LaGrange Lock and Dam Major Rehabilitation
Solicitation number
W912EK-18-R-0001
Issued by

View the file

Other files

File Type Posted
LaGrange_Major_Rehabilitation.pdf PDF
INDUSTRY_DAY_REGISTRATION_FORM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

22 May 2017

LAGRANGE LOCK MAJOR

REHABILITATION

INDUSTRY DAY

File Name

MEETING PURPOSE

• Ground rules.

• Discuss the requirement for Project Labor Agreements for this contracting requirement.

• Provide a overview of the project including the Rock

Island District major rehabilitation history, project location, and some of the main work features.

ROCK ISLAND DISTRICT MAJOR

REHABILITATION HISTORY

• LD 14 Major Rehabilitation – 1998

• LD 12 Major Rehabilitation – Stage I – 1999, Stage II-

2000, Stage III – 2002

• LD 11 Major Rehabilitation – Stage I – 2002, Stage II –

2005, Stage IIIA – 2008, Stage IIIB – 2009

• LD 19 Major Rehabilitation – Stage I – 2006, Stage II –

• Lockport Major Rehabilitation – Stage I – 2007, Stage III -

LAGRANGE MAJOR REHAB OVERVIEW

• Projected contract award in Spring 2018 (USACE is currently awaiting funding) with a lock closure in summer/early fall of 2020.

• General scope of work includes vertical and horizontal lock resurfacing, electrical/mechanical operating machinery replacement, and site work.

LOCATION

LOCATION

LOCATION (CON’T)

• GPS Coordinates: 39°56’30.57”N, 90°32’3.00”W

• Address: 7141965 East Street, Versailles, IL 62378

• Illinois Waterway River Mile 80.2

• 77.5 River Miles Downstream of Peoria, IL

• 7.8 River Miles Downstream of Beardstown, IL

GENERAL OVERVIEW OF INTERMEDIATE WALL

(I-WALL) 3D MODEL

NOT FOR CONSTRUCTION – ONLY UPSTREAM

I-WALL SHOWN DUE TO SIZE LIMITATIONS

New miter gate operating machinery

New I-wall HPU Building New Tainter

Valve Protection Pier and Operating Machinery

New Precast Panel Installation

MITER GATE OPERATING EQUIPMENT

(ACTUATOR)

NOT FOR CONSTRUCTION

New miter gate operating machinery (actuator)

TAINTER VALVE OPERATING EQUIPMENT

NOT FOR CONSTRUCTION

New tainter valve operating machinery and protection pier

I-WALL HYDRAULIC POWER UNIT (HPU)

BUILDING

NOT FOR CONSTRUCTION

New I-Wall Hydraulic Power Unit Building

PRECAST CONCRETE PANELS

NOT FOR CONSTRUCTION

New Precast Concrete Panels

TYPICAL PRECAST CONCRETE PANEL

FABRICATION AND INSTALLATION

PRECAST CONCRETE PANEL

PANEL FABRICATION

PRECAST CONCRETE PANEL STORAGE

INSTALLATION (CON’T)

LAGRANGE LOCK MAJOR REHABILITATION ��INDUSTRY DAY
MEETING PURPOSE
ROCK ISLAND DISTRICT MAJOR REHABILITATION HISTORY
LAGRANGE MAJOR REHAB OVERVIEW
LOCATION
LOCATION (CON’T)
GENERAL OVERVIEW OF INTERMEDIATE WALL (I-WALL) 3D MODEL
MITER GATE OPERATING EQUIPMENT (ACTUATOR)
TAINTER VALVE OPERATING EQUIPMENT
I-WALL HYDRAULIC POWER UNIT (HPU) BUILDING
PRECAST CONCRETE PANELS
TYPICAL PRECAST CONCRETE PANEL FABRICATION AND INSTALLATION
PRECAST CONCRETE PANEL �PANEL FABRICATION
PRECAST CONCRETE PANEL STORAGE
PRECAST CONCRETE PANEL INSTALLATION (CON’T)
PRECAST CONCRETE PANEL INSTALLATION (CON’T)
PRECAST CONCRETE PANEL INSTALLATION (CON’T)