W912EK22R00070002.pdf

PDF 256 KB Posted

Attached to
Saylorville Dam Trash Rack Debris Removal & Disposal
Solicitation number
W912EK22R0007
Issued by

View the file

Other files

File Type Posted
A22 - W912EK22R00070001.pdf PDF
A22 - W912EK22R0007-Photos.pdf PDF
W912EK22R0007.pdf PDF
A22 - W912EK22R0007-Drawings.pdf PDF
A22 - W912EK22R0007-Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514713088775

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to revise the Performance Work Statement and extend the solicitation cloasing date from 14 January 2022 at 2:00 PM CT to 18 January 2022 at 2:00 PM CT.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK22R0007

X 9B. DATED (SEE ITEM 11)

16-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jan-2022

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK22R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Jan-2022 02:00 PM to 18-Jan-2022 02:00 PM.

The following have been modified:

PWS

SAYLORVILLE DEBRIS REMOVAL & DISPOSAL CONTRACT

MAIN DAM CONTROL TOWER TRASH RACK

OVERVIEW:

Scope. The intention of this contract is for the Contractor to remove submerged woody debris and non-woody debris from the Main Dam Control Tower Trash Rack area at Saylorville Lake.

The Contractor is to furnish all personnel, equipment, supplies, and materials to remove submerged woody debris and non-woody debris from the Saylorville Lake Main Dam Control Tower Trash Rack. Prices should include mobilization & de-mob, fuel, labor, materials, and equipment to complete the job. All materials removed will be disposed of on-site by the Contractor in an area designated by the Government. The Contractor's work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and Local laws and regulations.

The Contractor is required to attend an on-site pre-work meeting to be scheduled after the Notice to Proceed or Award. The areas where the work will take place is only accessible during weekday business hours. It will be the Contractor's responsibility for transporting the woody debris and non-woody debris to the proper disposal locations. The Contractor is responsible for all clean up, debris removal, traffic and public control and the restoration of areas, facilities, or structures negatively impacted by this contract to its original condition.

Location. Saylorville Lake Project is located at 5600 NW 78th Ave, Johnston, IA 50131

Site Visit. It is strongly encouraged for the Contractor to make a site visit prior to bidding this contract. Contact the Technical Point of Contact, Lake Manager, Dayne Magneson (515-240- 9534) or Dayne.C.Magneson@usace.army.mil to arrange a site visit.

Schedule. Upon notification, removal will be completed within 90 days of Notice to Proceed (weather and water/ice conditions dependent). If conditions inhibit safe work, the Contractor may request additional days which are subject to approval by the COR. All service/work to remove all woody debris and non-woody debris will be performed during daylight hours between 0700-1800 (CT) on weekdays. Services on weekends or Federal holidays (list federal holidays) will not be permitted without approval from the COR in advance. Saylorville Dam is a flood mailto:Dayne.C.Magneson@usace.army.mil control project. Occasional retention of floodwaters may inundate portions of the dam property or access roads in the areas covered by this contract. The COR will notify the Contractor as areas are closed as a result of floodwaters and will coordinate rescheduling and/or canceling any subsequent service in the closed property area. When flooding ends and waters recede, the COR will notify the Contractor as areas reopen and services may resume.

TECHNICAL REQUIREMENTS:

General Requirement. The Contractor will perform woody debris and non-woody debris removal services in accordance with these specifications. The area for woody debris and non-woody debris removal may encompasses the entire inflow area of the trash rack submerged all the way to the reservoir floor, depth will vary with pool elevation. Normal Conservation Pool Level is 836’. The floor of the trash rack is at elevation 793’. The width of the trash rack is fifty-three (53) feet. Woody debris and non-woody debris is to be removed from the face of the trash rack to achieve 90% clearance of the trash rack inflow area. Estimated quantities are in the range from 700 CY to 1000 CY. These quantities are only for reference and could vary from the estimate as the debris is underwater and is hard to calculate.

Woody debris is considered to be any woody vegetation including, but not limited to, fallen trees, stumps, branches, root ball, logs, shrubs, branches, any boards or lumber including pallets, plywood, stakes, posts, carrying timbers, and other like items. All woody debris is to be transported to the on-site disposal area designated by the Government.

Non-woody debris may include various trash materials including, but not limited to, tires, drums, Styrofoam and plastic containers, propane cylinders and other non-valuable items. Non-woody debris will be removed and separated from the woody debris so the non-woody debris may be disposed of separately. All non-woody debris will be transported to the on-site disposal area designated by the Government.

Most of the debris is submerged woody debris. All woody debris will be transported to an on-site disposal location. The Government will supply a woody debris disposal site within one thousand (1,000) feet of the staging area. All non-woody debris is to be transported to an on-site disposal location. The Government will supply a non-woody debris disposal site within two thousand (2,000) feet of the staging area at the Saylorville Administration and Maintenance Complex.

If the Contractor encounters any containers (i.e. barrels, drums, etc.) suspected of containing, or having contained, hazardous or toxic substances, the Contractor will immediately notify the COR. The Government will be responsible for disposing such containers in the proper manner.

Inspections. The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

A pre-work debris inspection survey is to be conducted by the Contractor prior to starting work.

The inspection survey needs to show the volume of debris submerged against the trash rack. The survey is to be supplied to the Government before debris removal begins.

A final debris inspection survey will be required by the Contractor to show that the Contractor has met the requirements of the volume of debris removal. This inspection survey is to be supplied to the Government. Once it is determined by the Government that the contract requirements of 90% clearance of the inflow area of the trash rack have been completed the work will be considered complete.

If completed services do not conform to contract requirements, the Government may require the Contractor correct the deficient services to bring them into conformity with the requirements.

Correction of deficient services does not entitle the Contractor to an increase of the unit price contained in the awarded contract. If the Contractor fails to promptly correct unsatisfactory services or fails to take necessary action to ensure future work is in compliance with the contract requirements, the Government may proceed with any rights or remedies detailed within the contract clauses and terms. The Government reserves the right to delay or stop work as needed to accommodate higher priorities.

Work and Staging Area. The primary work area will be located at the Saylorville Lake Main Dam Control Tower on the reservoir side. The debris removal will take place at the inlet area of the Control Tower which is protected by the steel trash rack below the water surface. The trash rack is made up of vertical and horizontal steel beams. The spacing between beams is show in the attached drawings. Trash racks generally collect debris in a perpendicular alignment to the vertical beams; however, some debris does enter through the piers. The trash rack is accessible by a bridge to the bullnose of the inlet. The bridge deck does have weight limits that may restrict equipment capabilities. The bridge is designed for H 20 loading. There is a parking lot adjacent to the work area that will be designated as the staging area for this project. Equipment may be stored in the Control Tower Access parking lot. The area will be closed off to the public. The Government is not responsible for providing storage containers or facilities for the storage of Contractor supplies, materials, and equipment. The Government assumes no liability for the Contractors equipment and materials left on site. Following completion of the contract, all Contractor’s equipment and materials must be removed from Government property. This area is subject to highwater impacts from fluctuating reservoir pool levels. The Government will monitor pool levels and communicate any impacts to the Contractor as soon as changing pool levels or impacts are identified. The woody material disposal area is approximately one thousand (1,000) feet up the road from the staging area parking lot. The non-woody material disposal area is approximately two thousand (2,000) feet up the road from the staging area parking lot. Maps and photos are attached to show the work and staging areas.

Equipment. Work will require heavy machinery for lifting, pulling, dragging, and transporting of debris. It is the responsibility of the Contractor to control traffic and to provide proper barricades, cones, signage, and traffic control personnel to safely perform the work and protect the public. The Contractor will have access to the shoreline, bridge deck to the area above the trash rack, and/or water surface of the reservoir to remove material from the trash rack. The bridge deck does have weight limits that may restrict equipment capabilities. Equipment will need to be approved by the Government prior to access of the bridge. All load handling and crane operations are required to be completed in accordance with EM 385-1-1, Section 16. These requirements are applicable to load handling equipment (LHE) to include cranes, derricks, hoists and power-operated equipment that can be used to raise, lower and/or horizontally move a suspended load. This includes excavators, forklifts, and other equipment when used with rigging.

Property Damage. The Contractor will use reasonable care to avoid damaging existing, equipment, facilities, parking lots, roads, trash rack, bridges, and structures during the performance of the specified work. The Contractor will be responsible for restoring any Government facilities or structures damaged as a result of the Contractor’s actions. The Contractor will also be responsible for any damage to private property or injury to any person as a result of the Contractor’s operations. The Contractor is to notify the COR immediately of damage to Government and private property and injury to any person resulting from the Contractor’s operation. Also, the Contractor is to notify the COR of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only. The Contractor will also restore features (roadways, parking lots, structures, vegetation, etc.), which are damaged or destroyed by the Contractor’s operation. The Contractor will, at their own expense, provide proof to the COR and maintain during the entire performance of this contract the following: Insurance Type - General Liability (Bodily Injury and Property Damage Combined) Minimum Amounts of Liability $1,000,000.

Each Occurrence $1,000,000 Aggregate. The Contractor is required to provide a Certificate of Insurance to the COR at the time of the Pre-Work Conference.

Safety. Performance of all services must assure complete safety to public visitors, Government employees, Contractor employees, and all other persons in the worksite areas. The Contractor will comply with any pertinent requirements contained in the Corps of Engineers Safety Manual (EM 385-1-1), current at the time of award. Furthermore, the Contractor will comply with pertinent occupational safety and health standards as required by the Occupational Safety and Health Administration (OSHA). The complete safety manual with appendices can be reviewed at the following Internet address:

https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health- Requirements-Manual/.

The Contractor will provide Contractor personnel with any personal protective apparel and equipment required by the Safety Manual (EM 385-1-1) and, as necessary, eliminate or minimize hazards to personnel. As a minimum, each employee must wear a hard hat, shirt (with sleeves), long trousers, fall protection harness with lanyard, if required, protective shoes/boots (safety toed), and personal floatation devices when operating on or near boats during all contract work.

Contractor employees will utilize other safety equipment such as: hearing protection devices, work gloves, or protective glasses/goggles whenever required by the safety manual.

Before the Pre-Work Conference, the Contractor will be responsible to provide an approved Accident Prevention Plan, Activity Hazard Analysis Plan, and information about any aerial lifting devices to be used including model number, height, weight and capacity of lift. All aerial lifting devices must be in compliance with the Safety Manual (EM 385-1-1). The Contractor is required to attend a Pre-Work Conference, to be scheduled by the COR, within 10 calendar days of the Notice to Proceed.

The Contractor will prepare an Accident Prevention Plan (APP) specific to the activities being performed. The APP is to include Activity Hazard Analyses (AHAs) as described in Section 3 below. Special attention should focus on the requirements of EM 385-1-1, specifically Section 01.A.12 through 01.A.17 and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). Work will not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project. The APP is to interface with the Contractor's overall safety and health program. Any portions of the Contractor's safety and health program referenced in the APP will be included and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

An AHA is to be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis will define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work will not proceed on a phase of work until the AHAs have been submitted and accepted. A preparatory meeting will be conducted by the Prime Contractor to discuss the AHAs contents with all effected onsite employees. The AHA will be continuously reviewed and revised to address changing site conditions as appropriate.

Photos/Drawings/Maps. See attached photos, drawings, and maps of the Saylorville Main Dam Control Tower work area, debris, and onsite disposal locations.

Payment. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the COR. The invoice must include the invoice date, contract number, company name and address as registered in SAM.GOV, dates of service, description of work, quantities, process, and total amount due per line item.

Local Point of Contact.

Dayne Magneson Lake Manager US Army Corps of Engineers 515-276-4656, ext 6511 Email invoices to Dayne.C.Magneson@usace.army.mil mailto:Dayne.C.Magneson@usace.army.mil

SECURITY REQUIREMENTS:

**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms must be submitted with a coversheet stating the contract number (e.g. W912EK22CXXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:

Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201

Security Clause 1.

AT Level 1 Training. All Contractor and Sub-Contractor employees requiring access to non-public or private Government property must complete Anti-Terrorism (AT) Level 1 Training within 30 calendar days after notice to proceed date. AT Level 1 Training is available at the following website: https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam. The required training is under the heading “JS-US007-14: Level 1 Antiterrorism Awareness Training.”

Contractor employees who have a Common Access Card (CAC) may log in with their CAC.

Contractor employees without a CAC are to log into the “Non-CAC users” link and need to complete the training all at once, as no record of training is to be maintained aside from the certificate that is printed upon completion. All AT Level 1 Training certificates must be submitted to the Contracting Officer Representative within 5 calendar days of completion.

Security Clause 2(b).

For Access and General Protection Policy and Procedures. All Contractors and sub-contractor employees will comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor must submit background checks that have been conducted by a bonded third party within 6 months of the Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam

Identification Badges: The Contractor is responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge will have the following items shown: the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by driving under the influence or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g.

drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and Sub-Contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor is to immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. The Contractor is to submit a Personnel Change Request Form, will wait to receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor will be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification and the Contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site. The Contractor is to ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the

Government’s review of the background check and the Contractor will be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short-term employee.

3) Employee is escorted while on site by Prime Contractor approved personnel. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island District (as noted on the

ACL).

4) Each Contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-Verify requirements E-Verify paragraph).

3) Approved and identified Contractor employee must escort the foreign national employee at ALL times while on site.

4) Each contractor employee can sponsor only one short term foreign national at a time.

Personnel Change Request Form Contract #_______________ Date___________ We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long-term employee) must be submitted by close of business on (insert proposed date): ________________

(Insert signature block)

Security Clause 15.

Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-Verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. Documentation of company enrollment in E- Verify, via a print screen of the company profile within the E-Verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed.

*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

(End of Summary of Changes) http://www.uscis.gov/e-verify

File details come from the government source that posted it. Updated .