.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
22 May 2017
LAGRANGE LOCK MAJOR
REHABILITATION
INDUSTRY DAY
File Name
MEETING PURPOSE
• Ground rules.
• Discuss the requirement for Project Labor Agreements for this contracting requirement.
• Provide a overview of the project including the Rock
Island District major rehabilitation history, project location, and some of the main work features.
ROCK ISLAND DISTRICT MAJOR
REHABILITATION HISTORY
• LD 14 Major Rehabilitation – 1998
• LD 12 Major Rehabilitation – Stage I – 1999, Stage II-
2000, Stage III – 2002
• LD 11 Major Rehabilitation – Stage I – 2002, Stage II –
2005, Stage IIIA – 2008, Stage IIIB – 2009
• LD 19 Major Rehabilitation – Stage I – 2006, Stage II –
• Lockport Major Rehabilitation – Stage I – 2007, Stage III -
LAGRANGE MAJOR REHAB OVERVIEW
• Projected contract award in Spring 2018 (USACE is currently awaiting funding) with a lock closure in summer/early fall of 2020.
• General scope of work includes vertical and horizontal lock resurfacing, electrical/mechanical operating machinery replacement, and site work.
LOCATION
LOCATION
LOCATION (CON’T)
• GPS Coordinates: 39°56’30.57”N, 90°32’3.00”W
• Address: 7141965 East Street, Versailles, IL 62378
• Illinois Waterway River Mile 80.2
• 77.5 River Miles Downstream of Peoria, IL
• 7.8 River Miles Downstream of Beardstown, IL
GENERAL OVERVIEW OF INTERMEDIATE WALL
(I-WALL) 3D MODEL
NOT FOR CONSTRUCTION – ONLY UPSTREAM
I-WALL SHOWN DUE TO SIZE LIMITATIONS
New miter gate operating machinery
New I-wall HPU Building New Tainter
Valve Protection Pier and Operating Machinery
New Precast Panel Installation
MITER GATE OPERATING EQUIPMENT
(ACTUATOR)
NOT FOR CONSTRUCTION
New miter gate operating machinery (actuator)
TAINTER VALVE OPERATING EQUIPMENT
NOT FOR CONSTRUCTION
New tainter valve operating machinery and protection pier
I-WALL HYDRAULIC POWER UNIT (HPU)
BUILDING
NOT FOR CONSTRUCTION
New I-Wall Hydraulic Power Unit Building
PRECAST CONCRETE PANELS
NOT FOR CONSTRUCTION
New Precast Concrete Panels
TYPICAL PRECAST CONCRETE PANEL
FABRICATION AND INSTALLATION
PRECAST CONCRETE PANEL
PANEL FABRICATION
PRECAST CONCRETE PANEL STORAGE
INSTALLATION (CON’T)
| LAGRANGE LOCK MAJOR REHABILITATION ��INDUSTRY DAY |
| MEETING PURPOSE |
| ROCK ISLAND DISTRICT MAJOR REHABILITATION HISTORY |
| LAGRANGE MAJOR REHAB OVERVIEW |
| LOCATION |
| LOCATION (CON’T) |
| GENERAL OVERVIEW OF INTERMEDIATE WALL (I-WALL) 3D MODEL |
| MITER GATE OPERATING EQUIPMENT (ACTUATOR) |
| TAINTER VALVE OPERATING EQUIPMENT |
| I-WALL HYDRAULIC POWER UNIT (HPU) BUILDING |
| PRECAST CONCRETE PANELS |
| TYPICAL PRECAST CONCRETE PANEL FABRICATION AND INSTALLATION |
| PRECAST CONCRETE PANEL �PANEL FABRICATION |
| PRECAST CONCRETE PANEL STORAGE |
| PRECAST CONCRETE PANEL INSTALLATION (CON’T) |
| PRECAST CONCRETE PANEL INSTALLATION (CON’T) |
| PRECAST CONCRETE PANEL INSTALLATION (CON’T) |
File details come from the government source that posted it. Updated .