This amendment to the solicitation modifies the specifications section to replace pages 1 through 19 of Section 09 97 02 Painting: Hydraulic Structures. The specifications require painting services for exposed sheetpile on the transition wall, curved rubbing plates, flat repair plates, transition wall cap brackets, kevel rail clips, kevel rail base plates and shims, corner armor, wall armor, traveling bitt, end stops, and checkposts at Lock and Dam 17. Services include surface preparation, application of zinc-rich primer, gray or yellow topcoats, and achievement of specified film thicknesses in accordance with one of two outlined painting systems. The solicitation number is W912EK23R0003 for Lock and Dam 17 Upper Guidewall Sheet Pile Transition with an estimate between $1,000,000 to $5,000,000 and a 425-day period of performance. The contracting agency is the U.S. Army Corps of Engineers Rock Island District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Lock and Dam 17 - Upper Guidew all Sheet Pile Transition

The purpose of this amendment is to capture updates in the Specifications and Draw ings.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Apr-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK23R0003

X 9B. DATED (SEE ITEM 11)

23-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Apr-2023

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK23R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following modifications are made to the Section 09 97 02.

SECTION 09 97 02

PAGES SECTION 09 97 02 PAGE 1 THROUGH SECTION 09 97 02 PAGE 18.

Delete pages SECTION 09 97 02 Page 1 through SECTION 09 97 02 Page 18, in their entirety, and substitute therefor revised pages SECTION 09 97 02 Page 1 through SECTION 09 97 02 Page 19.

SOLITATION NO.: W912EK23R0003

B5MRLD17202201

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 97 02

PAINTING: HYDRAULIC STRUCTURES

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALIFICATIONS

1.3.1 Qualified Paint Applicator

1.3.1.1 Certification Test Procedure

1.3.1.2 Certification Criteria

1.3.2 Coating Thickness Gage Qualification

1.4 SAMPLING AND TESTING

1.5 QUALITY CONTROL PERSONNEL

1.6 PAINT PACKAGING, DELIVERY, AND STORAGE

PART 2 PRODUCTS

2.1 SPECIAL PAINT FORMULAS

2.2 PAINT FORMULATIONS

2.2.1 Formula V-766e, Vinyl-Type Gray Impacted Immersion Coating

2.2.2 Formula VZ-108d, Vinyl-Type Zinc-Rich Impacted Immersion Coating

2.2.3 Formula V-102e Vinyl-Type Ready-Mixed Aluminum Impacted

Immersion Coating

2.3 INGREDIENTS FOR SPECIAL PAINT FORMULAS

2.3.1 Pigments and Suspending Agents

2.3.1.1 Aluminum Powder

2.3.1.2 Carbon Black

2.3.1.3 Zinc Dust

2.3.1.4 Iron Oxide

2.3.1.5 Titanium Dioxide

2.3.1.6 Suspending Agent E

2.3.1.7 Suspending Agent F

2.3.2 Resins, Plasticizer, and Catalyst

2.3.2.1 Diisodecyl Phthalate

2.3.2.2 Vinyl Resin, Type 3

2.3.2.3 Vinyl Resin, Type 4

2.3.2.4 Ortho-phosphoric Acid

2.3.3 Solvent and Thinners

2.3.3.1 Methanol

2.3.3.2 Methyl Ethyl Ketone

2.3.3.3 Methyl Isobutyl Ketone

2.3.3.4 Methyl Isoamyl Ketone

2.3.3.5 Toluene

2.3.4 Silane

2.4 TESTING

2.4.1 Chromatographic Analysis

2.4.2 Vinyl Paints

PART 3 EXECUTION

3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED

3.1.1 General Requirements

SECTION 09 97 02 Page 1

AMEND 0002

14 APRIL 2023

3.1.2 Ferrous Surfaces Subject to Severe Exposure

3.1.3 Galvanized, Aluminum, Aluminum Alloy, or Copper Surfaces

3.2 PAINT APPLICATION

3.2.1 General

3.2.2 Mixing and Thinning

3.2.3 Atmospheric and Surface Conditions

3.2.4 Time Between Surface Preparation and Painting

3.2.5 Method of Paint Application

3.2.6 Coverage and Film Thickness

3.2.7 Progress of Painting Work

3.2.8 Contacting Surfaces

3.2.9 Drying Time Prior to Immersion

3.2.10 Protection of Painted Surfaces

3.2.11 Vinyl Paints

3.2.11.1 General

3.2.11.2 Vinyl Zinc-Rich Primer

3.2.11.3 Vinyl Paints

3.3 PAINT SYSTEMS APPLICATION

3.3.1 Surface Preparation

3.3.2 System No. 3-A-Z

3.4 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED

3.5 INSPECTION

3.6 PAINTING SCHEDULES

-- End of Section Table of Contents --

SECTION 09 97 02 Page 2

AMEND 0002

14 APRIL 2023

SECTION 09 97 02

PAINTING: HYDRAULIC STRUCTURES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D153 (1984; R 2020) Specific Gravity of Pigments

ASTM D281 (2012; R 2021) Oil Absorption of Pigments by Spatula Rub-Out

ASTM D304 (2011; R 2019) n-Butyl Alcohol (Butanol)

ASTM D520 (2000; R 2019) Zinc Dust Pigment

ASTM D561 (1982; R 2020) Carbon Black Pigment for Paint

ASTM D740 (2011; R 2019) Methyl Ethyl Ketone

ASTM D841 (2019) Nitration Grade Toluene

ASTM D962 (1981; R 2014) Aluminum Powder and Paste Pigments for Paints

ASTM D1045 (2019) Sampling and Testing Plasticizers Used in Plastics

ASTM D1152 (Withdrawn: 2006; R 2012) Methanol (Methyl Alcohol)

ASTM D1153 (Withdrawn: 2012) Methyl Isobutyl Ketone

ASTM D1200 (2010; R 2018) Viscosity by Ford Viscosity Cup

ASTM D1210 (2005; R 2014) Fineness of Dispersion of Pigment-Vehicle Systems by Hegman-Type Gage

ASTM D2917 (2007; R 2021) Methyl Isoamyl Ketone

ASTM D3721 (2005; R 2019) Synthetic Red Iron Oxide Pigment

SECTION 09 97 02 Page 3

AMEND 0002

ASTM D4228 (2005; R 2017) Qualification of Coating Applicators for Application of Coatings to Steel Surfaces

ASTM D4417 (2021) Field Measurement of Surface Profile of Blast Cleaned Steel

ASTM D7091 (2021) Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic, Nondestructive Coatings Applied to Non-Ferrous Metals

ASTM E1347 (2006; R 2020) Color and Color Difference Measurement by Tristimulus Colorimetry

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC SP 1 (2015; E 2016) Solvent Cleaning

SSPC SP 5/NACE No. 1 (2007) White Metal Blast Cleaning

SSPC Paint 27 (1982; E 2004) Basic Zinc Chromate-Vinyl Butyral Wash Primer

SSPC Paint 38 (2006) Single-Component Moisture-Cure Weatherable Aliphatic Polyurethane Topcoat, Performance-Based

SSPC Paint 40 (2019) Zinc-Rich Moisture-Cure Polyurethane Primer, Performance-Based

SSPC Paint 41 (2008) Moisture-Cured Polyurethane Primer or Intermediate Coat, Micaceous Iron Oxide Reinforced, Performance-Based

SSPC QP 1 (2019) Evaluating the Qualifications of Industrial/Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Metal Components)

SSPC QP 2 (2019) Evaluating the Qualifications of Industrial/Marine Painting Contractors (Removal of Hazardous Coatings from Structures)

SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)

SAE AMS-STD-595A (2021) Colors Used in Government Procurement

SECTION 09 97 02 Page 4

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Preparation and Painting Management Program; G ECDS

Submit records of third party qualification tests and certification, the specified preparation and painting work tasks and methods and develop a detailed Preparation and Painting Management Program that identifies the work procedures and safety and health measures to be used. Address the various sources of hazardous substances and the methods to be undertaken to address these hazards. Do not begin any preparation and painting work until the Safety and Health Plan has been reviewed and approved.

Equipment List

Submit items to be used in the work, including brand names, model, capacity, performance characteristics, quantities and other pertinent information.

SD-04 Samples

Special Paint Formulas; G ECDS

Submit samples of all special paint formula and proprietary paints. For products that are specified to be applied in accordance with the manufacturer's recommendations submit the paint producer's product data sheet or other written instructions for those products.

Solvent and Thinners; G ECDS

Submit samples of the thinners which are those solvents used to reduce the viscosity of the paint.

SD-07 Certificates

Qualified Paint Applicator; G ECDS Coating Thickness Gage Qualification; G ECDS Quality Control Inspector Qualification; G ECDS Shop Qualification; G ECDS

1.3 QUALIFICATIONS

1.3.1 Qualified Paint Applicator

Submit records of qualification tests and third party certification for all paint applicators. Furnish paint applicators qualified in accordance with SSPC QP 1 and SSPC QP 2 or with the AISC Sophisticated Paint Endorsement.

SECTION 09 97 02 Page 5

AMEND 0002

Prior to the initiation of any work, all paint applicators, tested and certified as meeting the requirements of the qualified paint applicator.

Certification to be administered by the Contracting Officer. Applicators failing the certification test are prohibited to apply any paint.

1.3.1.1 Certification Test Procedure

Conduct at the Fabricator's plant in coordination with the Contracting Officer. Supply the fabricated test plates to be used for the tests and provide crane service, rigging, and any other work necessary to provide accessibility for the certification testing and inspection. In preparation, clean and prepare the test plates in accordance with the requirements specified. Perform approved abrasive blasting with the blast media to be used. Apply the paints to those previously tested and approved for use. Apply paints as specified and approved. The painter being tested to mix and thin the paints to be used in the test and set up and adjust the application equipment for use. Each painter to apply each type of paint comprising the specified system. Paint the test plate in a near vertical position. Test plates in accordance with ASTM D4228.

1.3.1.2 Certification Criteria

Evaluate the painter based in accordance with the applied paint system specified. Deficiencies in the coatings, improper mixing or improper application methods are basis for failure. The Contracting Officer will be the sole judge as to the acceptability of each paint applicators performance.

1.3.2 Coating Thickness Gage Qualification

Submit for all coating thickness gages. Use Type 2 dry film thickness gages in accordance with ASTM D7091 to be used to make all coating thickness measurements on ferrous metal substrates. Gages to have an accuracy of plus or minus 3 percent or better. Use gages certified by the manufacturer as meeting these requirements.

1.4 SAMPLING AND TESTING

Allow at least 30 days for sampling and testing. Sampling may be at the site of fabrication. Notify the Contracting Officer when the paint and thinner are available for sampling. Sampling of each batch will be witnessed by the Contracting Officer unless otherwise specified or directed. Submit a 1-quart sample of paint and thinner for each batch proposed for use. Label the sample to indicate formula or specification number and nomenclature, batch number, batch quantity, color, date made, and Contract number then add an address label to the Paint Technology Center, 2902 Newmark Drive, Champaign, Illinois, 61822. Testing will be performed by the Government. Costs for retesting rejected material will be deducted from payments to the Fabricator at the rate of $250.00 for each sample retested.

1.5 QUALITY CONTROL PERSONNEL

The painting Quality Control personnel be certified in accordance with NACE CIP or SSPC PCI to Level 2 or Level 3. Submit or furnish credentials for each quality control person who will be inspecting the painting operations.

SECTION 09 97 02 Page 6

1.6 PAINT PACKAGING, DELIVERY, AND STORAGE

Process and package paint to ensure that within a period of one year from date of manufacture, will not gel, liver, or thicken deleteriously, or form gas in the closed container. Package paints, unless otherwise specified or permitted, in standard containers not larger than 5 gallons, with removable friction or lug-type covers. Line containers for vinyl-type paints with a coating resistant to solvents in the formulations and capable of effectively isolating the paint from contact with the metal container.

Label each container of paint or separately packaged component to indicate the purchaser's order number, date of manufacture, manufacturer's batch number, quantity, color, component identification and designated name, and formula or specification number of the paint together with special labeling instructions, when specified. Deliver to the specified location in unbroken containers. Store paints that can be harmed by exposure to cold weather in ventilated, heated shelters. Store all paints under cover from the elements and in locations free from sparks and flames.

PART 2 PRODUCTS

2.1 SPECIAL PAINT FORMULAS

Provide the paint composition as indicated. Where so specified, package certain components of a paint formulation in separate containers for mixing on the job. If not specified or otherwise prescribed, provide color as naturally obtained from the required pigmentation.

2.2 PAINT FORMULATIONS

Provide special paint formulas in accordance with the following:

2.2.1 Formula V-766e, Vinyl-Type Gray Impacted Immersion Coating

INGREDIENTS PERCENT BY MASS

Vinyl Resin, Type 3 5.6 Vinyl Resin, Type 4 11.6 Titanium Dioxide Carbon Black 13.0 Diisodecyl Phthalate 2.9 Methyl Isobutyl Ketone 32.0 Toluene 34.7 Ortho-Phosphoric Acid 0.2

100.0

a. Accomplish dispersion of pigment by means of pebble mills or other approved methods to produce a fineness of grind in accordance with ASTM D1210 of not less than 7 on the Hegman scale. Grinding in steel-lined or steel-ball mills is prohibited. Grinding aids, antisettling agents, or any other materials except those shown in the formula are prohibited. The paint to show the proper proportions of specified materials when analyzed by chromatographic and/or spectrophotometric methods. Measure the ortho-phosphoric acid

SECTION 09 97 02 Page 7 accurately and diluted with at least four parts of ketone to one part of acid and slowly incorporated into the finished paint with constant and thorough agitation.

b. Provide viscosity of the paint between 60 and 90 seconds in accordance with ASTM D1200 and a No. 4 Ford cup.

c. Provide the gray paints in the volume ratio designated by the purchaser. The gray paint contains no pigments other than those specified. Include enough carbon black to produce a dry paint film having a reflectance of 20-24 (ASTM E1347). The resulting gray color to approximate color 26231 of SAE AMS-STD-595A.

2.2.2 Formula VZ-108d, Vinyl-Type Zinc-Rich Impacted Immersion Coating

INGREDIENTS PERCENT BY WEIGHT POUNDS GALLONS

COMPONENT A

Vinyl Resin, Type 3 16.6 109.2 9.65 Methyl Isobutyl Ketone 80.6 528.9 79.30 Suspending Agent E 0.7 4.6 0.28 Suspending Agent F 0.4 2.7 0.19 Methanol 0.5 3.3 0.50 Synthetic Iron Oxide (Red) 1.2 7.9 0.19

100.0 656.6 90.11

COMPONENT B

Silane B 100.0 4.1 0.47

COMPONENT C

Zinc Dust 100.0 550.0 9.42

100.00 (mixed paint)

a. Disperse the iron oxide and suspending agents into the vehicle (Component A) to a fineness of grind of not less than 4 on the Hegman scale in accordance with ASTM D1210. Grinding in steel-lined containers or using steel-grinding media is prohibited. The sole purpose of the iron oxide pigment is to produce a contrasting color. A red iron oxide-type 3 vinyl resin vehicle paste may be used in place of dry iron oxide provided compensating adjustment are made in the additions of Type 3 resin and methyl isobutyl ketone. The finished product with zinc dust added to produce a paint which has a red tone upon drying and a reflectance of not more than 16 in accordance with

ASTM E1347.

b. Supply VZ-108d paint as a kit. Each kit consists of 4.5 gallons (33.1 pounds) of Component A in a 5-gallon lug closure type pail,

27.5 pounds of zinc dust (Component C) packaged in a 1-gallon plastic pail, and 3 fluid ounces of silane (Component B) packaged in a glass bottle of suitable size having a polyethylene lined cap. Place the bottle of silane on the zinc dust in the 1-gallon pail. In addition to standard labeling requirements, each container of each component to be properly identified as to component type and each container label of

SECTION 09 97 02 Page 8

Component A to carry the following: MIXING AND APPLICATION

INSTRUCTIONS: WARNING - THIS PAINT WILL NOT ADHERE TO STEEL SURFACES

UNLESS COMPONENT B IS ADDED. Remove the 3 ounces of bottled Component B (silane) from the Component C (zinc dust) container and add to the base paint Component A) with thorough stirring. Then sift the zinc dust into the base paint while it is being vigorously agitated with a power-driven stirrer and continue the stirring until the zinc dust has been dispersed. The mixed paint at some point be strained through a 30-60 mesh screen to prevent zinc dust slugs from reaching the spray gun nozzle. Stir the paint continuously during application at a rate that will prevent settling. If spraying is interrupted for longer than 15 minutes, the entire length of the hose to be whipped vigorously to redisperse the zinc. If the spraying is to be interrupted for more than 1 hour, empty the hose by blowing the paint back into the paint pot. Thinning will not normally be required when ambient temperatures are below 80 degrees F, but when the ambient and steel temperatures are higher, methyl isoamyl ketone (MIAK) or methyl isobutyl ketone (MIBK) should be used. If paint is kept covered at all times, pot life will be about 8 days.

2.2.3 Formula V-102e Vinyl-Type Ready-Mixed Aluminum Impacted Immersion Coating

INGREDIENTS PERCENT BY MASS

Vinyl Resin, Type 3 18.2 Aluminum Powder 8.3 Diisodecyl Phthalate 3.1 Methyl Isobutyl Ketone 33.8 Toluene 36.6 100.0

a. Provide with the aluminum pigment mixed into the vehicle.

b. Provide viscosity of the paint between 60 and 90 seconds using ASTM D1200 and a No. 4 Ford cup. The paint to show the proper proportions of specified materials when analyzed by chromatographic and/or spectrophotometric methods.

2.3 INGREDIENTS FOR SPECIAL PAINT FORMULAS

The following applies only to those special paints whose formulas as shown.

2.3.1 Pigments and Suspending Agents

2.3.1.1 Aluminum Powder

Provide in accordance with ASTM D962, Type 1, Class B.

2.3.1.2 Carbon Black

Provide in accordance with ASTM D561, Type I or II.

2.3.1.3 Zinc Dust

Provide in accordance with ASTM D520, Type II.

SECTION 09 97 02 Page 9

2.3.1.4 Iron Oxide

Provide in accordance with ASTM D3721. In addition, the pigment has a maximum oil absorption of 24 and a specific gravity of 4.90 to 5.20 when tested in accordance with ASTM D281 and ASTM D153, Method A, respectively.

When the pigment is dispersed into specified vinyl paint formulation, the paint to have color approximating in SAE AMS-STD-595A color 10076 (dark red paint), and shows no evidence of incompatibility or reaction between pigment and other components after 6 months storage.

2.3.1.5 Titanium Dioxide

Provide vinyl paint Formula V-766e in one of the following: Kronos 2160 or 2101, Kronos, Inc. or Ti-Pure 960, E.I. Dupont DeNemours and Co., Inc.

2.3.1.6 Suspending Agent E

Provide a light cream colored finely divided powder having a specific gravity of 2 to 2.3. Provide an organic derivative of magnesium aluminum silicate mineral capable of minimizing the tendency of zinc dust to settle hard without increasing the viscosity of the paint appreciably. M-P-A-14, produced by Elementis Specialties, has these properties.

2.3.1.7 Suspending Agent F

Provide a light cream colored finely divided powder having a specific gravity of approximately 1.8. Provide an organic derivative of a special montmorillonite (trialkylaryl ammonium hectorite). Bentone 27, produced by Elementis Specialties, has these properties.

2.3.2 Resins, Plasticizer, and Catalyst

2.3.2.1 Diisodecyl Phthalate

The purity is not to be less than 99.0 percent, contains not more than

0.1 percent water, and have an acid number in accordance with ASTM D1045, of not more than 0.10.

2.3.2.2 Vinyl Resin, Type 3

Provide a vinyl chloride-acetate copolymer of medium average molecular weight produced by a solution polymerization process and contains 85 to 88 percent vinyl chloride and 12 to 15 percent vinyl acetate by weight.

The resin to have film-forming properties and, in specified formulations, produce results equal to Vinnol H 15/50 M, as manufactured by Wacker Chemie

AG.

2.3.2.3 Vinyl Resin, Type 4

Provide a copolymer of the vinyl chloride-acetate type produced by a solution polymerization process, contains (by weight) 1 percent interpolymerized dibasic acid, 84 to 87 percent vinyl chloride, and 12 to 15 percent vinyl acetate. Provide film-forming properties and, in the specified formulations, produce results equal to Vinnol H 15/45 M, as manufactured by Wacker Chemie AG.

SECTION 09 97 02 Page 10

2.3.2.4 Ortho-phosphoric Acid

Provide a chemically pure 85 percent grade.

2.3.3 Solvent and Thinners

2.3.3.1 Methanol

Provide in accordance with ASTM D1152.

2.3.3.2 Methyl Ethyl Ketone

Provide in accordance with ASTM D740.

2.3.3.3 Methyl Isobutyl Ketone

Provide in accordance with ASTM D1153.

2.3.3.4 Methyl Isoamyl Ketone

Provide in accordance with ASTM D2917.

2.3.3.5 Toluene

Provide in accordance with ASTM D841.

2.3.4 Silane

Provide Silane B for Formula VZ-108d to be N-beta-(aminoethyl)-gamma-aminopropyltrimethoxy silane.

2.4 TESTING

2.4.1 Chromatographic Analysis

Solvents in vinyl paints and thinners will be subject to analysis by programmed temperature gas chromatographic methods or spectrophotometric methods, employing the same techniques that give reproducible results on prepared control samples known to meet the specifications. If the solvent being analyzed is of the type consisting primarily of a single chemical compound or a mixture or two or more such solvents, interpretation of the test results to take cognizance of the degree of purity of the individual solvents as commercially produced for the paint industry.

2.4.2 Vinyl Paints

Subject to the following adhesion test. When V-766 formulations are tested, spray apply 5 to 7 mils (dry) to mild steel panels. Clean steel panels essentially free of oil or other contaminants that may interfere with coating adhesion. Dry blast clean test panels to a white metal grade in accordance with SSPC SP 5/NACE No. 1. The surface to have an angular profile of 2.0 to 2.5 mils as measured by ASTM D4417, Method C. When VZ-108 is tested, mix the coating in its proper proportions and then spray apply to a dry film thickness of 1.5 to 2.5 mils above the blast profile.

Top coat VZ-108 with a V-766 known to pass test. In all cases, the complete system to have a total dry film thickness of 5 to 7 mils above the

SECTION 09 97 02 Page 11 blast profile. After being air dried for 2 hours at room temperature, dry the panel in a vertical position for 16 hours at 120 degrees F. After cooling for 1 hour, immerse panel in tap water at 85 to 90 degrees F for 48 to 72 hours. Immediately upon removal, dry the panel with soft cloth and examined for adhesion as follows: with a pocket knife or other suitable instrument, make two parallel cuts at least 1 inch long 1/4 to 3/8 inch apart through the paint film to the steel surface. Make a third cut perpendicular to and passing through the end of the first two. With the tip of the knife blade, loosen film from the panel from the third cut between the parallel cuts for a distance of 1/8 to 1/4 inch. With the panel being held horizontally, the free end of the paint film to be grasped between the thumb and forefinger and pulled vertically in an attempt to remove the film as a strip from between the first two cuts. Remove the strip of paint film at a rate of approximately 1/10 inch per second and maintain in a vertical position during the process of removal. The adhesion is acceptable if the strip of paint breaks when pulled or if the strip elongates a minimum of 10 percent during removal. Paints not intended to be self-priming to exhibit no delamination from the primer.

PART 3 EXECUTION

3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED

3.1.1 General Requirements

Clean surfaces before applying paint or surface treatments. Remove deposits of grease or oil in accordance with SSPC SP 1 and prior to mechanical cleaning. Remove lubricant on the exterior surfaces of bolted connection nuts with proper solvents. Accomplish solvent cleaning with mineral spirits or other low toxicity solvents having a flash point above 100 degrees F. Use clean cloths and clean fluids to avoid leaving a thin film of greasy residue on the surfaces being cleaned. Protect items that are not to be prepared or coated from damage by the surface preparation methods. Cleaning and painting so programmed that dust or other contaminants from the cleaning process do not fall on wet, newly painted surfaces, and surfaces not intended to be painted, to be protected from the effects of cleaning and painting operations. Conduct welding of, or in the vicinity of, previously painted surfaces in a manner to prevent weld spatter from striking the paint and to otherwise reduce coating damage to a minimum; restore paint damaged by welding operations to original condition. Surfaces to be painted when inaccessible after fabrication or assembly operations, paint prior to inaccessible.

3.1.2 Ferrous Surfaces Subject to Severe Exposure

Dry blast-clean ferrous surfaces subject to extended periods of immersion or as otherwise required in accordance with SSPC SP 5/NACE No. 1. The blast profile to be 1.5 to 2.5 mils as measured by ASTM D4417, Method C.

Use appropriate abrasive blast media to produce the desired surface profile and to give an angular anchor tooth pattern. If recycled blast media is used, maintain an appropriate particle size distribution that the specified profile is consistently obtained. Steel shot or other abrasives that do not produce an angular profile are prohibited. Remove weld spatter not dislodged by blasting with impact or grinding tools and the areas reblasted prior to painting. Surfaces to be dry at the time of blasting. Within

SECTION 09 97 02 Page 12

6 hours after cleaning, prior to the deposition of any detectable moisture, contaminants, or corrosion, all ferrous surfaces blast clean in accordance with SSPC SP 5/NACE No. 1 of dust and abrasive particles by brush, vacuum cleaner, and/or blown down with clean, dry, compressed air, and given the first coat of paint. Maintain coatings in good condition by cleaning and touching up of areas damaged during the fabrication and delivery period.

If pinpoint or general rusting appears, reblast surfaces and repaint at no additional cost to the Government.

3.1.3 Galvanized, Aluminum, Aluminum Alloy, or Copper Surfaces

Wash with mineral spirits and pretreat with a primer in accordance with SSPC Paint 27. Mix the pretreatment primer by adding one volume of acid component (diluent) to four volumes of resin component (base solution) slowly and with constant stirring. After mixing, use the material within 8 hours. Spray apply the pretreatment primer at a coverage rate of 250 to 300 square feet/gallon (of resin component) to give a dry film thickness of

0.3 to 0.5 mil. Small areas may be coated by brush or swab. Take care in spray application to avoid the deposition of dry particles on the surface.

Maintain a wet spray at all times by additional thinning with Normal Butanol ASTM D304. The acid component (diluent), over and above the amount prescribed above, are not to be used for thinning purposes. Surfaces to receive the first coat of paint after at least 1 but not more than 24 hours drying of the pretreatment primer film.

3.2 PAINT APPLICATION

3.2.1 General

The finished coating to be free from holidays, pinholes, bubbles, runs, drops, ridges, waves, laps, cracks, excessive or unsightly brush marks, and variations in color, texture, and gloss. Application of initial or subsequent coatings are not to commence until the Contracting Officer has verified that atmospheric conditions and the surfaces to be coated are satisfactory. Apply each paint coat in a manner that will produce an even, continuous film of uniform thickness. Edges, corners, crevices, seams, joints, welds, rivets, corrosion pits, and other surface irregularities to receive a stripe coat to ensure that they receive an adequate thickness of paint. Equip spray equipment with traps and separators and where appropriate, mechanical agitators, pressure gauges, pressure regulators, and screens or filters. Furnish air caps, nozzles, and needles as recommended by the spray equipment manufacturer for the material being applied. Airless-type spray equipment may be used only on broad, flat, or otherwise simply configured surfaces, except that it may be employed for general painting if the spray gun is equipped with dual or adjustable tips of proper types and orifice sizes. Airless-type equipment is prohibited for use in the application of vinyl paints.

3.2.2 Mixing and Thinning

Mix thoroughly, strain where necessary, and keep at a uniform composition and consistency during application. Add paste or dry-powder pigments specified at the time of use, with the aid of powered stirrers, incorporated into the vehicle or base paint in a manner that will produce a smooth, homogeneous mixture free of lumps and dry particles. Where necessary to suit conditions of the surface temperature, weather, and

SECTION 09 97 02 Page 13 method of application, the paint may be thinned immediately prior to use.

Limit thinning of not more than 1 pint per gallon of the proper thinner;

this limitation is not to be applied when more specific thinning instructions are provided. Bring paint that has been stored at low temperature up to at least 70 degrees F before being mixed and thinned, and temperature in the spray tank or other working container is not to fall below 60 degrees F during the application. Paint that has deteriorated in any manner that it cannot be restored to original condition by customary field-mixing methods is prohibited for use. Paint and thinner that is more than 1 year old will be resampled and resubmitted for testing to determine its suitability for application.

3.2.3 Atmospheric and Surface Conditions

Apply only to surfaces that are 5 degrees above the dew point temperature and are completely free of moisture as determined by sight and touch.

Paint is not to be applied to surfaces upon which there is detectable frost or ice. Except as otherwise specified, the temperature of the surfaces and air in contact with is not to be less than 45 degrees F during paint application nor apply paint if the surfaces can be expected to drop to 32 degrees F or lower before the film has dried to a reasonably firm condition. During periods of inclement weather, painting may be continued by enclosing the surfaces and applying artificial heat, provided the minimum temperatures and surface dryness requirements prescribed previously are maintained. Paint not to be applied to surfaces heated by direct sunlight or other sources to temperatures that will cause detrimental blistering, pinholing, or porosity of the film. Take daily sling-psychrometer readings before painting operations are commenced.

Maintain a daily log of the dew point determination and the time of the determination and submit.

3.2.4 Time Between Surface Preparation and Painting

Prime cleaned surfaces or prepared for painting as soon as practicable after such preparation has been completed but in no case longer than 6 hours, and in any event, prior to any deterioration of the prepared surface.

3.2.5 Method of Paint Application

Apply paint by brush or spray to ferrous and nonferrous metal surfaces.

Apply a stripe coat to ensure adequate coverage of edges, corners, crevices, pits, rivets, bolts, welds, and similar surface irregularities.

Other methods of application to metal surfaces will be subject to the specific approval of the Contracting Officer. Whenever application of paint by a specific method to a surface is permitted or directed, it is understood that all areas inaccessible to that method will be coated by alternate means.

3.2.6 Coverage and Film Thickness

Film thickness or spreading rates as specified. Where spreading rate is not specified, apply paint at a rate normal for the type of material being used. In any event, the combined coats to completely hide base surface and the finish coats to completely hide undercoats of dissimilar color.

SECTION 09 97 02 Page 14

Measurement on Ferrous Metal: Where dry film thickness requirements are specified for coatings on ferrous surfaces, make measurements with a gage qualified in accordance with paragraph "Coating Thickness Gage Qualification." Calibrate and use in accordance with ASTM D7091.

Calibrate using plastic shims with metal practically identical in composition and surface preparation to that being coated, and of substantially the same thickness (except that for measurements on metal thicker than 1/4 inch, the instrument may be calibrated on metal with a minimum thickness of 1/4 inch). Frequency of measurements to be as recommended for field measurements by ASTM D7091 and reported as the mean for each spot determination. Calibrate the instruments or calibration verified prior to, during, and after each use.

3.2.7 Progress of Painting Work

Where painting on any type of surface has commenced, the complete painting operation, including priming and finishing coats, on that portion of the work completed as soon as practicable, and without prolonged delays.

Sufficient time to elapse between successive coats to permit them to dry properly for recoating, and modify this period as necessary to suit adverse weather conditions. Paint will be considered dry for recoating when it feels firm, does not deform or feel sticky under moderate pressure of the finger, and the application of another coat of paint does not cause film irregularities such as lifting or loss of adhesion of the undercoat. All coats of all painted surfaces to be unscarred and completely integral at the time of application of succeeding coats. At the time of application of each successive coat, clean undercoats of dust, grease, overspray, or foreign matter by means of airblast, solvent cleaning, or other suitable means. Undercoats of high gloss will, if necessary for establishment of good adhesion, be scuff sanded, solvent wiped, or otherwise treated prior to application of a succeeding coat.

3.2.8 Contacting Surfaces

Paint bolted connection faying surfaces surfaces with primer only before connecter installation. Unless otherwise specified, corrosion-resisting metal surfaces (i.e., stainless steel, aluminum bronze, and galvanized surfaces) are not to be painted.

3.2.9 Drying Time Prior to Immersion

Minimum drying periods after final coat prior to immersion at least 3 days.

Minimum drying periods to increase twofold if the drying temperature is below 65 degrees F and/or if the immersion exposure involves considerable abrasion.

3.2.10 Protection of Painted Surfaces

Where shelter and heat are provided for painted surfaces during inclement weather, maintain such protective measures until the paint film has dried and discontinuance of the measures is authorized. Items that have been painted are not to be handled, worked on, or otherwise disturbed until the paint coat is fully dry. Store all coated metalwork out of contact with the ground in a manner and location that will minimize the formation of water-holding pockets; soiling, contamination, and deterioration of the paint film, and damaged areas of paint on such metalwork will be cleaned and touched up without delay.

SECTION 09 97 02 Page 15

3.2.11 Vinyl Paints

3.2.11.1 General

Spray apply vinyl paints, except that areas inaccessible to spraying will be brushed. All of the vinyl paints require thinning for spray application except the zinc-rich vinyl paint (Formula VZ 108d) which will normally require thinning only under certain weather conditions. Thinners for vinyl paints as follows:

APPROXIMATE AMBIENT AIR TEMPERATURE

(Degrees F)

Below 50 MEK

50 - 70 MIBK

Above 70 MIAK

The amount of thinner will be varied to provide a wet spray and avoid deposition of particles that are semidry when strikes the surface. Vinyl paints are not to be applied when the temperature of the ambient air and receiving surfaces is less than 35 degrees F nor when the receiving surfaces are higher than 125 degrees F. Each spray coat of vinyl paint consists of a preliminary extra spray pass on edges, corners, interior angles, pits, seams, crevices, junctions of joining members, rivets, weld lines, and similar surface irregularities followed by an overall double spray coat. A double spray coat of vinyl-type paint consists of applying paint to a working area of not less than several hundred square feet in a single, half-lapped pass, followed after drying to at least a near tack-free condition by another spray pass applied at the same coverage rate and where practicable at right angles to the first. Rivets, bolts, and similar surface projections to receive sprayed paint from every direction to ensure complete coverage of all faces. Fill pits, cracks, and crevices with paint insofar as practicable, but in any event, cover all pit surfaces and seal off all cracks and crevices against the entrance of moisture.

Keep fluid and atomization pressures as low as practicable consistent with good spraying results. Unless otherwise specified, apply not more than

2.0 mils, average dry film thickness, of vinyl paint per double spray coat. Except where otherwise indicated, an undercoat of the vinyl-type paint may receive the next coat any time after the undercoat is tack-free and firm to the touch, provided that no speedup or delay in the recoating schedule will cause film defects such as sags, runs, air bubbles, air craters, or poor intercoat adhesion. Neither the prime coat nor any other coat will be walked upon or be subjected to any other abrading action until it has hardened sufficiently to resist mechanical damage.

3.2.11.2 Vinyl Zinc-Rich Primer

Mix primer combining components A, B, and C. Mix in accordance with label instructions. After mixing, keep paint covered at all times to avoid contamination and apply within eight days after mixing. When the ambient and steel temperature is below 80 degrees F, the paint normally would not require thinning; however, paint at all times contain sufficient volatiles (thinners) to permit satisfactorily atomized, to provide a wet spray, and to avoid deposition of particles that are semidry when they reach the surface. Stir paint continuously during application at a rate that will

SECTION 09 97 02 Page 16 prevent the zinc dust from settling. When spraying is resumed after any interruption of longer than 15 minutes, vigorously whip entire length of the material hose until any settled zinc is redispersed. Long periods of permitting the paint to remain stagnant in the hose will be avoided by emptying the hoses whenever the painting operation is suspended for more than 1 hour. Keep paint hoses as short as practicable, preferably not more than 50 feet in length. Equipment used for spraying zinc primer is not to be used for spraying other vinyl-type paints without first being thoroughly cleaned, since many of the other paints will not tolerate zinc contamination; type of hot spray is prohibited for use. An average dry film thickness of up to 2.5 mils may be applied in one double-spray coat.

Not more than 8 days will elapse after application of a VZ-108d zinc-rich coat before receiving a succeeding coat. Authorization to extend the recoat time where prime-painted pieces are assembled, bolted and retensioned three weeks after initial tensioning such that retensioning can be accomplished prior to subsequent coats of paint. Ensure primed surfaces to receive paint are clean and dry prior to application of successive coats. Use water to remove dust and detergent to remove grease and oil.

3.2.11.3 Vinyl Paints

Vinyl Paints (Formula V-766e) is a ready-mixed paint designed to be spray applied over a wide range of ambient temperatures by field thinning with the proper type and amount of thinner. For spray application, thin as necessary up to approximately 25 percent (1 quart per gallon of base paint) with the appropriate thinner; when ambient and steel temperatures are above normal, up to 40-percent thinning may be necessary for satisfactory application.

3.3 PAINT SYSTEMS APPLICATION

3.3.1 Surface Preparation

The method of surface preparation and pretreatment shown in the tabulation of paint systems is for identification purposes only. Accomplish cleaning and pretreatment of surfaces prior to painting in accordance with detailed requirements previously described.

3.3.2 System No. 3-A-Z

Spray applied to an average dry film thickness of a minimum of 6.5 mils for the completed system, and the thickness at any point is not be less than

5.5 mils. The dry film thickness of the zinc-rich coat at approximately

2.5 mils. Specified film thickness, including the prescribed total, attained in any event, and apply any extra coats needed to attain specified thickness at no additional cost to the Government. Attaining specified film thickness in fewer than the prescribed number of coats or spray passes will be acceptable provided heavier applications do not cause an increase in pinholes, bubbles, blisters, or voids in the dried film and also provided that not more than 2.0 mils (dry film thickness) per double spray coat nor apply more than 1.0 mil per single spray pass of nonzinc paint at one time.

SECTION 09 97 02 Page 17

3.4 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED

Prior to surface preparation and coating applications, remove, mask, or otherwise protect, hardware, machined surfaces, radiator covers, plates, lighting fixtures, and other such items not to be painted. After paint cures, reinstall removed items and cleanup any spills or spatters. Correct any paint drips, areas missed, and paint limit lines.

3.5 INSPECTION

Inspect, document, and report all work phases and operations on a daily basis. As a minimum report the following:

a. Inspections performed, including the area of the structure involved and the results of the inspection.

b. Surface preparation operations performed, including the area of the structure involved, the mode of preparation, the kinds of solvent, abrasive, or power tools employed, and whether Contract requirements were met.

c. Thinning operations performed, including thinners used, batch numbers, and thinner/paint volume ratios.

d. Application operations performed, including the area of the structure involved, mode of application employed, ambient temperature, substrate temperature, dew point, relative humidity, type of paint with batch numbers, elapsed time between surface preparation and application, elapsed time for recoat, condition of underlying coat, number of coats applied, and if specified, measured dry film thickness or spreading rate of each new coating.

3.6 PAINTING SCHEDULES

Items or surfaces to be coated: All exposed sheetpile transition wall, curved rubbing plates and flat repair plates on transition wall.

SYSTEM NO. 3-A-Z

SURFACE

PREPARATION

1st COAT 2nd COAT 3rd COAT 4th COAT

White metal blast cleaning

Vinyl zinc-rich

VZ-108D

(double spray coat)

White Vinyl V-766E (double spray coat)

Aluminum Vinyl V-102E (double spray coat)

Aluminum Vinyl V-102E (double spray coat)

SECTION 09 97 02 Page 18

AMEND 0002

14 APRIL 2023

Items or surfaces to be coated: Transition wall cap brackets, kevel rail clips, kevel rail base, plates and shims, corner armor and wall armor, finish color to be gray. For transition wall cap, traveling bitt, end stops and checkposts finish color to be yellow.

SYSTEM NO. 23-A-Z

SURFACE

PREPARATION

1st COAT 2nd COAT 3rd COAT

White metal blast cleaning

SSPC Paint 40 Type II

SSPC Paint 41 SSPC Paint 38

-- End of Section --

SECTION 09 97 02 Page 19

AMEND 0002

14 APRIL 2023

A22 - W912EK23R0003 - AMEND0002 - Just the Amend
A22 - SPECS - AMEND 0002
NARRATIVE
09 97 02
PAINTING: HYDRAULIC STRUCTURES
09 97 02 - PAINTING: HYDRAULIC STRUCTURES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALIFICATIONS
1.3.1 Qualified Paint Applicator
1.3.1.1 Certification Test Procedure
1.3.1.2 Certification Criteria

1.3.2 Coating Thickness Gage Qualification

1.4 SAMPLING AND TESTING
1.5 QUALITY CONTROL PERSONNEL
1.6 PAINT PACKAGING, DELIVERY, AND STORAGE
PART 2 PRODUCTS
2.1 SPECIAL PAINT FORMULAS
2.2 PAINT FORMULATIONS
2.2.1 Formula V-766e, Vinyl-Type Gray Impacted Immersion Coating
2.2.2 Formula VZ-108d, Vinyl-Type Zinc-Rich Impacted Immersion Coating
2.2.3 Formula V-102e Vinyl-Type Ready-Mixed Aluminum Impacted Immersion
2.3 INGREDIENTS FOR SPECIAL PAINT FORMULAS
2.3.1 Pigments and Suspending Agents
2.3.1.1 Aluminum Powder
2.3.1.2 Carbon Black
2.3.1.3 Zinc Dust
2.3.1.4 Iron Oxide
2.3.1.5 Titanium Dioxide
2.3.1.6 Suspending Agent E
2.3.1.7 Suspending Agent F
2.3.2 Resins, Plasticizer, and Catalyst
2.3.2.1 Diisodecyl Phthalate
2.3.2.2 Vinyl Resin, Type 3
2.3.2.3 Vinyl Resin, Type 4
2.3.2.4 Ortho-phosphoric Acid
2.3.3 Solvent and Thinners
2.3.3.1 Methanol
2.3.3.2 Methyl Ethyl Ketone
2.3.3.3 Methyl Isobutyl Ketone
2.3.3.4 Methyl Isoamyl Ketone
2.3.3.5 Toluene

2.3.4 Silane

2.4 TESTING
2.4.1 Chromatographic Analysis
2.4.2 Vinyl Paints
PART 3 EXECUTION
3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED
3.1.1 General Requirements
3.1.2 Ferrous Surfaces Subject to Severe Exposure
3.1.3 Galvanized, Aluminum, Aluminum Alloy, or Copper Surfaces
3.2 PAINT APPLICATION
3.2.1 General
3.2.2 Mixing and Thinning
3.2.3 Atmospheric and Surface Conditions
3.2.4 Time Between Surface Preparation and Painting
3.2.5 Method of Paint Application
3.2.6 Coverage and Film Thickness
3.2.7 Progress of Painting Work
3.2.8 Contacting Surfaces
3.2.9 Drying Time Prior to Immersion
3.2.10 Protection of Painted Surfaces
3.2.11 Vinyl Paints
3.2.11.1 General
3.2.11.2 Vinyl Zinc-Rich Primer
3.2.11.3 Vinyl Paints
3.3 PAINT SYSTEMS APPLICATION
3.3.1 Surface Preparation
3.3.2 System No. 3-A-Z
3.4 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
3.5 INSPECTION
3.6 PAINTING SCHEDULES