Industry Day #3 agenda and site map
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Day_3_attendee_sheet.pdf | ||
| INDUSTRY_DAY_REGISTRATION_FORM.docx | DOCX document | |
| DRAFT_W912EK18R0001_DRAFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LaGrange Lock and Dam Major Rehabilitation
Industry Day #3
22 February 2018
1. Contracting Considerations and Ground Rules
The solicitation was released as a DRAFT Solicitation to obtain industry input and questions pertaining to the specifications and drawings for the LaGrange Lock and Dam Major Rehabilitation effort. The information provided in the notice is subject to change and is not binding on the Government. The notice DOES NOT constitute a Request for Proposal (RFP) and is not a commitment by the U.S. Government to procure subject services.
The intent of this Construction Industry Day is to provide all interested contractors the opportunity to tour and review the construction project site prior to the release of the final solicitation at a later date.
*No inclusion of Project Labor Agreements
*No questions related to the drawings and specifications.
The Rock Island Districts request interested contractors to review the DRAFT Solicitation along with the associated documents and provide feedback using the Bidder Inquiry information contained in clause
MVR.02. The question and comment period will be open until 15 March 2018 at 2:00pm CT.
*Provide an overview of the project including the project location and some of the main work features
2. Construction Sequencing
Work Required Prior to I-Wall Miter Gate Machinery Replacement
Installation of I-Wall Miter Gate Machinery
* Includes construction of I-Wall Hydraulic Power Unit Building
Lock Closure (90 days July to October 2020
Major Work items
* Contractor Placement of Chamber Bulkheads and dewater chamber
* All vertical concrete work inside and outside the chamber
* All land wall miter gate and tainter valve operating equipment
* All electrical power
Additional Site Work
*Access Road
*New Maintenance Building
*New 450kW generator and support structure
*Regulating weir concrete placement
3. Guided tour: If attendee wants to walk on the I-wall they MUST bring their OWN life vest. One will not be provided by the US Army Corps of Engineers.
© 2018 Google
© 2018 Google
© 2018 Google
B5ECDAJG
Callout Park along the road and in this parking lot
B5ECDAJG
Callout Site tour will start here
B5ECDAJG
Line
B5ECDAJG
Line
B5ECDAJG
Line
B5ECDAJG
Line
B5ECDAJG
Line
B5ECDAJG
Line
B5ECDAJG
Line
B5ECDAJG
Text Box
B5ECDAJG
Text Box
B5ECDAJG
Text Box
B5ECDAJG
Text Box
B5ECDAJG
Text Box
B5ECDAJG
Callout Site tour stop #
B5ECDAJG
Text Box
NOTES
1. If attendees want to walk on the I-wall (stops 2 and 3), they will need to bring their own life vest.
2. Stops 1-4 are planned to last 20-30 minutes and stop 5 is planned to last 10 minutes.