AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

ILLINIOS RIVER BASIN, LAGRANGE LOCK AND DAM, MAJOR REHABILITATION

The reason for this amendment is to correct the follow ing: SECTION 00 73 05; SECTION 01 50 02; SECTION 02 41 00; SECTION 40 95 00; and the DRAWINGS.

The source selection plan, past performance propsoal submission is corrected.

The bidder inquiry questions and answ ers are hereby acknow ledged and incorporated.

The solicitation close date is hereby extended from 03 August 2018 to 07 August 2018 at 2:00pm CT.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK-18-R-0001

X 9B. DATED (SEE ITEM 11)

18-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jul-2018

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK-18-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0003

The following modifications are made to SECTION 00 73 05; SECTION 01 50 02; SECTION 02 41 00; SECTION 40 95 00; and the DRAWINGS.

SECTION 00 73 05

a. PAGE DOCUMENT TABLE OF CONTENTS 00 73 05 Page 2. Delete page DOCUMENT TABLE OF CONTENTS 00 73 05 Page 2, in its entirety, and substitute therefor revised page DOCUMENT TABLE OF CONTENTS 00 73 05 Page 2, Amendment No. 0003, dated 20 July 2018.

b. PAGE 00 73 05-30. Delete page 00 73 05-30, in its entirety, and substitute therefor revised page 00 73 05-30, Amendment No. 0003, dated 20 July 2018.

SECTION 01 50 02

c. PAGES 01 50 20-2 AND 01 50 02-3. Delete pages 01 50 20-2 and 01 50 20-3, in their entirety, and substitute therefor revised pages 01 50 20-2 and 01 50 20-3, Amendment No. 0003, dated 20 July 2018.

SECTION 02 41 00

d. PAGE 02 41 00-4. Delete page 02 41 00-4, in its entirety, and substitute therefor revised page 02 41 00-4, Amendment No. 0003, dated 20 July 2018.

SECTION 40 95 00

e SECTION TABLE OF CONTENTS 40 95 00 PAGE 1, PAGE 2, AND PAGE 3. Delete SECTION TABLE OF CONTENTS 40 95 00 Page 1, Page 2, and Page 3, in their entirety, and substitute therefor revised pages SECTION TABLE OF CONTENTS 40 95 00 Page 1, Page 2, and Page 3, Amendment No. 0003, dated 20 July 2018.

f. PAGES 40 95 00-3, 40 95 00-4, and 40 95 00-15. Delete pages 40 95 00-3, 40 95 00-4, and 40 95 00-15, in their entirety, and substitute therefor revised and new pages 40 95 00-3, 40 95 00-4, 40 95 00-15, and 40 95 00-15a, Amendment No. 0003, dated 20 July 2018.

DRAWING (SUPERSEDED)

g. Landwall Drawing Set Sheet ID SE201. Delete Drawing SE201, in its entirety, and substitute therefor revised Drawing SE201, Amendment No. 0003, dated 19 July 2018.

W912EK-18-R-0001

h. Landwall Drawing Set Sheet ID EA201. Delete Drawing EA201, in its entirety, and substitute therefor revised Drawing EA201, Amendment No. 0003, dated 20 July 2018.

i. Landwall Drawing Set Sheet ID EC502. Delete Drawing EC502, in its entirety, and substitute therefor revised Drawing EC502, Amendment No. 0003, dated 20 July 2018.

j. Bubbler System Drawing Set Sheet ID M-110. Delete Drawing M-110, in its entirety, and substitute therefor revised Drawing M-110, Amendment No. 0003, dated 20 July 2018.

k. PLC Drawing Set Sheet ID E-501. Delete Drawing E-501, in its entirety, and substitute therefor revised Drawing E-501, Amendment No. 0003, dated 20 July 2018.

l. I-Wall Drawing Set Sheet ID SD560. Delete Drawing SD560, in its entirety, and substitute therefor revised Drawing SD560, Amendment No. 0003, dated 23 July 2018.

The following paragraph was corrected within the source selection plan.

i. VOLUME II – Past Performance: This volume shall contain past performance information regarding similar contracts. This volume shall not exceed twenty five (25) pages plus five (5) pages for each major subcontractor.

Offerors may submit all Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded during the past fifteen (15) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Data concerning the Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror may also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. No past performance information shall be contained in any other volume of this proposal.

The solicitation close date is hereby extended from 03 August 2018 to 07 August 2018 at 2:00pm CT.

AMEND 0003

20 JULY 2018

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: LaGrange Lock and Dam, Major Rehabilitation Review: Solicitation Bidder Inquiry (00002) (sorted by CommentID ) Displaying 31 inquiries.

Id Discipline Sheet Detail Spec

7539251 Mechanical MC102 35 01 41-14 (1.6.1)

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Referenced on Plan Sheet MC102, the Rotary Actuator Performance requirements table shows Max. Operating torque is 4,500,000 in-lbs at 2050-psi. Specification 35 01 41-14 (1.6.1) which says "Required Gate Opening Torque:

6.736M in-lbs @ 2050 psi" Please clarify, if the specification reference is a requirement for the rotary actuator torque or if the specification refers to the actual torque at the gate and the rotary actuator torque is 4,500,000 in-lbs torque per the Plan sheet.

On: Jun 26 2018.

Government Response. . Amendment forthcoming On: Jun 27 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7548659 Electrical 40 95 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

1. The laptop will have Allen Bradley RSLogix 5000 PLC programming software. There is no specification for Visualization/HMI/SCADA/XL Reporter/ or Historian Software.

a. What additional software is required?

b. Specification 40 95 00, Attachment B shows 13 sample screens for operating this equipment. You have not specified a touchscreen or SCADA computer to be utilized for displaying these screens.

c. There are descriptions of graphing and trending. You have not specified any software or additional computer to be utilized for this capability.

On: Jul 02 2018.

Government Response. . 1.a: Contractor is required to provide software as required to meet the contract requirements, including but not limited to data logging, programming, and graphical representation of lock operation and equipment parameters (i.e. gate position, hydraulic pressure and flow and temperature, v.

time) on the laptop, and alarm messaging including out at each control stand.

1.b: Touchscreen is not required, but may be permitted. Note that the lock personnel will typically operate the lock machinery from hard-wired controls from each control stand, and not from the laptop PC. The Laptop PC will require an organization of screens to allow programming, trouble-shooting and graphical representation of lock operations and measured data (see 1.a. above).

1.c: See 1.a. above. The required laptop PC will be utilized for these processes. Software required for graphing, trending, trouble-shooting, commissioning and programming may be determined in part, by equipment installed. On: Jul 03 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7548664 Electrical 40 95 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

2. Drawing EH601, Component #12, The digital displays you have specified 2005S-485/485-120-C are obsolete Single Line Displays. 485 communications are also obsolete. Please specify a modern Ethernet display. This is possibly where the 13 sample screens are intended to be displayed? You would need a much larger (15" type) modern touchscreen with integral computer running Factorytalk SE Server (or similar) and each remaining touchscreen at the other 3 locations would be a client. Is this your intention? Other USACE locations have a standalone dedicated computer or redundant computers for SCADA and do not use a computer mounted at each control cabinet, however this is not shown on the network diagram. Regardless, this single line display cannot be programmed for the 13 sample screens and is only used for short pre-programmed messages.

On: Jul 02 2018.

Page 1 of 10ProjNet: Logged In User

7/25/2018https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

Government Response. . Obsolete displays noted in this inquiry are acknowledged by the government.

Drawing EH601 (Landwall set), Note 8, indicates that the listed part numbers are for design basis to help show intent, and not required part numbers. All displays other than the laptop PC are intended to show text alarm messages at a minimum. Communications protocol shall be field determined for robustness and to minimize maintenance as required for final installed components to make a complete and functional system.

On: Jul 03 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7548680 Electrical 40 95 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 1.2.1, a. - Refers to 4 PLC Cabinets (2 cabinets and 2 desks. These are on dwgs E501 and EH501.

Paragraph also refers to "small control panel at Land Wall Control Station 1st floor. Please provide drawing or details for this panel.

On: Jul 02 2018.

Government Response. . The reference to the control panel at the Land Wall Control Station 1st Floor is in error and no panel is required at this location. An amendment will be forthcoming to make these corrections. On: Jul 03 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7549353 Specifications Source Selection Plan/ Clause 5152.232-

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Refer to Page 11 of 226, 4th paragraph, states: "Assume NTP of 1 October 2018 for proposal evaluation". Clause

5152.232.9001 Page 28 of 226, 1st par. indicates $15 million is reserved for CURRENT FISCAL YEAR 2018.

Question #1. Since the NTP will be in FY2019, will the FY18 $15 million above be added to the estimated FY2019 funds for this contract?

Q2- What is the estimated FY2019 funding for this contract?

Q3- Page 11 of 22, end of 4th par. states "...end of closure period(1 July 2020-29 September 2020)". This sentence is not clear, and does not coincide with Spec 00 73 05 requirements. Please clarify.

On: Jul 02 2018.

Government Response. . Question 1: Additional funds will be cumulative, and not limited to the first FY they are made available. The contract obligation shall not exceed the total funds that are available as is noted in the continuing contracts clause.

Question 2: Any future FY funding will be announced at the time it is available for use on the this project.

Question 3: Page 11 of 226, 4th par. indicates that the scheduled lock closure period is from 01 July 2020 to 1100 hours on 29 September 2020. This corresponds to Specification Section 00 73 05, Par. 1.3.2.3 Lock Closure Period. Note that Par. 1.3.2.3 includes subparagraphs 1.3.2.3.1 thru 1.3.2.3.3 which details segments of work within the overall lock closure period. Par. 1.3.2.3.1 indicates a lock closure commencement of 01 July 2020 and Par. 1.3.2.3.3 requires work to be fully complete by 1100 hours on 29 September 2020 On: Jul 03 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7554886 Mechanical 35 01 41

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

I have been unable to locate the plans for the Hydraulic Power Units for Bid Items 0009AF and 0011AE. Please provide them.

On: Jul 06 2018.

Page 2 of 10ProjNet: Logged In User

Government Response. . There are no specific detailed drawings for the HPU's for this project, but rather they are performance based components. The requirements for the HPU's can be found on Contract Drawing M-601 and Specification Section 35 01 41, Par. 2.7 Hydraulic Power Unit. On: Jul 16 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7555078 Hydraulics MD531 and MD532 35 01 41

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Several conflicting material requirements between the drawings and the specification have been found. The following list provides some examples. (This list is not meant to be comprehensive/complete. Other material discrepancies may exist.)

- Cardanic Ring – Mark No. MD531-A1: ASTM A29, Grd. 1049 on drawing and ASTM A668 Class G per specification section 35 01 41 Paragraph 2.2.2.1.

- Cylinder Trunnion – Mark No. MD531-C1: ASTM A29, Grd. 1049 on drawing and ASTM A668 Class G per specification section 35 01 41 Paragraph 2.2.2.1.

- Trunnion Pin – Mark No. MD531-A3: ASTM A322, Grd. 4340 on drawing and ASTM A473 UNS S43000 per specification section 35 01 41 Paragraph 2.2.2.2.

- Clevis Pin – Mark No. MD532-A5: ASTM A564, Type 630 on drawing and ASTM A473 UNS S43000 per specification section 35 01 41 Paragraph 2.2.2.2.

Guidance on these (and other) apparent discrepancies is respectfully requested. After material requirements are clarified, can the USACE please advise if suppliers may use equivalent (or better) materials (perhaps with advance approval) instead of those specified if relevant material characteristics are matched or bettered.

On: Jul 06 2018.

Government Response. . Amendment will be forthcoming On: Jul 11 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7555120 Hydraulics 35 01 41

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification section 35 01 41 paragraph 2.6 states:

"The miter gate rotary actuator cylinders and Tainter valve machinery cylinders to be heavy-duty mill type cylinders with bolting flanges rigidly welded on the cylinder tube."

and

"Cylinder tubes which have been welded to be stress relief heat treated and all welds to be radiographed or ultrasonically and magnetic particle tested."

Specification section 35 01 41 paragraph 1.6.3.3 states:

"Weld hydraulic cylinders and hydraulic rotary actuators in accordance with ASME BPVC SEC VIII.

Weld piping in accordance with ASME B31.1."

These hydraulic cylinder construction details (requirements) are not unusual or inappropriate. These features and manufacturing requirements are, however, more expensive than those of other hydraulic cylinders in use in at other similar USACE locks. Can the USACE please confirm that no deviations from these specific requirements will be granted? Manufacturers that bid faithfully to the above USACE requirements will price themselves out of contention if others budget on tapped-barrel and other non-conforming and less expensive construction details with the expectation (hope?) that they will receive waivers from these requirements.

On: Jul 06 2018.

Government Response. . Contractors are to bid the contract as shown On: Jul 12 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Page 3 of 10ProjNet: Logged In User

7555126 Hydraulics 35 01 41

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification section 35 01 41 paragraph 1.6.3.3 states:

"Weld hydraulic cylinders and hydraulic rotary actuators in accordance with ASME BPVC SEC VIII."

Is ASME U Stamp certification required?

On: Jul 06 2018.

Government Response. . Contract documents do not require U stamp certification On: Jul 11 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7555156 Hydraulics 35 01 41

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification section 35 01 41 paragraph 2.6.1 requires:

"Piston rods to be in accordance with ASTM A564/A564M, Type 630, stainless steel and chrome plated. Fabricate the cylinders in a manner suitable for use with the position indicating system as specified. The chrome coating to have a 0.008-0.013 inch minimum thickness, surface finish of 10-16 micro-inches RMS or better to ensure smooth, quiet, vibration free and leak free operation, surface hardness of 50 Rockwell C minimum, impact resistance of 5 to 11 pound per foot, modulus of elasticity of 52 x 106 to 60 x 106 psi, linear expansion coefficient of 4.0 x 10-6 /degree F, and be capable of withstanding a fracture force of 41 ksi minimum."

The 0.008 - 0.013 inch specified chrome plate thickness is considerably thicker than that normally specified for heavy duty cylinders in abrasive environments. Multiple plating layers will be required to satisfy this requirement. Portions of the current rod plating specification are consistent with requirements suggested for ceramic coated (not chrome plated) cylinder piston rods in a late 1990s publication. Is it possible that portions of a ceramic rod coating specification were included in the specification?

Chrome plate thicknesses of about 0.0005 inch are typical in ordinary commercial hydraulic cylinders. 0.002" minimum chrome plate thicknesses are commonly called out for heavy-duty cylinders. UFGS-35 05 40.14 calls out a minimum chrome plate thicknesses of 0.003 inch. (The UFGS-35 05 40.14 plating requirement approximates our experience-based recommendation.) Can the USACE please review the current specification and confirm the chrome plating thickness requirement?

On: Jul 06 2018.

Government Response. . Amendment is forthcoming On: Jul 11 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7556041 Hydraulics 35 01 41

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification section 35 01 41 paragraph 1.7.2.1 requires: "Coat all parts with a rust preventative, wrap in heavy-duty plastic, and securely contain in wooden crates. Clearly mark each crate with its contents (including Contract number and Corps mark number) on the outside, with a non-ferrous metal tag, engraved with the contents, and secured to the crate with non-ferrous screws. Provide a means for inspection of the crate's contents without destroying the crate."

Specification section 35 01 41 paragraph 1.7.2.2 requires: "The shipping provisions will be such that the cylinders may be rotated in increments of 90 degrees during storage. Should the cylinders be stored by the Contractor during fabrication, shipping, or at the worksite in the horizontal position more than 30 days, rotate them every 30 days as follows: first 90 degrees, then 180 degrees, then 90 degrees, and then 180 degrees."

Specification section 35 01 41 Paragraph 1.7.2.2.1 requires: "Standard commercial packaging in accordance with ASTM D3951 will be acceptable except where a different method or standard of packaging is specified."

Can the USACE please clarify the packaging requirements for the five tainter valve hydraulic cylinder assemblies?

(1) It is assumed that at least four of the hydraulic cylinder assemblies, and perhaps all five, are to be supplied/shipped fully assembled with their cardanic rings, pillow blocks, and cylinder bases. Is this assumption

Page 4 of 10ProjNet: Logged In User consistent with USACE expectations and requirements?

(2) Does the crating requirement (in paragraph 1.7.2.1) apply to all five cylinders? Only to the spare cylinder?

(3) Will the four cylinder/cardanic-ring/cylinder-base assemblies meant for immediate installation be rotated in the field in accordance with paragraph 1.7.2.2? If so, their crates (if applicable) or storage/shipping cradles will need be larger (and perhaps more complicated) to accommodate this requirement.

On: Jul 06 2018.

Government Response. . (1) Is it up to the prime contractor and any subcontractor to determine the best methods and configuration for shipping the cylinders as long as all contract requirements are met.

(2) Applies to all five cylinders.

(3) Rotation requirements are in reference to the cylinder and piston rod, not the cylinder and cardanic ring.

On: Jul 11 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7556055 Contracting Solicitation pages 3-8

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are schedules available to confirm exactly which supplies/services must be included in each of the Solicitation's individual itemized Supplies/Services? This information will help address questions about the items to be packaged in each of the listed line-items. Some example questions follow. (These are only example questions; this list is not meant to be comprehensive/complete.)

• Which project supplies and services are to be included in line item 0015AJ – "Connection Components"?

• Is line item 0014AH – "Hydraulic Cylinder Rod End Assemblies" comprised of all parts shown on I-Wall MD532 and Land-Wall MD532 and nothing else?

• Are the Cardanic rings, pins, and pillow block assemblies shown on drawings MD530 and MD531 to be included in line item 0014AG – "Hydraulic Cylinder Assemblies and Hardware"? What about the bolts that fasten the Pillow Block Caps (MD530-A3) to the Pillow Block Bases (MD530-A1), which don't seem to be indicated in the drawings. Are these to be included in this line item or are they accounted for somewhere else?

• Specification section 35 01 41 paragraph 1.7.2.2.1 states: "Each [hydraulic cylinder] consists of the hydraulic cylinder, trunnion, cardanic ring, cylinder support bracket, manifolds, piping, bushings, and pins." Is the "cylinder support bracket" mentioned in this sentence referring to the "Cylinder Base" shown on drawing I-Wall SD550? If so, does this mean that the spare cylinder is to be supplied with a cylinder base? (Landwall SD550 and I-Wall SD552 suggest that a total of four cylinder bases is required - not five.)

On: Jul 06 2018.

Government Response. . For the first three bullets: Specification Section 01 22 00, Par. 1.2 states that all items which are not specifically noted in the Bid Schedule shall be included with the item most closely associated with the work involved.

For the last bullet: An amendment will be forthcoming to remove "cylinder support bracket" from Section 35 01 41, Par. 1.7.2.2.1. The spare cylinder does not require a base, as indicated by the quantity of parts suggests On: Jul 16 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7560368 Environmental 00 73 05

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

If the water rises over the lock wall elevation and a dewatered state cannot be maintained in the lock chamber during the closure period and key closure activities cannot move forward, is the contractor held responsible for conditions that are clearly beyond their control? Will the closure period be extended a commensurate amount?

On: Jul 11 2018.

Government Response. . See specification section 00 73 05 paragraphs 1.27 and 1.28. Also refer to the FAR CLAUSE 52.249-10. On: Jul 19 2018

Page 5 of 10ProjNet: Logged In User

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7560433 Project Management Bid Schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

CLIN 0025AE has no extended details on the bid schedule. Is this correct?

On: Jul 11 2018.

Government Response. . Amendment forthcoming On: Jul 16 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7560553 Contracting SF 1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

This project has a high degree of complexity in construction phasing/ schedule,and many specialized items of work.

We request an extension to the bid due date, to August 30, 2018, for adequate time to submit a responsive proposal.

On: Jul 11 2018.

Government Response. . A time extension is not being considered at this time. On: Jul 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7561308 Geotechnical 03 05 00; Concrete Demo

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Would a rotary, carbide-tipped concrete grinder be acceptable for vertical and/or horizontal concrete removal?

On: Jul 11 2018.

Government Response. . Specification Section 03 05 00, Par. 3.1 states:

Determine the means and methods of demolition, in accordance with these specifications, which provides the rates of production to complete the work within the established time limits and which prevents damage to items and portions of the facility that are to remain.

Expansive grouts for concrete removal are prohibited. Boom or vehicle mounted or otherwise heavy duty pavement impact breakers or drop balls where the blow energy exceeds approximately 1,000 foot-pounds are prohibited.

Note that concrete removal procedures are required to be submitted and approved by the government. On:

Jul 17 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7565139 Hydraulics Various Various Various

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please see attached PDF with various questions.

(Attachment: La-Grange__Controls_Questions.pdf) On: Jul 13 2018.

Government Response. . 7: LAPTOP COMPUTERS 40.95.00, 1.2.3, 2.6.1 Is the Laptop in 40.95.00 section 1.2.3 and 2.6.1 the Same?, If so they do not match, please amend requirement. if not which is to be delivered by BR? Do we deliver both?

RESPONSE: amendment will be forthcoming.

8: HMI SCREENS 40.95.00 ATTACHMENT B

Is this HMI supposed to be installed on one of the Laptop Computers decided on above? Which computer is HMI Runtime supposed to be installed on? Please Refer to the specs required and screen resolution to Run the RSVIEW SE and how it relates to the specs of the selected computer.

RESPONSE: See above response; Only one laptop PC is required for this project; Install software as required including but not limited to accomplish all programming, commissioning, testing, trouble-shooting, Page 6 of 10ProjNet: Logged In User data logging, graphing, and trending.

9: HMI SCREENS (Bubbler) 40.95.00 ATTACHMENT B The Screens refer to the Bubbler Control, Please clarify how the PLC is attached and controls the Bubblers.

Note the LCSP, UCSP. Consoles and PLC circuit/logic does not indicate bubbler control. Is the Bubbler System remain a standalone system?

RESPONSE: The PLC will only monitor the 200hp bubbler motor status, run-time 'meter', voltage, current, power, at least three temperature sensors (LW_EA201, note 2, and LW-EA105, note 24 respectively). on/off control will only be from the new soft-start enclosure.

10: SIGNAL AIR HORN E-503 What is the Electrical Specs of the Horn, Voltage , Power/Amps

RESPONSE: (E-503, PLC_set): Lock Control System Drawing is diagrammatic, and does not show required lighting contactors or solenoids. Connect new controls to the existing 120V solenoid for air driven Navigation Horn.

11: NAVIGATION AND TRAFFIC LIGHTS E503 What is the Electrical Specs of the Lights Voltage , Power/Amps

RESPONSE: (E-503, PLC_set): This Lock Control System Drawing is diagrammatic, and does not show required contactors or solenoids. Traffic and navigation fixtures will be 120V, LED type. Navigation and Traffic light fixture salient characteristics will be in forthcoming amendment. On: Jul 24 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7567132 Hydraulics 35 01 41-21

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Hydraulics Specification is clear that there are 5 each MG Rotary Actuators and 5 each Cylinder Assemblies, including spares. It's taken that four are operational, with one as a spare.

Solicitation Schedule of Prices suggests that Spares should be a separate line item as there is a separate Spare Parts line Item for the MG Rotary Actuator, 0019AA with it's connecting components 0019AB. However, there is no Hydraulic Cylinder (and Rod End attachment, Cardanic Ring, etc) listed as a separately priced Spare Parts line item.

Because these are high dollar items that shouldn't be missed, we suggest that a line item be created in the Schedule of Prices for spare Hydraulic Cylinder & Rod End Components (with cardanic rings, LDT & pins).

Also, there were no explicit spares for the HPUs mentioned in the Specification. Is this to be negotiated post-Award and during the design approval process after a BOM is completed?

On: Jul 16 2018.

Government Response. . 0019AE and 0019AF were added per Amendment No. 0002 On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7568454 Contracting W912EK18R0001; Shts 14 & 20 of 226

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On Sheet 14 of 226 the guidance for Factor 2: Past Performance indicates that the offeror may go back 15 years for relevant contracts then on sht 20 of 226 is indicates that only those awarded within 10 years of the issuance of this RFP will be accepted. Which do we follow?

On: Jul 17 2018.

Government Response. . The offeror may go back 15 years, amendment forthcoming to correct. On: Jul 17 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7571477 Mechanical M-110 A1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 7 of 10ProjNet: Logged In User

Drawing M-110 in the Bubbler System Drawing set notes a Tannergas Tank. Is this tank existing and being relocated to tie into the new air system or will a new Tannergas tank need to be provided in the new Bubbler Piping scope of work? If new is to be provided please provide specification.

On: Jul 18 2018.

Government Response. . Amendment forthcoming On: Jul 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7572702 Contracting SF1442

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We request that an additional 2 weeks be added to the bid due date.

On: Jul 19 2018.

Government Response. . Proposal due date has been extended to 07 August 2018 at 2:00pm CT. See forthcoming amendment. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7573785 Project Management 01 05 02 - 1.4.1/1.4.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification 01 05 02 paragraph 1.4.1 indicates that the location of the government offsite temporary field office shall be approved by the Contracting Officer.

Q1. Is this location going to be on government owned property or is it the responsibility of the contractor to lease the necessary property?

Q2. Also if the property is government owned are the requested utilities available on the property?

On: Jul 19 2018.

Government Response. . Amendment forthcoming On: Jul 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7575426 Hydraulics 35 01 41-63

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On page 35 01 41-63, Section 3.6.2-c, the testing specification requires the entire actuator assembly be submerged such as to simulate 30 feet under water for 24 hours. Then the actuator to be disassembled and evaluated for water intrusion. If performed on a production unit, the sealing interface will be compromised. Can the disassembly evaluation be completed on an validation unit and production units be verified using a method not requiring disassembly?

On: Jul 20 2018.

Government Response. . Assuming the sealing interface which will be compromised is a gasket/sealant, the replacement of this item as part of this test should be accounted for, and the Contractor shall bid the project according to the specifications. If the sealing surface that may be compromised from disassembly is something more substantial (i.e., steel flange), note that these units, during their lifetime, will most likely need to be disassembled for repairs/rehabilitation in the future. It seems unreasonable that the actuators cannot be disassembled and reassembled like most other machinery with only the replacement of typical wear items (gaskets, bushings, seals, etc). On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7575448 Hydraulics 35 01 41-34

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The current assumed sector shaft size of 10 inches ( from MC511-A1 Sector Drawing)does not meet the rigidity requirements as specified. Can the shaft size and therefore the actuator pinion size be increased?

On: Jul 20 2018.

Government Response. . Specification Section 35 01 41, Par. 2.6.2.3 requires the actuator fabricator to design the shaft to meet several design requirements. The government did not design the shaft, but rather

Page 8 of 10ProjNet: Logged In User provided a nominal shaft diameter for bidding purposes. This paragraph also states to submit the design for government approval. If dimensions vary, the manufacturer should provide a narrative along with the computations on why the shaft diameter needs to be increased. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7575465 Hydraulics 35 01 41-36

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Does the USACE prefer oil or grease lubrication in the gear box?

On: Jul 20 2018.

Government Response. . Specification Section 35 01 41-36, Par. 2.6.2.6, is clear that all gears and lower bearings are to be oil lubricated. Upper bearing may be either oil or grease, and the government will rely on the manufacturers expertise and recommendation on which lubrication method provides the most durable and reliable final product for the government. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7578283 Structural S-331 A3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section A3 on dwg S-331 calls out the vertical concrete be precast. The rest of the vertical concrete outside the lock chamber is to be cast-in-place. Is the pre-cast notation a mistake?

On: Jul 23 2018.

Government Response. . The pre-cast notation is not a mistake. Vertical concrete resurfacing within the lock chamber is precast wall units, the concrete outside of the lock chamber is cast in place. On: Jul 25

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7579170 Civil 33 32 13 Sewage Lift Station

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

To install the new sewage lift station it is required to excavate down to elevation 418.5, which is 15.5 feet below the lock wall elevation. Drawing MA511 appears to indicate the central control station foundation extends down beyond this elevation. Reference drawing A4 appears to indicate the foundation only extends down a few feet. Please clarify the extent and type of foundation below the central control station so that it can be determined if any additional support is needed during the excavation for the new lift station.

On: Jul 24 2018.

Government Response. . Top of lift station equal to lock wall elev 434. 0, bottom is at 421.0, as shown on MA511. contractor to excavate 2.5' below 421.0, so 418.5 is correct. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7579175 Mechanical 33 32 13 Sewage Lift Station

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Drawing CX101 indicates to demolish existing sewage lift station manhole and pump/pump components. Drawing C-402 includes a note to Do Not Disturb the existing sewage lift station manhole. Please clarify the direction and extent of removal required for the existing lift station?

On: Jul 24 2018.

Government Response. . Specification Section 00 73 05, Par. 1.3.2.4 requires that the CCS Parking Lot, Access Road, and Maintenance Building be completed after all other work has been completed at the site (so as not to damage the new roadway). The note on C-402 is stating that when performing the work on the access road and parking lot, that the new sewage lift station manhole constructed as part of the land wall work, should not be disturbed or damaged. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Page 9 of 10ProjNet: Logged In User

7579473 Hydraulics mc104

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

MC104 Keynote #2 specifies stroke adjusters for 2 degrees of adjustment but the specification only calls out 2 degrees of over travel in each direction for a total of 160 degrees. Is the actuator to be designed to facilitate in-field stroke adjustment?

On: Jul 24 2018.

Government Response. . Keynote 2 on MC104 states "ROTARY ACTUATOR SHALL HAVE TWO

STROKE ADJUSTORS MADE OF STAINLESS STEEL, PROVIDING A MINIMUM OF 2.00 DEGREES OF

ADJUSTMENT AT THE END OF TRAVEL." The two stroke adjustors are intended to provide the 2 degrees of adjustment on each end, which is in accordance with the specifications. The actuator is to be designed for in-field stroke adjustment. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7579589 Structural SD560 A3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The A3 Plan View on sheet SD560 has notation that indicates A3/SD360. Should the notation be A3/SD260?

On: Jul 24 2018.

Government Response. . The reference to SD360 on SD560 should be SD561. Amendment forthcoming On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7579611 Structural 01 53 11-4, par. 2.1.1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

No mention is made of the lifting beam that typically accompanies the government chamber bulkheads. Is this to be used to handle these bulkheads? If so, what is it's weight?

On: Jul 24 2018.

Government Response. . The bulkhead lifting beam is not available for use by the LaGrange Major Rehabilitation Contractor, as Rock Island District Maintenance personnel will be using it at another site. The Contractor will have to determine the best methodology for setting/raising of the bulkheads, noting there are provisions within the existing bulkheads for slinging the bulkheads. On: Jul 25 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

Page 10 of 10ProjNet: Logged In User

fasa
0003 specification
Responses Bidder Inquiry