O U
T D
R A
F
C S
A
.0 A
L E
X
IS
T C
H E
C K
P O
S T
C
S T
A
.0
A
M J
S T
A
.0
A
L E
X
IS
T C
H E
C K
P O
S T
C
S T
A
.5
A
L E
X
IS
T C
H E
C K
P O
S T
C S T
A
.0
A
M
JS
T A
.0
A
M J
FLOW
FLOW
3 4 5
6 7 8
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NOT SHOWN ON THIS SHEET.
EXISTING FACILITIES WHICH ARE TO BE REMOVED AND REINSTALLED ARE 3.
WALKWAY PLANK GRATING WILL HAVE 1/2" GAP AT MONOLITH JOINTS.2.
FOR SIMILAR REPAIRS ANNOTATED BY THE LEGEND DESCRIPTION.
SECTION CUTS ARE NOT SHOWN AT EACH REPAIR AREA AND ARE TYPICAL 1.
GENERAL SHEET NOTES
NEW WALKWAY
HORIZONTAL RESURFACING
LEGEND
C S T
A
.5
A
L E
X
IS
T L
IG
H
T P
O L
E
HANDRAIL HANDRAIL
SUPPORT TYP
C WALKWAY L
SUPPORT TYP
C WALKWAY L
SUPPORT TYP
C WALKWAY L
S-512-D1 S-512-D14
TYP OF 9
S-512-D14
TYP OF 10
TYP OF 2
S-512-N1
S-512-A1
S-512-G1
TYP OF 8
SUPPORT TYP
C WALKWAY L
S-512-A15
SUPPORT TYP
C WALKWAY L
SUPPORT TYP
C WALKWAY L
S-511-G14
TYP
TYP
S-511-G14
S-301
L1
S-301
L11
S-301
F1
S-301
F11
S-301
A1
S-106
A1
S-105
E1
S-106
J1
S-106
J11
C K
I S
L A
N D
IL
L
IN
R O
C K
I S
L A
N D
D
IS
T R
T
U R
N E
R
M O
N O
L
IT
H S
-1
U P
S T
R E
A M
G U
ID
E
W A
L L
R E
P A
IR
S
P L
A N
S-102
C S
C H
U M
A C
H E
R
B
B O
Y D
S T
M
R P
R O
J
D B
O D
M E
R
LOCK18
W
E K
B
PLAN - MONOLITHS 15-17
E1
SCALE: 1/4"=1'-0"
PLAN - MONOLITHS 12-14
K1
SCALE: 1/4"=1'-0"
PLAN - MONOLITHS 9-11
TYP
REINSTALL HANDRAIL
TYP
REINSTALL HANDRAIL
TYP
REINSTALL HANDRAIL
EXISTING MONITORING WELL
EXISTING MONITORING WELL
TYP
MONUMENT
INSTALL SURVEY
TYP
MONUMENT
INSTALL SURVEY
TYP
MONUMENT
INSTALL SURVEY
NEW WALKWAY
A N
S I
D
S O
L
IC
IT
A
T
IO
N
K E
V E
L R
A
IL
R E
P L
A C
E M
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .