Solicitation No. W912EK19R0012
ILLINOIS RIVER BASIN
MULTIPLE SITES
LASALLE COUNTY, IL
MARSEILLES AND STARVED ROCK
LOCKS
MITER GATE INSTALLATION
Construction Solicitation and Specifications
JULY 2019
US Army Corps of Engineers Rock Island District
DEPARTMENT OF THE ARMY
ROCK ISLAND DISTRICT, CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND, ILLINOIS 61201
REPLY TO
ATTENTION OF http://www.mvr.usace.army.mil
PREBID MEETING NOTICE
Prebid meetings will be held to discuss the Starved Rock Lock and Dam and Marseilles Lock and Dam Miter Gate Installation Project, Solicitation No. W912EK19R0012 and to provide opportunities for offerors to visit the sites. These meetings will be the only on-site visits with the Corps of Engineers during the bidding phase. The meetings will be held on Thursday, August 1, 2019 at 10:00 A.M. at Marseilles Lock and Dam, Marseilles, Illinois and then at 1:00 P.M. at Starved Rock Lock and Dam, Ottawa, Illinois. Offerors may visit the site on their own and contact the POC listed below to set up a site visit.
Offerors are highly encouraged to attend this prebid meeting.
Make arrangements at least 24 hours in advance of the prebid meeting with:
Mr. Mike Edwards, P.E.
Area Engineer Eastern Area Office U.S. Army Corps of Engineers 926 SW Adams Street-Suite 110 Peoria, IL 61602 Telephone No.: 309-637-1321 (Collect calls not accepted.)
Offerors are required to bring Safety Equipment for this meeting:
safety hat, safety glasses, steel-toed boots, and life-vest (U.S. Coast Guard approved).
Questions from Offerors submitted and Government responses will be documented via ProjNet Bidder Inquiry. Please reference clause MVR.02 - Questions and Answers via ProjNet for further instruction.
ILLINOIS RIVER BASIN, MARSEILLES AND STARVED ROCK LOCKS, LASALLE COUNTY, IL, MITER GATE INSTALLATION
SEE SECTION 01 11 00: SUMMARY OF WORK
NAICS: 237990
SIZE STANDARD: $36,500,000.00
ESTIMATED RANGE: MORE THAN $10,000,000.00
CONTRACT COMPLETION: 390 consecutive calendar days
BASIS FOR AWARD: BEST VALUE-TRADE OFF
ALL QUESTIONS SHALL BE SUMITTED THROUGH PROJNET-SEE CLAUSE MVR.02 FOR ADDITIONAL INFORMATION
CARISSA J MCKINLEY 309-794-5661
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
19-Jul-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________390 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 Aug 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND IL 61201
W912EK
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
--- --- ---- REF BLOCK 18A)FAX:TEL: 309-794-5613 (INVOICES TEL: FAX:
W912EK19R0012 229
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912EK19R0012
Section 00100 - Bidding Schedule/Instructions to Bidders
SCHEDULE OF PRICES
BASE BID
STARVED ROCK LOCK AND DAM
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Temporary Field Offices
0001AA First 6 Months 6 MO $ $
0001AB Over 6 Months 1 MO $ $
0002 Mobilization and Demobilization 1 JOB XXXXXXXX $
0003 Stair Towers 1 JOB XXXXXXXX $
0004 Weep Hole Cleaning 1 JOB XXXXXXXX $
0005 Upstream Gate Installation
0005AA Miter Gate Disposal 1 JOB XXXXXXXX $
0005AB Lock Wall Concrete and Embedded Steel Removal
1 JOB XXXXXXXX $
0005AC Lock Wall Concrete Placement 1 JOB XXXXXXXX $
0005AD Anchorage Fabrication and Delivery 1 JOB XXXXXXXX $
0005AE Anchorage Installation 1 JOB XXXXXXXX $
0005AF Quoin Fabrication and Delivery 1 JOB XXXXXXXX $
0005AG Quoin Installation 1 JOB XXXXXXXX $
0005AH Pintle Base Fabrication and Delivery 1 JOB XXXXXXXX $
0005AJ Pintle Base Installation 1 JOB XXXXXXXX $
0005AK Sill Concrete Removal 1 JOB XXXXXXXX $
0005AL Sill Concrete Placement 1 JOB XXXXXXXX $
0005AM Control Stand Removal and Replacement 1 JOB XXXXXXXX $
0005AN Distribution and Controls Wiring
1 JOB XXXXXXXX $
0005AP Temporary Electrical and Control System
0005AQ Electrical Commissioning
0005AR Strut Arm Limit Switch Work
0005AS Handrail Removal and Reinstallation
170 LF $ $
0006 Downstream Gate Installation
0006AA Miter Gate Disposal
0006AB Lock Wall Concrete and Embedded Steel Removal
0006AC Lock Wall Concrete Placement
0006AD Anchorage Fabrication and Delivery
0006AE Anchorage Installation
0006AF Quoin Fabrication and Delivery
0006AG Quoin Installation
0006AH Pintle Base Fabrication and Delivery
0006AJ Pintle Base Installation
0006AK Sill Concrete Removal
0006AL Sill Concrete Placement
0006AM Post-Tensioned Rock Anchors
24 EA $ $
0006AN Temporary Electrical and Control System 1 JOB XXXXXXXX
0006AP Electrical Commissioning
0006AQ Strut Arm Limit Switch Work
0006AR Handrail Removal and Reinstallation
"TOTAL OF ESTIMATED AMOUNTS - BASE BID
(ITEM NOS. 0001 THROUGH 0006AR, INCL.)"
OPTION A
MARSEILLES LOCK AND DAM
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0101 Temporary Field Offices
0101AA First 6 Months
6 MO $ $
0101AB Over 6 Months
1 MO $ $
0102 Mobilization and Demobilization
0103 Stair Towers
0104 Weep Hole Cleaning
0105 Upstream Gate Installation
0105AA Miter Gate Disposal
0105AB Lock Wall Concrete and Embedded Steel Removal
0105AC Lock Wall Concrete Placement
0105AD Anchorage Fabrication and Delivery
0105AE Anchorage Installation
0105AF Quoin Fabrication and Delivery
0105AG Quoin Installation
0105AH Pintle Base Fabrication and Delivery
0105AJ Pintle Base Installation
0105AK Sill Concrete Removal
0105AL Sill Concrete Placement
0105AM Control Stand Removal and Replacement
0105AN Distribution and Controls Wiring
0105AP Temporary Electrical and Control System 1 JOB XXXXXXXX $
0105AQ Electrical Commissioning
0105AR Strut Arm Limit Switch Work
0105AS Handrail Removal and Reinstallation
0106 Downstream Gate Work
0106AA Distribution and Controls Wiring
0106AB Electrical Commissioning
0106AC Strut Arm Limit Switch Work
"TOTAL OF ESTIMATED AMOUNTS - OPTION A
(ITEM NOS. 0101 THROUGH 0106AC, INCL.)"
"TOTAL OF ESTIMATED AMOUNTS - BASE BID AND OPTION A
(ITEM NOS. 0001 THROUGH 0106AC, INCL.)"
JOB= LUMP SUM MO=MONTH EA= EACH LF= LINEAR FEET
ENSURE THE AMOUNT LINES FOR ALL ITEMS ARE COMPLETE AND FILLED OUT.
THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTION A BY 15 NOVEMBER 2019.
IF OPTION A IS EXERCISED, THE CONTRACT DURATION WILL NOT BE EXTENDED.
SOURCE SELECTION
1. 1. Basis for Award
The Government will select for award the proposal that is most advantageous and represents the best overall value to the Government, considering the Technical Approach, Past Performance, Small Business Participation and Price, along with their respective sub-factors (as applicable).
As a result, the Government may select for award the Offeror whose proposed prices are not the lowest, but whose technical approach, past performance and small business participation proposals are more complete as to justify the payment of a higher price. Conversely, the Government may select for award the Offeror whose proposed prices are lower than other proposals that are not sufficiently more advantageous to justify the payment of a higher price.
The evaluation factors are as follows: technical approach, past performance, small business participation and price. All non-price evaluation factors, when combined, are approximately equal to price. The technical approach is significantly more important than past performance and small business. The past performance factor is significantly more important than small business participation.
Proposed prices will be evaluated but not scored or otherwise combined with the other aspects of the proposal evaluation. An Offeror must be considered “Acceptable” with no greater than a moderate risk in all factors and sub-factors to be considered for award. Any sub-factor rated as “unacceptable” will render the entire factor “unacceptable”.
1. 2. Factors and Sub-Factors to Be Evaluated
Award will be made to the Offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors identified and described below. The following evaluation factors and sub-factors will be used to evaluate each proposal:
Factor 1: Technical Approach: This factor is further divided into the following sub-factors;
a. Sub-factor 1: Work Plan
Element 1: Work Plan Narrative Element 2: Schedule
b. Sub-factor 2: Corporate Management Element 1: Key Personnel Element 2: Safety
Sub-factor 1 is significantly more important than sub-factor 2.
Factor 2: Past Performance: The past performance evaluation considers each Offeror's demonstrated recent, relevant and quality record of performance in supplying products and services that meet the contract’s requirements.
Factor 3: Small Business Participation: All Offerors will be evaluated on the level of proposed participation of small businesses.
Factor 4: Price: The resulting award will be a Firm Fixed Price Contract for construction services. Price reasonableness will be utilized in the evaluation of this effort in accordance with FAR Part 15 procedures.
2. 3. Evaluation Approach
All proposals will be evaluated by the Source Selection Team (SST). Evaluation of the Offeror’s proposal shall address each factor and sub-factor as it applies to the plans and specifications. A detailed explanation of the criteria for the evaluation is set forth in this section. During evaluations of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.
The overarching evaluation approach for all factors and sub-factors is as follows:
1. Adequacy of Response. The proposal will be evaluated to determine whether the Offeror’s methods and approach have completely considered, defined, and satisfied the requirements specified in the Request for Proposal (RFP). The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP.
2. Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which the Offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.
Definitions:
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Strength: An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
See FAR 15.001.
Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
Uncertainty: Any aspect of a non-cost/price factor proposal for which the intent of the Offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
2. 3. 1. Factor 1: Technical Approach
The Government will be utilizing a combined technical/risk rating approach which includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties and deficiencies in determining the technical rating.
Sub-factor ratings shall be rolled up into an overall rating for Factor 1; Technical Approach. The following table, which utilizes a combined technical/risk rating, shall be used for the technical factor and all sub-factors.
COMBINED TECHNICAL/RISK RATING
Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
The Technical Approach Factor is divided into the following sub-factors:
2. 3. 1. 1. Sub-factor 1: Work Plan
This sub-factor evaluates the Offeror’s proposed work plan for the entire length of the contract.
The Government will evaluate the Offeror’s proposed work plan to determine understanding of and compliance with the Government’s requirements. The elements are listed in descending order of importance.
Element 1: Work Plan Narrative
The Offeror shall submit a Work Plan that describes the overall plan of operations to complete the contract work. The Offeror is encouraged to provide descriptions and illustrations which show the contractor’s, subcontractor’s, and supplier’s qualifications and methodology to accomplish the work, including, but not limited to, descriptions of equipment, special fabrications, and specialized labor. Items of particular concern to the government are:
Proposed concrete demolition procedure and what steps will be taken to protect the adjacent components from damage;
Proposed electrical demolition and installation procedure;
Proposed rock anchor installation procedure; and Coordination of construction at both sites to coincide for the full lock closure.
The Government will evaluate the work plan narrative based on the following:
Completeness of plan with respect to items of concern listed above;
Demonstration of thorough understanding of and ability to comply with the project requirements;
Reasonableness of contractor sequencing in terms of site constraints and challenges associated with the work; and Ability to mitigate construction and scheduling risk associated with project features.
Element 2: Schedule
The Offeror shall submit a single critical path method construction schedule and narrative demonstrating a logical and efficient sequence for completing the work at both Marseilles and Starved Rock sites, on a single schedule.
Items of particular concern to the Government are:
Labels and durations on all activities;
Detailed work sequences for all major activities, including the reasoning for the timing of activities;
Critical long-lead time materials and fabrications;
Submittal (including shop drawings) preparation and approval; and Timing of work items to be coordinated with the Government.
The Government will evaluate the schedule based on the following:
Completeness and reasonableness of the schedule;
Demonstration of thorough understanding of the project requirements;
Reasonableness of work sequencing in terms of site constraints, river hydrologic conditions, and challenges associated with the work;
Ability to mitigate construction and scheduling risk associated with project features and project locations Consideration of lead times for major equipment; and Minimization of critical path activities.
The contractor shall assume a contract notice to proceed (NTP) of 15 October 2019 for proposal evaluation purposes only. October 15th is an estimated date for evaluation purposes and may not necessarily represent the actual NTP date for the awarded contract.
2. 3. 1. 2. Sub-factor 2: Corporate Management
Element 1: Key Personnel
The Government will evaluate the Offeror’s proposed key personnel to be utilized on the contract. Resumes shall be limited to one (1) page per individual and shall include the name, proposed role for the project, education, years of experience in the proposed role, years of experience with the Offeror and notable experience similar to this project.
The Government defines key personnel as the Project Manager, Site Superintendent, Quality Control Manager and Site Safety and Health Officer.
Evaluation Criteria:
The Government will evaluate the information to determine how well the Offeror identifies and demonstrates that its key personnel has the necessary qualifications to manage, control and perform these construction requirements:
a. Project Manager with at least 5 years construction and construction management experience.
b. Site Superintendent with at least 5 years of experience managing projects with multiple sub-contractors and familiarity with scheduling multiple locations.
c. Quality Control System Manager shall meet the requirements in Section 01 45 04.
d. Site Safety and Health Officer with at least 5 years of experience managing and implementing safety and occupation health program(s) which demonstrate relevance to the project scope and applicable sections of EM 385-1-1, Safety and Health Requirements Manual, version 2014
The Government intends to give greater weight to proposals where the key personnel demonstrate:
More extensive experience working on relevant projects that are similar in size, scope and complexity to the work that is the subject of this requirement
Experience in proposed role which greatly exceeds the years of experience listed above;
More extensive experience in proposed role with the Offeror.
Element 2: Safety
The Government will evaluate the Offeror’s proposal to determine capability to meet the Government requirements in regards to Safety. The Offeror’s proposal will be evaluated on the following:
Experience Modifier
The Government will evaluate the Experience Modifier as provided by the Offeror’s Insurance Carrier in accordance to the table below. The Offeror must provide documentation, from their Insurance Carrier, that demonstrates their safety and health program experience using an “Experience Modification Rate (EMR)” from 2013-2018.
Rating Experience Modifier
Superior 0.7 or below Acceptable 0.71 to 1.0
Sub-Standard 1.1 or greater
2. 3. 2. Factor 2: Past Performance
The Government will evaluate the Offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the Plans and Specifications.
Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires set forth in Appendix D.
The Government will focus its inquiries on the Offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including cost, schedule, performance, construction experience and management of subcontractors. Major subcontractors for the purpose of Past Performance evaluation are defined as members of an Offeror’s overall team who are expected to perform ten (10%) percent or more of the proposed effort. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, Offerors will be reminded to include the most recent and relevant efforts within the past fifteen (15) years in their proposal.
The Government may use data provided by the Offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System (NAICS) 237990. Data used in conducting performance risk assessments shall not extend past fifteen (15) years prior to the issue date of the solicitation, but may include performance data generated during the past fifteen (15) years without regard to the contract award date.
Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
The past performance factor considers each Offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract requirements. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each Offeror. There are three (3) aspects to the past performance evaluation: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information).
The first aspect is the recency of the Offeror’s past performance. Recency is expressed as a time period during which past performance references are considered relevant, and is critical to establishing the relevancy of past performance information. Offerors may submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past fifteen (15) years, from the issue date of this RFP.
The second aspect is to determine how relevant a recent effort accomplished by the Offeror is to the effort to be acquired. In establishing what is relevant for the acquisition, consideration will be given to those aspects of an Offeror’s history of contract (or subcontract) performance that would provide the most context and give the greatest ability to measure whether the Offeror will successfully satisfy the current requirement. With respect to relevancy, past performance of greater relevancy will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Relevance will reflect what an Offeror has done in relation to same/similar construction type projects such as:
Vertical and horizontal concrete demolition with protection of adjacent concrete components
Mass Placement of Concrete (over 100 cubic yards) Navigation Lock Power Control & Lighting Systems Placement of rock anchors Management of two or more concurrent construction sites on navigational waterways, the
Source Selection Team may determine the past performance project to be more relevant and thus may receive a higher past performance rating
The criteria set forth below will be used to rate the degree of past performance relevancy.
PAST PERFORMANCE RELEVANCY
Relevancy Description
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The third aspect of the past performance evaluation is to establish the overall quality of the Offeror’s past performance in accordance with FAR 15.304(c)(2). The Source Selection Team will review all past performance information collected and determine the quality of the Offeror’s performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment.
The past performance confidence assessment will utilize the most appropriate ratings from the table below. This rating considers the assessed confidence of the recent/relevant/quality information gathered. In the case of Offerors for which there is no information on past contract performance or where past contract performance information is not available, the Offeror will not be evaluated favorably or unfavorably and will be assigned a performance confidence rating of “neutral.” If an Offeror’s past performance is unknown and assigned a performance confidence rating of “neutral,” the Source Selection Authority may determine that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating.
Performance Confidence Assessment Ratings
Assessment Description
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
2. 3. 3. Factor 3: Small Business Participation
All Offerors (both large and small businesses) will be evaluated on the level of proposed participation of small businesses in the performance of acquisition (as small business prime Offerors or small business subcontractors) relative to the objectives and goals established herein.
Evaluation of the small business participation plan shall be in accordance with the Small Business Participation Commitment Template set forth in Appendix F, and will be incorporated as part of the resulting contract in section H.
The Government will evaluate:
1. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
2. The extent to which offers demonstrate substantive commitment to the small business firms identified in proposal, such as J/V, Mentor Protégé Agreements, or other demonstrations of commitment (i.e. binding commitments-even verbal-that could become enforceable after award) Enforceable commitments will be weighted more heavily than non-enforceable ones;
3. Identification of the complexity and variety of the work small firms are to perform;
4. Past performance of the Offeror’s compliance with requirements of FAR 52.219-8, Utilization of Small Business Concerns;
5. Past performance of the Offeror in complying with the requirements of FAR 52.219-
9, Small Business Subcontracting Plan (where applicable for large business Offeror)
6. The extent of the participation of small business prime Offerors and small business subcontractors in terms of total contract value.
7. The extent to which the Offeror meets or exceeds the goals identified in the table below. While there is no goal assigned for the specific socio-economic set asides, anything proposed other than 0.00% would be a strength.
The Small Business goals for this procurement are identified below:
Procurement Goals
Small Business Category Procurement Goals
Small Business (SB) 30%
Small Disadvantaged Business 0%
Women-Owned Small Business 0%
HUBZone Small Business 0%
Veteran Owned Small Business 0%
Service-Disabled Veteran-Owned Small Business 0%
The adjectival rating shown in the table below depicts how well the Offeror’s proposal meets the small business participation requirements:
Small Business Participation Ratings
Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.
Good Proposal indicates a thorough approach and understanding of the small business objectives.
Acceptable Proposal indicates an adequate approach and understanding of small business objectives.
Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.
Unacceptable Proposal does not meet small business participation requirements and contains one or more deficiencies. Proposal is un-awardable.
2. 3. 4. Factor 4: Price
Price will be evaluated for reasonableness in accordance with FAR Part 15. Contract Line Item prices will be evaluated to determine whether the proposed prices are reasonable for the work to be performed; reflect a clear understanding of the requirements; and are consistent with the Offeror's technical proposal.
The Offeror shall ensure the information submitted is consistent with and fully supports the dollar values set forth in the SF1442 Schedule of Prices.
The Government may reject any proposal that is evaluated and determined to be unrealistic in terms of project commitments, including contract terms and conditions, or unreasonably high or low in cost when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the project.
2. 4. Proposal Submission
2. 4. 1. Introduction
The Offeror’s proposal shall be submitted in electronic version to the Contract Specialist, Carissa McKinley, carissa.j.mckinley@usace.army.mil, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.
The Offeror’s proposal shall consist of the following five (5) volumes:
I – Technical Approach II – Past Performance III – Small Business Participation
*Small Business Subcontracting Plans shall be submitted with the proposal if the Offeror is a large business.
IV – Price V – Solicitation, Offer and Award Documents and
Certifications/Representations/Bonds/JV or LLC info
Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform.
Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. 4. 2. Proposal Submission Requirements
The proposal submission requirements are as follows:
a. Each volume shall be submitted as a separate PDF file. Each volume shall be clearly labeled with its title. Offeror shall sign the first two pages of SF 1442.
b. Typing should be single spaced. Each paragraph shall be separated by at least one (1) blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
Table below illustrates the Proposal Submission Requirements and volumes of material that shall be submitted:
VOLUME TITLE
DIGITAL
COPIES
MAXIMUM PAGES
I – Technical Approach 1 50
II – Past Performance 1 25*
III – Small Business Participation and Subcontracting Plan, if applicable
1 25**
IV – Price 1 Schedule of Prices
V– Solicitation, Offer and Award Documents and Certifications/ Representations/Bid Bond
1 N/A
Notes:
* Not including the Past Performance Questionnaire Forms.
** The Small Business Subcontracting Plan shall be submitted with the proposal, if Offeror is a large business, to be considered for award. Small Business Subcontracting Plan is required in accordance with FAR 52.219-9 if other than a U.S. Small Business Offeror. See Appendix (G) Subcontracting Plan Example.
The small business subcontracting plans are excluded from the page count.
Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
A copy of the bid bond shall be submitted with the proposal. The original bid bond shall be received by the contract specialist within three (3) days of solicitation closing to be considered for award.
2. 4. 3. Proposal Files
The proposal files shall adhere to the following formatting guidelines.
2. 4. 3. 1. Format
The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
NOTE: 11x17 pages are acceptable for tables/graphic representations; however, each 11x17 page counts as two (2) pages.
2. 4. 3. 2. File Packaging
Files shall be in read-only format, using PDF files.
2. 4. 3. 3. Content Organization
All information shall be confined to the appropriate volume. Each volume of the proposal shall consist of a Table of Contents, along with the detailed information provided below:
VOLUME I – Technical Approach:
The volume shall consist of all information required to support the technical approach.
No technical approach information shall be contained in any other volume of this proposal. The volume shall be organized into the following sections:
Sub-Factor 1: Work Plan. The work plan portion of the proposal shall address the following as a minimum:
o Element 1: Work Plan Narrative o Element 2: Schedule
Sub-Factor 2: Corporate Management. The corporate management portion of the proposal shall address the following as a minimum:
o Element 1: Key Personnel o Element 2: Safety
VOLUME II – Past Performance
Provide descriptions on a minimum of two (2) projects, but no more than five (5), substantially complete or completed by the Prime Contractor within the last fifteen (15) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than fifteen (15) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if all features of work are usable and pre-final inspections have been held.
The prime contractor must have self-performed at least 15 percent of the direct contract labor (including layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment or subcontractors to be considered similar.
Offerors shall submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past fifteen (15) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation.
The following information shall be provided for each project:
a) Project Title, Location, and Contract Number/Unique Identifier
b) Current percentage of construction complete and the date it was or will be complete
a. For projects that are not yet complete, provide description of work remaining to be completed.
c) Scope of the project, to include purpose
d) Size of the project,
e) Portion and percentage of work that was self-performed
Data concerning the Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. No past performance information shall be contained in any other volume of this proposal.
Submit a separate sheet for each reference. It is the Offeror’s responsibility to ensure points of contact can be contacted by the Government’s evaluators and that they will cooperate.
The Offeror shall submit up to five (5) Past Performance Questionnaire (PPQ) Forms which shall identify if the contract is active or complete; if the contract was for the Government (Federal, state, local, etc.) or commercial; and if the Offeror was the prime contractor, a teaming partner, and/or joint venture. Clearly link the past performance information to the Technical Approach factor/sub-factors/elements stated in the solicitation.
Additionally, as applicable, Offerors are to include a discussion of efforts to resolve problems encountered as well as efforts to identify and manage project risk. Where problems existed, clearly demonstrate management actions employed in overcoming these problems and the effects of those actions, in terms of improvements achieved or problems rectified.
Contracts shall be at least six (6) months old to be considered. Contracts with expiration dates prior to fifteen (15) years ago shall not be considered. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.
The Past Performance Questionnaire must be submitted by the Offeror with the proposal submission and NOT sent directly to the agency from the references.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the Offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture Offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number (formerly known as DUNS) with the JV proposal. Projects performed by other contractors than the Offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV Offeror as demonstrated by a signed JV agreement. If the Offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed five (5).
VOLUME III – Small Business Participation Plan
No small business participation information shall be contained in any other volume of this proposal. Content of Small Business Participation Volume shall include the following:
Small Business Participation Plan – See Appendix (F) Enclosure 4 - Small Business Participation Plan Example
Small Business Subcontracting Plan is required in accordance with FAR 52.219-9 if other than a U.S. Small Business Offeror. See Appendix (G) Subcontracting Plan Example
Separate from a Small Business Participation Plan, other than U.S. Small Business Offerors must also submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219-7004 if the Offeror has a comprehensive subcontracting plan).
In accordance with DFARS 215.304(c) (i) (C), the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted pursuant to FAR 52.219-9, therefore subcontracting plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. The Subcontracting Plan is NOT evaluated or rated, but will be reviewed and, if applicable, negotiated prior to incorporation into contract.
VOLUME IV – Price:
No pricing information shall be contained in any other volume of this proposal.
The Schedule of Prices must be completed and returned. Failure to provide the Schedule of Prices will result in your proposal not being considered for award.
VOLUME V – Solicitations, Offer And Award Documents And Certifications / Representations/ Bid Bond
Standard Form 1442 Solicitation, Offer and Award and all amendments Representations, Certification and Other Statements of Offerors, Bid Bond
2. 5. Discussions
In accordance with FAR 15.306(d), discussion sessions with each Offeror may be held. Should discussions take place, all Offerors in the competitive range will be allowed a minimum of seven
(7) calendar days to submit Final Proposal Revisions.
If discussions are conducted, the Contracting Officer will schedule the discussion sessions, and each Offeror will be notified of the time and place at least three (3) business days prior to their discussion session. Appropriate security clearances should be provided by the Offerors in sufficient time to process the requests. The Contracting Officer will provide additional instructions with the notification. The discussion sessions will take place by the method of the Government’s choosing and provided to the contractor in writing.
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
(End of Provision)
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)
(a) Definition. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
(b) The Offeror shall enter its CAGE code in its offer with its name and address or otherwise include it prominently in its proposal. The CAGE code entered must be for that name and address. Enter ``CAGE'' before the number.