About this file

This is a set of engineering drawings and specifications for flood repair work at Bay Island Drainage and Levee District No. 1 in Mercer County, Illinois along the Mississippi River. The drawings detail repairs to twelve distinct areas located on the riverside slope and toe of the levee between River Miles 434 to 444.

The plan set includes cover sheets, legends, survey control points, site plans, staging areas, typical sections, and detailed cross sections for both base bid and option A repair areas. The repairs involve placing riprap, bedding stone, and pervious fill materials along damaged sections of the levee. Specific work includes shaping existing pervious fill, placing new pervious fill material, installing bedding stone and riprap protection layers of varying thicknesses (12"-36"), and key-in requirements at repair area boundaries. The drawings provide detailed elevation data, stationing information, and construction work limits for each repair area. Critical water elevation and survey control point data is included to guide construction activities. The project is being managed by the US Army Corps of Engineers Rock Island District with a planned issue date of September 2024.

View the file

Other files for this federal contract opportunity

Other files attached to INVITATION FOR BID - Mississippi River Basin, Bay Island Drainage and Levee District No. 1, Mercer County, Illinois, 2023 Event PL84-99 Flood Repairs, newest first.
File Type Posted
B01 - BID SUMMARY SHEET_24B0007 Bay Island PL84-99_signed.pdf PDF
W912EK24B0007 AMENDMENT 0007.pdf PDF
Mississippi River Basin Bay Island Drainage Site visit Sign In No. 2.pdf PDF
W912EK24B0007 AMENDMENT 0006.pdf PDF
Mississippi River Basin Bay Island Drainage PREBID Site visit Sign In.pdf PDF
W912EK24B0007 AMENDMENT 0005.pdf PDF
W912EK24B0007 AMENDMENT 0004.pdf PDF
W912EK24B0007 REVISED SPEC_AMND 0003 -2025-02-12.pdf PDF
W912EK24B0007 AMENDMENT 0003.pdf PDF
W912EK24B0007 - BAY ISLAND PL84-99 AMENDMENT 0002.pdf PDF
W912EK24B0007 - BAY ISLAND PL84-99 AMENDMENT 0001.pdf PDF
W912EK24B0007 - BAY ISLAND PL84-99 FINALPLAN SET.pdf PDF
W912EK24B0007 - BAY ISLAND PL84-99 FINAL SOLICITATION WITH SPECS.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

/0

W

E K

B

PROJECT LOCATION

2023 EVENT PL84-99 FLOOD REPAIRS

MERCER COUNTY, IL

BAY ISLAND DRAINAGE AND LEVEE DISTRICT NO 1

MISSISSIPPI RIVER BASIN

W912EK24B0007

ROCK ISLAND DISTRICT

H

E D

D L

E S

T E

C O

V E

R S

H E

E T

G-001

E J O

H N

S O

N

T

T A

E T

S

F E

B

M

N D

S H

E E

T R

E

IS

S U

D

B

B A

Y

IN

O

A M

C C

L A

N A

H

CROSS SECTIONS - REPAIR AREA 6B - STA 7+50 TO STA 11+15 - OPTION AC-338

CROSS SECTIONS - REPAIR AREA 6B - STA 0+00 TO STA 7+00 - OPTION AC-337

CROSS SECTIONS - REPAIR AREA 6A - STA 7+50 TO STA 8+30 - OPTION AC-336

CROSS SECTIONS - REPAIR AREA 6A - STA 0+00 TO STA 7+00 - OPTION AC-335

CROSS SECTIONS - REPAIR AREA 5D - STA 20+00 TO STA 23+00 - OPTION AC-334

CROSS SECTIONS - REPAIR AREA 5D - STA 0+00 TO STA 19+00 - OPTION AC-333

CROSS SECTIONS - REPAIR AREA 5C - STA 0+00 TO STA 6+00 - OPTION AC-332

CROSS SECTIONS - REPAIR AREA 5B - STA 20+00 TO STA 20+34 - OPTION AC-331

CROSS SECTIONS - REPAIR AREA 5B - STA 0+00 TO STA 19+00 - OPTION AC-330

CROSS SECTIONS - REPAIR AREA 5A - STA 20+00 TO STA 26+62 - OPTION AC-329

CROSS SECTIONS - REPAIR AREA 5A - STA 0+00 TO STA 19+00 - OPTION AC-328

CROSS SECTIONS - REPAIR AREA 7 - STA 8+00 TO STA 8+25 - BASE BIDC-327

CROSS SECTIONS - REPAIR AREA 7 - STA 4+00 TO STA 7+50 - BASE BIDC-326

CROSS SECTIONS - REPAIR AREA 7 - STA 0+00 TO STA 3+50 - BASE BIDC-325

CROSS SECTIONS - REPAIR AREA 4 - STA 40+00 TO STA 46+04 - BASE BIDC-324

CROSS SECTIONS - REPAIR AREA 4 - STA 25+00 TO STA 31+00 - BASE BIDC-323

CROSS SECTIONS - REPAIR AREA 4 - STA 25+00 TO STA 31+00 - BASE BIDC-322

CROSS SECTIONS - REPAIR AREA 4 - STA 19+00 TO STA 24+00 - BASE BIDC-321

CROSS SECTIONS - REPAIR AREA 4 - STA 13+00 TO STA 18+00 - BASE BIDC-320

CROSS SECTIONS - REPAIR AREA 4 - STA 7+00 TO STA 12+00 - BASE BIDC-319

CROSS SECTIONS - REPAIR AREA 4 - STA 0+00 TO STA 6+00 - BASE BIDC-318

CROSS SECTIONS - REPAIR AREA 3 - STA 8+00 TO STA 16+37 - BASE BIDC-317

CROSS SECTIONS - REPAIR AREA 3 - STA 4+00 TO STA 7+50 - BASE BIDC-316

CROSS SECTIONS - REPAIR AREA 3 - STA 0+00 TO STA 3+50 - BASE BIDC-315

CROSS SECTIONS - REPAIR AREA 2B - STA 24+00 TO STA 24+90 - BASE BIDC-314

CROSS SECTIONS - REPAIR AREA 2B - STA 16+00 TO STA 23+00 - BASE BIDC-313

CROSS SECTIONS - REPAIR AREA 2B - STA 8+00 TO STA 15+00 - BASE BIDC-312

CROSS SECTIONS - REPAIR AREA 2B - STA 0+00 TO STA 7+00 - BASE BIDC-311

CROSS SECTIONS - REPAIR AREA 2A - STA 8+00 TO STA 10+25 - BASE BIDC-310

CROSS SECTIONS - REPAIR AREA 2A - STA 4+00 TO STA 7+50 - BASE BIDC-309

CROSS SECTIONS - REPAIR AREA 2A - STA 0+00 TO STA 3+50 - BASE BIDC-308

CROSS SECTIONS - REPAIR AREA 1 - STA 9+00 TO STA 11+75 - BASE BIDC-307

CROSS SECTIONS - REPAIR AREA 1 - STA 5+00 TO STA 8+50 - BASE BIDC-306

CROSS SECTIONS - REPAIR AREA 1 - STA 0+00 TO STA 4+50 - BASE BIDC-305

TYPICAL SECTIONS - KEY-INC-304

TYPICAL SECTIONS - REPAIR AREAS 5 AND 6 - OPTION AC-303

TYPICAL SECTIONS - REPAIR AREAS 3, 4, AND 7 - BASE BIDC-302

TYPICAL SECTIONS - REPAIR AREAS 1, 2A, AND 2B - BASE BIDC-301

PLAN - REPAIR AREAS 6A AND 6B - OPTION AC-112

PLAN - REPAIR AREAS 5C AND 5D - OPTION AC-111

PLAN - REPAIR AREAS 5A AND 5B - OPTION AC-110

PLAN - REPAIR AREA 7 - BASE BIDC-109

PLAN - REPAIR AREA 4 - STA 32+00 TO STA 46+04 - BASE BIDC-108

PLAN - REPAIR AREA 4 - STA 0+00 TO STA 32+00 - BASE BIDC-107

PLAN - REPAIR AREA 3 - BASE BIDC-106

PLAN - REPAIR AREA 2B - BASE BIDC-105

PLAN - REPAIR AREAS 1 AND 2A - BASE BIDC-104

PLAN - BORROWC-103

PLAN - STAGINGC-102

SITE PLANC-101

PLAN - SURVEY CONTROLV-101

ABBREVIATIONSG-003

LEGEND AND GENERAL NOTESG-002

COVER SHEETG-001

DESCRIPTIONSHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

IS

APPROVAL RECOMMENDED BY:

DATE

DATE

DATE

DATE

DATE

GEOTECHNICAL BRANCHCHIEF,

DESIGN BRANCHCHIEF,

TECHNICAL SERVICES BRANCHCHIEF,

TECHNICAL LEAD

HYDROLOGY & HYDRAULICS BRANCHCHIEF,

APPROVED BY:

OF ALL DRAWINGS IN THIS SET.

SIGNATURES INDICATE OFFICIAL RECOMMENDATION

EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

DOCUMENTS WITHIN THE SCOPE OF THEIR

INDIVIDUALS APPEAR ON THESE PROJECT

SIGNATURES AND REGISTRATION DESIGNATIONS OF

DISTRICT CORPS OF ENGINEERS. THE INITIALS OR

THIS PROJECT WAS DESIGNED BY THE ROCK ISLAND

DATEENGINEERING & CONSTRUCTION DIVISIONCHIEF,

of Engineers

US Army Corps

S te a m b o a t

Is la n d

H R

E P

\B

S

T M

B T

I2

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-G

-0 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:3

:3

P

M

/1 /2

ISSUE DATE: SEPTEMBER 2024

CONTRACT NO:

SOLICITATION NO:

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

H

E D

D L

E S

T

L

G E

N D

A N

D G

E N

E R

A L

N O

T E

S

G-002

E J O

H N

S O

N

T

T A

E T

S

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

E K

B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B A

Y

IN

O

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-G

-0

.d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:1

A

M

/1

/2

GENERAL NOTES

ROCK PLACEMENT FOR AREAS 1, 3, AND 7 IS TO BE FROM THE WATER.20.

PLACE STRIPPED MATERIAL AT LANDSIDE LEVEE TOE.

MAX DEPTH OF 4 INCHES AND SHAPE TO A UNIFORM SLOPE AND GRADE.

STRIP ALL AREAS TO RECEIVE PERVIOUS FILL OR BEDDING STONE TO A 19.

CONTRACT DRAWING SET.

TAKE PRECEDENCE OVER OFFSET DISTANCES INDICATED IN THE

ELEVATIONS, AND SLOPES, ALONG WITH CONSTRUCTION TOLERANCES

OFFICER'S CONSIDERATION. THE DESIGN TEMPLATE, ALIGNMENTS,

EXISTING CONDITIONS SHOULD BE NOTED FOR THE CONTRACTING

DIFFERENCES IN THE APPLICATION OF THE DESIGN TEMPLATE AND

PROFILES, AND CROSS SECTIONS SHOULD BE REVIEWED AND ANY

CONDITIONS. DATA FROM THE PRELIMINARY SURVEY, DATA, PLANS,

DATA, AND OFFSETS DO NOT NECESSARILY REPRESENT CURRENT

18. GOVERNMENT PROVIDED SURVEY, ELEVATION DATA, EXISTING GROUND

AT CONTRACTOR'S REQUEST.

BE PROVIDED ELECTRONICALLY VIA CAD FILE UPON AWARD OF CONTRACT

17. CONSTRUCTION WORK LIMITS, CLEARING LIMITS, AND ALIGNMENTS WILL

SEEDING OF SAND LEVEE IS NOT REQUIRED.

THE WORK LIMITS OR STAGING AREAS IS PER THE SPECIFICATIONS.

SEEDING OF IDENTIFIED SEEDING AREAS AND DISTURBED AREAS WITHIN 16.

REQUIREMENTS AND ROUTE TO THE SITE.

CONTRACTING OFFICER. THE CONTRACTOR SHALL VERIFY ACCESS

WITH THE ROAD COMMISSIONERS, THE LEVEE DISTRICT, AND THE

15. THE CONTRACTOR SHALL COORDINATE ALL ROAD AND LEVEE ACCESS

TO PROJECT COMPLETION AT NO ADDITIONAL COST TO THE GOVERNMENT.

SHALL BE MINIMIZED AND REPAIRED TO PRE-PROJECT CONDITIONS PRIOR

14. DAMAGE TO THE LEVEE SYSTEM CAUSED BY CONSTRUCTION ACTIVITIES

GOVERNMENT.

ACTIVITIES TO PRE-PROJECT CONDITIONS AT NO ADDITIONAL COST TO THE

REPLACEMENT OF ANY ROADWAYS DAMAGED DUE TO PROJECT

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR

AS SPECIFIED.

POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE NPEDS PERMIT

12. THE CONTRACTOR SHALL PREPARE AND SUBMIT A STORM WATER

PERMITS PRIOR TO INITIATING CONSTRUCTION.

11. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL APPLICABLE

CONTOURS.

10. THE CONTRACTOR IS TO FIELD VERIFY THE INDICATED ELEVATIONS AND

SPECIFICATIONS SECTIONS 00 73 05 AND 02 21 00.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR SURVEYS AS SPECIFIED IN

REQUIREMENTS.

8. REFER TO SECTIONS 00 73 05 AND 01 57 19 FOR ENVIRONMENTAL

INFORMATION FOR THE MISSISSIPPI RIVER.

SEE SPECIFICATIONS SECTION 00 73 05 FOR HYDRAULICS DATA AND GAGE 7.

OFFICER PRIOR TO ANY WORK STARTING.

STAKED BY THE CONTRACTOR AND APPROVED BY THE CONTRACTING

THE LAYOUTS OF THE PROJECT FEATURES AS SHOWN SHALL BE FIELD 6.

CONSTRUCTION.

RESPONSIBLE FOR REPAIRING ANY UTILITIES DAMAGED DURING

AT THE STAGING AREAS PRIOR TO THE BEGINNING OF WORK AND SHALL BE

THE CONTRACTOR IS RESPONSIBLE FOR LOCATING UTILITIES ON SITE AND 5.

CONSTRUCTED. REMOVE RAMPS AS PART OF SITE RESTORATION.

TEMPORARY GRAVEL CONSTRUCTION RAMPS FOR LEVEE ACCESS MAY BE 4.

ADDITIONAL STAGING WITH THE CONTRACTING OFFICER.

PROJECT CONDITIONS. COORDINATE AGGREGATE PLACEMENT AND ANY

PLACED IS TO BE REMOVED WITH THE STAGING AREA RESTORED TO PRE-

AREAS BECOME SOFT, RUTTED, AND DIFFICULT TO USE . AGGREGATE

STAGING AREAS AT NO ADDITIONAL COST TO THE GOVERNMENT IF THE

GOVERNMENT. THE CONTRACTOR MAY PLACE AGGREGATE AT THE

ITEMS PRIOR TO FLOOD EVENTS AT NO ADDITIONAL COST TO THE

FOR PROTECTING OR REMOVING ANY STAGED EQUIPMENT OR OTHER

REMAIN WITHIN THE WORK LIMITS SHOWN. CONTRACTOR IS RESPONSIBLE

STAGING SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AND 3.

RIVERSIDE SLOPE AND TOE OF THE LEVEE.

REPAIRS CONSIST OF 12 DISTINCT REPAIR AREAS LOCATED ON THE 2.

18 OF THE MISSISSIPPI RIVER FROM RIVER MILES (RM) 434 TO 444.

THE PROJECT IS LOCATED IN MERCER COUNTY, ILLINOIS IN POOLS 17 AND 1.

LEGEND

XXX.XX

US HIGHWAY

STATE HIGHWAY

INTERSTATE HIGHWAY

WATER ELEVATION

RIVERMILE

FLOW ARROW

RIPRAP PATCHING

PERVIOUS FILL

BEDDING STONE

RIPRAP SECTION VIEW

CONTROL POINT

BORING LOCATION

NORTH INDICATOR

WINGDAM

RIPRAP PLAN VIEW

BREAKLINE

CLEARING LIMITS

CONSTRUCTION WORK LIMITS

CENTERLINE

EXISTING GROUND

N

FLOW

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/1

/2

E K

B

LOCK AND DAM 17

LEVEE CENTERLINE (TYP)

A1

SCALE: 1" = 2000'

PLAN - SURVEY CONTROL

24-274-100

24-297-40752

24-296-5222

24-290-3906

24-291-4399

24-274-105

24-274-101

BAY SITE 6 2024 REBAR W/ CAP 552.382054724.441643934.8724-297-40752

USACE L102552.972051844.511649467.6824-296-5222

CP BAY SITE 3A 2024553.392045273.971659844.3024-291-4399

CP BAY SITE 3C 2024552.282048161.041655541.7324-290-3906

CP BAY SITE2 2024553.652043939.911676222.7524-274-105

CP BAY SITE 1 2024554.052044071.411678345.3324-274-101

KRI 088 2013551.362064245.221650669.8424-274-100

DESCRIPTIONELEVATIONEASTINGNORTHINGPOINT

SURVEY CONTROL POINTS

M

R

IC

H M

O

U

R V

E Y

C O

N T

R O

L

P L

A N

V-101

E

S E

L F

E

M

R

IC

H M

O N

D

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

M

R

IC

H M

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

M

IS

S

IS

S

IP

P I R

IV

E R

30TH ST

27TH ST

20TH ST

T

H A

V E

25TH ST

L /D

R D

SWAN LAKE RD

15TH ST

RM 434

RM 435

RM 436

RM 437

RM 438

RM 439

RM 444

RM 443

RM 442

RM 441

RM 440

L/D RD

T

H A

V E

B A

Y I

S L

A N

D R

O A

D

DRAINAGE AND LEVEE DISTRICT NO 1

BAY ISLAND

F

LO

W

RM 446

RM 445

30TH ST

T

H A

V E

T

H A

V E

T

H A

V E

ELIZA CREEK

FLOW

IO

W

A R

IV

E R

F L O

W

0 4000'2000'

TO CONVERT FROM NAVD88 TO MSL 1912 ADD 0.70'3.

VERTICAL: NAVD88 GEOID 18

HORIZONTAL: NAD83(2011), IL WEST, US SURVEY FEET

PROJECT DATUM:2.

FIELD WORK COMPLETED OCTOBER 21, 2024 (FC-24-1)1.

GENERAL SHEET NOTES

NORTH

PLAN

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-1 .d g n

D S

P

D

A E

C p d f.

p lt c fg

:3

:1

P

M

/7 /2

M

IS

S

IS

S

IP

P I R

IV

E R

30TH ST

27TH ST

20TH ST

SWAN LAKE RD

15TH ST

RM 434

RM 435

RM 436

RM 437

RM 438

RM 439

RM 444

RM 443

RM 442

RM 441

RM 440

RM 433

L/D RD

T

H A

V E

B A

Y I

S L

A N

D R

O A

D

LOCK AND DAM 17

DRAINAGE AND LEVEE DISTRICT NO 1

BAY ISLAND

BOSTON

NEW

F

LO

W

SEE SHEET C-104

BASE BID

REPAIR AREA 1

SEE SHEET C-105

BASE BID

REPAIR AREA 2B

SEE SHEET C-107

BASE BID

REPAIR AREA 4

SEE SHEET C-106

BASE BID

REPAIR AREA 3

SEE SHEET C-112

OPTION A

REPAIR AREA 6A

SEE SHEET C-102

STAGING AREA

FRIEDEN

SEE SHEET C-104

BASE BID

REPAIR AREA 2A

SEE SHEET C-112

OPTION A

REPAIR AREA 6B

SEE SHEET C-111

OPTION A

REPAIR AREA 5D

SEE SHEET C-110

OPTION A

REPAIR AREA 5A

SEE SHEET C-110

OPTION A

REPAIR AREA 5B

SEE SHEET C-111

OPTION A

REPAIR AREA 5C

RM 445

T

H A

V E

T

H A

V E

LEVEE CENTERLINE (TYP)

SEE SHEET C-102

STAGING AREA

LOCK AND DAM

ELIZA CREEK

FLOW

A1

SCALE: 1" = 2000'

SITE PLAN

0 4000'2000'

SEE SHEET C-109

BASE BID

REPAIR AREA 7

NORTH

PLAN

A H

E D

D L

E S

T

IT

E P

L A

N

C-101

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

J1

SCALE: 1" = 1000'

PLAN - REPAIR AREAS 1 AND 7 ACCESS ROUTE

15TH ST

T

H A

V E

ACCESS ROUTE (TYP)

ACCESS ROUTE

REPAIR AREA 7

REPAIR AREA 1

0 2000'1000'

G17

SCALE: 1" = 800'

4 ACCESS ROUTE

PLAN - REPAIR AREAS 2, 3, AND

ACCESS TO REPAIR AREAS 2 AND 3

ACCESS TO REPAIR AREA 4

LOCK AND DAM 17

L/D RD

T

H A

V E

VIA BAY ISLAND RD

AREAS 5D AND 6B

ACCESS TO REPAIR

VIA PRIVATE ROAD

AREAS 5A, 5B, 5C, AND 6A

ACCESS TO REPAIR

REPAIR AREA 5C

B A Y

IS

LA

N

D R

O A D

L17

SCALE: 1" = 400'

4 ACCESS ROUTE

PLAN - REPAIR AREAS 2, 3, AND

800'0 400'

0 800' 1600'

FL

OWELI

ZA

CREEK

C-101

J1

C-101

G17

C-101

L17

,0

,9

.9

E ,6

,2

.7

.1

S

P

E8 .0

S

T

.2

S

T2 ,0

,9

.1

E ,6

,4

.2

L D S

T A

.0

S

B

P O

B

S T

A

.0

N

L D S

T A

N ,6

,7

.7

E ,0

,3

.2

P O

E

S T A

.0

N ,6

,2

.9

E ,0

,1

.3

P O

T

S T

A

.2

P O

T

S T

A

.5

P O

T

S T

A

.1

P O

T

S T

A

.6

P O

T

S T

A

.4

P

O T

S T A

.0

P O

T

S T A

.4

P O

TS

T A

.0

P O

T

S T A

.7

P O

T

S T A

.5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-1 .d g n

D S

P

D

A E

C p d f.

p lt c fg

:5

:0

P

M

/7 /2

H1

SCALE: 1' = 50'

PLAN - REPAIR AREA 2A - BASE BID

50' 100'0

AND PLACE PERVIOUS FILL

SHAPE EXISTING PERVIOUS FILL

LEVEE CENTERLINE

LEVEE CENTERLINE

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 4.

OUTSIDE OF IDENTIFIED CLEARING LIMITS.

CLEAR AND GRUB TREES WITHIN LIMITS SHOWN. DO NOT DISTURB TREES 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

FLOW

FLOW

MISSISSIPPI RIVER

MISSISSIPPI RIVER

CONSTRUCTION WORK LIMITS

CONSTRUCTION WORK LIMITS

CLEARING LIMITSPLACE RIPRAP AND BEDDING

A1

SCALE: 1" = 50'

PLAN - REPAIR AREA 1 - BASE BID

NORTH

PLAN

50' 100'0

PLACE AND SHAPE PERVIOUS FILLPLACE AND SHAPE PERVIOUS FILL

NORTH

PLAN

EXISTING RIPRAP

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A S

A

N D

A

P L

A N

C-104

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

C-301

A11

C-304

L1

C-301

A1

C-304

A1

C-301

E1

C-301

K1

C-301

A1

C-304

A1

C-304

L1

P O

E

S T

A

.3

N ,6

,4

.8

E ,0

,1

.1

P O

T

S T

A

.2

P O

T

S T

A

.1

P O

B

S T

A

.0

N

L D S

T A

N ,6

,6

.3

E ,0

,9

.1

P O

T

S T

A

.4

P O

T

S T

A

.8

P O

T

S T

A

.0

P O

T

S T

A

.8

P O

T

S T

A

.2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-1 .d g n

D S

P

D

A E

C p d f.

p lt c fg

:0

:1

P

M

/7 /2

A1

SCALE: 1' = 50'

PLAN - REPAIR AREA 2B - STA 0+00 TO STA 12+00 - BASE BID

50' 100'0

H1

SCALE: 1' = 50'

PLAN - REPAIR AREA 2B - STA 12+00 TO STA 24+90 - BASE BID

50' 100'0

LEVEE CENTERLINE

LEVEE CENTERLINE PLACE AND SHAPE PERVIOUS FILL

PLACE AND SHAPE PERVIOUS FILL

FLOW

FLOW

MISSISSIPPI RIVER

MISSISSIPPI RIVER

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

CONSTRUCTION WORK LIMITS

CONSTRUCTION WORK LIMITS

M A T

C H L

IN

E H

/C -1

M A

T C

H L

IN

E A

/C -1

NORTH

PLAN

NORTH

PLAN

PLACE AND SHAPE PERVIOUS FILL

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

B

P L

A N

C-105

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

C-301

C-301

A11

C-301

A11 C-301

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

A1

SCALE: 1' = 50'

PLAN - REPAIR AREA 3 - STA 0+00 TO STA 13+00 - BASE BID

PLACE RIPRAP AND BEDDING

LEVEE CENTERLINE

CONSTRUCTION WORK LIMITS

H1

SCALE: 1" = 50'

PLAN - REPAIR AREA 3 - STA 13+00 TO STA 16+37 - BASE BID

LEVEE CENTERLINE

PLACE AND SHAPE PERVIOUS FILL

CONSTRUCTION WORK LIMITS

PLACE RIPRAP

EXISTING RIPRAP

PLACE AND SHAPE PERVIOUS FILL

CLEARING LIMITS

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

P L

A N

C-106

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

EXISTING RIPRAP

FOR RIPRAP PLACEMENT WITH THE COR

IDENTIFY AREAS WITHIN THIS BOUNDARY

,0

,9

.0

E ,6

,8

.4

L D S

T A

.0

S

B

.9

S

T

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

,0

,6

.3

E ,6

,4

.5

.1

S

E

S te a m b o a t

Is la n d

H

R E

P

\B

S

T M

B T

I2

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-1

.d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:4

P

M

/1 /2

50' 100'0

FLOW

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 4.

OUTSIDE OF IDENTIFIED CLEARING LIMITS.

CLEAR AND GRUB TREES WITHIN LIMITS SHOWN. DO NOT DISTURB TREES 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

MISSISSIPPI RIVER

M A

T C

H L

IN

E H

/C -1

NORTH

PLAN

NORTH

PLAN

M A

T C

H L

IN

E H

/C -1

50' 100'0

C-302

A1

C-302

E1

C-304

A1

C-302

K1

C-302

K1

C-304

L1

,0

,7

.4

E

,6

,0

.6

L D

S T

A

.0

S

B

.8

S

T

.9

S

T

.2

S

T

.3

S

T

.8

S

T

.3

S

T

.3

S

T 2 .1

S

T 3 .8

S

T

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-1 .d g n

D S

P

D

A E

C p d f.

p lt c fg

:4

:4

P

M

/7 /2

A1

SCALE: 1' = 60'

PLAN - REPAIR AREA 4 - STA 0+00 TO STA 16+00 - BASE BID

H1

SCALE: 1' = 60'

PLAN - REPAIR AREA 4 - STA 16+00 TO STA 32+00 - BASE BID

60' 120'0

60' 120'0

LEVEE CENTERLINE

PLACE RIPRAP AND BEDDING

PLACE RIPRAP AND BEDDINGLEVEE CENTERLINE

FLOW

FLOW

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 4.

OUTSIDE OF IDENTIFIED CLEARING LIMITS.

CLEAR AND GRUB TREES WITHIN LIMITS SHOWN. DO NOT DISTURB TREES 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

MISSISSIPPI RIVER

MISSISSIPPI RIVER

M A

T C

H L

IN

E H

/C -1

M A

T C

H L

IN

E A

/C -1

CONSTRUCTION WORK LIMITS

CONSTRUCTION WORK LIMITS

CLEARING LIMITS

CLEARING LIMITS

NORTH

PLAN

M A

T C

H L

IN

E A

/C -1

NORTH

PLAN

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

S

T A

T O

S T

A

P L

A N

C-107

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

C-302

C-302

A11

C-304

L1

C-304

,0

,7

.8

E ,6

,9

.1

.0

S

E

.6

S

T

.6

S

T

.7

S

T

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-1 .d g n

D S

P

D

A E

C p d f.

p lt c fg

:4

:1

P

M

/7 /2

A1

SCALE: 1' = 60'

PLAN - REPAIR AREA 4 - STA 32+00 TO STA 46+04 - BASE BID

60' 120'0

LEVEE CENTERLINE

PLACE RIPRAP AND BEDDING

FLOW

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 4.

OUTSIDE OF IDENTIFIED CLEARING LIMITS.

CLEAR AND GRUB TREES WITHIN LIMITS SHOWN. DO NOT DISTURB TREES 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

MISSISSIPPI RIVER

M A T

C H L

IN

E H

/C -1

CONSTRUCTION WORK LIMITS

CLEARING LIMITS

NORTH

PLAN

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

S

T A

T

O S

T A

P L

A N

C-108

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

C-302

C-304

L1

C-304

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

LEVEE CENTERLINE

PLACE BEDDING AND RIPRAP

CONSTRUCTION WORK LIMITS

A1

SCALE: 1" = 40'

PLAN - REPAIR AREA 7 - BASE BID

AND PLACE PERVIOUS FILL

SHAPE EXISTING PERVIOUS FILL

CLEARING LIMITS

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

P L

A N

C-109

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

P O

B

S T

A

.0

N L

D S

T A

N ,6

,1

.2

E ,0

,1

.3

P O

E

S T

A

.4

N ,6

,3

.5

E ,0

,0

.5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-1 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:5

:1

A

M

/1

/2

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 4.

OUTSIDE OF IDENTIFIED CLEARING LIMITS.

CLEAR AND GRUB TREES WITHIN LIMITS SHOWN. DO NOT DISTURB TREES 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

NORTH

PLAN

40' 80'0

C-302

E11

C-304

L1

C-304

L1

C-304

A1

C-304

22+00

23+00

24+00

25+00

26+00

,0

,3

.6

E ,6

,4

.4

L D S

T A

.0

S

B

2,061,416.73 E

1,647,745.69 N

26+62.35 STA

POE

.4

S

T 1 .3

S

T

.5

S

T

.6

S

T

.4

S

T

.7

S

T

.5

S

T 1 .8

S

T

.8

S

T

.2

S

T 2 .3

S

T

.9

S

T

21+61.89

S

TA P

O T

22+02.16

STA

POT

22+98.39

STA

POT

24+32.92

STA

POT

25+54.53 STA

POT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

,0

,6

.4

E ,6

,0

.5

L D S

T A

.0

S

B

,0 ,0 .3

,6 ,7 .4

L D S

T A

.0

S

B

,0 ,3 .5

E ,6 ,8 .1

.9

S

E

.4

S

T

.4

S

T

.3

S

T .9

S

T

.4

S

T

.0

S

T 1 .4

S

T

.3

S

T 1 .4

S

T

.6

TA

T

.2

S

T

.0

S

T

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B A

Y

IN

O

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-1

.d g n

D S

P

D

A E

C p d f.

p lt c fg

:0

:1

P

M

/7 /2

PLACE AND SHAPE PERVIOUS FILL

LEVEE CENTERLINE

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

CONSTRUCTION WORK LIMITS

A1

SCALE: 1" = 100'

PLAN - REPAIR AREA 5A - OPTION A

H1

SCALE: 1" = 100'

PLAN - REPAIR AREA 5B - OPTION A

100' 200'0

NORTH

PLAN

NORTH

PLAN

100' 200'0

PLACE AND SHAPE PERVIOUS FILL

PLACE AND SHAPE PERVIOUS FILL

PLACE AND SHAPE PERVIOUS FILL

PLACE AND SHAPE PERVIOUS FILL

LEVEE CENTERLINE

A H

E D

D L

E S

T E

N

O P

T

IO

N A

R E

P A

IR

A

R E

A S

A

A N

D

B

P L

A N

C-110

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

ELIZA CREEK

FL

OWELI

ZA

CREEK

CONSTRUCTION WORK LIMITS

C-303

A1

C-303

A1

C-303

A1

C-303

A1

C-303

A1

C-303

A1

C-303

A1

C-303

A1

C-303

,0 ,6 .4

,0 .5

L D S

T A

.0

S

B

,0

,6

.1

E ,6

,6

.0

.0

S

E0 .5

S

T

.3

S

T

.2

S

T

.6

S

T 4 .5

S

T

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

,0

,2

.4

E ,6

,2

.9

L D S

T A

.0

S

B 2 ,0

,8

.1

E ,6

,5

.7

.0

S

E

.1

S

T

.9

S

T 2 .2

S

T

A N

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

S p e c if ic W o rk

\B

B A

Y

IN

O

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-1

.d g n

D S

P

D

A E

C p d f.

p lt c fg

:0

:0

P

M

/7 /2

LEVEE CENTERLINE

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

CONSTRUCTION WORK LIMITS

A1

SCALE: 1" = 40'

PLAN - REPAIR AREA 5C - OPTION A

H1

SCALE: 1" = 100'

PLAN - REPAIR AREA 5D - OPTION A

40' 80'0

NORTH

PLAN

NORTH

PLAN

100' 200'0

PLACE AND SHAPE PERVIOUS FILL

PLACE AND SHAPE PERVIOUS FILL

PLACE AND SHAPE PERVIOUS FILL

LEVEE CENTERLINE

CONSTRUCTION WORK LIMITS

A H

E D

D L

E S

T E

N

O P

T

IO

N A

R E

P A

IR

A

R E

A S

C

A N

D

D

P L

A N

C-111

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

ELIZA CREEK

FLOW

ELIZA CREEK

C-303

A1

C-303

A1

C-303

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

SCALE: 1' = 50'

PLAN - REPAIR AREA 6A - OPTION A

LEVEE CENTERLINE

LEVEE CENTERLINE

BEDDING, AND RIPRAP

PLACE PERVIOUS FILL,

BEDDING, AND RIPRAP

PLACE PERVIOUS FILL,

CONSTRUCTION WORK LIMITS

CONSTRUCTION WORK LIMITS

H1

SCALE: 1" = 50'

PLAN - REPAIR AREA 6B - OPTION A

A H

E D

D L

E S

T E

N

O P

T

IO

N A

R E

P A

IR

A

R E

A S

A

A N

D

B

P L

A N

C-112

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

0 7

,0

,7

.6

E ,6

,0

.1

L D S

T A

.0

S

B

,0

,2

.9

,6

.4

.3

S

E

.0

S

T

.1

S

T

.3

S

T 3 .0

S

T

.8

S

T

.0

S

T

.1

S

T

,0

,5

.2

E ,6

,7

.1

L D S

T A

.0

S

B

,0

,2

.7

,8

.5

.9

S

E

.9

S

T 5 .8

S

T

.0

S

T

.6

S

T

.7

S

T

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B A

Y

IN

O

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-1

.d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:5

:3

A

M

/1

/2

50' 100'0

50' 100'0

FLOW

FLOW

SPECIFICATIONS.

BRANCHES, AND TRASH. DISPOSE OF DEBRIS ACCORDING TO

MATERIALS. DEBRIS GENERALLY CONSISTS OF DRIFTWOOD, DOWNED TREES,

FROM BEDDING STONE AND RIPRAP PLACEMENT PRIOR TO PLACING

REMOVE DEBRIS FROM PERVIOUS FILL PLACEMENT AND SHAPING AREA AND 3.

RESTORED TO PRE-PROJECT CONDITIONS AT THE CONTRACTORS EXPENSE.

ANY DAMAGE TO EXISTING ROADWAYS AND LEVEE ACCESS RAMPS SHALL BE 2.

FOR REPAIRS ONLY.

CONTRACT STATIONING DOES NOT MATCH THE NLD AND SHOULD BE USED

LEVEE CENTERLINE IS BASED ON THE NATIONAL LEVEE DATABASE (NLD). THE 1.

GENERAL SHEET NOTES

ELIZA CREEK

ELIZA CREEK

NORTH

PLAN

NORTH

PLAN

C-303

A11

C-303

A11

C-304

G1

C-304

G1

C-304

A1

C-304

A1

C-304

A1

C-304

A1

C-304

G1

C-304

G1

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

SCALE: 1" = 15'

TYPICAL SECTION - REPAIR AREA 1 - STA 0+00 TO STA 4+00 AND STA 9+00 TO STA 11+75 - BASE BID

E1

SCALE: 1" = 15'

TYPICAL SECTION - REPAIR AREA 1 - STA 4+50 TO STA 6+00 - BASE BID

K1

SCALE: 1" = 15'

TYPICAL SECTION - REPAIR AREA 1 - STA 6+50 TO STA 8+50 - BASE BID

A11

SCALE: 1" = 20'

TYPICAL SECTION - REPAIR AREAS 2A AND 2B - BASE BID

PERVIOUS FILL MATERIAL

PLACE AND SHAPE

PERVIOUS FILL MATERIAL

PLACE AND SHAPE

OVER MIN 6" BEDDING STONE

PLACE 24" ILDOT RR4 RIPRAP

PLACE MIN 24" ILDOT RR4 RIPRAP

2H:1V

EXISTING GROUND

PERVIOUS FILL MATERIAL

PLACE AND SHAPE

10'

10'

10'

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A S

A

A

N D

B

T Y

P

IC

A L

S E

C T

IO

N

S

C-301

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

IN3

2H:1V

M

IN3

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A

EXISTING RIPRAP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:0

:3

A

M

/1

/2

ADJACENT TO WORK AREA.

SPREAD MATERIAL EXCAVATED FOR KEY-INS ON LANDSIDE LEVEE TOE 9.

DAILY STAGE DATA.

EXCEEDANCE DURATION ELEVATION. REFER TO RIVERGAGES.COM FOR

THE MEDIAN ANNUAL WATER LEVEL, WHICH IS THE 50% ANNUAL

WATER ELEVATION SHOWN FOR THE MISSISSIPPI RIVER CORRESPONDS TO 8.

RIPRAP PLACEMENT TO BE FROM THE WATER.7.

OVER EXISTING RIPRAP.

FIELD VERIFY EXTENT OF EXISTING RIPRAP. DO NOT PLACE BEDDING STONE 6.

ADJACENT TO THE REPAIR AREA.

STONE. SPREAD STRIPPED MATERIAL ON THE LANDSIDE LEVEE TOE

STRIP EXISTING VEGETATION PRIOR TO PLACING PERVIOUS FILL OR BEDDING 5.

SPECIFICATIONS.

DISPOSE OF CLEARED AND GRUBBED MATERIAL IN ACCORDANCE WITH

CLEAR AND GRUB TREES WITHIN LIMITS IDENTIFIED PRIOR TO STRIPPING. 4.

ACCORDANCE WITH FEDERAL, STATE, AND LOCAL LAWS.

SHOWN. DEBRIS SHALL BE PROPERLY DISPOSED OF OFF SITE IN

THE CONTRACTOR SHALL REMOVE DEBRIS WITHIN THE WORK LIMITS AS 3.

TO THE LINES AND GRADES SHOWN.

PLACE RIPRAP AND BEDDING STONE IN ACCORDANCE WITH SPECIFICATIONS 2.

REFER TO SPECIFICATIONS FOR MATERIAL REQUIREMENTS.1.

GENERAL NOTES

15' 30'0 20' 40'0

15' 30'0

15' 30'0

EL VARIES

EL 543.0

EL VARIES

EL 543.0

EL VARIES

EL VARIES

EL VARIES

EL VARIES

EL VARIES

EL VARIES

RIVERSIDE

RIVERSIDE

RIVERSIDE

RIVERSIDE

536.51

536.51

535.64

536.51

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

SCALE: 1" = 15'

TYPICAL SECTION - REPAIR AREA 3 - STA 0+00 TO STA 6+50 - BASE BID

E1

SCALE: 1" = 15'

TYPICAL SECTION - REPAIR AREA 3 - STA 7+00 TO STA 9+00 - BASE BID

E11

SCALE: 1" = 15'

TYPICAL SECTION - REPAIR AREA 7 - BASE BID

K1

SCALE: 1" = 10'

TYPICAL SECTION - REPAIR AREA 3 - STA 9+50 TO STA 16+37 - BASE BID

A11

SCALE: 1" = 10'

TYPICAL SECTION - REPAIR AREA 4 - BASE BID

10'

EXISTING GROUND

EXISTING GROUND

EXISTING GROUND

PERVIOUS FILL MATERIAL

PLACE AND SHAPE

10'

RIPRAP BELOW EL 535.4

PLACE MIN 36" ILDOT RR5

2H:1V

EXISTING GROUND

SHAPE WITH PERVIOUS FILL.

SLOPE AND GRADE. FILL AND

STRIP AND SHAPE TO A UNIFORM

OVER 6" BEDDING STONE

PLACE 24" ILDOT RR4 RIPRAP

10'

VARIES

10'

PERVIOUS FILL MATERIAL

PLACE AND SHAPE

EXISTING GROUND

OVER MIN 6" BEDDING STONE

PLACE 24" ILDOT RR4 RIPRAP

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A S

A N

D

T Y

P

IC

A L

S E

C T

IO

N

S

C-302

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

IN3

VARIES

2H:1V

M

IN3

2H:1V

M

IN3

2H:1V

M

IN3

PLACE ILDOT RR5 RIPRAPFOR RIPRAP PLACEMENT WITH THE COR

IDENTIFY AREAS WITHIN THIS BOUNDARY

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A

EXISTING RIPRAP

OVER 6" BEDDING STONE ABOVE EL 535.4

PLACE MIN 24" ILDOT RR5 RIPRAP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:0

:1

A

M

/1 /2

ADJACENT TO WORK AREA.

SPREAD MATERIAL EXCAVATED FOR KEY-INS ON LANDSIDE LEVEE TOE 10.

DAILY STAGE DATA.

EXCEEDANCE DURATION ELEVATION. REFER TO RIVERGAGES.COM FOR

THE MEDIAN ANNUAL WATER LEVEL, WHICH IS THE 50% ANNUAL

WATER ELEVATION SHOWN FOR THE MISSISSIPPI RIVER CORRESPONDS TO 9.

RIPRAP PLACEMENT TO BE FROM THE WATER.8.

SMOOTHLY BLEND NEW RIPRAP INTO ADJACENT EXISTING RIPRAP.7.

OVER EXISTING RIPRAP.

FIELD VERIFY EXTENT OF EXISTING RIPRAP. DO NOT PLACE BEDDING STONE 6.

ADJACENT TO THE REPAIR AREA.

STONE. SPREAD STRIPPED MATERIAL ON THE LANDSIDE LEVEE TOE

STRIP EXISTING VEGETATION PRIOR TO PLACING PERVIOUS FILL OR BEDDING 5.

CLEAR AND GRUB TREES WITHIN LIMITS IDENTIFIED PRIOR TO STRIPPING.4.

ACCORDANCE WITH FEDERAL, STATE, AND LOCAL LAWS.

SHOWN. DEBRIS SHALL BE PROPERLY DISPOSED OF OFF SITE IN

THE CONTRACTOR SHALL REMOVE DEBRIS WITHIN THE WORK LIMITS AS 3.

TO THE LINES AND GRADES SHOWN.

PLACE RIPRAP AND BEDDING STONE IN ACCORDANCE WITH SPECIFICATIONS 2.

REFER TO SPECIFICATIONS FOR MATERIAL REQUIREMENTS.1.

GENERAL NOTES

15' 30'0

15' 30'0 10' 20'0

15' 30'0

10' 20'0

EL 520.0

EL 543.3

EL 520.0

EL 552.60

EL VARIES

RIVERSIDE

RIVERSIDE

RIVERSIDE

EL 551.8

EL VARIES

RIVERSIDE

RIVERSIDE

EL 552.5

EL 544.0

535.40

533.13

535.40

535.40

536.51

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

SCALE: 1" = 10'

TYPICAL SECTION - REPAIR AREAS 5A, 5B, 5C, AND 5D - OPTION A

A11

SCALE: 1" = 10'

TYPICAL SECTION - REPAIR AREAS 6A AND 6B - OPTION A

EXISTING GROUND

EXISTING GROUND

PERVIOUS FILL

PLACE AND SHAPE

SHAPE WITH PERVIOUS FILL

SLOPE AND GRADE. FILL AND

STRIP AND SHAPE TO A UNIFORM

PLACE 6" BEDDING STONE

PLACE 12" ILDOT RR3 RIPRAP

A H

E D

D L

E S

T E

N

O P

T

IO

N A

R E

P A

IR

A

R E

A S

A

N D

T Y

P

IC

A L

S E

C T

IO

N

S

C-303

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

UNIFORM SLOPE AND GRADE

STRIP AND SHAPE TO A RIPRAP FOR 3' AT TIE IN

PLACE 24" ILDOT RR3

3'

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S te a m b o a t

Is la n d

H

R E

P

\B

S

T M

B T

I2

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-3

.d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:1

:2

A M

/1

/2

ADJACENT TO WORK AREA.

SPREAD MATERIAL EXCAVATED FOR KEY-INS ON LANDSIDE LEVEE TOE 9.

DAILY STAGE DATA.

EXCEEDANCE DURATION ELEVATION. REFER TO RIVERGAGES.COM FOR

THE MEDIAN ANNUAL WATER LEVEL, WHICH IS THE 50% ANNUAL

WATER ELEVATION SHOWN FOR THE MISSISSIPPI RIVER CORRESPONDS TO 8.

MAXIMIZE RIPRAP PLACEMENT FROM THE WATER.7.

ADJACENT TO THE REPAIR AREA.

STONE. SPREAD STRIPPED MATERIAL ON THE LANDSIDE LEVEE TOE

STRIP EXISTING VEGETATION PRIOR TO PLACING PERVIOUS FILL OR BEDDING 6.

CLEAR AND GRUB TREES WITHIN LIMITS IDENTIFIED PRIOR TO STRIPPING.5.

ACCORDANCE WITH FEDERAL, STATE, AND LOCAL LAWS.

SHOWN. DEBRIS SHALL BE PROPERLY DISPOSED OF OFF SITE IN

THE CONTRACTOR SHALL REMOVE DEBRIS WITHIN THE WORK LIMITS AS 4.

GRADES SHOWN IN ACCORDANCE WITH SPECIFICATIONS.

SHAPE EXISTING SAND LEVEE AND PLACE PERVIOUS FILL TO THE LINES AND 3.

TO THE LINES AND GRADES SHOWN.

PLACE RIPRAP AND BEDDING STONE IN ACCORDANCE WITH SPECIFICATIONS 2.

REFER TO SPECIFICATIONS FOR MATERIAL REQUIREMENTS.1.

GENERAL NOTES

EL VARIES

EL VARIES

EL 551.4

EL VARIES

10' 20'0 10' 20'0

RIVERSIDE RIVERSIDE

532.82 532.82

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

H

E D

D L

E S

T

K

Y -I

N

T Y

P

IC

A L

S E

C T

IO

N

S

C-304

E J O

H N

S O

N

T

T A

E

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

E K

B

EXISTING GROUND

10'

PLACE 6" CA 5 BEDDING STONE

PLACE 24" RIPRAP

BEGIN KEY-IN AT POB/POE

L1

SCALE: 1" = 5'

TYPICAL SECTION - RR4 AND RR5 KEY-IN

G1

SCALE: 1" = 5'

TYPICAL SECTION - RR3 KEY-IN

A1

SCALE: 1" = 5'

TYPICAL SECTION - KEY-IN

EXISTING GROUND 5'

PLACE 6" CA 11 BEDDING STONE

PLACE 12" RIPRAP

BEGIN KEY-IN AT POB/POE

EL VARIES

EXISTING GROUND

PLACE 6" CA 11 BEDDING STONE

BEGIN KEY-IN AT POB/POE

SEE G1/C-304 AND L1/C-304

THICKNESS VARIES

10'

TOE TOP ELEVATION

MATCH ADJACENT WEIGHTED

EL VARIES

BELOW TOP OF WEIGHTED TOE

END KEY-IN EMBEDMENT 24"

F E

B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:0

:4

A

M

/1

/2

ADJACENT TO WORK AREA.

SPREAD MATERIAL EXCAVATED FOR KEY-INS ON LANDSIDE LEVEE TOE 7.

ELEVATIONS AT EACH REPAIR AREA.

DAILY STAGE DATA. REFER TO SHEETS C-301 TO C-303 FOR WATER

EXCEEDANCE DURATION ELEVATION. REFER TO RIVERGAGES.COM FOR

THE MEDIAN ANNUAL WATER LEVEL, WHICH IS THE 50% ANNUAL

WATER ELEVATION SHOWN FOR THE MISSISSIPPI RIVER CORRESPONDS TO 6.

REPAIR AREA.

STRIPPED MATERIAL ON THE LANDSIDE LEVEE TOE ADJACENT TO THE

STRIP EXISTING VEGETATION PRIOR TO PLACING BEDDING STONE. SPREAD 5.

CLEAR AND GRUB TREES WITHIN LIMITS IDENTIFIED PRIOR TO STRIPPING.4.

ACCORDANCE WITH FEDERAL, STATE, AND LOCAL LAWS.

SHOWN. DEBRIS SHALL BE PROPERLY DISPOSED OF OFF SITE IN

THE CONTRACTOR SHALL REMOVE DEBRIS WITHIN THE WORK LIMITS AS 3.

TO THE LINES AND GRADES SHOWN.

PLACE RIPRAP AND BEDDING STONE IN ACCORDANCE WITH SPECIFICATIONS 2.

REFER TO SPECIFICATIONS FOR MATERIAL REQUIREMENTS.1.

GENERAL NOTES

RIVERSIDE

1 4

0 5' 10'

0 5' 10'

0 5' 10'

VARIES

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2A - STA 0+00 TO STA 3+50 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

A

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-308

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

0+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.7

(5

.9

.3

(5

.3

0+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.9

(5

.6

.6

(5

.6

1+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.9

(5

.6

.4

(5

.8

1+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.5

(5

.7

.7

(5

.1

2+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.4

(5

.7

.2

(5

.4

2+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.7

.1

(5

.9

3+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.7

(5

.5

.4

(5

.7

3+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.3

.3

(5

.6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:3

:0

A

M

/1 /2

10' 20'0

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2A - STA 4+00 TO STA 7+50 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

A

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-309

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

4+00

540 540

550 550

.2

(5

.7

.5

(5

.2

4+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.6

(5

.3

.3

(5

.1

5+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.5

(5

.4

.6

(5

.0

5+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.4

(5

.7

.4

(5

.6

6+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.5

.5

(5

.1

6+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.1

(5

.5

.7

(5

.6

7+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.6

.3

(5

.3

7+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.1

(5

.9

.2

(5

.6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:5

A

M

/1 /2

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2A - STA 8+00 TO STA 10+25 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

A

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-310

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

8+00

540 540

550 550

.5

(5

.1

.9

(5

.3

8+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.8

(5

.4

.5

(5

.3

9+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.0

(5

.1

.4

(5

.8

9+50

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.6

(5

.7

.8

(5

.6

10+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.9

(5

.7

.0

(5

.3

10+25

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.9

.7

(5

.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:1

A

M

/1

/2

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2B - STA 0+00 TO STA 7+00 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

B

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-311

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

540 540

550 550

.2

(5

.3

.5

(5

.0

1+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.0

(5

.0

.2

(5

.7

2+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.7

(5

.6

.3

(5

.2

3+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

4+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

5+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

6+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 5503

.2

(5

.6

.0

(5

.6

7+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B A

Y

IN

O

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-3

.d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:5

A

M

/1 /2

10' 20'0

NO WORK WHERE ALL EXISTING GROUND IS ABOVE DESIGN TEMPLATE.1.

GENERAL SHEET NOTES

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2B - STA 8+00 TO STA 15+00 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

B

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-312

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

540 540

550 550

.4

(5

.8

.1

(5

.1

9+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.4

(5

.7

.5

(5

.2

10+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.6

(5

.2

.1

(5

.8

11+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.7

.7

(5

.8

12+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.5

.2

(5

.2

13+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.6

(5

.8

.9

(5

.4

14+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.6

(5

.6

.0

(5

.8

15+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.9

(5

.4

.2

(5

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:4

A

M

/1 /2

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2B - STA 16+00 TO STA 23+00 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

B

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-313

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

16+00

540 540

550 550

.0

(5

.4

.8

(5

.0

17+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.0

(5

.5

.8

(5

.8

18+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.1

(5

.2

.0

(5

.0

19+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.5

(5

.9

.4

(5

.7

20+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.0

(5

.7

.8

(5

.8

21+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 5503

.9

(5

.9

.0

(5

.9

22+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.7

(5

.8

.6

(5

.8

23+00

-10 0 10 20 30 40 50 60 70 80

540 540

550 5503

.6

(5

.3

.1

(5

.7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:5

A

M

/1 /2

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

CROSS SECTIONS - REPAIR AREA 2B - STA 24+00 TO STA 24+90 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

B

S T

A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-314

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

24+00

540 540

550 550

.2

(5

.0

.0

(5

.5

24+90

-10 0 10 20 30 40 50 60 70 80

540 540

550 550

.2

(5

.0

.7

(5

.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S p e c if ic W o rk

\B

B

A Y

IN

O

\B

B

A Y

IN

O

-C

A D

S

H E

E T

-2 -0

-2

-C

-3 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:4

:5

A

M

/1 /2

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

IL

B A

Y I

S L

A N

D D

R A

IN

A

G E

A N

D L

E V

E E

D

IS

T R

IC

T

N O

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

E K

B

SCALE: 1" = 20'

CROSS SECTIONS - REPAIR AREA 3 - STA 0+00 TO STA 3+50 - BASE BID

A H

E D

D L

E S

T E

N

B A

S E

B

ID

R E

P A

IR

A

R E

A

S

T A

T

O S

T A

C R

O S

S S

E C

T

IO

N S

C-315

E J O

H N

S O

N

T

T A

E T

S

F E

B

N D

S H

E E

T R

E

IS

S U

B A

Y

IN

O

A M

C C

L A

N A

H

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.9

(5

.0

.9

(5

.0

.5

(5

.7

0+50

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.1

(5

.0

.1

(5

.0

.1

(5

.5

1+00

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.4

(5

.0

.4

(5

.0

.4

(5

.9

1+50

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.1

(5

.0

.1

(5

.0

.1

(5

.0

2+00

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.3

(5

.0

.3

(5

.0

.1

(5

.5

2+50

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.4

(5

.0

.4

(5

.0

.6

(5

.9

3+00

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.8

(5

.0

.8

(5

.0

.0

(5

.8

3+50

0 20 40 60 80 100 120 140 160 180

520 520

540 540

.6

(5

.0

.6

(5

.0

.2

(5

.6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

S te a m b o a t

Is la n d

H

R E

P

\B

S

T M

B T

I2

\B

B A

Y

IN

O

-C A

D

S H

E E

T -2

-0

-2

-C

-3

.d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:0

:3

P

M

/1 /2

20' 40'0

S I

D

S O

L

IC

IT

A

T

IO

N

E V

E N

T P

L

-9

F

L O

O D

R E

P A

IR

S

M E

R C

E R

C O

U N

T Y

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .