W912EK19R0012 Amendment 0001 The purpose of this amendment is to make changes: SCHEDULE OF PRICES; SECTION 01 22 00; SECTION 01 33 00; SECTION 01 78 00; SECTION 35 20 23; and to delete SECTION 32 92 19. SECTION "Source Selection", paragraph 2.5 - Discussions: "all Offerors in the competitive range will be allowed a minimum of three (3) days to submit Final Proposal Revisions." All other terms and conditions remain unchanged.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes to the following:

SCHEDULE OF PRICES; SECTION 01 22 00; SECTION 01 33 00; SECTION 01 78 00; SECTION 35 20 23; and to delete SECTION 32 92 19.

SECTION "Source Selection", paragraph 2.5 - Discussions: "all Offerors in the competitive range will be allowed a minimum of three (3) days to submit Final Proposal Revisions."

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2019

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK19R0012

X 9B. DATED (SEE ITEM 11)

18-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2019

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0001

The following modifications are made to SCHEDULE OF PRICES; SECTION 01 22 00; SECTION 01 33 00; SECTION 01 78 00; SECTION 35 20 23; and to delete

SECTION

32 92 19.

SCHEDULE

OF PRICES

a. SCHEDULE OF PRICES. Delete the Schedule of Prices, in its entirety, and substitute therefor revised Schedule of Prices.

01 22 00

b. PAGES SECTION 01 22 00 PAGE 1 THROUGH SECTION 01 22 00 PAGE 12.

Delete pages SECTION 01 22 00 Page 1 through SECTION 01 2200 Page 12 in their entirety, and substitute therefor revised and new pages SECTION 01 22 00 Page 1 through SECTION 01 22 00 Page 13.

01 33 00

c. SECTION 01 33 00 SUBMITTAL REGISTER (Page 1 of 14 through Page

14 of 14). Delete the Submittal Register, in its entirety, and substitute therefor revised Submittal Register (Page 1 of 14 through Page 14 of 14).

SECTION 05 59 13

d. SECTION 05 59 13 Page 1 through SECTION 05 59 13 Page 28. Delete pages SECTION 05 59 13 Page 1 through SECTION 05 59 13 Page 28, in their entirety, and substitute therefor revised and new pages SECTION 05 59 13 Page 1 through SECTION 05 59 13 Page 29.

SECTION 31 68 13

e. SECTION 31 68 13 Page 1 through SECTION 31 68 13 Page 29. Delete pages SECTION 31 68 13 Page 1 through SECTION 31 68 13 Page 29, in their entirety, and substitute therefor revised pages SECTION 31 68 13 Page 1 through SECTION 31 68 13 Page 29.

SECTION 40 95 00

f. SECTION 40 95 00 Page 1 through SECTION 40 95 00 Page 8. Delete pages SECTION 40 95 00 Page 1 through SECTION 40 95 00 Page 8, in their entirety, and substitute therefor revised pages SECTION 40 95 00 Page 1 through SECTION 40 95 00 Page 8.

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

SCHEDULE OF PRICES

SCHEDULE OF PRICES

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE BID

STARVED ROCK LOCK AND DAM

0001 Temporary Field Offices

0001AA First 6 Months 6 MO $ $

0001AB Over 6 Months 1 MO $ $

0002 Mobilization and Demobilization 1 JOB XXXXXXXX $

0003 Stair Towers 1 JOB XXXXXXXX $

0004 Weep Hole Cleaning 1 JOB XXXXXXXX $

0005 Upstream Gate Installation

0005AA Miter Gate Disposal 1 JOB XXXXXXXX $

0005AB Lock Wall Concrete and Embedded Steel Removal

1 JOB XXXXXXXX $

0005AC Lock Wall Concrete Placement 1 JOB XXXXXXXX $

0005AD Anchorage Fabrication and Delivery 1 JOB XXXXXXXX $

0005AE Anchorage Installation 1 JOB XXXXXXXX $

0005AF Quoin Fabrication and Delivery 1 JOB XXXXXXXX $

0005AG Quoin Installation 1 JOB XXXXXXXX $

0005AH Pintle Base Fabrication and Delivery 1 JOB XXXXXXXX $

0005AJ Pintle Base Installation 1 JOB XXXXXXXX $

SCHEDULE OF PRICES (cont.)

0005AK

Sill Concrete Removal

JOB

XXXXXXXX

0005AL Sill Concrete Placement 1 JOB XXXXXXXX $

0005AM Control Stand Removal and Replacement

1 JOB XXXXXXXX $

0005AN Distribution and Controls Wiring 1 JOB XXXXXXXX $

0005AP Temporary Electrical and Control System

1 JOB XXXXXXXX $

0005AQ Electrical Commissioning 1 JOB XXXXXXXX $

0005AR Strut Arm Limit Switch Work 1 JOB XXXXXXXX $

0005AS Handrail Removal and Reinstallation 170 LF $ $

0006 Downstream Gate Installation

0006AA Miter Gate Disposal 1 JOB XXXXXXXX $

0006AB Lock Wall Concrete and Embedded Steel Removal

1 JOB XXXXXXXX $

0006AC Lock Wall Concrete Placement 1 JOB XXXXXXXX $

0006AD Anchorage Fabrication and Delivery 1 JOB XXXXXXXX $

0006AE Anchorage Installation 1 JOB XXXXXXXX $

0006AF Quoin Fabrication and Delivery 1 JOB XXXXXXXX $

0006AG Quoin Installation 1 JOB XXXXXXXX $

0006AH Pintle Base Fabrication and Delivery 1 JOB XXXXXXXX $

0006AJ Pintle Base Installation 1 JOB XXXXXXXX $

0006AK

Sill Concrete Removal

0006AL Sill Concrete Placement 1 JOB XXXXXXXX $

0006AM Post-Tensioned Rock Anchors 24 EA $ $

0006AN Temporary Electrical and Control System

1 JOB XXXXXXXX $

0006AP Electrical Commissioning 1 JOB XXXXXXXX $

0006AQ Strut Arm Limit Switch Work 1 JOB XXXXXXXX $

0006AR Handrail Removal and Reinstallation 170 LF $ $

TOTAL OF ESTIMATED AMOUNTS - BASE BID

(ITEM NOS. 0001 THROUGH 0006AR, INCL.)

OPTION A

MARSEILLES LOCK AND DAM

0101 Temporary Field Offices

0101AA First 6 Months 6 MO $ $

0101AB Over 6 Months 1 MO $ $

0102 Mobilization and Demobilization 1 JOB XXXXXXXX $

0103 Stair Towers 1 JOB XXXXXXXX $

0104 Weep Hole Cleaning 1 JOB XXXXXXXX $

0105 Upstream Gate Installation

0105AA Miter Gate Disposal 1 JOB XXXXXXXX $

0105AB Lock Wall Concrete and Embedded Steel Removal

1 JOB XXXXXXXX $

0105AC Lock Wall Concrete Placement 1 JOB XXXXXXXX $

0105AD

Anchorage Fabrication and Delivery

0105AE Anchorage Installation 1 JOB XXXXXXXX $

0105AF Quoin Fabrication and Delivery 1 JOB XXXXXXXX $

0105AG Quoin Installation 1 JOB XXXXXXXX $

0105AH Pintle Base Fabrication and Delivery 1 JOB XXXXXXXX $

0105AJ Pintle Base Installation 1 JOB XXXXXXXX $

0105AK Sill Concrete Removal 1 JOB XXXXXXXX $

0105AL Sill Concrete Placement 1 JOB XXXXXXXX $

0105AM Control Stand Removal and Replacement

1 JOB XXXXXXXX $

0105AN Distribution and Controls Wiring 1 JOB XXXXXXXX $

0105AP Temporary Electrical and Control System

1 JOB XXXXXXXX $

0105AQ Electrical Commissioning 1 JOB XXXXXXXX $

0105AR Strut Arm Limit Switch Work 1 JOB XXXXXXXX $

0105AS Handrail Removal and Reinstallation 170 LF $ $

0106 Downstream Gate Work

0106AA Temporary Electrical and Control System

1 JOB XXXXXXXX $

W912EK19R0012

0106AB

Electrical Commissioning

0106AC Strut Arm Limit Switch Work 1 JOB XXXXXXXX $

0106AD Lock Wall Concrete and Embedded Steel Removal

1 JOB XXXXXXXX $

0106AE Lock Wall Concrete Placement 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS - OPTION A

(ITEM NOS. 0101 THROUGH 0106AE, INCL.)

TOTAL OF ESTIMATED AMOUNTS - BASE BID AND OPTION A

(ITEM NOS. 0001 THROUGH 0106AE, INCL.)

EA = EACH JOB = LUMP SUM LF = LINEAR FEET MO =

MONTHS ENSURE THAT AMOUNT LINES FOR ALL ITEMS ARE

COMPLETED.

THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE "OPTION A"

BY 15 NOVEMBER 2019.

IF "OPTION A" IS EXERCISED, THE CONTRACT DURATION

WILL NOT BE EXTENDED.

SOURCE SELECTION

1. 1. Basis for Award

The Government will select for award the proposal that is most advantageous and represents the best overall value to the Government, considering the Technical Approach, Past Performance, Small Business Participation and Price, along with their respective sub-factors (as applicable).

As a result, the Government may select for award the Offeror whose proposed prices are not the lowest, but whose technical approach, past performance and small business participation proposals are more complete as to justify the payment of a higher price. Conversely, the Government may select for award the Offeror whose proposed prices are lower than other proposals that are not sufficiently more advantageous to justify the payment of a higher price.

The evaluation factors are as follows: technical approach, past performance, small business participation and price. All non-price evaluation factors, when combined, are approximately equal to price. The technical approach is significantly more important than past performance and small business. The past performance factor is significantly more important than small business participation.

Proposed prices will be evaluated but not scored or otherwise combined with the other aspects of the proposal evaluation. An Offeror must be considered “Acceptable” with no greater than a moderate risk in all factors and sub-factors to be considered for award. Any sub-factor rated as “unacceptable” will render the entire factor “unacceptable”.

1. 2. Factors and Sub-Factors to Be Evaluated

Award will be made to the Offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors identified and described below. The following evaluation factors and sub-factors will be used to evaluate each proposal:

Factor 1: Technical Approach: This factor is further divided into the following sub-factors;

a. Sub-factor 1: Work Plan

Element 1: Work Plan Narrative Element 2: Schedule

b. Sub-factor 2: Corporate Management Element 1: Key Personnel Element 2: Safety

Sub-factor 1 is significantly more important than sub-factor 2.

Factor 2: Past Performance: The past performance evaluation considers each Offeror's demonstrated recent, relevant and quality record of performance in supplying products and services that meet the contract’s requirements.

Factor 3: Small Business Participation: All Offerors will be evaluated on the level of proposed participation of small businesses.

Factor 4: Price: The resulting award will be a Firm Fixed Price Contract for construction services. Price reasonableness will be utilized in the evaluation of this effort in accordance with FAR Part 15 procedures.

2. 3. Evaluation Approach

All proposals will be evaluated by the Source Selection Team (SST). Evaluation of the Offeror’s proposal shall address each factor and sub-factor as it applies to the plans and specifications. A detailed explanation of the criteria for the evaluation is set forth in this section. During evaluations of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.

The overarching evaluation approach for all factors and sub-factors is as follows:

1. Adequacy of Response. The proposal will be evaluated to determine whether the Offeror’s methods and approach have completely considered, defined, and satisfied the requirements specified in the Request for Proposal (RFP). The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP.

2. Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which the Offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.

Definitions:

Deficiency: A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

Strength: An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.

See FAR 15.001.

Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

Uncertainty: Any aspect of a non-cost/price factor proposal for which the intent of the Offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).

2. 3. 1. Factor 1: Technical Approach

The Government will be utilizing a combined technical/risk rating approach which includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties and deficiencies in determining the technical rating.

Sub-factor ratings shall be rolled up into an overall rating for Factor 1; Technical Approach. The following table, which utilizes a combined technical/risk rating, shall be used for the technical factor and all sub-factors.

COMBINED TECHNICAL/RISK RATING

Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

The Technical Approach Factor is divided into the following sub-factors:

2. 3. 1. 1. Sub-factor 1: Work Plan

This sub-factor evaluates the Offeror’s proposed work plan for the entire length of the contract.

The Government will evaluate the Offeror’s proposed work plan to determine understanding of and compliance with the Government’s requirements. The elements are listed in descending order of importance.

Element 1: Work Plan Narrative

The Offeror shall submit a Work Plan that describes the overall plan of operations to complete the contract work. The Offeror is encouraged to provide descriptions and illustrations which show the contractor’s, subcontractor’s, and supplier’s qualifications and methodology to accomplish the work, including, but not limited to, descriptions of equipment, special fabrications, and specialized labor. Items of particular concern to the government are:

• Proposed concrete demolition procedure and what steps will be taken to protect the adjacent components from damage;

• Proposed electrical demolition and installation procedure;

• Proposed rock anchor installation procedure; and

• Coordination of construction at both sites to coincide for the full lock closure.

The Government will evaluate the work plan narrative based on the following:

• Completeness of plan with respect to items of concern listed above;

• Demonstration of thorough understanding of and ability to comply with the project requirements;

• Reasonableness of contractor sequencing in terms of site constraints and challenges associated with the work; and

• Ability to mitigate construction and scheduling risk associated with project features.

Element 2: Schedule

The Offeror shall submit a single critical path method construction schedule and narrative demonstrating a logical and efficient sequence for completing the work at both Marseilles and Starved Rock sites, on a single schedule.

Items of particular concern to the Government are:

• Labels and durations on all activities;

• Detailed work sequences for all major activities, including the reasoning for the timing of activities;

• Critical long-lead time materials and fabrications;

• Submittal (including shop drawings) preparation and approval; and

• Timing of work items to be coordinated with the Government.

The Government will evaluate the schedule based on the following:

• Completeness and reasonableness of the schedule;

• Demonstration of thorough understanding of the project requirements;

• Reasonableness of work sequencing in terms of site constraints, river hydrologic conditions, and challenges associated with the work;

• Ability to mitigate construction and scheduling risk associated with project features and project locations

• Consideration of lead times for major equipment; and

• Minimization of critical path activities.

The contractor shall assume a contract notice to proceed (NTP) of 15 October 2019 for proposal evaluation purposes only. October 15th is an estimated date for evaluation purposes and may not necessarily represent the actual NTP date for the awarded contract.

2. 3. 1. 2. Sub-factor 2: Corporate Management

Element 1: Key Personnel

The Government will evaluate the Offeror’s proposed key personnel to be utilized on the contract. Resumes shall be limited to one (1) page per individual and shall include the name, proposed role for the project, education, years of experience in the proposed role, years of experience with the Offeror and notable experience similar to this project.

The Government defines key personnel as the Project Manager, Site Superintendent, Quality Control Manager and Site Safety and Health Officer.

Evaluation Criteria:

The Government will evaluate the information to determine how well the Offeror identifies and demonstrates that its key personnel has the necessary qualifications to manage, control and perform these construction requirements:

a. Project Manager with at least 5 years construction and construction management experience.

b. Site Superintendent with at least 5 years of experience managing projects with multiple sub-contractors and familiarity with scheduling multiple locations.

c. Quality Control System Manager shall meet the requirements in Section 01 45 04.

d. Site Safety and Health Officer with at least 5 years of experience managing and implementing safety and occupation health program(s) which demonstrate relevance to the project scope and applicable sections of EM 385-1-1, Safety and Health Requirements Manual, version 2014

The Government intends to give greater weight to proposals where the key personnel demonstrate:

• More extensive experience working on relevant projects that are similar in size, scope and complexity to the work that is the subject of this requirement

• Experience in proposed role which greatly exceeds the years of experience listed above;

• More extensive experience in proposed role with the Offeror.

Element 2: Safety

The Government will evaluate the Offeror’s proposal to determine capability to meet the Government requirements in regards to Safety. The Offeror’s proposal will be evaluated on the following:

• Experience Modifier

• The Government will evaluate the Experience Modifier as provided by the Offeror’s Insurance Carrier in accordance to the table below. The Offeror must provide documentation, from their Insurance Carrier, that demonstrates their safety and health program experience using an “Experience Modification Rate (EMR)” from 2013-2018.

Rating Experience Modifier Superior 0.7 or below

Acceptable 0.71 to 1.0 Sub-Standard 1.1 or greater

2. 3. 2. Factor 2: Past Performance

The Government will evaluate the Offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the Plans and Specifications.

Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires set forth in Appendix D.

The Government will focus its inquiries on the Offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including cost, schedule, performance, construction experience and management of subcontractors. Major subcontractors for the purpose of Past Performance evaluation are defined as members of an Offeror’s overall team who are expected to perform ten (10%) percent or more of the proposed effort. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, Offerors will be reminded to include the most recent and relevant efforts within the past fifteen (15) years in their proposal.

The Government may use data provided by the Offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System (NAICS) 237990. Data used in conducting performance risk assessments shall not extend past fifteen (15) years prior to the issue date of the solicitation, but may include performance data generated during the past fifteen (15) years without regard to the contract award date.

Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

The past performance factor considers each Offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract requirements. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each Offeror. There are three (3) aspects to the past performance evaluation: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information).

The first aspect is the recency of the Offeror’s past performance. Recency is expressed as a time period during which past performance references are considered relevant, and is critical to establishing the relevancy of past performance information. Offerors may submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past fifteen (15) years, from the issue date of this RFP.

The second aspect is to determine how relevant a recent effort accomplished by the Offeror is to the effort to be acquired. In establishing what is relevant for the acquisition, consideration will be given to those aspects of an Offeror’s history of contract (or subcontract) performance that would provide the most context and give the greatest ability to measure whether the Offeror will successfully satisfy the current requirement. With respect to relevancy, past performance of greater relevancy will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

Relevance will reflect what an Offeror has done in relation to same/similar construction type projects such as:

• Vertical and horizontal concrete demolition with protection of adjacent concrete components

• Mass Placement of Concrete (over 100 cubic yards)

• Navigation Lock Power Control & Lighting Systems

• Placement of rock anchors

• Management of two or more concurrent construction sites on navigational waterways, the

Source Selection Team may determine the past performance project to be more relevant and thus may receive a higher past performance rating

The criteria set forth below will be used to rate the degree of past performance relevancy.

PAST PERFORMANCE RELEVANCY

Relevancy Description

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

The third aspect of the past performance evaluation is to establish the overall quality of the Offeror’s past performance in accordance with FAR 15.304(c)(2). The Source Selection Team will review all past performance information collected and determine the quality of the Offeror’s performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment.

The past performance confidence assessment will utilize the most appropriate ratings from the table below. This rating considers the assessed confidence of the recent/relevant/quality information gathered. In the case of Offerors for which there is no information on past contract performance or where past contract performance information is not available, the Offeror will not be evaluated favorably or unfavorably and will be assigned a performance confidence rating of “neutral.” If an Offeror’s past performance is unknown and assigned a performance confidence rating of “neutral,” the Source Selection Authority may determine that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating.

Performance Confidence Assessment Ratings

Assessment Description

Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

Unknown Confidence (Neutral)

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.

2. 3. 3. Factor 3: Small Business Participation

All Offerors (both large and small businesses) will be evaluated on the level of proposed participation of small businesses in the performance of acquisition (as small business prime Offerors or small business subcontractors) relative to the objectives and goals established herein.

Evaluation of the small business participation plan shall be in accordance with the Small Business Participation Commitment Template set forth in Appendix F, and will be incorporated as part of the resulting contract in section H.

The Government will evaluate:

1. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;

2. The extent to which offers demonstrate substantive commitment to the small business firms identified in proposal, such as J/V, Mentor Protégé Agreements, or other demonstrations of commitment (i.e. binding commitments-even verbal-that could become enforceable after award) Enforceable commitments will be weighted more heavily than non-enforceable ones;

3. Identification of the complexity and variety of the work small firms are to perform;

4. Past performance of the Offeror’s compliance with requirements of FAR 52.219-8, Utilization of Small Business Concerns;

5. Past performance of the Offeror in complying with the requirements of FAR 52.219- 9, Small Business Subcontracting Plan (where applicable for large business Offeror)

6. The extent of the participation of small business prime Offerors and small business subcontractors in terms of total contract value.

7. The extent to which the Offeror meets or exceeds the goals identified in the table below. While there is no goal assigned for the specific socio-economic set asides, anything proposed other than 0.00% would be a strength.

The Small Business goals for this procurement are identified below:

Procurement Goals

Small Business Category Procurement Goals

Small Business (SB) 30%

Small Disadvantaged Business 0%

Women-Owned Small Business 0%

HUBZone Small Business 0%

Veteran Owned Small Business 0%

Service-Disabled Veteran-Owned Small Business 0%

The adjectival rating shown in the table below depicts how well the Offeror’s proposal meets the small business participation requirements:

Small Business Participation Ratings

Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.

Good Proposal indicates a thorough approach and understanding of the small business objectives.

Acceptable Proposal indicates an adequate approach and understanding of small business objectives.

Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet small business participation requirements and contains one or more deficiencies. Proposal is un-awardable.

2. 3. 4. Factor 4: Price

Price will be evaluated for reasonableness in accordance with FAR Part 15. Contract Line Item prices will be evaluated to determine whether the proposed prices are reasonable for the work to be performed; reflect a clear understanding of the requirements; and are consistent with the Offeror's technical proposal.

The Offeror shall ensure the information submitted is consistent with and fully supports the dollar values set forth in the SF1442 Schedule of Prices.

The Government may reject any proposal that is evaluated and determined to be unrealistic in terms of project commitments, including contract terms and conditions, or unreasonably high or low in cost when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the project.

2. 4. Proposal Submission

2. 4. 1. Introduction

The Offeror’s proposal shall be submitted in electronic version to the Contract Specialist, Carissa McKinley, carissa.j.mckinley@usace.army.mil, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.

The Offeror’s proposal shall consist of the following five (5) volumes:

I – Technical Approach II – Past Performance III – Small Business Participation

*Small Business Subcontracting Plans shall be submitted with the proposal if the Offeror is a large business.

IV – Price V – Solicitation, Offer and Award Documents and

Certifications/Representations/Bonds/JV or LLC info

Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.

Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform.

Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

2. 4. 2. Proposal Submission Requirements

The proposal submission requirements are as follows:

a. Each volume shall be submitted as a separate PDF file. Each volume shall be clearly labeled with its title. Offeror shall sign the first two pages of SF 1442.

b. Typing should be single spaced. Each paragraph shall be separated by at least one (1) blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

Table below illustrates the Proposal Submission Requirements and volumes of material that shall be submitted:

VOLUME TITLE DIGITAL

COPIES MAXIMUM PAGES

I – Technical Approach 1 50

II – Past Performance 1 25*

III – Small Business Participation and Subcontracting Plan, if applicable

1 25**

IV – Price 1 Schedule of Prices

V– Solicitation, Offer and Award Documents and Certifications/ Representations/Bid Bond

1 N/A

Notes:

* Not including the Past Performance Questionnaire Forms.

** The Small Business Subcontracting Plan shall be submitted with the proposal, if Offeror is a large business, to be considered for award. Small Business Subcontracting Plan is required in accordance with FAR 52.219-9 if other than a U.S. Small Business Offeror. See Appendix (G) Subcontracting Plan Example.

The small business subcontracting plans are excluded from the page count.

Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

A copy of the bid bond shall be submitted with the proposal. The original bid bond shall be received by the contract specialist within three (3) days of solicitation closing to be considered for award.

2. 4. 3. Proposal Files

The proposal files shall adhere to the following formatting guidelines.

2. 4. 3. 1. Format

The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”

NOTE: 11x17 pages are acceptable for tables/graphic representations; however, each 11x17 page counts as two (2) pages.

2. 4. 3. 2. File Packaging

Files shall be in read-only format, using PDF files.

2. 4. 3. 3. Content Organization

All information shall be confined to the appropriate volume. Each volume of the proposal shall consist of a Table of Contents, along with the detailed information provided below:

VOLUME I – Technical Approach:

The volume shall consist of all information required to support the technical approach.

No technical approach information shall be contained in any other volume of this proposal. The volume shall be organized into the following sections:

• Sub-Factor 1: Work Plan. The work plan portion of the proposal shall address the following as a minimum:

o Element 1: Work Plan Narrative o Element 2: Schedule

• Sub-Factor 2: Corporate Management. The corporate management portion of the proposal shall address the following as a minimum:

o Element 1: Key Personnel o Element 2: Safety

VOLUME II – Past Performance

Provide descriptions on a minimum of two (2) projects, but no more than five (5), substantially complete or completed by the Prime Contractor within the last fifteen (15) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than fifteen (15) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if all features of work are usable and pre-final inspections have been held.

The prime contractor must have self-performed at least 15 percent of the direct contract labor (including layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment or subcontractors to be considered similar.

Offerors shall submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past fifteen (15) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation.

The following information shall be provided for each project:

a) Project Title, Location, and Contract Number/Unique Identifier

b) Current percentage of construction complete and the date it was or will be complete

a. For projects that are not yet complete, provide description of work remaining to be completed.

c) Scope of the project, to include purpose

d) Size of the project,

e) Portion and percentage of work that was self-performed

Data concerning the Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. No past performance information shall be contained in any other volume of this proposal.

Submit a separate sheet for each reference. It is the Offeror’s responsibility to ensure points of contact can be contacted by the Government’s evaluators and that they will cooperate.

The Offeror shall submit up to five (5) Past Performance Questionnaire (PPQ) Forms which shall identify if the contract is active or complete; if the contract was for the Government (Federal, state, local, etc.) or commercial; and if the Offeror was the prime contractor, a teaming partner, and/or joint venture. Clearly link the past performance information to the Technical Approach factor/sub-factors/elements stated in the solicitation.

Additionally, as applicable, Offerors are to include a discussion of efforts to resolve problems encountered as well as efforts to identify and manage project risk. Where problems existed, clearly demonstrate management actions employed in overcoming these problems and the effects of those actions, in terms of improvements achieved or problems rectified.

Contracts shall be at least six (6) months old to be considered. Contracts with expiration dates prior to fifteen (15) years ago shall not be considered. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

The Past Performance Questionnaire must be submitted by the Offeror with the proposal submission and NOT sent directly to the agency from the references.

NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the Offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture Offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number (formerly known as DUNS) with the JV proposal. Projects performed by other contractors than the Offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV Offeror as demonstrated by a signed JV agreement. If the Offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed five (5).

VOLUME III – Small Business Participation Plan

No small business participation information shall be contained in any other volume of this proposal. Content of Small Business Participation Volume shall include the following:

Small Business Participation Plan – See Appendix (F) Enclosure 4 - Small Business Participation Plan Example

Small Business Subcontracting Plan is required in accordance with FAR 52.219-9 if other than a U.S. Small Business Offeror. See Appendix (G) Subcontracting Plan Example

Separate from a Small Business Participation Plan, other than U.S. Small Business Offerors must also submit a subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219-7004 if the Offeror has a comprehensive subcontracting plan).

In accordance with DFARS 215.304(c) (i) (C), the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted pursuant to FAR 52.219-9, therefore subcontracting plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. The Subcontracting Plan is NOT evaluated or rated, but will be reviewed and, if applicable, negotiated prior to incorporation into contract.

VOLUME IV – Price:

No pricing information shall be contained in any other volume of this proposal.

The Schedule of Prices must be completed and returned. Failure to provide the Schedule of Prices will result in your proposal not being considered for award.

VOLUME V – Solicitations, Offer And Award Documents And Certifications / Representations/ Bid Bond

Standard Form 1442 Solicitation, Offer and Award and all amendments Representations, Certification and Other Statements of Offerors, Bid Bond

2. 5. Discussions

In accordance with FAR 15.306(d), discussion sessions with each Offeror may be held. Should discussions take place, all Offerors in the competitive range will be allowed a minimum of three

(3) calendar days to submit Final Proposal Revisions.

If discussions are conducted, the Contracting Officer will schedule the discussion sessions, and each Offeror will be notified of the time and place at least three (3) business days prior to their discussion session. Appropriate security clearances should be provided by the Offerors in sufficient time to process the requests. The Contracting Officer will provide additional instructions with the notification. The discussion sessions will take place by the method of the Government’s choosing and provided to the contractor in writing.

(End of Summary of Changes)

Solicitation No. W912EK19R0012

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 JOB PAYMENT ITEMS

1.1.1 Mobilization and Demobilization

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.2 Stair Towers

1.1.2.1 Payment

1.1.2.2 Unit of Measure

1.1.3 Weep Hole Cleaning

1.1.3.1 Payment

1.1.3.2 Unit of Measure

1.1.4 Miter Gate Disposal

1.1.4.1 Payment

1.1.4.2 Unit of Measure

1.1.5 Lock Wall Concrete and Embedded Steel Removal

1.1.5.1 Payment

1.1.5.2 Unit of Measure

1.1.6 Lock Wall Concrete Placement

1.1.6.1 Payment

1.1.6.2 Unit of Measure

1.1.7 Anchorage Fabrication and Delivery

1.1.7.1 Payment

1.1.7.2 Unit of Measure

1.1.8 Anchorage Installation

1.1.8.1 Payment

1.1.8.2 Unit of Measure

1.1.9 Quoin Fabrication and Delivery

1.1.9.1 Payment

1.1.9.2 Unit of Measure

1.1.10 Quoin Installation

1.1.10.1 Payment

1.1.10.2 Unit of Measure

1.1.11 Pintle Base Fabrication and Delivery

1.1.11.1 Payment

1.1.11.2 Unit of Measure

1.1.12 Pintle Base Installation

1.1.12.1 Payment

1.1.12.2 Unit of Measure

1.1.13 Sill Concrete Removal

1.1.13.1 Payment

1.1.13.2 Unit of Measure

1.1.14 Sill Concrete Placement

1.1.14.1 Payment

1.1.14.2 Unit of Measure

1.1.15 Control Stand Removal and Replacement

1.1.15.1 Payment

1.1.15.2 Unit of Measure

SECTION 01 22 00 Page 1

AMEND 0001

30 JULY 2019

1.1.16 Distribution and Controls Wiring

1.1.16.1 Payment

1.1.16.2 Unit of Measure

1.1.17 Temporary Electrical and Control System

1.1.17.1 Payment

1.1.17.2 Unit of Measure

1.1.18 Electrical Commissioning

1.1.18.1 Payment

1.1.18.2 Unit of Measure

1.1.19 Strut Arm Limit Switch Work

1.1.19.1 Payment

1.1.19.2 Unit of Measure

1.2 UNIT PRICE PAYMENT ITEMS

1.2.1 Temporary Field Offices

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Post-Tensioned Rock Anchors

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Handrail Removal and Reinstallation

1.2.3.1 Payment

1.2.3.2 Unit of Measure

PART 2 MATERIALS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00 Page 2

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 JOB PAYMENT ITEMS

Payment items for the work of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, to be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed to constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.1 Mobilization and Demobilization

1.1.1.1 Payment

Mobilization and demobilization for all plant and equipment, materials, tools, and supplies necessary to complete the work, will be paid for:

Item No. 0002, "Starved Rock Lock and Dam - Mobilization and Demobilization," of the Base Bid; and

Item No. 0102, "Marseilles Lock and Dam - Mobilization and Demobilization," of Option A; as applicable.

Mobilization consists of all costs required to prepare plant and equipment for shipment, moving plant, equipment, supplies, and incidentals to the work site. Demobilization consists of all costs required to prepare plant and equipment for removal and for removing all plant, equipment, unused supplies, and incidentals from the work site, including restoration of staging areas used for construction operations. The Contractor will be paid 60 percent of the job price upon completion of mobilization to the work site. The remaining 40 percent will be paid to the Contractor upon completion of demobilization at the end of the Contract. Failure to justify such price to the satisfaction of the Contracting Officer may result in: payment of actual mobilization costs, as determined by the Contracting Officer at the completion of mobilization; actual demobilization costs, as determined by the Contracting Officer at the completion of demobilization; and payment of the remainder of this item in the final payment under this Contract. Construction bonds, with proof of a paid invoice, may be paid under this payment item.

1.1.1.2 Unit of Measure

Unit of measure: job.

SECTION 01 22 00 Page 3

1.1.2 Stair Towers

1.1.2.1 Payment

Payment for all costs associated with providing, maintaining, removing, and reinstalling stair towers as described in Section 01 53 11 PROTECTION, DEWATERING, AND DEBRIS REMOVAL, will be made for:

Item No. 0003, "Starved Rock Lock and Dam - Stair Towers," of the Base Bid; and

Item No. 0103, "Marseilles Lock and Dam - Stair Towers," of Option A;

as applicable.

1.1.2.2 Unit of Measure

Unit of measure: job.

1.1.3 Weep Hole Cleaning

1.1.3.1 Payment

Payment for all costs associated with cleaning, providing clean aggregate, repacking weep holes with clean aggregate, and disposing of materials as described in Section 01 53 11 PROTECTION, DEWATERING, AND DEBRIS REMOVAL, will be made for:

Item No. 0004, "Starved Rock Lock and Dam - Weep Hole Cleaning," of the Base Bid; and

Item No. 0104, "Marseilles Lock and Dam - Weep Hole Cleaning," of Option A; as applicable.

1.1.3.2 Unit of Measure

Unit of measure: job.

1.1.4 Miter Gate Disposal

1.1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.