LaGrange Lock Major Rehabilitation

Industry Day

22 May 2017

INTRODUCTION

SCOPE OF WORK

Specific work includes, but is not limited to, dewatering and maintaining dewatered lock chamber; debris removal within the lock chamber; installation of lock dewatering observation wells; cleaning of lock chamber floor weep holes; horizontal concrete removal and replacement; concrete trenching for mechanical piping installation;

vertical concrete line drilling, saw cutting, blasting, and grinding; precast concrete panel fabrication and installation; construction of concrete protective piers on top of lock wall; blocking and securing existing miter gates for work on gate appurtenances;

miter gate anchorage removal and replacement; miter gate machinery removal and replacement including rotary actuators; tainter valve cylinder removal and replacement; removal and repair of tainter valves; new PLC system; new I-wall mechanical control building; miscellaneous electrical work; fabrication of movable control stands; hydraulic system and piping removal and replacement; HTRW removal of sand in pipe trenches; bubbler system installation; generator installation;

commissioning of electrical/mechanical systems; existing central control station building rehabilitation; existing fuel tank removal; handrail installation; concrete road and parking lot construction; maintenance building addition; and sewage lift station rehabilitation.

PROJECT SPECIFICS

Currently scheduled for a lock closure in the late summer/early fall of 2020.

Projected contract award in Spring 2018 (USACE is currently awaiting funding)

LOCATION

LOCATION (CON’T)

EXISTING SITE CONDITIONS – LOCK

WAWALLS

EXISTING SITE CONDITIONS – LOCK

WALLS

EXISTING SITE CONDITIONS –

HORIZONTAL CONCRETE

TAINTER VALVE OPERATING

EQUIPMENT

NOT FOR CONSTRUCTION

MITER GATE OPERATING EQUIPMENT

(ACTUATOR)

I-WALL HYDRAULIC POWER UNIT (HPU)

BUILDING

PRECAST CONCRETE PANEL

FABRICATION AND INSTALLATION

PANEL FABRICATION

PRECAST CONCRETE PANEL STORAGE

INSTALLATION (CON’T)