Final_REFERENCE_PLAN_SET_DWGS-Solicitation.pdf
PDF 38 MB Posted
- Solicitation number
- W912EK-17-R-0012
About this file
Final REFERENCE Plan Set Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
E C
D B
D
R .d g n
REFERENCE DRAWING NO. R-001
®of Engineers
US Army Corps of Engineers
US Army Corps
REFERENCE DRAWING NO. R-001.1
E C
D B
D
R .d
REFERENCE DRAWING NO. R-002
E C
D B
D
R .d
REFERENCE DRAWING NO. R-003
E C
D B
D
R .d
REFERENCE DRAWING NO. R-004
E C
D B
D
R .d
REFERENCE DRAWING NO. R-005
E C
D B
D
R .d
REFERENCE DRAWING NO. R-006
E C
D M
L L
R .d
REFERENCE DRAWING NO. R-007
M39
SEE SHEET
MANIFOLD
BUBBLER
BUBBLER PIPING
CONCRETE FOR EMBEDMENT OF
SAWCUT MONOLITH AND TRENCH
SEE SHEET M40
UPSTREAM BUBBLER SCREEN
AIR
SEE NOTE 2
STEEL COMPRESSED AIR PIPING,
4" DIA. SCHED. 40 GALVANIZED
AIR
WORK, SEE ELECTRICAL SHEETS
CONTROL STAND-FOR NEW
EXISTING UPPER RIGHT
M39 & M40
BUBBLERS, SEE SHEETS
INTERMEDIATE WALL RECESS
UPSTREAM LANDWALL AND
SITE PLAN
20 200 40’
SCALE IN FEET
POSSIBLE DAMAGE TO THE NEW CONCRETE OR PIPING.
ADJACENT MONOLITH HORIZONTAL AND VERTICAL RESURFACING IS COMPLETED TO AVOID
ALL BUBBLER PIPING INSTALLED WITHIN THE LOCK CHAMBER SHALL BE INSTALLED AFTER
PIPING AND ELECTRICAL WITH RESPECT TO ABOVE GROUND PERMANENT REFERENCE POINTS.
INDICATE AND DIMENSION ON THE CONTRACT AS-BUILT DRAWINGS THE LOCATION OF NEW AIR
MATCH EXISTING AT NO ADDITIONAL COST TO THE GOVERNMENT. THE CONTRACTOR SHALL
BY CONSTRUCTION EFFORTS, THE CONTRACTOR SHALL REPAIR AND REPLACE THE DAMAGE TO
ION AND NOTE SUCH ON THE CONTRACT AS-BUILT DRAWINGS. IF ANY UTILITIES ARE DAMAGED
RECORD THE DEPTH, SIZE, AND LOCATION OF ALL UTILITIES ENCOUNTERED DURING CONSTRUCT-
AND OTHER UNDERGROUND UTILITIES AND FIELD VERIFY LOCATIONS. THE CONTRACTOR SHALL
AVOID SPRINKLER SYSTEMS, DUCT BANKS, CONDUITS, TELEPHONE LINES, WATER LINES, SEWER
NEW CONCRETE AND AIR PIPING. SEE SHEET S208.
EL. 584.5. THE CONTRACTOR WILL HAVE LIMITED HEAD ROOM AND WORKSPACE TO INSTALL THE
CANTILEVERED BULKHEADS WILL BE UTILIZED TO DEWATER THE LOCK AT THE UPSTREAM SILL
DEWATER THE SAND BAGGED AREAS.
INSTALLATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE UTILITY PUMPS TO
METHODS IN THE AREAS AROUND THE COMPRESSED AIR PIPE TO PROVIDE A DEWATERED
THE CONTRACTOR WILL BE REQUIRED TO PERFORM SAND BAGGING AND OTHER DEWATERING
WITHIN THE LOCK CHAMBER THAT AFFECTS COMPRESSED AIR PIPING WORK.
ITEMS AND ZEBRA MUSSELS. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ALL ICE
WHICH MAY BE ENCOUNTERED INCLUDES MUD, SILT, LOGS, ROCKS, SAND, WIRE ROPE, METAL
TO ALLOW UNOBSTRUCTED INSTALLATION OF THE COMPRESSED AIR PIPING. TYPICAL DEBRIS
THE CONTRACTOR SHALL REMOVE DEBRIS IN THE LOCK CHAMBER TO OBTAIN CLEAN CONCRETE
15.
14.
13.
12.
11.
NOTES:
SAN(ABANDONED)
LEGEND:
W(ABANDONED)
E(ABANDONED)
E
G
SAN
S
T
F
AIR
WATER
C.J.
CB
RGS
M.J.
EQ.
GA.
CLR.
EL.
PE
SPC’S
PROJ.
SQ.
GALV.
MH#
CMP
C.O.
EDB
CLEAR
TREE
GRASS
CATCH BASIN
MANHOLE COVER
EXISTING ABANDONED WATER LINE
EXISTING ABANDONED SANITARY SEWER LINE
EXISTING ABANDONED ELECTRIC LINE
EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING STORM SEWER LINE
EXISTING TELEPHONE CABLE
NEW COMPRESSED AIR
EXISTING FUEL OIL SUPPLY
EXISTING OTHER UTILITIES AS IDENTIFIED
EXISTING WATER LINE
CONCRETE JOINT
CORRUGATED METAL PIPE
SPACES
PROJECTION
SQUARE
RIGID GALVANIZED STEEL CONDUIT
POLYETHYLENE
CLEAN OUT
GAGE THICKNESS
EQUAL DISTANCE
ELEVATION
MONOLITH JOINT
GALVANIZED
MANHOLE
ELECTRICAL DUCTBANK
M35
M A
T C
H
L
IN
E
S
E
T
M
L A
Y O
U T
U P S T R
E A
M B
U B
B L E R
S
Y S T E
M
AIRAIR
A I R
A I R
A I R
D J
N
J J
D
J W
B
AIR AIR AIRAIR AIR
A I
R
PIPING, SEE NOTE 2
COMPRESSED AIR
GALVANIZED STEEL
4" DIA. SCHED. 40
A I
R A I
R
A I
R
COMPRESSED AIR SYSTEM
REFEED EXISTING BUILDING
AIR SYSTEM
BUILDING COMPRESSED
REFEED EXISTING
N P
P
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PRIOR TO FILLING VAULT WITH CONCRETE. SEE SHEET S816 FOR TRANSFORMER VAULT DETAILS.
NEW AIR PIPING SHALL BE ROUTED THROUGH NEW UTILITY CHASE IN EXISTING TRANSFORMER VAULT
EXISTING UTILITIES.
INSTALLATION. HAND EXCAVATION MAY BE REQUIRED IN VICINITIES HEAVILY CONGESTED WITH
THE CONTRACTOR SHALL TAKE PRECAUTION TO AVOID EXISTING UTILITIES DURING AIR LINE
GUTTER REMOVED DURING UTILITY INSTALLATION SHALL BE REPLACED IN KIND.
ALL CONCRETE SIDEWALK, ASPHALT PAVEMENT, GRAVEL DRIVEWAY, AND CONCRETE CURB AND
DEPTH AND AVOID THE NEW ELECTRICAL DUCTBANKS. SEE SHEETS M37 & M39.
THE CONTRACTOR SHALL RAISE THE AIR PIPES AT THE MONOLITHS TO THE CONCRETE TRENCH
SYSTEM IS TO BE INCLUDED IN THE COST OF THE BUBBLER SYSTEM.
CONCRETE REMOVAL AND PLACEMENT ASSOCIATED WITH THE INSTALLATION OF THE BUBBLER
FIELD VERIFY ALL DIMENSIONS AND QUANTITIES.
RECESSED POSITION.
THE BUBBLER SYSTEM SHALL BE INSTALLED TO CLEAR THE MITER GATES WHEN THE GATE IS IN THE
ALL CONNECTIONS SHALL BE THREADED UNLESS OTHERWISE SHOWN.
BANK WHERE FEASIBLE. SEE SHEET EL1 FOR LOCATION OF DUCTBANK.
OF 4’-0" BELOW GRADE. NEW AIR PIPING TO BE INSTALLED ADJACENT TO NEW ELECTRICAL DUCT-
LOCK CHAMBER SHALL BE SCHEDULE 40 GALVANIZED STEEL. ALL AIR PIPING SHALL BE BURIED A MINIMUM
ALL PIPES INSIDE THE LOCK CHAMBER SHALL BE SCHEDULE 40 STAINLESS STEEL. ALL PIPES OUTSIDE THE
REPAIRED PER SPECIFICATIONS.
SUPPORTS SHALL BE GALVANIZED. ANY MATERIAL COATING DAMAGED DURING INSTALLATION SHALL BE
STAINLESS STEEL. ALL MATERIAL OUTSIDE OF THE LOCK CHAMBER ON THE BUBBLER SYSTEM INCLUDING
ALL MATERIAL INSIDE OF THE LOCK CHAMBER ON THE BUBBLER SYSTEM INCLUDING SUPPORTS SHALL BE
PIPING, SEE NOTE 2
COMPRESSED AIR
GALVANIZED STEEL
1-1/2" DIA. SCHED. 40
EXISTING AIR COMPRESSOR AND COALESCING OIL FILTER
A I R
A I R
A I R
GALVANIZED STEEL
1-1/2" DIA. SCHED. 40
B M
A
F R J
J
U L
A
U I
O F
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a w y
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
P
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
N
G I
N E
E R
S
U
R
Y
G I
N E
D I
S T
R I
C T
D e s i g n e d
C h e c k
R e v i e w
D a t e
P r o j e c t o d e
S o l i c i t a t i u m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
K
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
4"W
E
E
RW
RW RW RW RW
R W
W
S
S
E
E E
ST STST ST
RW RW
S
S
S
S
E
E E
S
S
W
4"W4"W4"W4"W
4"W4"W4"W4"W
W
4"W4"W
4"W
E
E
E
E
E
E
E
T
T
T T
LP GAS
E
S
E E
E
E
EE
E
G
S
T
S
S
S
S
ST
E
E
EE
E
BUILDING
GENERATOR
STAND-BY
CENTER
VISITOR
BUILDING
MAINTENANCE
STATION
CENTRAL CONTROL
REFERENCE DRAWING R-008
SITE PLAN
20 200 40’
SCALE IN FEET
POSSIBLE DAMAGE TO THE NEW CONCRETE OR PIPING.
ADJACENT MONOLITH HORIZONTAL AND VERTICAL RESURFACING IS COMPLETED TO AVOID
ALL BUBBLER PIPING INSTALLED WITHIN THE LOCK CHAMBER SHALL BE INSTALLED AFTER
PIPING AND ELECTRICAL WITH RESPECT TO ABOVE GROUND PERMANENT REFERENCE POINTS.
INDICATE AND DIMENSION ON THE CONTRACT AS-BUILT DRAWINGS THE LOCATION OF NEW AIR
MATCH EXISTING AT NO ADDITIONAL COST TO THE GOVERNMENT. THE CONTRACTOR SHALL
BY CONSTRUCTION EFFORTS, THE CONTRACTOR SHALL REPAIR AND REPLACE THE DAMAGE TO
ION AND NOTE SUCH ON THE CONTRACT AS-BUILT DRAWINGS. IF ANY UTILITIES ARE DAMAGED
RECORD THE DEPTH, SIZE, AND LOCATION OF ALL UTILITIES ENCOUNTERED DURING CONSTRUCT-
AND OTHER UNDERGROUND UTILITIES AND FIELD VERIFY LOCATIONS. THE CONTRACTOR SHALL
AVOID SPRINKLER SYSTEMS, DUCT BANKS, CONDUITS, TELEPHONE LINES, WATER LINES, SEWER
NEW CONCRETE AND AIR PIPING. SEE SHEET S208.
EL. 584.5. THE CONTRACTOR WILL HAVE LIMITED HEAD ROOM AND WORKSPACE TO INSTALL THE
CANTILEVERED BULKHEADS WILL BE UTILIZED TO DEWATER THE LOCK AT THE UPSTREAM SILL
DEWATER THE SAND BAGGED AREAS.
INSTALLATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE UTILITY PUMPS TO
METHODS IN THE AREAS AROUND THE COMPRESSED AIR PIPE TO PROVIDE A DEWATERED
THE CONTRACTOR WILL BE REQUIRED TO PERFORM SAND BAGGING AND OTHER DEWATERING
WITHIN THE LOCK CHAMBER THAT AFFECTS COMPRESSED AIR PIPING WORK.
ITEMS AND ZEBRA MUSSELS. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ALL ICE
WHICH MAY BE ENCOUNTERED INCLUDES MUD, SILT, LOGS, ROCKS, SAND, WIRE ROPE, METAL
TO ALLOW UNOBSTRUCTED INSTALLATION OF THE COMPRESSED AIR PIPING. TYPICAL DEBRIS
THE CONTRACTOR SHALL REMOVE DEBRIS IN THE LOCK CHAMBER TO OBTAIN CLEAN CONCRETE
15.
14.
13.
12.
11.
NOTES:
SAN(ABANDONED)
LEGEND:
W(ABANDONED)
E(ABANDONED)
E
G
SAN
S
T
F
AIR
WATER
C.J.
CB
RGS
M.J.
EQ.
GA.
CLR.
EL.
PE
SPC’S
PROJ.
SQ.
GALV.
MH#
CMP
C.O.
EDB
CLEAR
TREE
GRASS
CATCH BASIN
MANHOLE COVER
EXISTING ABANDONED WATER LINE
EXISTING ABANDONED SANITARY SEWER LINE
EXISTING ABANDONED ELECTRIC LINE
EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING STORM SEWER LINE
EXISTING TELEPHONE CABLE
NEW COMPRESSED AIR
EXISTING FUEL OIL SUPPLY
EXISTING OTHER UTILITIES AS IDENTIFIED
EXISTING WATER LINE
CONCRETE JOINT
CORRUGATED METAL PIPE
SPACES
PROJECTION
SQUARE
RIGID GALVANIZED STEEL CONDUIT
POLYETHYLENE
CLEAN OUT
GAGE THICKNESS
EQUAL DISTANCE
ELEVATION
MONOLITH JOINT
GALVANIZED
MANHOLE
ELECTRICAL DUCTBANK
M36
L A
Y O
U T
D O
W N
S T R
E A
M B
U B
B L E R
S
Y S T E
M
M A
T
IN
E
SEE SHEET M41
BUBBLER MANIFOLD
BUBBLER PIPING
CONCRETE FOR EMBEDMENT OF
SAWCUT MONOLITH AND TRENCH
SEE SHEET M38
DOWNSTREAM BUBBLER SCREEN
NEW WORK, SEE ELECTRICAL SHEETS
EXISTING LOWER RIGHT CONTROL STAND-FOR
SHEETS M37 & M38
BUBBLER SCREENS, SEE
INTERMEDIATE WALL RECESS
DOWNSTREAM LANDWALL AND
D J
N
J J
D
J W
B
AIRAIR AIRAIR
A I
R A I
R
N P
P
PRIOR TO FILLING VAULT WITH CONCRETE. SEE SHEET S816 FOR TRANSFORMER VAULT DETAILS.
NEW AIR PIPING SHALL BE ROUTED THROUGH NEW UTILITY CHASE IN EXISTING TRANSFORMER VAULT
EXISTING UTILITIES.
INSTALLATION. HAND EXCAVATION MAY BE REQUIRED IN VICINITIES HEAVILY CONGESTED WITH
THE CONTRACTOR SHALL TAKE PRECAUTION TO AVOID EXISTING UTILITIES DURING AIR LINE
GUTTER REMOVED DURING UTILITY INSTALLATION SHALL BE REPLACED IN KIND.
ALL CONCRETE SIDEWALK, ASPHALT PAVEMENT, GRAVEL DRIVEWAY, AND CONCRETE CURB AND
DEPTH AND AVOID THE NEW ELECTRICAL DUCTBANKS. SEE SHEETS M37 & M39.
THE CONTRACTOR SHALL RAISE THE AIR PIPES AT THE MONOLITHS TO THE CONCRETE TRENCH
SYSTEM IS TO BE INCLUDED IN THE COST OF THE BUBBLER SYSTEM.
CONCRETE REMOVAL AND PLACEMENT ASSOCIATED WITH THE INSTALLATION OF THE BUBBLER
FIELD VERIFY ALL DIMENSIONS AND QUANTITIES.
RECESSED POSITION.
THE BUBBLER SYSTEM SHALL BE INSTALLED TO CLEAR THE MITER GATES WHEN THE GATE IS IN THE
ALL CONNECTIONS SHALL BE THREADED UNLESS OTHERWISE SHOWN.
BANK WHERE FEASIBLE. SEE SHEET EL1 FOR LOCATION OF DUCTBANK.
OF 4’-0" BELOW GRADE. NEW AIR PIPING TO BE INSTALLED ADJACENT TO NEW ELECTRICAL DUCT-
LOCK CHAMBER SHALL BE SCHEDULE 40 GALVANIZED STEEL. ALL AIR PIPING SHALL BE BURIED A MINIMUM
ALL PIPES INSIDE THE LOCK CHAMBER SHALL BE SCHEDULE 40 STAINLESS STEEL. ALL PIPES OUTSIDE THE
REPAIRED PER SPECIFICATIONS.
SUPPORTS SHALL BE GALVANIZED. ANY MATERIAL COATING DAMAGED DURING INSTALLATION SHALL BE
STAINLESS STEEL. ALL MATERIAL OUTSIDE OF THE LOCK CHAMBER ON THE BUBBLER SYSTEM INCLUDING
ALL MATERIAL INSIDE OF THE LOCK CHAMBER ON THE BUBBLER SYSTEM INCLUDING SUPPORTS SHALL BE
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
4"W4"W4"W4"W 4"W
4"W4"W4"W4"W4"W
E
E
E
E
E E
E
T
T
T
T T
REFERENCE DRAWING R-009
10’ 10’ 10’8’6’4’6’ 2’ 2’
EL. 580.0
EL. 579.0
UNION
STRAP ANCHOR
REDUCER
ON 2�" } PIPE)
(REDUCING BUSHING
REDUCING TEE,NOZZLE,
EL. 612.5
L PINTLEC
EL. 607.25
EL. 606.0
EL. 603.25
AIR CONTROL VALVES
S T
A
A
EL. 576.0
S T
A
A
EL. 578.33
EL. 577.0
TO COMPRESSOR
4" SUPPLY LINE
M37 M41
EL. 579.5
EL. 547.5
PIPE PLUG
STAGGER BRACKETS
AIR ISOLATION VALVE
EL. 579.1
EL. 574.5
EL. 576.75
4’
M J
A
A
INSULATING COUPLING
PULLBOX
ELECTRICAL
MANHOLE
ELECTRICAL
EXISTING HANDRAIL
SEE NOTE 3
STAND
CONTROL
RIGHT
LOWER
M
A
A
BULKHEAD SLOT
EXISTING TAINTER VALVE
DIA. HANDRAIL
32" TO L OF 2" C
SEE NOTE 3
EXISTING HANDRAIL
M
A
A
14" MAX.
M
A
A
M
A
A
END OF PIPE
PIPE PLUG IN
OF ANCHOR
FIELD ADJUST LOCATION
DETAIL, SHEET M41, SEE NOTE 5
POINTING DOWNWARD, SEE NOZZLE
2"} PIPE - MANIFOLD WITH 9 NOZZLES
SEE NOTE 4
B M37 M37
GATE RECESS
4 40 8 FT
SCALE IN FEET
EL. 576.0
UNION
EL. 578.33
TYP.
ANCHOR,
STRAP
NEW CONCRETE
EL. 578.5
M.J. CONCRETE MONOLITH JOINT
EL. 578.5
RECESS FACE
EXISTING CONCRETE
NOTES:
LEGEND:
B
M37M37NO SCALE
SECTION
PLAN
ELEVATION
DOWNSTREAM - LANDWALL MITER GATE RECESS
D J
N
J J
D
J W
B M
IT
T E
R
E C
E S S
L A
N D
W A
L L
D O
W N
S T R
E A
M B
U B
B L E R
S
Y S T E
M
M37
SEE NOTE 2
HEAT TRACED PIPES,
9.91"} INSULATED
2"} PIPE - AIR SUPPLY, SEE NOTE 5
3" x 2" REDUCER
3"} PIPES
EL. 587.0
EL. 604.0
2"} PIPES
D D
N P
P
CONCRETE
EXISTING
ELEVATIONS FOR CLARITY.
PIPING SHOWN AT DIFFERENT
NOTE:
SEE SHEET M42
DETAILS AND ISOMETRIC,
FOR HEAT TRACE WIRING
DETAIL, SEE SHEET M42
FOR HEAT TRACE PIPE
SAWCUT
FENCE
REINSTALL
REMOVE AND
SEE NOTE 1
PROVIDE BOND BREAKER
SEE NOTE 2
STEEL PIPE,
STAINLESS
DIELECTRIC UNIONS
PIPE PLUGS
TO MITER GATE RECESS
FITTINGS TO CONFORM
BEND PIPING OR USE SPECIAL
CONTRACTOR SHALL CUSTOM
STAINLESS STEEL.
ALL PIPING INSIDE THE LOCK CHAMBER SHALL BE
FINAL ELEVATIONS.
COORDINATE WITH THE CONTRACTING OFFICER TO DETERMINE
AVOID EXISTING OBSTRUCTIONS PIPING NOT SHOWN.
ELEVATION OF THE SUPPLY PIPE AND MANIFOLD PIPE TO
THE CONTRACTOR MAY BE REQUIRED TO FIELD ADJUST THE
GATE RECESSES TO INSTALL THE PIPING AND CONCRETE.
DEBRIS ACROSS THE LOCK CHAMBER AND WITHIN THE MITER
THE CONTRACTOR SHALL BE EXPECTED TO REMOVE AND CLEAR
OF NEW AIR PIPE.
HANDRAILING AND FITTINGS TO ALLOW FOR INSTALLATION
THE CONTRACTOR SHALL TEMPORARILY REMOVE 2" DIAMETER
SEE SHEET M42 FOR PIPE SUPPORT DETAILS.
SUPPORTED AS SHOWN WITHIN THE GATE RECESS AREA.
WITH MITER GATE OPERATION. PIPING SHALL BE
PIPING SHALL BE INSTALLED SO AS TO NOT INTERFERE
PROVIDE COUPLINGS AS REQUIRED.
6.
5.
4.
3.
2.
1.
SAWCUT
PIPE TRENCH
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
REFERENCE DRAWING R-0010
UNION
STRAP ANCHOR
REDUCER
ON 2�" } PIPE)
(REDUCING BUSHING
REDUCING TEE,NOZZLE,
7’7’
10’10’10’ 8’ 6’ 4’ 4’2’2’
EL. 580.0
L PINTLE
C
3"} SUPPLY PIPE
3" X 2" REDUCER
B
LANDWALL
FACE LOCK
RECESS BUBBLER
ELBOW TO RIVERWALL
EL. 579.5
2’
7’7’
110’-0"
10’10’10’ 8’ 6’ 4’ 4’2’2’
EL. 577.25
C
3"} SUPPLY PIPE
3" X 2�" REDUCER
FACE LOCK RIVERWALL
RIVERWALL RECESS BUBBLER
3"} SUPPLY PIPE TO
s c r i p t i
CLARITY.
AT DIFFERENT ELEVATIONS FOR
SUPPORT CHANNEL. PIPES SHOWN
ELEVATION AND SHARE A COMMON
PIPES MAY BE INSTALLED AT SAME
STRUT ANCHOR SPACING
10’ TYPICAL
SEE SECTION
NEW CONCRETE,
END OF PIPE
PIPE PLUG IN
END OF PIPE
PIPE PLUG IN
SEE NOTE 3
SEE NOTE 3
S T
A
A
INSULATING COUPLING
EL. 612.5
L PINTLEC
EL. 607.0
EL. 606.0
DIA. HANDRAIL
32" TO L OF 2" C
EXISTING HANDRAIL
LIGHT POLE
EXISTING RECESS
S T
A
A
RECESS
LANDWALL
ELBOW TO
SEE NOTE 7
2"} PIPE - AIR SUPPLY
EL. 576.75
EL. 576.75
EL. 578.5
EL. 576.0
EL. 578.5
EL. 578.33
EL. 576.75
EL. 576.0
M.J. CONCRETE MONOLITH JOINT
EL. 578.33
EL. 576.0
M38 M41 S
T
A
EL. 579.0
SEE NOTE 7
DETAIL SHEET M42.
DOWNWARD. SEE NOZZLE
WITH 9 NOZZLES POINTING
2"} PIPE - MANIFOLD
EL. 574.5
CONCRETE
NEW
2 1/2 "} BUBBLER SCREEN
INSTALL THREADED PIPING PLUG
TO END OF NEW CONCRETE AND
EXTEND BUBBLER SCREEN PIPING
NOTES:
D J
N
J J
D
J W
B
M38
R
IV
E R
W A
L L
R
E C
E S S
S C
R E
D D
O W
N S T R
E A
M B
U B
B L E R
S
Y S T E
M
6 60 12’
SCALE IN FEET
LEGEND:
ELEVATION
DOWNSTREAM BUBBLER SCREEN
ELEVATION
DOWNSTREAM - INTERMEDIATE WALL MITER GATE RECESS
B
M38 M41
SEE NOZZLE DETAIL SHEET M42
12 SPACES @ 8’-0" = 96’-0"
NOZZLE SPACING
ALL PIPING INSIDE THE LOCK CHAMBER SHALL BE STAINLESS STEEL.
FINAL ELEVATIONS.
NOT SHOWN. COORDINATE WITH THE CONTRACTING OFFICER TO DETERMINE
THE SUPPLY PIPE AND MANIFOLD PIPE TO AVOID EXISTING OBSTRUCTIONS
THE CONTRACTOR MAY BE REQUIRED TO FIELD ADJUST THE ELEVATION OF
THREADED HEX HEAD PIPE PLUG.
EXTEND BUBBLER SCREEN PIPE TO END OF NEW CONCRETE AND INSTALL
EMBEDDED IN THE DOWNSTREAM BUBBLER SCREEN.
PIPE COUPLINGS MAY BE INSTALLED IN LIEU OF UNIONS WHERE
THE GATE RECESS AREA.
GATE OPERATION. PIPING SHALL BE SUPPORTED AS SHOWN WITHIN
PIPING SHALL BE INSTALLED SO AS NOT TO INTERFERE WITH MITER
ENTIRE WIDTH OF LOCK CHAMBER TO INSTALL THE BUBBLER PIPING.
SANDBAGGING AND DEWATERING SHOULD BE EXPECTED ACROSS THE
LOCATIONS WITH EITHER STANDING OR FLOWING WATER PRESENT.
THE CONTRACTOR SHALL EXPECT THESE AREAS TO BE WET
RECESSES TO INSTALL THE BUBBLER PIPING AND CONCRETE.
DEBRIS ACROSS THE LOCK CHAMBER AND WITHIN THE MITER GATE
THE CONTRACTOR SHALL BE EXPECTED TO REMOVE AND CLEAR
PROVIDE PIPE COUPLINGS AS REQUIRED.
8.
7.
6.
5.
4.
3.
2.
1.
D D
N P
P
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
REFERENCE DRAWING R-0011
REDUCER
ELEVATION
10’ 10’ 10’8’6’4’4’ 2’2’
UPSTREAM - LANDWALL MITER GATE RECESS
2.5’
EL. 603.25
EL. 606.0
EL. 607.25
L PINTLEC
PLAN
EL. 578.5
EL.584.5
RECESS
MACHINERY
MITER GATE
DIA. HANDRAIL
32" TO L OF 2" C
10’ TYP.
END OF PIPE
PIPE PLUG IN
END OF PIPE
PIPE PLUG IN
ANCHOR
LOCATION OF
FIELD ADJUST
w/NOZZLE ON 2�" } PIPE)
(PROVIDE REDUCING BUSHING
REDUCING TEE,NOZZLE,
M.J. CONCRETE MONOLITH JOINT
EXISTING HANDRAIL
EXISTING PULLBOX
INSULATING COUPLING
STAND
CONTROL
LEFT
UPPER
M J
S T
A
M J
S T
A
M
A
S T
A
14" MAX.
PIPE TRENCH
SAWCUT
SPACING
STRUT ANCHOR
PARKING
CONCRETE
EXISTING
FENCE SWING GATE
SEE NOTE 2
M J
M J
M J
B
EL.582.45
NEW CONCRETE
SEE NOTE 5
GATE RECESS
UNIONTYP.
ANCHOR
STRAP
RECESS FACE
EXISTING CONCRETE
EL. 581.0
EL. 582.45
EL. 582.5
NEW CONCRETE
EXISTING CONCRETE
SEE NOTE 1
PROVIDE BOND BREAKER
SAWCUT
SEE NOTE 3
SEE NOTE 7
SEE NOTE 7
M39 M39
EL.582.5
EL.584.5
EL.584.0
EL.585.0
EL.581.0
EL. 612.5
SAWCUT, REMOVED AND REPLACED
AND ASPHALT DRIVE TO BE
EXISTING CONCRETE PARKING
EL.582.25
EL.579.5
SEE NOTE 8
2"} PIPE - AIR SUPPLY
PIPE PLUG
EXISTING ASPHALT DRIVEWAY
SEE ELECTRICAL SHEET E1
NEW ELECTRICAL DUCT BANK
ELECTRICAL DUCT BANK
FROM COMPRESSOR
ANIZED STEEL PIPE
SUPPLY LINE, GALV-
4" COMPRESSED AIR
D M39 M41
FENCE
REINSTALL
REMOVE AND
NOTES:
LEGEND:
B
M39M39NO SCALE
SECTION
4 40 8’
SCALE IN FEET
D J
N
J J
D
J W
B M
IT
T E
R
E C
E S S
U P S T R
E
N D
W A
L L
B U
B B
L E R
S
Y S T E
M
M39
D D
N P
P
2"} PIPES
EL. 604.0
EL. 598.0
SEE NOTE 2
HEAT TRACED PIPES,
9.91"} INSULATED
STAGGER BRACKETS
SEE SHEET M42
DETAILS AND ISOMETRIC,
FOR HEAT TRACE WIRING
DETAIL, SEE SHEET M42
FOR HEAT TRACE PIPE
3"} PIPES, SEE NOTE 4
SEE NOTE 8
SEE NOZZLE DETAIL SHEET M41,
9 NOZZLES POINTING DOWNWARD.
2"} PIPE - MANIFOLD WITH
2"} PIPE, SEE NOTE 4
FOR CLARITY.
PIPING SHOWN AT DIFFERENT ELEVATIONS
PIPE, SEE NOTE 4
STAINLESS STEEL
SEE NOTE 2
DIELECTRIC UNIONS
TO MITER GATE RECESS
FITTINGS TO CONFORM
BEND PIPING OR USE SPECIAL
CONTRACTOR SHALL CUSTOM
STEEL.
ALL PIPING INSIDE THE LOCK CHAMBER SHALL BE STAINLESS
ELEVATIONS.
WITH THE CONTRACTING OFFICER TO DETERMINE FINAL
EXISTING OBSTRUCTIONS PIPING NOT SHOWN. COORDINATE
ELEVATION OF THE SUPPLY PIPE AND MANIFOLD PIPE TO AVOID
THE CONTRACTOR MAY BE REQUIRED TO FIELD ADJUST THE
NEW CONCRETE AIR PIPING. SEE SHEET S208.
HAVE LIMITED HEAD ROOM AND WORK SPACE TO INSTALL THE
SILL EL.584.5 TO DEWATER THE LOCK. THE CONTRACTOR WILL
CANTILEVERED BULKHEADS WILL BE UTILIZED OVER THE UPPER
PROVIDE PIPE COUPLINGS AS REQUIRED.
MITER GATE RECESSES TO INSTALL THE PIPING.
CLEAR DEBRIS ACROSS THE LOCK CHAMBER AND WITHIN THE
THE CONTRACTOR SHALL BE EXPECTED TO REMOVE AND
SEE SHEET M42 FOR PIPE SUPPORT DETAILS.
SUPPORTED AS SHOWN WITHIN THE GATE RECESS AREA.
WITH MITER GATE OPERATION. PIPING SHALL BE
PIPING SHALL BE INSTALLED SO AS TO NOT INTERFERE
MAXIMUM 14" CONCRETE TRENCH DEPTH.
PIPE TRANSITION FROM 4’ EARTHEN TRENCH DEPTH TO
OF NEW AIR PIPE.
HANDRAILING AND FITTINGS TO ALLOW FOR INSTALLATION
THE CONTRACTOR SHALL TEMPORARILY REMOVE 2" DIA.
ASPHALT REQUIREMENTS.
SPECIFICATIONS FOR REPLACEMENT CONCRETE AND
CONCRETE PARKING TO TRENCH FOR AIR PIPE. SEE
CUT CONCRETE MONOLITH, ASPHALT DRIVEWAY AND
DUCTBANKS ALONG THE BACK OF MONOLITH #20. SAW-
INSTALL AIR PIPE TRENCH TO AVOID NEW ELECTRICAL
9.
8.
7.
6.
5.
4.
3.
2.
1.
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
REFERENCE DRAWING R-0012
REDUCER
2�" } PIPE)
(REDUCING BUSHING ON
REDUCING TEE, NOZZLE,
ELEVATION
ELEVATION
10’10’10’ 8’ 6’ 4’ 4’2’2’
2"} PIPE - AIR SUPPLY
3" X 2" REDUCER
2.5’
7’7’
110’-0"
10’ TYP.
3" X 2�" REDUCER
A
LANDWALL
FACE LOCK
FACE LOCK RIVERWALL
RECESS BUBBLER
ELBOW TO RIVERWALL
RIVERWALL RECESS BUBBLER
3"} SUPPLY PIPE TO
EL. 585.0
EL. 584.5
EL. 582.0
EL. 584.5
EL. 581.0
R E
C E
N D
W A
L L
EL.576.5
S T
A
A
S T
A
A
S T
A
A
EL. 575.0
EL. 581.0
SPACING
STRUT ANCHOR
10’ TYP.
SPACING
STRUT ANCHOR
SEE NOTE 3
SEE NOTE 3
END OF PIPE
PIPE PLUG IN
END OF PIPE
PIPE PLUG IN
INSTALL THREADED PIPE PLUG
TO END OF NEW CONCRETE AND
EXTEND BUBBLER SCREEN PIPING
EL. 603.25
EL. 606.0
EL. 607.25
EL. 612.5
L PINTLEC
DIA. HANDRAIL
30" TO L OF 2" C
EXISTING HANDRAILING
2�"} BUBBLER SCREEN
AT DIFFERENT ELEVATIONS FOR CLARITY
SUPPORT CHANNEL. PIPES SHOWN
ELEVATION AND SHARE A COMMON
PIPES MAY BE INSTALLED AT SAME
SEE NOTE 6
SEE NOTE 5
2"} PIPE - AIR SUPPLY
SEE NOTE 6
EL. 584.5
EL. 581.0
EL. 581.5
EL. 582.33
EL. 582.5
M40 M41
UPSTREAM BUBBLER SCREEN
UPSTREAM - INTERMEDIATE WALL MITER GATE RECESS
EL. 582.5
EL. 582.33
SEE NOTE 5
SEE NOZZLE DETAIL, SHEET M42,
9 NOZZLES POINTING DOWNWARD.
2"} PIPE - MANIFOLD WITH
EL. 584.0
WHERE EMBEDDED IN CONCRETE
STANDARD PIPE LENGTHS
INSTALL COUPLINGS AT
ALL PIPES
NOTES:
LEGEND:
D J
N
J J
D
J W
IV
E R
W A
L
R
E C
E S S
U P S T R
E
R E E
N B
U B
B L E R
S
Y S T E
M
M40
SEE NOZZLE DETAIL SHEET M42
12 SPACES @ 8’-0" = 96’-0"
NOZZLE SPACING
4 40 8
SCALE IN FEET
STAINLESS STEEL.
ALL PIPING INSIDE THE LOCK CHAMBER SHALL BE
WATERLINE. SEE SHEET S208.
SPACE TO INSTALL THE NEW CONCRETE AIR PIPING AND
CONTRACTOR WILL HAVE LIMITED HEAD ROOM AND WORK-
UPPER SILL EL. 584.5 TO DEWATER THE LOCK. THE
CANTILEVERED BULKHEADS WILL BE UTILIZED OVER THE
DETERMINE FINAL ELEVATIONS.
COORDINATE WITH THE CONTRACTING OFFICER TO
TO AVOID EXISTING OBSTRUCTIONS NOT SHOWN.
THE ELEVATION OF THE SUPPLY PIPE MANIFOLD PIPE
THE CONTRACTOR MAY BE REQUIRED TO FIELD ADJUST
SUPPORTED AS SHOWN WITHIN THE GATE RECESS AREA.
FERE WITH MITER GATE OPERATON. PIPING SHALL BE
PIPING SHALL BE INSTALLED SO AS NOT TO INTER-
LOCK CHAMBER TO INSTALL THE BUBBLER PIPING.
SHOULD BE EXPECTED ACROSS THE ENTIRE WIDTH OF
WATER PRESENT. SANDBAGGING AND DEWATERING
WET LOCATIONS WITH EITHER STANDING OR FLOWING
THE CONTRACTOR SHALL EXPECT THESE AREAS TO BE
BUBBLER PIPING AND CONCRETE.
WITHIN THE MITER GATE RECESSES TO INSTALL THE
AND CLEAR DEBRIS ACROSS THE LOCK CHANNEL AND
THE CONTRACTOR SHALL BE EXPECTED TO REMOVE
PROVIDE PIPE COUPLINGS AS REQUIRED.
7.
6.
5.
4.
3.
2.
1.
D D
N P
P
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
REFERENCE DRAWING R-0013
REFERENCE DRAWING R-0014
N
J J
D
J W
B
M42
A
T
A
IL
S
II
S E C
T
IO
N S
B U
B B
L E R
S
Y S T E
M
PIPE
LOCK WASHER
IN EPOXY GROUT,(TYP.)
�"} THREADED RODS SET
TYPICAL PIPE SUPPORT
MIN.
CLAMP PLATE
�" X 3"
UNIONS AS REQUIRED
OF FITTINGS AND
CHANNEL) FOR CLEARANCE
SPACER (GALVANIZED STEEL
NO SCALE
UNION AND FACE OF WALL
�" CLEARENCE BETWEEN
PROVIDE CHANNEL TO ALLOW
STRAP ANCHOR BELOW GRADE
4"
DUCT BANK
NOTES:
EL. 604.0
HANDRAIL
EXISTING
M A
X
EXISTING FENCE
STEEL AIR PIPE
4" GALVANIZED
SEE NOTE 2
DUCTBANK(S)
NEW ELECTRICAL
SEE NOTE 1
SUPPLY PIPE,
NEW 4" O AIR
AIR PIPE DETAIL
NO SCALE
V A
R I
E S
CONDUIT (TYP)
FLEXIBLE METAL
�" LIQUIDTIGHT
(3 REQUIRED)
INSTALLED IN FD BOX
�" TO �" REDUCER
FITTING
�" LR
FITTING
�" T
(1 REQUIRED)
INSTALLED IN FD BOX
1" TO�" REDUCER
COVER (TYP)
BOX WITH GASKETED
FD TYPE CAST JUNCTION
N P
P
RECESS
CONFORM TO MITER GATE
SPECIAL FITTINGS TO
BEND CONDUIT OR USE
CONTRACTOR SHALL CUSTOM
NO SCALE
HEAT TRACE ELECTRICAL DETAIL
UPSTREAM LAND WALL SHALL BE SIMILAR (MITER GATE 2)
DOWNSTREAM LAND WALL SHOWN (MITER GATE 1)
SERVICE PIPE
INSULATION
CONDUIT
PIPE SUPPORT
S
S
(TYP.)
6"
S
S
S
L
= MAXIMUM 10’-0"
= MAXIMUM 5’-0"
SPANS BETWEEN PIPE SUPPORT CENTERS
S
S
NO SCALE
AIR GAP
HEAT TRACE TUBE
TUBE
5’ CAPILLARY
(BOTH ENDS)
WELDED
CONTINUOUSLY
(BOTH ENDS)
WELDED
CONTINUOUSLY
A MINIMUM OF 2 PIPE SUPPORTS.
FOR SIX FOOT LENGTH, PROVIDE
HEAT TRACE PIPE ASSEMBLY DETAIL
LOCK MONOLITH
CONCRETE
EXISTING
STEEL CONDUIT
1" RIGID GALVANIZED
STEEL CONDUIT
�" RIGID GALVANIZED
TO SNAG RACEWAY WHEN WATER IS AT HIGH LEVELS
TIGHT TO CONCRETE SO FLOATING DEBRIS IS NOT LIKELY
3. KEEP RIGID CONDUITS AND LT. FLEXIBLE CONDUITS
NEW ELECTRICAL DUCTBANKS WHERE PRESENT.
2. THE CONTRACTOR SHALL ROUTE NEW AIR PIPE TO AVOID
TRENCH DEPTH SHALL NOT EXCEED 14".
THE BOTTOM OF TRENCH ALONG THE LANDSIDE MONOLITHS.
1" CLEARANCE BETWEEN THE BOTTOM OF THE PIPE AND
1. PROVIDE SUFFICENT DEPTH OF AIR PIPE TO MAINTAIN
AND WIRING
FIELD CONDUIT
SERVICE PIPE
INSULATION
5’-0"
2"
AIR GAP
NO SCALE
HEAT TRACE WIRING DETAIL
PIPE CLAMPS
CONDUIT
END SEAL ASSEMBLY
SELF-REGULATING HEATER CABLE
CABLE INSTALLATION
SELF-REGULATING HEATER
SILICONE CAULK AFTER
CAPILLARY TUBES WITH
SEAL ENDS OF HEAT AND
GASKET
BOX COVER
BOX COVER
CONDUIT LOCKNUT
JUNCTION BOX
CONDUIT
METAL FLEX
LIQUID-TIGHT
LOCKNUT
GROUND
NO SCALE
HEAT TRACE WIRING ISOMETRIC
GASKET
ADAPTER
BOX
STAND-OFF
PIPE CLAMPS
HEAT TUBE
HEATER CABLE
SELF-REGULATING
CABLE INSTALLATION
CAULK AFTER HEATER
TUBE WITH SILICONE
SEAL ENDS OF HEAT
HEATER CABLE (TYP)
OF SELF-REGULATING
END CAP AT END
NOT SHOWN FOR CLARITY)
SPACERS, AND CONDUIT
PIPE - (INSULATION,
2"} COMPRESSED AIR
CONSTRUCTION
NON-STANDARD
U-GROMET - DOUBLE OR
PRODUCTS
O-GROMET - OVERJACKET
SEALING GROMET (SPECIFY)
CONDUCTORS & GROUND
CURRENT CARRYING
WATER PROOF SPLICE,
CONDUIT
RIGID
PIPE
1’-0"
LOCK WASHER
IN EPOXY GROUT,(TYP.)
�"} THREADED RODS SET
TYPICAL PIPE SUPPORT
MIN.
CLAMP PLATE
�" X 3"
UNIONS AS REQUIRED
OF FITTINGS AND
CHANNEL) FOR CLEARANCE
SPACER (STAINLESS STEEL
NO SCALE
UNION AND FACE OF WALL
�" CLEARENCE BETWEEN
PROVIDE CHANNEL TO ALLOW
STRAP ANCHOR IN CHAMBER
NOTE:
WORK ON THE BUBBLER SYSTEM IN THE FUTURE.
�" DIAMETER. THIS IS REQUIRED TO ALLOW DIVERS TO
BOLT SIZE ASSOCIATED WITH THE CLAMP PLATE SHALL BE
WITH THE �" THREADED ROD, THE MINIMUM ALLOWABLE
1. IF THE CONTRACTOR DOES NOT SECURE THE CLAMP PLATE
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
REFERENCE DRAWING R-0015
B
J J
D
D J
N
N P
P
10 100
SCALE IN FEET
BUBBLER PIPING AND COMPRESSOR PLAN
M43
P L
A N
A
M P
R E S S
O R
B U
B B
L E R
P
IP
IN
G
COMPRESSED AIR SYSTEM
REFEED EXISTING BUILDING
AIR SYSTEM
BUILDING COMPRESSED
REFEED EXISTING
ON SHEET M42
PIPING, SEE NOTE 2
COMPRESSED AIR
GALVANIZED STEEL
4" DIA. SCHED. 40
KEY NOTES:
MANHOLE #2
POLYETHYLENE REQUIREMENTS.
SEE SPECIFICATION SECTION 02510a FOR
WATER LINE SHALL BE PRESSURE TESTED.
SHALL BE 2" WELDED POLYETHYLENE. THE
STEEL WATERLINE. THE NEW WATERLINE
FIBER DUCT AFTER REMOVAL OF THE EXISTING
16380-3.2.1.3. FOR CLEANING THE 4 INCH
00800-1.1.2, 16380-3.2.1.2, AND
CALLED OUT IN SPECIFICATION SECTIONS
CONTRACTOR SHALL FOLLOW THE PROCEDURES
SHEET R20 FOR DUCT BANK LOCATION. THE
#2 AND #5. SEE SECTION H-H ON REFERENCE
THE EXISTING WATERLINE BETWEEN MANHOLE
WALL. THE CONTRACTOR SHALL DEMOLISH
TOP OF MANHOLE #5 ON THE INTERMEDIATE
THRU CROSSOVER TO ELBOW CONNECTION AT
FROM FIRST UNION AT TOP OF MANNOLE #2
GALVANIZED STEEL NON-POTABLE WATERLINE
CONTRACTOR SHALL REPLACE EXISTING 2"ON SHEET M42
PIPING, SEE NOTE 2
COMPRESSED AIR
GALVANIZED STEEL
1-1/2" DIA. SCHED. 40
COALESCING OIL FILTER
COMPRESSOR AND
EXISTING AIR
ON SHEET M42
PIPING, SEE NOTE 2
COMPRESSED AIR
GALVANIZED STEEL
1-1/2" DIA. SCHED. 40
DRAIN IN MANHOLE #2. SEE DETAIL BELOW.
CONTRACTOR SHALL PROVIDE A LOW POINT
LOW POINT DRAIN
NO SCALE
1�"
AIR
N
�" BALL VALVE
B M
A
F R J
J
U L
I
T
BUILDING
GENERATOR
STAND-BY
CENTER
VISITOR
BUILDING
MAINTENANCE
STATION
CENTRAL CONTROL
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
M
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 238
E
E
RW RW RW RW
W
S
E
E E
ST ST
E
E
S
S
S
E
E E
S
S
W
4"W4"W4"W
4"W4"W
E
E
E
E
T T
LP GAS
E E
E
E
S
S
S
S
S
ST
E
E
E
AIRAIR
A I R
A I R
A I R
AIR AIR
A I
R
A I
R A I
R
A I
R
A I R
A I R
A I R
REFERENCE DRAWING R-0016
R
B G
R
J W
B
FLOW
FLOW
T11
P11 P12 P13 P14
P16 P17 P18 P1G T10
P11 P15
P18
P12
P1A
CE8CEI
P1AP18 P19 GND
P13 P14 P17
JB-E
JB-A
C1A C1B C1C C1D C1E C1G C1I C1L C1T
C1A C1B C1C C1D C1E C1G C1I C1L
CAI
GNDCA
A
E
V A
T
IO
N L
A N
D W
A L L
P
L A
N D
O W
N S T R
E A
M
CE9 CW1
P1A
CW1
GND
CW1
T11
P15
P11
P12 P16
CE
CAI
C1T CA
CE9 CW1
T10
UNIT ON NEW CONCRETE PAD, SEE
REINSTALL EXISTING TOW HAULAGE
PR-"E"
NO. 1, SEE
L.R. MITER GATE
MH-C1, SEE
PR-"A"
NO. 1, SEE
L.R. TAINTER VALVE
MH-C1
1.
STAND, SEE
NEW CONTROL
L.R. MITER GATE RECESS
GATE RECESS
L.R. TAINTER
STATION
LOWER GAUGING
(TYP)
SEE NOTE 1
(TYP)
SEE NOTE 1
SEE
LOWER GAUGING STATION,
P18 P19
P1P
P1P
CW1
L18
L1C L1H L1G
L1K
L12 L19 L1C L1G L1H
L1K
L12 L19 L1A L1B L1K
GND
L12 L19 L1A L1K
GND
L12 L19
L12 IN (1) 2’’ CONDUIT
IN (1) 2’’ CONDUITL12
L1G
GND
C1PC10
C1PC10
2.
JB-11, SEE
IN (2) 2’’ CONDUIT
GENERAL NOTES
SECTIONS, DETAILS AND
NEW DUCT BANK, SEE
LOWER GAUGING STATION RECESS
18’’
30’’20’’24’’
D D
EL4 EL77
EL4 EL69
EL4 EL29
EL4 EL13
EL4 EL27
EL21EL21
EL4EL4
DOWNSTREAM LANDWALL PLAN VIEW
EL4EL4
DOWNSTREAM LANDWALL ELEVATION VIEW
GENERAL NOTES:
10 100 20’
SCALE IN FEET
EL4 EL76
EL4 EL13
EL4 EL68
E
E L
E L
D
E L
E L
C
E L
E L
B
E L
E L
C O
N T I N
U
M A
T
N
E
C O
N T I N
U
M A
T
N
E
I
E L
E L
NEW TRAFFIC LIGHTS (TL-1)
EXISTING LIGHT POLE WITH
GND
L1GL1C L1H
P1G L11
P1G
P1A
FD-6, (LP-6), (LP-11)
SEE
AND TRANSFORMER T-3
JB-11
EL4 EL12
3.
FOR DUCT EXPANSION/CONTRACTION JOINTS.
COORDINATE SPECIAL FEATURES AS REQUIRED
SEE LEGEND ON SHEET EL3.
SHOWN.
QUANTITIES ARE NOT LIMITED TO THE EXAMPLES
EXAMPLES ARE IDENTIFIED ON THIS SHEET, BUT
DUCTS AT ALL LOCATIONS AS IDENTIFIED ON DETAIL
PROVIDE FLEXIBLE COUPLINGS IN CONCRETE EMBEDDED
L1A
L11
L11
C O
N T I N
U
C O
N T I N
U
(1) 2’’, (1) 1’’, AND (1) �’’ CONDUIT
SEE NOTE 3
IN (2) 2’’ CONDUIT.
MANHOLE TO FIXTURE FB
(1) 2’’ CONDUIT FROM EXISTING
GND
P16
P15
FIXTURE FB-1, SEE
FB-1, LP-38
IN 1" CONDUITP1H
M42 FOR DETAILS.
CONDUIT & WIRING. SEE SHEET
PIPE HEATERS JUNCTION BOX,
NEW HIGH VOLUME BUBBLER AIR
BREAK COUPLING FIXTURE
NEW FX-1 TOW
BELOW TOP OF CONCRETE
TOP OF DUCTBANK IS APPROX. 0.3’
HIGH POINT OF DUCT BANK -
4.9’
SLOPES 1%
DUCTBANK
SLOPES 1%
DUCTBANK
APPROX.
TO FD4-1L1L
FD-5N, (LP-2), (LP-11)
GND
L1P
JUNCTION BOX
NEW LIGHTING
L1L L1P
EL4.1
SP SP
C1
TO
SP
TO
MH
SP
(TYP)
SEE NOTE 1
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
E
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 126
REFERENCE DRAWING NO. 0017
FLOW
A
T
N T I N
U
8FLOW
P24
P23P22P21
C2A
P2EP28P27P26P25 GND
P02P01C80
P05
P04
P13P12P11
C1T
P14 P18P17P16
GNDP1D
P27P24P23
GND
CW2CF9
P25P24P23
P28P27P26 T20P2A
P22P21 P26P25
P28
CW2
P29
W
P21
C2T
P22
B G
R
K R
R
J W
B
C20C10
C1LC1IC1GC1EC1DC1CC1BC1A
C2B C2C C2D C2F C2H C2I
CF9
C2T
C2A C2B C2C C2D C2F C2H C2I C2L CB
T21P2EP2A
JB-F
JB-B
C2A C2B C2C C2D C2F C2H
C2I C2L
C2LC2IC2HC2FC2DC2CC2BC2A
SEE NOTE 3
CF
P25 P26 P28 P2A
GND
CW2
CB CBI
CF9
MATCH LINE CONTINUED ON EL3
T20
C2L
T20
CW2
GND
CFI CF8
GND
P22P21
CBI CF9CB
T20
CE9 CW1
GND
FG FG
SEE
JIB CRANE,
PR-"B"
NO.2, SEE
U. R. TAINTER VALVE
MH-2
NO. 2, SEE
U. R. MITER GATE
PR-"F"
MH-C2, SEE
MH-C2
CF CFI CF8 GND
GATE RECESS
U.R. MITER
GATE RECESS
U.R. TAINTER
(2) 2’’ CONDUITS
P2P
P2P
P2P
P21
P22 P26P25
L22
L28
L12 L19 L1A L1D L1K
L21 L2A
FG, (LP-34)FG, (LP-34)
L2A
L21 L2A
CW2 L23 L26 L2A L2G L2K
P2A L24 L26 L2A L2K P2A
L20 L20
GNDL21 L2A
L23 L26 L2A L2G
T22
L22
C10 C1P
P1A
C20
C2P C2T
P2P
C20 C2P
C20 C2P
C20 C2P C2T
P28 P2CL22CW2
P29
L2K
GND
GND
L2G
JB-21, SEE
SEE EL25
SHED
SCOOTER
NEW
38’’ 18’’26’’ 26’’ 19’’
18’’26’’30’’
EXISTING TREE ROOTS
CONTRACTOR TO REMOVE
EXISTING SEWER TO REMAIN
P L
E
V A
T
IO
N
U P P
N D
W A
L L
D D
EL77
EL6
EL68
EL6
EL30
EL6
EL69
EL6EL28
EL6
EL12
EL6
EL13
EL6
EL10
EL6
10 100 20’
SCALE IN FEET
EL6EL6
UPSTREAM LANDWALL PLAN VIEW
EL6EL6
UPSTREAM LANDWALL ELEVATION VIEW
NOTES:
A 2 E
L
E L
EL19
A
EL6
E L
A
E L
A 2 E L
E L
B 2 E
L
E L
C 2 E
L
E L 6 D
2 E L
E L
E 2 E
L
E L
F 2 E
L
E L
EL13
EL6
EL6 EL76
G 2 E
L
E L
STAND, SEE
NEW CONTROL
EL13
EL6
M A
T
N
N T I N
U
E V
A T I
V
O V
E
M A
T
N
N T I N
U E
D
M A
T
N
N T I N
U
L O
W
E V
A T I
L O
W
M A
T
N
N T I N
U E
D
M A
T
N
N T I N
U
O V
E
SHEET
MH-2, SEE
P1D P1F
L26 L2K
P2E
S B
GNDP0B
L26 L2K
P2A
L25 IN �’’ C
CENTRAL CONTROL HOUSE
FLAG POLE
EXISTING
L26 L2K P2E
P2H IN 1’’ C
P2E
P2E
DRAWINGS
STRUCTURAL
STATION, SEE AND
UPPER GAUGING
GATEWELL MANHOLE
IN (2) 3’’ CONDUITS INTO
GND
P28
NEW MH-3, SEE
T-2
(ON ROOF TOP)
AIR HORN
SEE NOTE 6
SEWER MANHOLE
EXISTING ABANDONED
STRUCTURAL DRAWINGS
OF EXISTING VAULT WITH
COORDINATE FILLING
3 ON EL4
SEE NOTE
STATION RECESS
UPPER GAUGING
GND
IN �’’ C
GAUGE
TEMP.
GND
BY OTHERS)
REMOVED AND REINSTALLED
GAUGE IS NOT SHOWN) WILL BE
GAUGE & RAIN GAUGE (RAIN
LOCATION (THE EXISTING TEMP.
�’’ C FOR TEMP. GAGE IN SAME
REMOVE AND REINSTALL NEW
P15
FB-2, LP-38
(1) 2" CONDUIT
FIXTURE FB-2, SEE
SHEET M42 FOR DETAILS
BOX, CONDUIT & WIRING. SEE
AIR PIPE HEATERS JUNCTION
NEW HIGH VOLUME BUBBLER
FUTURE USE BY OTHERS.
TEMP SENSOR. CAP FOR
NEW 2’’ CONDUIT FOR WATER
L2J
L20 IN �’’ C
FK, (LP-34)
FI & PHOTOCELL, (LP-39)
�" C TO INSTRUMENTATION
M A
T
N
E
S
L
E
L
NO. 5 ON I-WALL
LOCATION SHALL BE ON TOP OF MANHOLE
STATION SHALL BE BY OTHERS. NEW
REMOVAL AND RELOCATION OF MET
DURING ALL CONSTRUCTION. COORDINATE
MAINTAIN PROTECTION OF EQUIPMENT
TEMPORARY CONNECTIONS BY OTHERS.
EXISTING MET STATION. COORDINATE
SLOPES 1%
DUCTBANK
PULLBOX.)
DOWN 1% TO THE NEXT
THE DUCT BANK SLOPES
CRETE AND FROM THERE,
0.36’ BELOW TOP OF CON-
OF DUCTBANK IS APPROX.
(AT THE HIGH POINT, TOP
POINT OF DUCT BANK
APPROX. 63.2’ TO HIGH
UNIT(SEE NOTE 7)
A/C CONDENSING
FD-9N, (LP-34), (LP-13)
(PB-NOTE 4)
PULLBOX
P1G P1P T10 T12 GND GND GND
L1P
EL6.4
L2J
L2J L29
L29 GND
BOX
JUNCTION
LIGHTING
L23 L24
L26 GND
OF PULLBOX
(3) 2" CONDUITS OUT
BOX
JUNCTION
LIGHTING
L2J
L29
(LP-34)
FD-10,
L2J
7.
6.
5.
4.
3.
2.
1.
TO DIRECTLY ABOVE T-2 ON BRACKETS ON CCS WALL.
AC CONDENSING UNIT ACTUALLY EXISTS OR WILL BE RELOCATED BY OTHERS
FILLING.
STRUCTURAL DRAWINGS FOR MANHOLE FINAL PREPARATIONS FOR
PENETRATE AND USE MANHOLE FOR DUCTBANK AS REQUIRED. SEE
AT BOTH ENDS.
SEAL EXISTING CONDUITS FROM MH-2 TO EXISTING GASOLINE DISPENSER
FLUSH WITH TOP OF LOCK WALL.
NOMINAL INTERIOR DIMENSIONS SHALL BE 18’’Wx18’’Lx12’’D INSTALLED
WITH HEAVIER DUTY TRAFFIC ANTI-SKID OR CHECKERED GASKETED COVER.
INSTALL NEW FLUSH MOUNT FLANGED CAST IRON SIDEWALK TYPE BOX
FOR MAIN LOCK CROSSOVER CONDUCTORS SEE SHEET EL1.
INSTALL NEW CONDUCTORS IN EXISTING MAIN CROSSOVER DUCT BANK.
SEE LEGEND ON SHEET EL3.
SEE GENERAL NOTES ON SHEET EL4.
CW2 CW4
L21CW4
CW4
CW4
CW4
V20
GND
V20
V20
CBI
V20
GNDV20
TRAFFIC LIGHTS, TL-1
POLE FD-9N WITH
NEW LIGHT
CONDUIT
(1) 2’’
ON S.W. SIDE
JIB CRANE DISCONNECT
SP
SPARE 2" CONDUIT
L01 G7 G8 G9 G10 G11
T50
C81
CONDUIT
(1) 2", (1) 1", AND (1) �"
COUPLING LIGHT
NEW FX-2 TOW BREAK
(LP-6,LP-13)
CONCRETE PAD, SEE
HAULAGE UNIT ON NEW
REINSTALL EXISTING TOW
FD4-3N
TO
GND
V20T21 T22
SP
NOTE
8.
NOTES CONTINUED:
MH-3 TO JB-B TO CB2
2 SPARE CONDUITS FROM
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
E
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
Sheet of 126
E
E
E
E
E
ST
REFERENCE DRAWING NO. R-0018
G
R
K R
R
J W
B
BOX FRAME
CONTINUOUS TO JUNCTION
TOP SLAB SHALL BE
ALL SIDES
FORM SMOOTH
PVC END BELLS
NECESSARY FOR
BREAK OUT AS
(TYPICAL)
TYPES, SIZES & LOCATIONS
SEE PLANS FOR CONDUIIT
FLOW
INSTALL NEW MANHOLE
LADDER, SEE
(4) BOLTS
FRAME AND LID WITH
JUNCTION BOX
1.
FLOW
SEE
BRACKETS (TYP.)
SEE
BRACKETS (TYP.)
P U
L L B
X
T
A
IL
S M
A N
H O
D
DRAWINGS
SEE STRUCTURAL
DRAWINGS
SEE STRUCTURAL
EXTEND MANHOLE
D D
EL21
EL12
EL21
EL12
EL21
EL12
EL21
EL12
EL77
EL12
EL21
EL12
EL77
EL12
EL21
EL12
EL21
EL12
EL21
EL12
EL21
EL12
EL12
EL21
EL12
EL12EL2
EL12EL8
EL12EL7
EL12EL6
EL12EL5
MANHOLE MH-1 MANHOLE MH-C5 MANHOLE MH-C6
NOTE:
4 4’0
SCALE IN FEET
4 4’0
SCALE IN FEET
4 4’0
SCALE IN FEET
A
EL12EL12
SECTION
A
EL12 EL12
GUIDE WALL PULLBOX PLAN (TYP)
EL12EL44 4’0
SCALE IN FEET
NEW MANHOLE MH-3
TRANSFORMER T-3 AND JB-11
35’’
4 4’0
SCALE IN FEET
MH-C1
CONDUITS TO
FACING LOCK
THE RIVERWARD SIDE OF FENCE
THE NEW FENCE IMMEDIATELY TO
INSTALL ASSEMBLY ADJACENT TO
JB-11
GALVANIZED HARDWARE (TYP.)
ENCLOSED CIRCUIT BREAKER (NEMA 3R)
T-3
NEMA 3R
FITTING
DRAIN
TOP OF WALL
4 4’0
SCALE IN FEET
SPECIFICATION SECTION 16375.
MANHOLE NOTES, SEE DRAWING EL1O AND
PULL BOX DETAILS CONFORM TO GENERAL
23’’ MANHOLE I.D.
35’’ MANHOLE I.D.
24’’ X 24’’ X 10’’ AISI 304 S.S. HINGED JBOX. NEMA 3R
MOUNTING PLATE
�’’ HOT DIPPED GALVANIZED STEEL
CONDUITS
2’’ RGS
(TYP. 2)
W/ PIPE CAPS ON TOP
3’’ GALVANIZED PIPE
2’’
SEE
BRACKETS (TYP.),
SEE
GROUND BAR,
VERTICAL MOUNT
SEE (TYP.)
2’’
COUPLING (TYP.)
PIPE & CONDUIT
EL12EL4
JUNCTION BOX DETAIL
LOCK LIGHT TERMINAL SPLICE/TAP
NOT TO SCALE
CONDUIT
�’’ RGS
SEE NOTE 4
POLE HINGE
(SEE NOTE 4)
TIP-DOWN
DIRECTION OF
FLOW
ELEV. 612.5
TOP OF WALL
CAST HINGED ENCLOSURE
16" X 12" X 8" NEMA 4
SEE
GROUND BAR,
VERTICAL MOUNT
SEE
MANHOLE LADDER,
INSTALL NEW
EL77
EL12
SEE
GROUND BAR,
VERTICAL MOUNT
FLOW
SEE TYP.
SEE (TYP.)
EL77
EL12
SEE (TYP.)
ELEV. 615.5
RGS ENDCAPS
TIP DOWNSTREAM.
AND JUNCTION BOX, APPROXIMATELY 3 FEET APART. NOTE THAT TYPICALLY THE LIGHT STANDARDS
HITTING THE JUNCTION BOX, YET FAR ENOUGH TO ALLOW WORKSPACE AROUND THE LIGHT STANDARD
STANDARD AND THE JUNCTION BOX SHALL BE SUCH THAT THE POLE CAN BE TIPPED DOWN WITHOUT
4. FOR JUNCTION BOXES THAT ARE NOT IN-LINE WITH A FENCE, THE DISTANCE BETWEEN THE LIGHT
TO FIT (WHERE APPLICABLE FOR FD FIXTURES ONLY. SEE ALSO SHEET EL1).
ALLOW ALIGNMENTS OF HANDRAILS AND FENCES TO BE IN-LINE & THIS ASSEMBLY TO BE OFFSET
3. EMBED CONDUITS IN LOCKWALL OR FASTEN BEHIND GUIDEWALL. COORDINATE POSITION & LOCATE TO
FOR EVERY CONDUCTOR ENTERING/EXITING ENCLOSURE.
2. PROVIDE 90 DEGREES C POWER BLOCKS FOR CU WIRES FOR TERMINATION, TAP, AND CONTINUATION
FD FIXTURE LIGHT STANDARD ON THE GUIDEWALLS, LOCKWALLS, INTERMEDIATE WALL, AND RIVER WALL.
1. UNLESS OTHERWISE INDICATED ON THE DRAWINGS, THIS JUNCTION BOX SHALL BE INSTALLED AT EACH
NOTES:
STEEL MOUTING PLATE
HOT-DIPPED GALVANIZED �"
TO RGS FOR RISER
2’’ CONDUIT. TRANSITION
2’’ CONDUIT. TRANSITION TO RGS FOR RISER
CAST HINGED ENCLOSURE ON STEEL MOUNTING PLATE.
5. MOUNT THE NEMA 3R WEATHERPROOF RECEPTACLE APPROXIMATELY 5" FROM THE NEMA 4
AND SPECIFICATIONS
RECEPTICLE, SEE NOTE 5
NEMA 3R GFI, WEATHERPROOF
FLEX CONDUIT
�" LIQUID TIGHT
EL12.1
FD3-2N, FD4-3N, AND THE GUARD WALL NAV. LT. POLE.
FOR LIGHT POLES FD-1N, FD1-5N, FB-3A, FD2-1N, FD2-7N,
POLES. LIGHTING JUNCTION BOXES SHALL BE ADDED
FOR IDENTIFICATION OF THESE BOXES FOR LIGHT
CONDUITS FROM ITS PULLBOX. SEE PLAN DRAWINGS
BOX FOR LIGHT POLE FD3-1 REQUIRES FOUR (4) 2"
PULLBOX TO ROUTE CABLES. LIGHTING JUNCTION
2" CONDUITS ROUTED FROM THEIR RESPECTIVE
FD2-3, FD2-4, FD2-5, FD2-6, FD2-7N REQUIRE THREE (3)
FD-10, FD-12, FD1-1, FD1-2, FD1-3, FD1-4, FD1-5N, FD2-2,
LIGHTING JUNCTION BOXES FOR LIGHT POLES FD-3,
SEE
GROUND BAR,
VERTICAL MOUNT
SEE
(TYPICAL),
BRACKETS
SEE
MANHOLE LADDER,
INSTALL NEW
ADDED BREATHERS
STEEL PIPE (2 TYP.)
3" GALVANIZED
2’’ RGS CONDUITS
�’’ RGS CONDUIT
FD FIXTURE
TYPICAL
B M
A
F R J
J
U L
I
T
US Army Corps of Engineers
A
B C D
E F G H
Number:
Reference
Sheet
S c a l e
D r a
District Rock Island c p w w o r k i n g m v r b e d d b m a d m s
E
D G
N
A B C D E F G H
R O
C K
I
S L
A N
D
I
L L I
N O I
S
C O
R
G I
N E
E R
S
U
G I
N E
S T
R I
C T
D e s i g n
C h e c k
R e v i e w
D a t e
P r o j e d e
S o l i c i t a t i m b e r
O W
N
D e s c r i p t i o n
D a t e
S y m b o l
R e v i s i o n s
A p p r o v e d
M A J
H A
B I
L I
T A
T I
A G
E
I I
L O
M I
S S I
S S I
P
V E
R
I
O W
A
Y
W
E K
R
REFERENCE DRAWING NO. R-0019
R
K R
R
J W
B
D D
C A
B L E
S
C H
E D
U L E
II
P20 10 120 �" U.R. MITER GATE RECEPTACLE JUNCTION BOX "JB-F" U.R. MITER GATE OUTLET2 10 SINGLE
P10 10 120 �" L.R. MITER GATE OUTLET JUNCTION BOX "JB-E" L.R. MITER GATE OUTLET2 10 SINGLE
P40 10 120 �" U.L. MITER GATE OUTLET JUNCTION BOX "JB-H" U.L. MITER GATE OUTLET2 10 SINGLE
SINGLE102 L.L. MITER GATE OUTLETJUNCTION BOX "JB-G"L.L. MITER GATE OUTLET�"12010P30
PF4 6 480 N/A TOW HAULAGE ENGINE MOTOR STARTER3 2 W
N/APF2 8 480 N/A MITER GATES MOTOR3 2 W
43 MOTORTAINTER VALVESN/A4808PF1
P4C
P04
3 LOCK 120/208 VOLTS TRANSFORMER "T-2"* PANEL "MP"4 500 SINGLE
6 AS NOTED PANEL "LP" PANEL "MP" PANEL "LP"4 1 SINGLE
P07 480 AS NOTED SWITCHBOARD "SB-1"3 350 MULTI
P06 480 AS NOTED SWITCHBOARD "SB-1"3 350 MULTI
6 4803
10 4803 8 MULTI
P1C
6 480 AS NOTED LOWER GUIDEWALL BARGE OUTLET3 2 MULTI
P1B
P1A
2/0 480 AS NOTED BUBBLER AIR COMPRESSOR BUBBLER COMPRESSOR3 350 MULTI
P2B
10 480 AS NOTED3 6 MULTI
6 480 AS NOTED UPPER GUIDEWALL BARGE OUTLET3 2 MULTI
P3B
6 480 AS NOTED3 2 MULTI
P4D
3 480 SWITCHBOARD "SB-1"3 2/O SINGLE
P27 8 480 AS NOTED U.R. VALVE MAINTENANCE OUTLET POWER OUTLET "PR-B1"3 2 MULTI
P26 8 480 AS NOTED U.R. GATE MAINTENANCE OUTLET POWER OUTLET "PR-F1"3 2 MULTI
P25 10 480 AS NOTED UPPER RIGHT AIR COMPRESSOR POWER OUTLET "PR-F4"3 6 MULTI
P24 SWITCHBOARD "SB-1" MOTOR OUTLET "PR-B2"
P23 10 480 AS NOTED U.R. TAINTER VALVE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-B3"3 6 MULTI
P22 8 480 AS NOTED U.R. MITER GATE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-F2"3 2 MULTI
P21 8 480 AS NOTED U.R. MITER GATE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-F3"3 2 MULTI
P17 8 480 AS NOTED L.R. VALVE MAINTENANCE OUTLET POWER OUTLET "PR-A1"3 2 MULTI
P16 8 480 AS NOTED L.R. GATE MAINTENANCE OUTLET POWER OUTLET "PR-E1"3 2 MULTI
P14 8 480 AS NOTED L.R. TAINTER VALVE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-A2"3 4 MULTI
P13 8 480 AS NOTED L.R. TAINTER VALVE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-A3"3 4 MULTI
P12 8 480 AS NOTED L.R. MITER GATE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-E2"3 2 MULTI
P11 8 480 AS NOTED L.R. MITER GATE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-E3"3 2 MULTI
P47 8 480 AS NOTED U.L. VALVE MAINTENANCE OUTLET SWITCHBOARD "SB-1" POWER OUTLET "PR-D1"3 2 MULTI
P46 8 480 AS NOTED U.L. GATE MAINTENANCE OUTLET SWITCHBOARD "SB-1" POWER OUTLET "PR-H1"3 2 MULTI
P45 10 480 AS NOTED UPPER LEFT AIR COMPRESSOR SWITCHBOARD "SB-1" POWER OUTLET "PR-H4"3 6 MULTI
P44 10 480 AS NOTED U.L. TAINTER VALVE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-D2"3 6 MULTI
P43 10 480 AS NOTED U.L. TAINTER VALVE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-D3"3 6 MULTI
P42 8 480 AS NOTED U.L. MITER GATE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-H2"3 2 MULTI
P41 8 480 AS NOTED U.L. MITER GATE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-H3"3 2 MULTI
2/0
MULTI23 POWER OUTLET "PR-31"SWITCHBOARD "SB-1"INTERMEDIATE WALL BARGE OUTLETAS NOTED4806P3A
P01 480 LOCK MAIN FEEDER3 500 SINGLE
P02 LOCK MAIN FEEDER
P05
P31 480 AS NOTED L.L. MITER GATE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-G3"3 2 MULTI
P32 480 AS NOTED L.L. MITER GATE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-G2"3 2 MULTI
P33 480 AS NOTED L.L. TAINTER VALVE MOTOR-FAST SWITCHBOARD "SB-1" MOTOR OUTLET "PR-C3"3 6 MULTI
P34 480 AS NOTED L.L. TAINTER VALVE MOTOR-SLOW SWITCHBOARD "SB-1" MOTOR OUTLET "PR-C2"3 6 MULTI
P36 480 AS NOTED L.L. GATE MAINTENANCE OUTLET SWITCHBOARD "SB-1" POWER OUTLET "PR-G1"3 2 MULTI
P37 480 AS NOTED L.L. VALVE MAINTENANCE OUTLET SWITCHBOARD "SB-1" POWER OUTLET "PR-C1"3 2 MULTI
TYPESIZENO.
CABLE
DESIG.
CONDUCTORS
TO:CONDUIT CIRCUIT DUTY: FROM:
CKT.
VOLT.DIA.
GND
SIZE
CONDUCTORS
DESIG.
CABLE
NO. SIZE TYPE SIZE
GND
DIA. VOLT.
CKT.
FROM:CIRCUIT DUTY:CONDUIT TO:
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/ASINGLE5003 TRANSFORMER T-1LOCK MAIN SERVICE ENTRANCE3"480N/AP91
P92 N/A 480 3" LOCK MAIN SERVICE ENTRANCE TRANSFORMER T-1SINGLE N/A
P93 N/A 3" TRANSFORMER T-11 SINGLE N/A
SWITCHBOARD "SB-1"INTERMEDIATE WALL BARGE OUTLET POWER OUTLET "PR-32"
AS NOTED
AS NOTED
MULTI
MULTI
P4B
P4A
3 2
6 10
480 SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
UPPER I-WALL WALL BARGE OUTLET POWER OUTLET "PR-41"
P19
P18
L.R.C.S. "PANEL P1"
LOWER TOW HAULAGE UNIT
MULTI
MULTI23
5 10 AS NOTED
AS NOTED6 480
12010
POWER OUTLET "PR-11"
P1E
MULTI3 10 AS NOTED480
P1D
P29
P28 UPPER TOW HAULAGE UNIT
MULTI
MULTI3
10 AS NOTED
AS NOTED
10 U.R.C.S. "PANEL P2"
POWER OUTLET "PR-21"
P09
P08
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
�"SINGLE2 10 N/A 10 120 JUNCTION BOX "JB-A"L.R. TAINTER VALVE OUTLET L.R. TAINTER VALVE OUTLET
SINGLE2 10 N/A 10 120 JUNCTION BOX "JB-B"U.R. TAINTER VALVE OUTLET�" U.R. TAINTER VALVE OUTLET
�"SINGLE
P3C
2 10 N/A 10 120 JUNCTION BOX "JB-C"L.L. TAINTER VALVE OUTLET L.L. TAINTER VALVE OUTLET
SINGLE102 10N/A 120 JUNCTION BOX "JB-D"U.L. TAINTER VALVE OUTLET�" U.L. TAINTER VALVE OUTLET
P1G
P2P
MULTI
MULTI
6 U.R.C.S. "PANEL P2"
NOTE 1
NOTE 1 LOADCENTER P2
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
3 12 SINGLE N/A 12 120 �"
2/0
NEUTRAL
POWER OUTLET PLUG
POWER OUTLET PLUG
POWER OUTLET PLUG
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
208/120
208/120
AS NOTEDMULTI3 6 10 480 SWITCHBOARD "SB-1"
P3P
P4P
MULTI
MULTI
L.L.C.S. "PANEL P3"
U.L.C.S. "PANEL P4"
NOTE 1
NOTE 1
LOADCENTER P3
LOADCENTER P4
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
P0A
P3D 6 480 AS NOTED3 2 MULTI SWITCHBOARD "SB-1"INTERMEDIATE WALL BARGE OUTLET POWER OUTLET "PR-33"
I-WALL WALL JIB CRANE DISC.*
I-WALL WALL JIB CRANE DISC.*
3 SINGLE N/A 480
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
L.R. HAULAGE OUTLETS (120V)
U.R. HAULAGE OUTLETS (120V)
W
LANDWALL JIB CRANE
6 AS NOTED PANEL "MP"4 1 SINGLE N/A 208/120 CONTROL STATION PANEL "CCS" PANEL "CCS"
10 480 AS NOTED U.R. TAINTER VALVE MOTOR-SLOW3 6 MULTI
208/120
208/120
208/120
1010 CENTRAL CONTROL STATION A/C UNIT
480V OUTLETS (SCOOTER SHED&UNDER SB-1) 480V OUTLETS "PR-14","PR-10"
MULTI104 12010L27
MULTI88 AS NOTED10L24
MH8 LTS. & OUTLET"JB-41" (CABLE L3)�"120MULTI104L60 10
MULTI83 LOWER GUIDE WALL NAV. LT.NAVIGATIONAL LIGHTINGAS NOTED12010L1C
L12 10 2" FD FIXTURE AND OUTLET7 8 MULTI
L18 10 208 2" FB FIXTURE4 10 MULTI
L19 10 120 AS NOTED LOWER TRAFFIC SIGNAL SWITCHBOARD "SB-1" LOWER TRAFFIC SIGNALS5 8 MULTI
L1A 10 120 AS NOTED7 8 MULTI
L1D 10 120 2" FISHERMAN’S WARNING LIGHT LOWER FISHERMAN’S WARNING4 8 MULTI
L1G 10 120 2" LOWER GAUGING STATION4 10 MULTI
L1H 10 120 AS NOTED SMALL BOAT SIGNAL10 MULTI
L21 10 AS NOTED UPPER LAND WALL LIGHT FIXTURES16 8 MULTI
L22 10 AS NOTED4 8 MULTI
L23 10 AS NOTED UPPER LAND WALL LIGHT FIXTURES10 8 MULTI
L29 10 120 AS NOTED UPPER TRAFFIC SIGNAL UPPER TRAFFIC SIGNAL5 8 MULTI
L25 102 10
L2A 108
L2C 10 UPPER G.W. RED NAV. LIGHT2 8
L2D 102 8
L2E 10 FISHERMAN’S WARNING LIGHTS8
L2G 10 UPPER GAUGING STATION4 10
L2H 10 SMALL BOAT SIGNAL10
L3 10 INTERMEDIATE WALL LTG FIXTURE8
L30 10 NAV. LTG./FISH. WARNING LT.7 8
L33 108
L38 104 10
L3A 10 120 AS NOTED NAVIGATION LIGHTING LOWER INTERMEDIATE NAV.4 8 MULTI
L3E 10 120 2" LOWER FISHERMANS WARNING8 MULTI
L41 10 AS NOTED INTERMEDIATE WALL LTG. FIXTURES "JB-41" (CABLE L3)8 MULTI
L42 10 2"8 8 MULTI
L43 AS NOTED4 8 MULTI
L61 AS NOTED2 8 MULTI
MULTI 120 PANEL LP IN "SB-1"
MULTI 120 AS NOTED
120 AS NOTED
MULTI 120
MULTI 120 2" UPPER FISHERMAN’S WRNG LT.
MULTI 120 AS NOTED
MULTI 120
MULTI AS NOTED SWITCHBOARD "SB-1"
MULTI 120 AS NOTED
MULTI 2"
MULTI 208 2"
L48
L1I
L1J
L55
L35
L6 2
4 10
MULTI
SINGLE
SINGLE
SINGLE
MULTI
2"
AS NOTED RIVER WALL LIGHT FIXTURES
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
"JB-41" (CABLE L3)
SWITCHBOARD "SB-1"
N/A
N/A
MULTI84L1K AS NOTED10
L4A
GENERATOR/COMPRESSOR HOUSE PNL 480V-120/208V 30KVA TRANSFMR
208/120
L28 104 10 MULTI 208 2" FB FIXTURE
208/120
208/120
208/120
208/120
208/120
208/120
MH5 & SIGN LIGHT
208/120
208/120
208/120
208/120
208/120
MH8 LTS. & RECEPTACLE
MH2 LIGHT FIXTURES & RECEPTACLES
1"
FD FIXTURE (LOWER LAND WALL)
LOWER RIGHT GATE RECESS LIGHT
FD FIXTURES (LOWER GUIDE WALL)
UPPER RIGHT GATE RECESS LIGHT
FC & FS FIXTURES & RECEPTACLE
FISHERMAN’S WARNING LIGHTS (I-WALL)
UPPER LEFT GATE RECESS LIGHT
FD2 FIXTURE (I-WALL)
FB FIXTURE
FD FIXTURE (PATH) & RECEPTACLE
FD FIXTURES (UPPER GUIDE WALL)
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
SWITCHBOARD "SB-1"
"JB-42" (CABLE L30)
SWITCHBOARD "SB-1"
CNTRL. STD. (CABLE C1L)
CNTRL. STD. (CABLE C2L)
CNTRL. STD. (CABLE C4L)
CNTRL. STD. (CABLE C3L)
"JB-11" (CABLE L1A)
"JB-11" (CABLE L1A)
"JB-21" (CABLE L21)
"JB-21" (CABLE L21)
"JB-23" (CABLE L2B)
"JB-22" (CABLE L2A)
"JB-22" (CABLE L2A)
NAV LTG/SBS
NL/FWL/SBS/OUTDRAFT
"JB-21" (CABLE L21)
FIXTURE FD (CABLE L23)
L20 10 AS NOTED3 10 SINGLE
SWITCHBOARD "SB-1"208 EXISTING FG FIXTURES (PATH)
OLD GENERATOR BUILDING10 4803 MULTI8 AS NOTED SWITCHBOARD "SB-1"
MULTI3 10 10 120 AS NOTED SCOOTER SHED LTS & RECEPTACLES SCOOTER SHED
480V OUTLETS "PR-12","PR-13"
PHOTOCELL ON CCS WALL
FD FIXTURE (RIVER WALL)
SUMP PUMP DISC.*3 10 SINGLE N/A 10 480 �" CCS SUMP PUMP SWITCHBOARD "SB-1"
CCS GUAGE STATION EQUIPMENT CCS GUAGE STATION EQUIPMENT*
INTERMEDIATE WALL LTG. FIXTURES
"SB-1" PANEL CCS-19
N/A
N/A
2/0 4803 500 SINGLE N/A
2/0 4803 350 3"
3"2/0 4803 350
1/0 4803 500 SINGLE N/A
1/0 4803 500 SINGLE N/A
SINGLE
SINGLE N/A
N/A
3/0
3/0
PDP-22 ( P22 CCT. 2 )
"JB-42" (CABLE L30)
208/120 FC FIXTURES AND OUTLETS
P0B
MULTI
AS NOTED
AS NOTED
LOWER LEFT GATE RECESS LIGHTS
1�" *
4" *
TRANSFORMER "T-2" * TRANSFORMER "T-2" *
P0C
P0D
P0E
P8A
P5A
P0F
P0G
P0H
P8B
P1F
3 10 SINGLE N/A 10 480 �" SWITCHBOARD "SB-1"WATER PUMP (OLD FIRE PUMP)
3 MULTI 6 VISITOR BUILDING POWER1/0
P2A
LOCK MAIN SERV. ENTRANCE NEUTRAL
SERVICE ENTRANCE DISCONNECT
SERVICE ENTRANCE DISCONNECT
SERVICE ENTRANCE DISCONNECT
P5B
SWITCH "TS-X1" IN "SB-1"
SWITCH "TS-X1" IN "SB-1"
SWITCHBOARD "SB-1" BUS
SWITCHBOARD "SB-1" BUS
SERVICE DISCONNECT*
SERVICE DISCONNECT*
3" *
3" *
1" *
P48 3 2 MULTI 8 480 AS NOTED U.L. I-WALL TOW HAULAGE UNIT
U/S INTERMEDIATE WALL JIB CRANE
D/S INTERMEDIATE WALL JIB CRANE
L62 6 MULTI 10 208/120 AS NOTED
L63 6 MULTI 10 208/120 AS NOTED
FISHERMAN WARNING LIGHT (GUARD WALL)
"JB-42" (CABLE L30)
"JB-42" (CABLE L30)
NAVIGATION LIGHTS
NOTES:
L01
L02
MULTI
MULTI 10
120 2"
2" SWITCHBOARD "SB-1"120
N/A
L1L 2 4 MULTI 6 120 2" CNTRL. STD. PANEL "P1"
P3E 3 2 MULTI 6 SWITCHBOARD "SB-1"480 AS NOTED INTERMEDIATE WALL BARGE OUTLET…
This is the start of the file's text. The full file is on GovTribe.