A1
INDEX
SCALE : NO SCALE
GENERAL NOTES
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
G -0 x x x .d g n
:4
:2
A
M
B E
D D
L L
H
D
A T
E
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
B
M R
G -0 x x x .d g n
D U
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
E L
H
G-002
IN
D
E X A
N D G
E N
E R
A L N
O T
T A
L L R
E L
IE
F W
E L L S
N .T .S
W E
K -1
-R -0
J P
F
A J
G
TEMPERATURES AND WIND CHILL FACTORS.
TO WATER. THIS MAY REQUIRE ADDITIONAL LABOR OR SHIFTS AND SPECIAL EQUIPMENT OR SPECIAL EQUIPMENT MAINTENANCE TO COMPENSATE FOR LOST PRODUCTIVITY CAUSED BY LOW
TO ACCOMPLISH THE WORK, TAKING INTO ACCOUNT LOW TEMPERATURES, ICE, SLEET, SNOW, AND WIND CHILL FACTORS THAT MAY BE ENCOUNTERED AT THE SITE AND WORKING ADJACENT
13. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION, EQUIPMENT AND MATERIALS, INCLUDING BUT NOT LIMITED TO ENCLOSURES, HEATING, LIGHTING, AND SUFFICIENT LABOR
CONTRACTOR SHALL RELOCATE AND RESTORE SUCH UTILITIES AS REQUIRED AND APPROVED BY THE KO.
PROCEDURE PRIOR TO EXCAVATION. ANY DAMAGE CAUSED BY THE CONTRACTOR’S ACTIVITIES SHALL BE REPAIRED AT THE CONTRACTOR’S EXPENSE AS APPROVED BY THE KO. THE
12. UTILITIES MAY BE ENCOUNTERED DURING CONSTRUCTION ACTIVITIES. IT IS THE CONTRACTOR’S RESPONSIBILITY, AS REQUIRED BY LAW, TO FOLLOW THE PROPER NOTIFICATION/LOCATE
SPECIFICATION SECTION 31 23 19.
11. REMOVE OF ALL DRILL CUTTINGS ACCORDING TO SPECIFICATION SECTION 33 26 00. REMOVE SEDIMENT, WEEP HOLE CLEANOUT MATERIAL, AND OTHER DEBRIS ACCORDING TO
10. CONTRACTOR SHALL PROVIDE MEANS TO CAPTURE CONSTRUCTION DEBRIS, WASH WATER, AND OTHER MATERIAL FROM THE LOCK CHAMBER BEFORE IT ENTERS THE RIVER.
ORIGINAL LOCATION AND CONDITION, UNLESS OTHERWISE INDICATED IN THE CONTRACT DRAWINGS.
9. SECURITY FENCING AND HANDRAILING MAY BE REMOVED IN WORK AREAS DURING CONSTRUCTION AS LONG AS SAFETY AND SECURITY IS MAINTAINED AND REPLACEMENT MADE TO ITS
PREFERENCE OF UPPER POOL OR TAILWATER ELEVATION. NO EFFORT TO CONTROL WATER LEVEL OUTSIDE OF THE LOCK CHAMBER WILL BE MADE TO FACILITATE WELL INSTALLATION.
LEVEL IN THE LOCK CHAMBER AT THE UPSTREAM POOL ELEVATION. THE REMAINDER OF RELIEF WELLS SHALL BE INSTALLED WITH CHAMBER WATER LEVEL AT THE CONTRACTOR’S
WATER IS STORED IN THE POOL AND A CORRESPONDING TAILWATER DROP EFFECTED. THE WELLS IN THE UPPER HALF OF THE LOCK CHAMBER SHALL BE INSTALLED WITH THE WATER
8. DAM NO.11 IS A RUN-OF-THE-RIVER FACILITY, FUNCTIONING ONLY TO MAINTAIN A DESIGNATED 9-FOOT CHANNEL AND PASS FLOWS FROM DAM 10. IT CANNOT BE REGULATED SUCH THAT
DRAWING PREPARATION AND MATERIAL FABRICATION.
7. ALL ELEVATIONS AND DIMENSIONS SHALL BE VERIFIED IN THE FIELD BEFORE WORK BEGINS. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL DIMENSIONS PRIOR TO SHOP
DRAWINGS. BECAUSE THE DRAWINGS ARE NOT "AS BUILT", THEY DO NOT NECESSARILY REPRESENT ACTUAL FIELD CONDITIONS. REFERENCE DRAWINGS ARE NOT PRINTED TO SCALE.
6. REFERENCE DRAWINGS ARE DRAWINGS OF RECORD, INCLUDED SOLELY FOR THE CONTRACTOR’S BENEFIT. NO REQUIRED WORK UNDER THIS CONTRACT IS SHOWN ON THE REFERENCE
5. AN ELECTRICAL CROSSOVER IS LOCATED AT STATION 486.0A, CORING THROUGH THE STRUT IS NOT PERMITTED. SEE SHEET C-102.
C. VERIFY THE WELL LOCATION WITH KO PRIOR TO INSTALLATION.
THE WELL PROTECTION BLOCK WILL NOT BE PLACED OVER THE STRUT.
B. USE A DIVER TO LOCATE THE WEEP HOLE AND STRUT NEAREST THE WELL TO BE PLACED, LOCATE THE WELL RELATIVE TO THOSE FEATURES, AND CONFIRM THE FOOTPRINT OF
A. MARK THE STATION AT WHICH THE WELL IS TO BE LOCATED AND THE LOCATION OF THE NEAREST UPSTREAM AND DOWNSTREAM STRUT ON THE LOCK WALL.
THE FOLLOWING:
SHALL BE LOCATED TO AVOID THESE STRUTS. CORING THOUGH THE STRUTS IS NOT PERMITTED. TO MINIMIZE THE POSSIBILITY OF PENETRATING A STRUT, THE CONTRACTOR SHALL DO
4. STRUTS CROSS THE LOCK CHAMBER (PERPENDICULAR TO FLOW), SPACED AT 36 FEET ON CENTER. THE STRUTS ARE FIVE FEET THICK AND CONTAIN REINFORCING STEEL. ALL RELIEF WELLS
E. OPTION A (IF AWARDED).
D. RELIEF WELL TESTING.
C. PROTECTION BLOCK INSTALLATION.
B. WEEP HOLE CLEANING.
A. RELIEF WELL INSTALLATION AND DEVELOPMENT.
3. WORK TO BE PERFORMED BY CONTRACTOR TO INCLUDE BUT NOT LIMITED TO:
F. REMOVE BULKHEAD AND INSTALL BULKHEAD COVERS.
E. LOCK RE-WATERING.
D. MAINTAINING DEWATERED LOCK STATE, SEALING LEAKS AND ADDRESSING BOILS DURING PROTECTION BLOCK INSTALLATION.
C. LOCK DEWATERING.
B. REMOVING LOWER BULKHEAD SLOT COVERS, SETTING PUMPS AND SETTING LOWER CHAMBER BULKHEADS PRIOR TO DEWATERING.
A. SETTING UPPER CHAMBER BULKHEADS, I-WALL TAINTER VALVE BULKHEAD, AND UPPER WALKWAY PRIOR TO RELIEF WELL INSTALLATION.
2. WORK TO BE PERFORMED BY GOVERNMENT TO INCLUDE BUT NOT LIMITED TO:
REQUIRE PERIODS OF SOLE OCCUPANCY OF THE LOCK TO COMPLETE WORK DURING THE LOCK CLOSURE. SEE SPECIFICATIONS SECTION 00 73 05 FOR MORE INFORMATION.
1. THE LOCK CHAMBER WILL BE CLOSED TO NAVIGATION ON DECEMBER 4, 2018. THE LOCK CHAMBER WILL REOPEN TO NAVIGATION ON MARCH 12, 2019 AT 1200. THE GOVERNMENT WILL
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
FLOW
N
EL. 500.0
A1
LEGEND
SCALE : NO SCALE
ABBREVIATIONS
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
G -0 x x x .d g n
:4
:0
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
G -0 x x x .d g n
E
.T .S
L
G-003
E
G E
N D A
N D A
B B
R E
V
IA
T
IO
D U
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
T A
L L R
E L
IE
F W
E L L S
W E
K -1
-R -0
RUBBER
CONCRETE
STEEL
CONTRACTOR AREAS
GOVERNMENT AREAS
RELIEF WELLS
LOW STRENGTH GROUT
WATER LEVEL
TREELINE
RAILROAD
NORTH INDICATOR
FLOW ARROW
EXISTING GROUND
CONTROL POINT
CONSTRUCTION WORK LIMITS
CENTERLINE
BREAKLINE
J P
F
A J
G
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
L3
09-77-11
I1
L2L5
M I S S I S S I P P I R I V E R
LOCK AND DAM NO. 1 1
ACCESS ROAD
DAM
UPSTREAMDOWNSTREAM
FLOW
PROPERTY LINE
GOVERNMENT
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
V -1 x x x .d g n
:4
:1
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
V -1 x x x .d g n
E
A
S
H O
W N
L
V-101
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
A1
SURVEY CONTROL PLAN
S U
R V
E Y C
O N
T R
O L P
L A
N
0 100’SCALE : 1"=50’-0" 50’
IN
S
T A
L L R
E L
IE
F W
E L L S
W E
K -1
-R -0
N
D J J
A J
G
09-77-11
L2
L3
L5
I1
2,139,720.01
2,139,598.42
2,139,559.14
2,167,286.41
2,167,426.22
2,167,442.50
610.92
611.80
611.80
611.78
611.77
611.63
612.56
612.49
612.48
612.54
POINT
CONTROL
DESCRIPTION NORTHING EASTING
NAD83 ILLINOIS WEST (1202) SPCS
ELEVATION
NAVD 88
ELEVATION
MSL 1912
2,139,087.48 2,167,638.94
2,167,486.642,139,755.15
SURVEY CONTROL
3/4" ALUM ROD W/ ALUM ACCESS COVER
1" DIA BRASS ROD W/PUNCH MARK
1" DIA BRASS ROD W/PUNCH MARK
1" DIA BRASS ROD W/PUNCH MARK
1" DIA BRASS ROD W/PUNCH MARK
GENERAL NOTES
OCCUR ON INDIVIDUAL CONTROL POINTS.
OF THREE CONTROL POINTS. SOME SLIGHT VARIATION MAY
SUBTRACT 0.71 FEET. CONVERSION BASED ON AVERAGE
2. TO CONVERT HISTORIC MSL 1912 ELEVATIONS TO NAVD 88
WEST - 1202; VERTICAL MSL 1912; UNITS: US SURVEY FEET.
1. PROJECT DATUM: HORIZONTAL: NAD83 STATE PLANE ILLINOIS
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
FLOW
A1
SITE PLAN
0 100’SCALE : 1"=50’-0" 50’
GENERAL SHEET NOTES
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
C -1 x x x .d g n
:4
:2
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
C -1 x x x .d g n
E
S
H O
W N
L
C-101
IT
E P
L
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
ACCESS ROAD
EXISTING CHAIN LINK FENCE
GOVERNMENT PROPERTY LINE
AVAILABLE CONTRACTOR STAGING
DOWNSTREAM UPSTREAM
M I S S I S S I P P I R I V E R
DAM
DURING CONSTRUCTION
EXISTING GATES TO BE SECURED
EXISTING SEPTIC FIELD
CHAMBER
LOCK
AUXILIARY
GUIDEWALL
LOWER
EXISTING
SEE SHEET C-102
INSTALL NEW RELIEF WELLS
IN
S
T A
L L R
E L
IE
F W
E L L S
BULKHEAD STORAGE LOCATION
LOCK FOREBAY
CONTRACTOR FLEETING AREA
LOCK CHAMBER
PROJECT WORK LIMITS
INTERMEDIATE WALL
LAND WALL
SEE SHEET C-104
INSTALL RELIEF WELL MARKERS
W E
K -1
-R -0
N
J P
F
A J
G
CENTRAL CONTROL STATION
VISITOR CENTER
SEE SHEET C-105
TOW HAULAGE OPTION A
SEE SHEET C-106
TOW HAULAGE OPTION A
GOVERNMENT FLEETING AREA
AREA
STAGING
GOVERNMENT
ACCORDING TO THE SPECIFICATIONS SECTION 33 26 00.
THE GOVERNMENT, ACCORDING TO SPECIFICATIONS SECTION 31 23 19. DISPOSAL OF THE MATERIAL ON THE BARGE WILL BE PROVIDED BY THE GOVERNMENT,
14. PLACEMENT LOCATION FOR DRILL CUTTINGS AND SEDIMENT MATERIAL REMOVED FROM THE LOCK FLOOR WILL BE ON A 35 FOOT BY 150 FOOT BARGE FURNISHED BY
13. CONTRACTOR MAY COORDINATE ADDITIONAL FLEETING AREA UPON APPROVAL OF THE KO.
CONTRACTOR.
CONTRACTOR. UTILITIES, INCLUDING TEMPORARY CONSTRUCTION POWER AND LIGHTING DURING NON-DAYLIGHT HOURS, SHALL BE PROVIDED BY THE
12. GOVERNMENT UTILITIES (INCLUDING WATER, ELECTRICITY, FUEL, ETC.) AND EQUIPMENT (CRANE, FLOATING PLANT, ETC.) WILL NOT BE MADE AVAILABLE TO THE
11. ALL DISTURBED GRASS AREAS SHALL BE RE-GRADED AND SEEDED PER THE SPECIFICATIONS.
CONTRACTOR’S ACTIVITIES SHALL BE REPAIRED AT THE CONTRACTOR’S EXPENSE AS APPROVED BY THE KO.
10. THE CONTRACTOR SHALL NOT DISTURB THE SEPTIC FIELD, OR THE SPRINKLER SYSTEM HEADS LOCATED IN THE STAGING AREA. ANY DAMAGE INCURRED BY THE
9. THE CONTRACTOR IS NOT ALLOWED TO USE SPUDS IN THE LOCK CHAMBER.
8. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE ALL OFF-SITE PARKING FOR EQUIPMENT OR MATERIALS.
THE TAINTER GATE VALVES WILL BE CRACKED OPEN BY GOVERNMENT PERSONNEL UPON REQUEST.
7.THE TAINTER GATE VALVES WILL BE CLOSED DURING TIMES THE CONTRACTOR IS DRILLING IN THE LOCK CHAMBER. WHEN THE CONTRACTOR IS NOT WORKING
LOCK CHAMBER AND AT ANY OTHER AREAS WITHIN THE PROJECT SITE AS NEEDED TO COMPLETE WORK.
6. THE CONTRACTOR WILL PERFORM SNOW REMOVAL AS NEEDED WITHIN THE WORK LIMITS. THE CONTRACTOR IS RESPONSIBLE FOR SNOW AND ICE REMOVAL IN THE
5. CONTRACTOR SHALL MAINTAIN ACCESS FOR GOVERNMENT PERSONNEL TO THE LOCK AND DAM.
CONTRACT.
4. THE CONTRACTOR SHALL MAINTAIN THE ROAD AND PARKING LOT SURFACES AND RESTORE THEM TO PRE CONSTRUCTION CONDITION UPON COMPLETION OF THE
3. THE CONTRACTOR SHALL DEVELOP A PARKING AND STAGING PLAN TO BE COORDINATED AND APPROVED BY KO.
WILL BE DIRECTED AND SUPERVISED BY GOVERNMENT PERSONNEL.
WHEN EAGLE DAYS IS SCHEDULED. THE PUBLIC WILL BE ALLOWED TO USE THIS PARKING DURING THESE TWO DAYS FOR EAGLE DAYS. ALL PUBLIC TRAFFIC
2. THE VISITOR PARKING LOT WILL BE CLOSED TO THE PUBLIC DURING PROJECT CONSTRUCTION, EXCEPT ONE WEEKEND IN JANUARY, 2019. TO BE COORDINATED
1. THE VISITOR CENTER AND THE CENTRAL CONTROL STATION WILL BE CLOSED TO CONTRACTOR PERSONNEL.
PARKING SEE NOTE 2
VISITOR/CONTRACTOR
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
NO.
ROW
NEW RELIEF WELL LOCATION TABLE
STATION
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
C -1 x x x .d g n
:4
:3
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
C -1 x x x .d g n
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
L S
A S S
H O
W N
L L
H
C-1020 60’SCALE : 1"=30’-0" 30’
GENERAL SHEET NOTES
C L O
F P
IN
T L E
S T
A .0
R E
L
IE
F W
E L L L
O C
A T
IO
N P
L A
N
A1
RELIEF WELL LOCATION PLAN
FLOW
NO.
ROW
NEW RELIEF WELL LOCATION TABLE
STATION
NO.
ROW
NEW RELIEF WELL LOCATION TABLE
LAND WALL
OFFSET FROM
STATION
I-WALL
OFFSET FROM
I-WALL
OFFSET FROM
SEE SHEET S-201
INSTALL RELIEF WELL (TYP.)
IN
S
T A
L L R
E L
IE
F W
E L L S
LAND WALL
INTERMEDIATE WALL
E S
T A .6
A
E S
T A .2
A
E S
T A .5
A
E S
T A .2
A
E S
T A .7
A
E S
T A .5
A
E S
T A .5
A
E S
T A .2
A
E S
T A .5
A
E S
T A .5
A
E S
T A .7
A
E S
T A .0
A
E S
T A .7
A
E S
T A .0
A
E S
T A .5
A
E S
T A .5
A
E S
T A .5
A
E S
T A .2
A
E S
T A .7
A
E S
T A .5
A
E S
T A .7
A
E S
T A .5
A
E S
T A .7
A
E S
T A .5
A
E S
T A .3
A
E S
T A .5
A
E S
T A .2
A
E S
T A .5
A
E S
T A .5
A
E S
T A .5
A
E S
T A .5
A
E S
T A .5
A
E S
T A .5
A
E S
T A .7
A
E S
T A .5
A
E S
T A .0
A
E S
T A .0
A
W S
T A .1
.0
A
W S
T A .1
.0
A
W S
T A .1
.0
A
W S
T A .2
.0
A
W S
T A .2
.0
A
W S
T A .2
.0
A
W S
T A .4
.0
A
W S
T A .6
.0
A
E20
E19
E18
E17
E16
E15
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
E S
T A .0
A
E S
T A .0
A
E S
T A .0
A
E43
E42
E41
E40
E39
E38
E37
E36
E35
E34
E33
E32
E31
E30
E29
E28
E27
E26
E25
E24
E23
E22
E21
W27
W26
W25
W24
W23
W22
W21
W20
W19
W18
W17
W16
W15
W14
W13
W12
W11
W10
W9
W8
W7
W6
W5
W4
W3
W2
W1
1.5’
1.5’
1.5’
1.5’
1.5’
1.5’
4.5’
4.5’
4.5’
4.5’
4.5’
4.5’
1.5’
1.5’
1.5’
1.5’
1.5’
1.5’
35.0’
55.0’
44.5’
29.0’
15.25’
1.5’
1.5’
13.5’
4.5’
4.5’
4.5’
4.5’
4.5’
4.5’
4.5’
4.5’
1.5’
1.5’
1.5’
1.5’
1.5’
1.5’
1.5’
1.5’
1.5’
STA. 340.54A
STA. 320.54A
STA. 300.54A
STA. 281.00A
STA. 263.75A
STA. 245.00A
STA. 227.75A
STA. 211.54A
STA. 200.54A
STA. 179.25A
STA. 161.50A
STA. 143.25A
STA. 119.75A
STA. 107.25A
STA. 95.50A
STA. 83.75A
STA. 59.25A
STA. 44.50A
STA. 33.25A
STA. 26.67A
STA. 726.00A
STA. 726.00A
STA. 726.00A
STA. 726.00A
STA. 708.00A
STA. 662.50A
STA. 643.75A
STA. 628.54A
STA. 610.54A
STA. 592.54A
STA. 574.54A
STA. 556.54A
STA. 538.54A
STA. 521.25A
STA. 500.54A
STA. 479.37A
STA. 461.54A
STA. 443.75A
STA. 425.54A
STA. 407.75A
STA. 389.54A
STA. 371.75A
STA. 359.25A
E S
T A .2
A
E S
T A .7
A
E S
T A .2
A
W S
T A .4
.3
A
W S
T A .7
.0
A
W S
T A .7
.0
A
W S
T A .6
.0
A
W S
T A .6
.0
A
W S
T A .6
.0
A
W S
T A .5
.2
A
W S
T A .5
.7
A
W S
T A .5
.0
A
W S
T A .4
.0
A
W S
T A .4
.7
A
W S
T A .4
.0
A
W S
T A .3
.0
A
W S
T A .3
.0
A
W S
T A .3
.0
A
W S
T A .2
.2
A
W S
T A .7
.2
A
W S
T A .4
.5
A
W S
T A .2
.6
A
33.5’
6.5’
6.5’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
4.0’
1.5’
35.0’
W E
K -1
-R -0
STA. 726.00A
STA. 726.00A
STA. 697.00A
STA. 657.00A
STA. 643.00A
STA. 609.00A
STA. 575.25A
STA. 551.75A
STA. 517.00A
STA. 493.00A
STA. 479.37A
STA. 459.00A
STA. 443.75A
STA. 418.00A
STA. 384.00A
STA. 350.00A
STA. 316.00A
STA. 287.25A
STA. 270.00A
STA. 236.00A
STA. 202.00A
STA. 168.00A
STA. 140.00A
STA. 106.00A
STA. 71.25A
STA. 44.50A
STA. 26.68A
J P
F
A J
G
DO NOT DISTURB
EXISTING BUBBLER CROSSOVER DO NOT DISTURB
EXISTING STRUT (TYP.)
EXISTING SUMP
EXISTING SUMP
DO NOT DISTURB
EXISTING ELECTRICAL DUCT BANK
WEEP HOLE (TYP.)
CLEAN OUT EXISTING
DO NOT DISTURB
CROSSOVER
EXISTING BUBBLER
PEDESTALS (TYP)
EXISTING BULKHEAD
RECESS SLOT
BULKHEAD
EXISTING
LOCATION OF THE RELIEF WELLS.
NORTHING AND EASTING COORDINATES OF THE DRILLED
5. THE CONTRACTOR SHALL PROVIDE NAD83, ILLINOIS WEST,
BLOCKS.
SO THAT IT WILL NOT IMPACT INSTALLATION OF PROTECTION
4. RELIEF WELL LOCATION SHALL BE DETERMINED IN THE FIELD
DEPENDING ON RIVER FLOW CONDITIONS, SEE SPECIFICATIONS.
ELEVATION. THE UPSTREAM POOL ELEVATION VARIES
CONTRACTOR’S PREFERENCE OF UPPER POOL OR TAILWATER
WELLS SHALL BE INSTALLED WITH CHAMBER WATER LEVEL AT
THE UPPER HALF OF THE LOCK. THE REMAINDER OF RELIEF
UPSTREAM POOL ELEVATION DURING WELL INSTALLATION AT
3. WATER LEVEL IN THE LOCK CHAMBER WILL BE EQUAL TO THE
TO PROTECTION BLOCK INSTALLATION.
THAT HAS ACCUMULATED AT THE RELIEF WELL SITE PRIOR
2. CONTRACTOR MAY HAVE TO REMOVE ANY SILT OR DEBRIS
FLOOR SLAB STRUTS AND TIMBER PILES.
ELECTRICAL DUCT BANKS, CONDUITS, GATE ANCHORAGE’S,
AVOID OBSTRUCTIONS INCLUDING, BUT NOT LIMITED TO,
VERIFIED BY THE CONTRACTOR AND APPROVED BY THE KO, TO
1. THE FINAL LOCATION OF THE RELIEF WELLS SHALL BE FIELD
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
C -1 x x x .d g n
:4
:4
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
C -1 x x x .d
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
S
A S S
H O
W N
L L
H
C-103
M J S
T A .4
.5
A
M J S
T A .6
.0
B
M J S
T A .3
.0
B
M J S
T A .9 .0
A
M J S
T A .3
.0
A
M J S
T A .6
.0
A
M J S
T A .9
.5
A
M J S
T A .1
.5
A
M J S
T A .1
.5
A
M J S
T A .1
.5
A
M J S
T A .2
.5
A
M J S
T A .2
.5
A
M J S
T A .2
.5
A
M J S
T A .3
.5
A
M J S
T A .3
.5
A
M J S
T A .3
.5
A
M J S
T A .4
.5
A
M J S
T A .4
.5
A
M J S
T A .4
.5
A
M J S
T A .5
.5
A
M J S
T A .5
.5
A
M J S
T A .5
.5
A
M J S
T A .6
.1
A
M J S
T A .6
.9
A
M J S
T A .6
.6
A
M J S
T A .6
.0
A
M J S
T A .7
.0
A
M J S
T A .7
.0
A
M J S
T A .7
.0
A
FLOW
0 60’SCALE : 1"=30’-0" 30’
GENERAL SHEET NOTES
(DRILLED DURING 2008 DEWATERING)
EXISTING WEEP HOLE (TYP.)
(DRILLED DURING 2008 DEWATERING)
EXISTING 2" WELL POINTS (TYP.) (COMPLETED DURING 2008 DEWATERING)
EXISTING LOW STRENGTH GROUT (TYP.)
IN
S
T A
L L R
E L
IE
F W
E L L S
LAND WALL
INTERMEDIATE WALL
W E
K -1
-R -0
N
J P
F
A J
G
(INSTALLED 2008)
EXISTING WEEP HOLE AND WELL POINTS (TYP.)
DO NOT DISTURB
EXISTING STRUT (TYP.)
W E
E P H
O L E C
L E
A N
IN
G P
L A
N
A1
WEEP HOLE CLEANING PLAN
(ORIGINAL LOCK CONSTRUCTION)
EXISTING WEEP HOLE (TYP.)
D1
TYPICAL WEEP HOLE SECTION
LOCK FLOOR SLAB
FULL PENETRATION OF SLAB
6" Ø WEEP HOLE
0 2’SCALE : 1"=1’-0" 1’
RECESS SLOT
BULKHEAD
EXISTING
SEE SPECIFICATION SECTION 31 23 19.
ON TOP OF WEEP HOLES WHICH ERODE FOUNDATION SOILS
6. ADDITIONAL CLEAN STONE AGGREGATE IS TO BE PLACED
TO SPECIFICATION SECTION 31 23 19.
AND BACKFILL WITH CLEAN STONE AGGREGATE, ACCORDING
5. CLEAN EXISTING WEEP HOLES TO BASE OF FLOOR SLAB
SECTION 31 21 19.
CLEANED AND BACKFILLED ACCORDING TO SPECIFICATION
4. ALL WEEP HOLES NOT COVERED BY A BARGE ARE TO BE
IN THE REFERENCE DRAWINGS.
WEEP HOLES FROM THE 2008 DEWATERING ARE SHOWN
3. DRAWINGS FOR THE INSTALLATION OF WELL POINTS AND
NOT KNOWN. APPROXIMATELY 250 CY WERE PLACED IN 2008.
OF GROUTED VOIDS UNDER THE LOCK CHAMBER FLOOR IS
2. GROUT LOCATIONS ARE APPROXIMATE. THE EXACT EXTENT
IN 2008 WHEN INSTALLING NEW RELIEF WELLS.
LOW-STRENGTH GROUT INSTALLED UNDER THE LOCK FLOOR
1. CONTRACTOR MAY HAVE TO DRILL THROUGH AREAS OF
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
0 4’SCALE : 1"=2’-0" 2’
EXISTING LOCK BENCH
N
1’-6"
2’-6"
1’-6"
35’-0"
6"
6"
EXISTING CORNER ARMOR
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
C -1 x x x .d g n
:4
:5
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
C -1 x x x .d g n
E
S
H O
W N
L L
C-104
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
T A
L L R
E L
IE
F W
E L L S
L A
N D W
A L L
GENERAL SHEET NOTES
INSTALL RELIEF WELL (W2)
INSTALL RELIEF WELL (W3)
INSTALL RELIEF WELL (E2)
W E
K -1
-R -0
20’-0" 20’-0" 35’-0"
INSTALL RELIEF WELL (E1)INSTALL RELIEF WELL (W1)
INSTALL RELIEF WELL (E3)
INSTALL RELIEF WELL (E4)
INSTALL CAST IN PLACE CONCRETE BLOCK
INSTALL CAST IN PLACE CONCRETE BLOCK
INSTALL CAST IN PLACE CONCRETE BLOCK
INSTALL CAST IN PLACE CONCRETE BLOCK
INSTALL CAST IN PLACE CONCRETE BLOCK
INSTALL RELIEF WELL REFERENCE MARKER
INSTALL RELIEF WELL REFERENCE MARKER
INSTALL RELIEF WELL REFERENCE MARKER
INSTALL RELIEF WELL REFERENCE MARKERINSTALL RELIEF WELL REFERENCE MARKER
INSTALL RELIEF WELL REFERENCE MARKER
INSTALL RELIEF WELL REFERENCE MARKER
INSTALL CAST IN PLACE CONCRETE BLOCK
R E
F E
R E
N C
E M
A R
K E
R P
L A
N
A1
DOWNSTREAM RELIEF WELL AND REFERENCE MARKER PLAN
J P
F
A J
G
DO NOT DISTURB
EXISTING STRUT (TYP.)
DO NOT DISTURB
EXISTING BUBBLER CROSSOVER
D O
W N
S T
R E
A M R
E L
IE
F W
E L L A
N D
INSTALL PRECAST CONCRETE PROTECTION BLOCK
WITH KO.
FEATURES IN THE LOCK WALL. COORDINATE LOCATIONS
AVOID ALL GRATES, CONDUITS AND OTHER EMBEDDED
2. LOCATION OF RELIEF WELL REFERENCE MARKERS SHALL
IT IS CLOSER TO, SEE SHEET S-501 / A1.
CORRESPONDING TO ITS STATION ON THE SIDE OF THE LOCK
1. EACH RELIEF WELL SHALL HAVE A REFERENCE MARKER
RELIEF WELL REFERENCE MARKER NOTES:
33’-6" 20’-0" 20’-0" 33’-6"
EXIS
TIN
G M
ITE
R G
ATE
SIL
CLEAN OUT EXISTING WEEP HOLE (TYP.)
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
0 4’SCALE : 1"=2’-0" 2’
N
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
C -1 x x x .d g n
:4
:0
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
C -1 x x x .d g n
E
S
H O
W N
L L
C-105
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
T A
L L R
E L
IE
F W
E L L S
GENERAL SHEET NOTES
W E
K -1
-R -0
P
T
IO
N A
D O
W N
S T
R E
A M T
O W H
A U
L A
G E P
L A
N
TO REMAIN
EXISTING FENCE
EXISTING SHELTER
REMOVE AND REINSTALL
TO REMAIN
EXISTING SIDEWALK
AT FAIRLEAD
AND REINSTALL HANDRAIL
REMOVE RECONFIGURE
REMOVE EXISTING FAIRLEAD
FAIRLEAD
INSTALL NEW
GUTTER
EXISTING CONCRETE
A1
DOWNSTREAM TOW HAULAGE PLAN OPTION A
JUNCTION BOX
EXISTING LIGHTING
RECEPTACLE PEDESTAL
EXISTING TOW HAULAGE UNIT
EXISTING CONCRETE APRON
E X
IS
T
IN
G A
C C
E S
S R
O A
D
C1
S-302
A1
S-302
J P
F
A J
G
TOW HAULAGE UNIT SLAB
REMOVE AND REPLACE EXISTING
7’
TO BE REMOVED
EXISTING FENCE
TO BE REMOVED
EXISTING SWING GATE
NEW CONCRETE APPROACH SLAB
’4’
4’
GREATER THAN 30 DEGREES.
SLAB AND EXISTING CURB SHALL BE CUT BACK AT NO
10. THE TRANSITION BETWEEN NEW CONCRETE APPROACH
GUTTER.
9. NEW APPROACH SLAP SHALL BE SLOPED TO DRAIN TO
FIELD BASED ON ORIENTATION OF NEW THU SLAB.
8. EXACT LOCATION OF NEW GATE TO BE DETERMINED IN THE
WORK.
WILL NEED TO BE VERIFIED PRIOR TO COMPLETING SLAB
DOWNSTREAM END. ANCHOR BOLT CONFIGURATION
UPSTREAM END OF THE LOCK SHALL BE MOVED TO THE
THE TOW HAULAGE UNIT WHICH CURRENTLY EXISTS AT THE 7.
BUILDING AFTER REMOVAL.
THE GOVERNMENT AND PLACED IN THE MAINTENANCE
EXISTING FAIRLEAD SHALL BECOME PROPERTY OF 6.
FLUSH WITH TOP OF WALL AFTER REMOVAL.
CONCRETE WITH (9) 1" Ø ANCHORS. CUT ANCHORS
EXISTING DOWNSTREAM FAIRLEAD IS SECURED TO 5.
DESIGN STRENGTH.
SHALL BE THE TIME REQUIRED TO ACHIEVE 75% OF
TIME FOR SLAB. CURE TIME FOR THE CONCRETE
CLOSURE PERIOD, INCLUDING CONCRETE CURE
OPERATIONAL PRIOR TO THE END OF CONSTRUCTION
(FAIRLEAD, ELECTRICAL, SLAB) SHALL BE
TOW HAULAGE UNIT ASSOCIATED COMPONENTS F.
FAIRLEAD. MARK SLAB CONFIGURATION.
ENSURE NO INTERFERENCE BETWEEN THE CABLE AND
E. ADJUST NEW THU SLAB LOCATION AND ORIENTATION TO
THROUGHOUT THE ENTIRE REEVING PROCESS.
FAIRLEAD WITHOUT ANY INTERFERENCE
DRUM. STRING LINE TO ENSURE CABLE ENTERS
LOCATION OF EACH SIDE OF THE WIRE ROPE
BOTTOM OF DRUM HEIGHT AND CORRESPONDING
ANGLE OF WIRE ROPE, SET AT THE THEORETICAL
ii. USING A STRING LINE TO SIMULATE THE FLEETING
LOCATION AND ORIENTATION.
ELEVATION BASED ON PRELIMINARY THU SLAB
i. ESTABLISH BOTTOM OF THE THU WIRE ROPE DRUM
ON THE FAIRLEAD, BY PERFORMING THE FOLLOWING:
BETWEEN THE CABLE AND THE ROPE OPENING (SHANK)
CABLE TO DETERMINE IF THERE IS INTERFERENCE
D. DETERMINE THE FLEET ANGLE OF THE TOW HAULAGE
DRAWINGS.
BASED ON DIMENSIONS SHOWN ON THE CONTRACT
TOW HAULAGE UNIT SLAB AND TOW HAULAGE UNIT,
C. TEMPORARILY ESTABLISH THE LOCATION OF THE NEW
NOTED ON THE FAIRLEAD ASSEMBLY.
LOCATE FAIRLEAD AT THE MINIMUM DIMENSIONS B.
UNIT, AND THE WIRE ROPE DRUM WIDTH.
LEAD ELEVATION ABOVE THE BOTTOM OF THE
DRUM. DIMENSIONS REQUIRED ARE THE LINE
A. MEASURE EXISTING DIMENSIONS OF THU WIRE ROPE
HAULAGE UNIT (THU) SHALL FOLLOW THE PROCESS BELOW:
4. IN GENERAL, INSTALLATION OF THE DOWNSTREAM TOW
3. EXISTING TOW HAULAGE UNIT SLAB IS 3’-6" x 5’-6".
NEW TO EXISTING CONCRETE.
EXPANSION JOINTS SHALL BE INCLUDED AT ALL2.
OF 2" Ø X-STRONG ALUMINUM PIPE.
C. RECONFIGURING OF HANDRAIL WILL REQUIRE 20 LF
PER ANCHOR-RESIN-CONCRETE INTERFACE.
TENSILE STRENGTH FROM PULLOUT OF 6,000 LBS.
B. EPOXY ADHESIVE SHALL PROVIDE A MIN. ALLOWABLE
WITH 4" MIN. EMBEDMENT.
ALL-THREAD, DIA. TO MATCH EXISTING DIA.
GALVANIZED STEEL. ANCHOR RODS SHALL BE
A. ANCHOR RODS, NUTS AND WASHERS SHALL BE
ADHESIVE ANCHORS SHALL CONSIST OF THE FOLLOWING:
FOUR ANCHORS PER POST, FOR A TOTAL OF 12 ANCHORS.
ANCHORS PER POST. THERE ARE THREE POSTS WITH
ANCHORED TO THE NEW SIDEWALK WITH (4) EPOXY
AND REINSTALLED AS NOTED. THE POSTS WILL BE
1. EXISTING HANDRAIL SHALL BE REMOVED, RECONFIGURED,
3’
GATE
DOUBLE SWING
NEW 6’ X 10’
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
0 4’SCALE : 1"=2’-0" 2’
N
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R
C -1 x x x .d g n
:4
:0
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
C -1 x x x .d g n
E
S
H O
W N
L L
C-106
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
T A
L L R
E L
IE
F W
E L L S
GENERAL SHEET NOTES
W E
K -1
-R -0
T
IO
N A
U P
S T
R E
A M T
O W H
A U
L A
G E P
L A
N
A1
UPSTREAM TOW HAULAGE PLAN OPTION A
A1
S-302
C1
S-302
J P
F
A J
G
7’
NEW CONCRETE APPROACH SLAB
CONCRETE CURB
REMOVE EXISTING
REMOVE EXISTING GUTTER
EXISTING GUTTER TO REMAIN
E X
IS
T
IN
G A
C C
E S
S R
O A
D
EXISTING SHELTER
REMOVE AND REINSTALL
TO REMAIN
EXISTING FENCE
FAIRLEAD
INSTALL NEW
FAIRLEAD
REMOVE EXISTING
AT FAIRLEAD
AND REINSTALL HANDRAIL
REMOVE, RECONFIGURE
TOW HAULAGE UNIT SLAB
REMOVE AND REPLACE EXISTING
CONDUIT
EXISTING ELECTRICAL
TO REMAIN
EXISTING SIDEWALK
REMOVE EXISTING ASPHALT
PARKING LOT ELEVATION
MATCH EXISTING
GREATER THAN 30 DEGREES.
SLAB AND EXISTING CURB SHALL BE CUT BACK AT NO
9. THE TRANSITION BETWEEN NEW CONCRETE APPROACH
GUTTER.
8. NEW APPROACH SLAP SHALL BE SLOPED TO DRAIN TO
WORK.
WILL NEED TO BE VERIFIED PRIOR TO COMPLETING SLAB
DOWNSTREAM END. ANCHOR BOLT CONFIGURATION
UPSTREAM END OF THE LOCK SHALL BE MOVED TO THE
THE TOW HAULAGE UNIT WHICH CURRENTLY EXISTS AT THE 7.
BUILDING AFTER REMOVAL.
THE GOVERNMENT AND PLACED IN THE MAINTENANCE
EXISTING FAIRLEAD SHALL BECOME PROPERTY OF 6.
FLUSH WITH TOP OF WALL AFTER REMOVAL.
CONCRETE WITH (9) 1" Ø ANCHORS. CUT ANCHORS
EXISTING DOWNSTREAM FAIRLEAD IS SECURED TO 5.
DESIGN STRENGTH.
SHALL BE THE TIME REQUIRED TO ACHIEVE 75% OF
TIME FOR SLAB. CURE TIME FOR THE CONCRETE
CLOSURE PERIOD, INCLUDING CONCRETE CURE
OPERATIONAL PRIOR TO THE END OF CONSTRUCTION
(FAIRLEAD, ELECTRICAL, SLAB) SHALL BE
TOW HAULAGE UNIT ASSOCIATED COMPONENTS F.
FAIRLEAD, MARK SLAB CONFIGURATION.
NO INTERFERENCE BETWEEN THE CABLE AND
E. ADJUST SLAB LOCATION AND ORIENTATION TO ENSURE
THROUGHOUT THE ENTIRE REEVING PROCESS.
FAIRLEAD WITHOUT ANY INTERFERENCE
DRUM. STRING LINE TO ENSURE CABLE ENTERS
LOCATION OF EACH SIDE OF THE WIRE ROPE
BOTTOM OF DRUM HEIGHT AND CORRESPONDING
ANGLE OF WIRE ROPE, SET AT THE THEORETICAL
ii. USING A STRING LINE TO SIMULATE THE FLEETING
LOCATION AND ORIENTATION.
ELEVATION BASED ON PRELIMINARY THU SLAB
i. ESTABLISH BOTTOM OF THE THU WIRE ROPE DRUM
ON THE FAIRLEAD, BY PERFORMING THE FOLLOWING:
BETWEEN THE CABLE AND THE ROPE OPENING
CABLE TO DETERMINE IF THERE IS INTERFERENCE
D. DETERMINE THE FLEET ANGLE OF THE TOW HAULAGE
DRAWINGS.
BASED ON DIMENSIONS SHOWN ON THE CONTRACT
TOW HAULAGE UNIT SLAB AND TOW HAULAGE UNIT,
C. TEMPORARILY ESTABLISH THE LOCATION OF THE NEW
NOTED ON THE FAIRLEAD ASSEMBLY.
LOCATE FAIRLEAD AT THE MINIMUM DIMENSIONS B.
UNIT, AND THE WIRE ROPE DRUM WIDTH.
LEAD ELEVATION ABOVE THE BOTTOM OF THE
DRUM. DIMENSIONS REQUIRED ARE THE LINE
A. MEASURE EXISTING DIMENSIONS OF THU WIRE ROPE
HAULAGE UNIT (THU) SHALL FOLLOW THE PROCESS BELOW:
4. IN GENERAL, INSTALLATION OF THE UPSTREAM TOW
3. EXISTING TOW HAULAGE UNIT SLAB IS 3’-6" x 5’-6".
SHALL NOT EXCEED 4’-0" ON CENTER.
NEW TO EXISTING CONCRETE. CONTRACTION JOINTS
EXPANSION JOINTS SHALL BE INCLUDED AT ALL2.
OF 2" Ø X-STRONG ALUMINUM PIPE.
C. RECONFIGURING OF HANDRAIL WILL REQUIRE 20 LF
PER ANCHOR-RESIN-CONCRETE INTERFACE.
TENSILE STRENGTH FROM PULLOUT OF 6,000 LBS.
B. EPOXY ADHESIVE SHALL PROVIDE A MIN. ALLOWABLE
WITH 4" MIN. EMBEDMENT.
ALL-THREAD, DIA. TO MATCH EXISTING DIA.
GALVANIZED STEEL. ANCHOR RODS SHALL BE
A. ANCHOR RODS, NUTS AND WASHERS SHALL BE
ADHESIVE ANCHORS SHALL CONSIST OF THE FOLLOWING:
FOUR ANCHORS PER POST, FOR A TOTAL OF 12 ANCHORS.
ANCHORS PER POST. THERE ARE THREE POSTS WITH
ANCHORED TO THE NEW SIDEWALK WITH (4) EPOXY
AND REINSTALLED AS NOTED. THE POSTS WILL BE
1. EXISTING HANDRAIL SHALL BE REMOVED, RECONFIGURED,
4’
3’
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A3 S-201
S-201
3’-0"
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -1 x x x .d g n
:4
:2
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
S -1 x x x .d g n
M
IM
S
H O
W N
M
S-101
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
3"
10"10"10"
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"C1
PRECAST CONCRETE PROTECTION BLOCK PLAN
6’-6"
3’-3"
2’-0" 2’-0"
COVER PLATE
PROTECTIVE
1/2" PL
IN
S
T A
L L R
E L
IE
F W
E L L S
W E
K -1
-R -0
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"
A1
RELIEF WELL PRECAST CONCRETE PROTECTION BLOCK PLAN
A4
RELIEF WELL CIP CONCRETE PROTECTION BLOCK PLAN
A1 S-303
C1 S-303
C3
R E
L
IE
F W
E L L P
R O
T E
C T
IO
N B
L O
C K
S P
L A
N
GENERAL SHEET NOTES
AND CASTING OF CIP PROTECTION BLOCK.
3. BLOCK OFF FLOW FROM RISER PIPE PRIOR TO FORMING
SLUMP.
COMPRESIVE STRENGTH AND HAVE NO MORE THAN 1 INCH
2. CONCRETE FOR CIP PROTECTION BLOCK SHALL HAVE 4000 PSI
LOCK BULKHEADS.
GATES AND IN AREAS NEAR UPSTREAM AND DOWNSTREAM
IN AREAS DIRECTLY UNDER THE SECTOR ARC OF THE MITER
1. CAST IN PLACE PROTECTION BLOCKS ARE TO BE INSTALLED
EXISTING LAND OR INTERMEDIATE WALL
SHEET
SEE PLAN C1 THIS
PROTECTION BLOCK,
CONCRETE
INSTALL PRECAST
E O J
A J
G
RISER PIPE
RELIEF WELL
OUTLET
CONCRETE
PRECAST
OUTLET
CONCRETE
PRECAST
10" O
TLET
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
ELEVATION VARIES SEE REFERENCE DRAWINGS
GENERAL SHEET NOTES
0 4’SCALE : 1"=2’-0" 2’A1
RELIEF WELL ELEVATION
1’-4"
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -2 x x x .d g n
:4
:4
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
R E
L
IE
F W
E L L A
M R
S -2 x x x .d g n
S
H O
W N
L L
H
R E
L
IE
F W
E L L P
R O
T E
C T
IO
N B
L O
C K
S-201
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
T A
L L R
E L
IE
F W
E L L S
INSTALLED
AFTER PROTECTION BLOCKS ARE
PRECAST PROTECTION BLOCK
REMOVED AND REINSTALLED IN THE
HORIZONTAL CHECK VALVE TO BE
ONCE LOCK IS DEWATERED,
MORE THAN 6" FROM LOCK FLOOR
CUT RELIEF WELL RISER PIPE NO
TO LOCK DEWATERING
DEVELOPMENT AND PRIOR
PIPE AFTER WELL
TO BE INSTALLED IN RISER
HORIZONTAL CHECK VALVE
W E
K -1
-R -0
M A
X
1’-6"
8"
TYP.
2" CHAMFER 45°
A3
RELIEF WELL PRECAST PROTECTION BLOCK ELEVATION
2’1’0SCALE : 1"=1’-0"
C3
RELIEF WELL PRECAST PROTECTION BLOCK ELEVATION
2’1’0SCALE : 1"=1’-0"
C1 S-301
A3C3 S-301
A1 S-301
S-301
E L E
V A
T
IO
N S
EXISTING LOCK FLOOR
BLOCK
CONCRETE PROTECTION
INSTALL PRECAST
B E
N C
H
W A
L L
X
IS
T
EXISTING LOCK FLOOR
X
IS
T
IN
G W
A L L O
R B
E N
C H
EXISTING LOCK FLOOR
PROTECTION BLOCK
CONCRETE
INSTALL PRECAST
E O J
A J
G
BOTTOM PLATE
FILTER (4")
SEE RELIEF WELL NOTE 1
CONTINUOUS SLOT SCREEN,
WIRE WRAPPED
MANUFACTURER
WELL SCREEN
TO BE PROVIDED BY
WELL SCREEN TO PVC
CONNECTION FROM
TOP OF WELL SCREEN,
BACKFILL
GROUT
TREMIE
BENTONITE CHIPS
TOP OF FILTER
RISER PIPE
OUTLET
ELEVATION OF
CENTERLINE
9" TO
AND C3 ON SHEET S-501
LATCH SEE DETAIL C1
FLAPPER VALVE AND
BLOCK NOTE 2)
PROTECTION
(SEE
BLOCK)
HOOK (4 PER
#4 LIFTING
PROTECTION BLOCKS.
2. ALL FOUR LIFTING HOOKS MUST BE USED WHEN PLACING THE
SEE S-301 AND S-303 FOR ANCHOR DETAILS.
LOCK CHAMBER AFTER LOCK CHAMBER HAS BEEN DEWATERED.
1. PROTECTION BLOCKS TO BE ANCHORED TO THE FLOOR OF THE
RELIEF WELL PROTECTION BLOCK NOTES:
2. ALL WELLS SHALL HAVE SHOWN DIMENSIONS.
FOOT LENGTH.
SIZE 0.10" MINIMUM INTAKE AREA 107 SQUARE INCHES PER
WRAPPED CONTINUOUS SLOT SCREENS WITH MAXIMUM SLOT
1. WELL SCREENS SHALL BE 8" DIA. STAINLESS STEEL WIRE
RELIEF WELL NOTES:
CHARACTERISTICS.
1. SEE SPECIFICATIONS FOR HORIZONTAL CHECK VALVE
CHECK VALVE NOTES:
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -3 x x x .d g n
:4
:5
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
S -3 x x x .d
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
IN
S
T A
L L R
E L
IE
F W
E L L S
GENERAL SHEET NOTES
W E
K -1
-R -0
C1
RELIEF WELL PRECAST PROTECTION BLOCK SECTION
A1
RELIEF WELL PRECAST PROTECTION BLOCK SECTION
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"A3
RELIEF WELL PRECAST PROTECTION BLOCK SECTION
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"C3
RELIEF WELL PRECAST PROTECTION BLOCK SECTION
M
IM
A S S
H O
W N
M
IM
S-301
R E
L
IE
F W
E L L P
R E
C A
S T P
R O
T E
C T
IO
N B
L O
C K
S E
C T
IO
N S
1’-6"
CL
CL
E X
IS
T
IN
G W
A L L O
R B
E N
C H
INSTALLATION OF PROTECTION BLOCK
ALONG PERIMETER PRIOR TO
NON-SHRINK GROUT MINIMUM 1" HIGH
PROTECTION BLOCK. RUN LINE OF
REMOVE DEBRIS IN CONTACT WITH
3"
FLOOR
LOCK
EXISTING
" 8 1–"4
11’-3
"8 1– "8
51’-2
(2 PER BLOCK)
CHECK VALVE
HORIZONTAL
FOR CLARITY
VALVE NOT SHOWN
HORIZONTAL CHECK
LOCK FLOOR
ABOVE
PROTRUSION
6" MAX
FLOOR
LOCK
EXISTING
CLCL
CL
1’-6"
CL
BLOCK
INSTALLATION OF PROTECTION
HIGH ALONG PERIMETER PRIOR TO
NON-SHRINK GROUT MINIMUM 1"
PROTECTION BLOCK. RUN LINE OF
REMOVE DEBRIS IN CONTACT WITH
3"
2’-0" 1’-3" 3’-3"
CL
BANKS
STRUTS OR DUCT
THROUGH LOCK
BE PLACED
NO ANCHORS TO
FLOOR
LOCK
EXISTING
"4
COVER PLATE
PROTECTIVE
1/2" PL
CL
E M
B E
D M
E N
T
T Y
P
FLOOR
LOCK
EXISTING
6" 1’-0" 1’-6"
CL
CL
BANKS
OR DUCT
LOCK STRUTS
THROUGH
PLACED
TO BE
NO ANCHORS
E X
IS
T
IN
G W
A L L O
R B
E N
C
BACKFILL
TREMIE GROUT
RISER PIPE
RELIEF WELL RISER PIPE
RELIEF WELL
BACKFILL
TREMIE GROUT
(8 PER BLOCK)
ANCHOR
1/2" DIA. COVER PLATE
(8 PER BLOCK)
ANCHOR
1/2" DIA. COVER PLATE
(4 PER BLOCK)
ANCHOR BAR
#8, 2’-0" LONG
AFTER ANCHOR PLACEMENT (TYP.)
FILL WITH NON SHRINK GROUT
DIA. ANCHOR HOLE,"8
AFTER ANCHOR PLACEMENT (TYP.)
FILL WITH NON SHRINK GROUT
DIA. ANCHOR HOLE,"8
E O J
A J
G
(4 PER BLOCK)
ANCHOR BAR
#8, 2’-0" LONG
TO ALLOW RELIEF WELL WATER TO FLOW.
P) UNLATCH BOTH FLAPPER VALVE LATCH MECHANISMS
O) INSTALL PROTECTIVE COVER PLATE.
N) REMOVE TEMPORARY RELIEF WELL PLUG.
SPECIFIED IN NOTE 4.
M) FILL REMAINING SPACE WITH NON SHRINK GROUT AS
L) REMOVE EXCESS ADHESIVE.
K) INSTALL ANCHOR BARS.
RECOMENDATIONS.
HOLES IN ACCORDANCE WITH MANUFACTURES
J) INSTALL ADHESIVE FROM THE BOTTOM OF THE ANCHOR
I) CLEAN ANCHOR HOLES.
H) ROUGHEN INSIDE SURFACE OF HOLES.
G) CLEAN ANCHOR HOLES.
SPECIFIED DEPTH.
" DRILL BIT TO THE 8
1 F) DRILL INTO LOCK FLOOR WITH 1
E) POSITION BLOCK OVER RELIEF WELL.
BLOCK.
D) INSTALL LINE OF GROUT FOR LEVELING THE PROTECTION
C) TEMPORARILY BLOCK RELIEF WELL FLOW.
B) CUT RISER PIPE TO SPECIFIED HEIGHT ABOVE LOCK FLOOR.
RECOMENDATIONS.
BLOCK IN ACCORDANCE WITH MANUFACTURES
REINSTALL HORIZONTAL CHECK VALVE IN PROTECTION
A) REMOVE TEMPORARY HORIZONTAL CHECK VALVE AND
6. PROCEDURE FOR PLACEMENT OF PROTECTION BLOCKS:
EXCEED ASTM C881, TYPE 1, CLASS A.
5. ADHESIVE FOR SETTING ANCHOR BARS SHALL MEET OR
4. NON-SHRINK GROUT SHALL BE ASTM C1107.
3. ANCHOR BARS SHALL BE ASTM A615, GRADE 60 REBAR.
COVER PLATE ANCHORS SHALL BE STAINLESS STEEL.
B8, CLASS 1 STAINLESS STEEL. NUTS AND WASHERS FOR
PROTECTION BLOCK. ANCHORS SHALL BE ASTM A193, GRADE
2. COVER PLATE ANCHORS SHALL BE CAST IN THE PRECAST
STAINLESS STEEL.
1. COVER PLATE SHALL BE MADE OF ASTM A276, TYPE 304
(2 PER BLOCK)
MECHANISM
VALVE LATCH
AND FLAPPER
FLAPPER VALVE,
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -3 x x x .d g n
:4
:0
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
H O
W N
IS
S
IS
S
IP
P I
R
IV
E R B
A
4’-0" TYP.
CONTRACTION JOINT TYP.
GRANULAR BASE
4" COMPACTED
BACKFILL AND RESEED AT NEW SLAB
EXISTING LOCKWALL
#6 @ 12" E.W.
EMBED 22" IN EPOXY GROUT
#6B ANCHORS @ 2’-0" E.W.
(NO CHAMFER)
" TOOLED JOINT RADIUS4
#4 @ 2’-0"
S-302
SIDEWALK
EXISTING
VARIES
NEW TOW HAULAGE UNIT SLAB
SEE NOTE 4
THREADED ROD AND COUPLING.
W E
K -1
-R -0
M R
B
M R
S -3 x x x .d g n
L O
C K A
N D D
A M
D U
B U
Q U
E
IA
IN
S
T A
L L R
E L
IE
F W
E L
GENERAL SHEET NOTES
T O
W H
A U
L A
G E S
L A
B S
E C
T
IO
N S
O P
T
IO
N A
A1
TOW HAULAGE SLAB SECTION OPTION A
VARIES
E O J
A J
G
THERE ARE SIX ANCHORS.
BE ASTM F1554, GALVANIZED STEEL. FOR BIDDING PURPOSES,CONTRACTOR SHALL ASSUME ANCHORS ARE 1" DIAMETER AND
BE COATED WITH ANTI-SIEZE COMPOUND AND COUPLER NUTS SHALL BE HEAVY HEX GALVANIZED STEEL. THREADED RODS SHALL
THE LOCATIONS OF THE EXISTING TOW HAULAGE BOLTS, AND SHALL BE DOCUMENTED. THREADED ROD/COUPLER THREADS SHALL
WITH THE FINISHED SURFACE OF THE NEW TOW HAULAGE SLAB. THE LOCATIONS OF THE COUPLER NUTS SHALL BE IDENTICAL TO
SHALL INSTALL THREADED ANCHORS 1’-10" BELOW THE TOP OF THE LOCKWALL AND SHALL INSTALL COUPLER NUTS TO BE FLUSH
UNIT FOR THE NEW THREADED ANCHORS/COUPLERS. PRIOR TO PLACEMENT OF THE NEW TOW HAULAGE SLAB, THE CONTRACTOR
4. THE CONTRACTOR SHALL FIELD MEASURE AND MATCH THE LOCATIONS AND DIMENSIONS OF BOLTS SECURING THE TOW HAULAGE
3. CUT OFF EXISTING TOW HAULAGE SLAB ANCHORS AT CONCRETE REMOVAL LINE.
THESE ANCHORS.
2. CONTRACTOR SHALL FIELD VERIFY TOW HAULAGE ANCHOR LOCATIONS AND PLACE REINFORCING AND ANCHORS IN SLAB TO AVOID
1. CONTRACTOR SHALL REMOVE AND REINSTALL EXISTING TOW HAULAGE UNIT ON NEW TOW HAULAGE UNIT SLAB.
TOW HAULAGE SLAB NOTES:
RESURFACING
EXISTING 4" HORIZONTAL
BOND BREAKER
ORGANIC FELT #15
APPLY ASHPALT SATURATED
C1
CONCRETE APPROACH SLAB SECTION OPTION A
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -3 x x x .d g n
:4
:1
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
S -3 x x x .d g n
S
H O
W N
M
S-303
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
T A
L L R
E L
IE
F W
E L L S
GENERAL SHEET NOTES
S E
C T
IO
N S
W E
K -1
-R -0
6" 1’ 2’SCALE : 1 1/2"=1’-0"A1
RELIEF WELL CIP PROTECTION BLOCK SECTION
6" 1’ 2’SCALE : 1 1/2"=1’-0"C1
RELIEF WELL CIP PROTECTION BLOCK SECTION
R E
L
IE
F W
E L L C
IP
P
R O
T E
C T
IO
N B
L O
C K
C3 SCALE : 1"=1" 2"1"0
OVERFLOW RISER PIPE VALVE
E O J
A J
G
CL
(3 PER BLOCK)
NEW #4 ANCHOR
(SEE C3)
VALVE
RISER PIPE
NEW OVERFLOW
INSTALLATION (SEE A1 S-201)
FROM INITIAL RELIEF WELL
HORIZONTAL CHECK VALVE
LOCK FLOOR AND SAVE
CUT RISER PIPE FLUSH WITH
FLOOR
LOCK
EXISTING
GROUT BACKFILL
TREMIE
RISER PIPE
RELIEF WELL
RISER PIPE
RELIEF WELL
PIPE VALVE HANDLE
OVERFLOW RISER
AROUND
ALL
CHAMFER
45°
PLACEMENT
CONCRETE
AGENT PRIOR TO
APPLY BONDING
REMOVE DEBRIS AND
GROUT BACKFILL
TREMIE
FLOOR
LOCK
EXISTING
RISER PIPE
RELIEF WELL
(SEE NOTE 5)
INTO RISER PIPE
RISER VALVE BODY
LAG SCREWS THRU
(SEE NOTE 6)
PREVENTION
FOR RUST
" Ø HOLE8
3OF
CIRCUMFERENCE
PAINT INSIDE
GROUT BACKFILL
OF TREMIE
TOP ELEVATION
ACCEPT LAG SCREWS
THE VALVE BODY TO
THRU THE SIDE OF
DRILL TWO HOLES
(SEE NOTE 4)
VALVE BODY
(SEE NOTE 4)
COVER
VALVE
OUTLET
BLOCK
PROTECTION
CIP
"4
"8
"4
CL
CL
CL
"2
FLOOR
EXISTING LOCK
6. PAINT SHALL BE ZINC RICH PRIMER PAINT
GROUP 1, 304 STAINLESS STEEL
" LONG AND MADE OF ASTM F593, 2
1" - 7 X 1 8
3 PIPE SHALL BE
5. LAG SCREWS FOR OVERFLOW VALVE ATTACHMENT TO RISER
COMPATIBLE WITH RISER PIPE MATERIAL.
CHARACTERISTICS. OVERFLOW VALVE SHALL BE
4. SEE SPECIFICATIONS FOR OVERFLOW VALVE
3. BONDING AGENT SHALL BE ASTM C1059 TYPE II.
GRADE 60 REBAR.
2. CIP PROTECTION BLOCK ANCHORS SHALL BE ASTM A615,
SLUMP.
COMPRESSIVE STRENGTH AND HAVE NO MORE THAN 1 INCH
CONCRETE FOR CIP PROTECTION BLOCK SHALL HAVE 4000 PSI 1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -5 x x x .d g n
:4
:3
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
S -5 x x x .d g n
S
H O
W N
S-501
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
0 4’SCALE : 1"=2’-0" 2’
3" 3"
6"
0 1" 2" 3" 4"SCALE : 6"=1’-0"
"4
3"
0 1" 2" 3" 4"SCALE : 6"=1’-0"C1
6" FLAPPER VALVE AND LATCH DETAIL
C3
6" FLAPPER VALVE DETAIL
CORNER ARMOR
EXISTING
IN
S
T A
L L R
E L
IE
F W
E L L S
9"
9"
9"
B5, BOTTOM BARS (#6, 2 REQUIRED)
B4, TOP BARS (#6, 2 REQUIRED)
B3, TYPE B STIRRUPS, (#6, 4 REQUIRED)
B2, TYPE A STIRRUPS, (#6, 6 REQUIRED)
A4
REINFORCEMENT SCHEDULE
2’1’0SCALE : 1"=1’-0"A3
REINFORCEMENT DETAILS
2’1’0SCALE : 1"=1’-0"
"4 33’-4
B1 B1
B2
B3B3
"8 52’-2
B1B1
B4B5
B4
B5
B4
B5
WALL
INTERMEDIATE
WALL OR
TOP OF LAND
1"
GROUT
NEW EPOXY
CONCRETE
EXISTING
R O
U G
H E
N E
D S
U R
F A
C E O
F R
O D
ADDITIONAL MARKERS TO REPRESENT WELLS AT STA. 44.5A AND 726.0A
W E
K -1
-R -0
A1
RELIEF WELL REFERENCE MARKER DETAIL
B1, LIFTING HOOK, (#4, 4 REQUIRED)
7"
"16
Ø
Ø
"2 13’-4
"2 15’-11
"4 12’-7
" R 8
" R 8
" R 8 11" R 8
" R 8
" R 8 11" R 8
" R 4
" R 4
" R 8 11" R 8
CLARITY
NOT SHOWN FOR
COMPONENTS
3. INTERNAL
OUTS
SHEET FOR BAR CALL
SCHEDULE, A4 THIS
EE REINFORCEMENT 2. S
GRADE 60
SHALL BE ASTM A615
1. REINFORCEMENT
1/8
VALVE BODY
BASE PLATE TO
LATCH KEY HOLE
C O
V E
R
T Y
P
T A
IL
S A
N D R
E
IN
F O
R C
E M
E N
T S
C H
E D
U L E
FRONT VIEW
SIDE VIEW
3"
BASE PLATE
LATCH KEY HOLE
COVER
VALVE
" Ø4
FLANGE
MOUNTING
11" Ø VALVE
C3
S-501
S-502
OPENING
THROUGH KEY HOLE
PIN AT BOTTOM TO FIT
" Ø LATCH HANDLE,2
C1
CONCRETE)
TOP OF
(FLUSH WITH
STEEL ROD
1" DIA. X 10"
COVER (TYP)
2" MIN
POSITION
LOCKED
HANDLE IN
" Ø LATCH2
TO VALVE COVER
KEEPER PLATES
" LATCH 2
14"X2"X RECEIVE LATCH
1" Ø HOLE TO
LATCH KEEPER PLATES
AFTER INSERTION THRU
TO LATCH HANDLE
" Ø LATCH PIN 4
12"X
E O J
A J
G
PIVOT PIN
VALVE COVER
M O
U N
T
IN
G F
L A
N G
E F
L A
P P
E R V
A L
V
T L E
T A
E C
A S
T B
L O
C K
P B
E T
W E
HARDWARE
MOUNTING
VALVE
GENERAL SHEET NOTES
STAINLESS STEEL.
ALL SHALL BE COMPRISED OF ASTM A276, TYPE 304
LATCH KEY HOLE BASE PLATE, AND LATCH KEEPER PLATES
PIVOT PIN, VALVE MOUNTING HARDWARE, LATCH HANDLE,
3. FLAPPER VALVE BODY, FLAPPER VALVE COVER, VALVE COVER
WELL.
CORRESPOND TO A MARKER ON THE WALL CLOSEST TO THE
STATIONS 44.5A AND 726.0A EACH RELIEF WELL SHALL
2. WHEN DOCUMENTING THE RELIEF WELLS IN A ROW AT
SHALL BE MADE OF ASTM A767, GRADE 40 GALVANIZED REBAR
MARKER LOCATIONS WITH THE KO. REFERENCE MARKERS
THE CONTRACTOR SHALL VERIFY RELIEF WELL REFERENCE1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -5 x x x .d g n
:4
:4
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
S -5 x x x .d g n
S
H O
W N
S-502
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
0 1" 2" 3" 4"SCALE : 6"=1’-0"
S
T A
L L R
E L
IE
F W
E L L S
W E
K -1
-R -0
"8
A1
FLAPPER VALVE ISO VIEW (CLOSED, LATCHED POSITION)
A3
FLAPPER VALVE ISO VIEW (OPEN, UNLATCHED POSITION)
SCALE : NO SCALE
(PARTIAL VIEW)
VALVE COVER
(PARTIAL VIEW)
VALVE BODY
C1
FLAPPER VALVE BOLT DETAIL
OF BOLT (SEE NOTE 1)
MATCH THREADS AND SIZE
NUT AND WASHER TO
5/8" DIA. THREADED ROD,
"(SEE NOTE 2)8
(PARTIAL VIEW)
" Ø LATCH LEVER2
SCALE : NO SCALE
SCALE : NO SCALEC5
CIP BLOCK ISO VIEW
SCALE : NO SCALEC3
PRECAST PROTECTION BLOCK ISO-VIEW
D E
T A
IL
S A
N D I S
O V
IE
W S
(PARTIAL VIEW)
KEEPER PLATE
COVER OPEN
POSITION, AND VALVE
UNLOCKED
LATCH HANDLE IN
COVER CLOSED
POSITION, AND VALVE
LOCKED
LATCH HANDLE IN
E O J
A J
G
OUTLET
CONCRETE
PRECAST
EDGE OF
CHECK VALVE
FOR HORIZONTAL
CONCRETE WALL
GENERAL SHEET NOTES
PROHIBITED.
PRECAST BLOCK FOR THREADED ROD PLACEMENT IS
CLASS 1 STAINLESS STEEL. DRILLING OF HOLES INTO THE
2. THREADED ROD SHALL BE MADE OF ASTM A193, GRADE B8,
THE VALVE FLANGE PATTERN SIZE AND SPACING.
FLAPPER VALVE PLACEMENT. RADIAL PATTERN TO MATCH
CAST IN THE PRECAST PROTECTION BLOCK PRIOR TO
1. THREADED ROD FOR MOUNTING FLAPPER VALVE SHALL BE
FOOTPRINT
NEW FAIRLEAD
CORNER ARMOR
SHEAVE
CL FAIRLEAD
E
A V
E
C L F
A
IR
L E
A D
MONOLITH JOINT
PL. 1", ASTM A709
M O
N O
L
IT
H J
O
IN
T
LOCK CHAMBER
FACE OF
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"0 6" 1’ 2’SCALE : 1 1/2"=1’-0"
M O
N O
L
IT
H J
O
IN
T
LOCK CHAMBER
FACE OF
E
A V
E
C L F
A
IR
L E
A D
CORNER ARMOR
SHEAVE
CL FAIRLEAD
MONOLITH JOINT
PL. 1", ASTM A709
0 6" 1’ 2’SCALE : 1 1/2"=1’-0"
HORIZONTAL
TOP OF WALL
WEIGHT
M
IN
8""2 12’-1"2
11’-13" MIN.
12" MIN.
4’-2"
"2 11’-7"2
11’-7
2’-0"
M
IN
3" MIN.
FOOTPRINT
NEW FAIRLEAD
M
IN
4’-2"
M
IN
M
IN
1’ MIN. 3" MIN.
4" MIN.
M
IN
"2 11’-7"2
11’-7
M
IN
T
Y P
7/16
7/16
TOWARD LOCK CHAMBER
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -5 x x x .d g n
:4
:5
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
H O
W N
S
IS
S
IP
P I
R
IV
E R B
A
" M
IN
. T
Y P
2’-0"
UPSTREAM LAND WALL OPPOSITE HAND
DOWNSTREAM LAND WALL FAIRLEAD SHOWN
S-503
W
E
K -1
-R -0
B
M R
M R
S -5 x x x .d g n
L O
C K A
N D D
A M
B U
Q U
E
IA
IN
S
T A
L L R
E L
IE
F W
E L L S
GENERAL SHEET NOTES
O P
T
IO
N A
UPSTREAM TOW HAULAGE FAIRLEAD ASSEMBLY DETAIL OPTION A
A1
DOWNSTREAM TOW HAULAGE FAIRLEAD ASSEMBLY DETAIL OPTION A
A3
C1
TOW HAULAGE FAIRLEAD ASSEMBLY DETAIL OPTION A
T O
W H
A U
L A
G E F
A
IR
L E
A D A
S S
E M
B L
Y D
E T
A
IL
E O J
A J
G
HORIZONTAL RESURFACING.
DOWNSTREAM END. THIS ALLOWS THE THREADED ROD TO BE INSTALLED 2’-0" PAST THE 4"
BE EMBEDDED A MINIMUM 2’-4" BELOW THE HORIZONTAL SURFACE ON THE UPSTREAM AND
" DIA., GALVANIZED ASTM A193 B7 STEEL. THREADED RODS SHALL4
17. THREADED RODS SHALL BE 1
THE EXISTING FAIRLEAD SHEAVE GROOVE LOCATION.
" FROM8
1 JOINT DISTANCES TO THE GROOVE OF THE FAIRLEAD SHEAVE VARIES LESS THAN
NEW FAIRLEADS SHALL BE LOCATED SUCH THAT THE LOCKWALL FACE AND MONOLITH
FIELD MEASUREMENTS OF EXISTING FAIRLEAD LOCATIONS SHALL BE MADE AS SHOWN, AND
6. NEW FAIRLEADS SHALL BE SHOP WELDED TO BASE PLATES PRIOR TO FIELD INSTALLATION.
6X36IWRC ROPE (58,800 LBS).
" DIA. 8
5 PRODUCT SHALL BE RATED FOR BREAKING STRENGTH OF
BASIS IS "SMITH BERGER DECK MOUNTED BALANCED HEAD FAIRLEAD, MODEL MD 616.
5. REPLACEMENT FAIRLEAD SHALL BE A STANDARD MANUFACTURER’S PRODUCT. PRODUCT DESIGN
IN SHOP, USING E70XX ELECTRODES.
4. ALL WELDING SHALL BE IN ACCORDANCE WITH AWS D1.5. ALL WELDS SHALL BE COMPLETED
FLUSH AT THE TOP OF WALL ELEVATION IN PREPARATION FOR THE NEW ASSEMBLY.
3. CONTRACTOR SHALL REMOVE UPSTREAM FAIRLEAD UNIT, AND GRIND EXISTING ANCHORS
FAIRLEADS NEAR THE MAINTENANCE BUILDING, AS DIRECTED BY KO.
2. EXISTING FAIRLEADS TO REMAIN GOVERNMENT PROPERTY, AND CONTRACTOR SHALL PLACE
INSTALLED AT THE EXISTING UPSTREAM LOCATION.
ONE ASSEMBLY SHALL BE INSTALLED AT THE EXISTING DOWNSTREAM LOCATION AND ONE
1. CONTRACTOR SHALL PROVIDE AND INSTALL TWO NEW TOW HAULAGE FAIRLEAD ASSEMBLIES.
PL. 1", ASTM A709
WITH A MINIMUM OF FOUR STAINLESS STEEL BOLTS.
AND BOLTED TO THE FAIRLEAD IN THE APPROXIMATE LOCATION SHOWN IN DETAIL C1,
FROM HORIZONTAL IN ITS STATIONARY POSITION. WEIGHT SHALL BE A ONE PIECE UNIT
11. THE HEAD OF THE FAIRLEAD SHALL BE WEIGHTED SUCH THAT THE HEAD IS 10 DEGREES
ANCHORAGE PLATE SHALL BE SEALED AT CONCRETE INTERFACE WITH CAULKING.
SAFETY YELLOW IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS.
10. ALL EXPOSED SURFACES OF TOW-HAULAGE FAIRLEAD ASSEMBLY SHALL BE PAINTED
TESTED IN ACCORDANCE WITH AWS D1.5.
9. 50 PERCENT OF THE WELDS BETWEEN THE FAIRLEAD AND BASE PLATE SHALL BE
THREADED ROD ANCHORS. ANCHOR NUTS SHALL BE GALVANIZED ASTM A563, GRADE D.
" DIA. HOLES TO ACCOMMODATE2
18. ANCHORAGE PLATE SHALL BE PREDRILLED WITH 1
" THICK WASHER, TYP.4
1PLATE
WITH ASTM A563 GRADE D NUT, AND
EMBEDDED IN EPOXY GROUT
" ASTM A193 B7 THREADED ROD4
" THICK WASHER, TYP.4
1PLATE
WITH ASTM A563 GRADE D NUT, AND
EMBEDDED IN EPOXY GROUT
" ASTM A193 B7 THREADED ROD4
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
SCALE : 3/4"=1’-0" 0 1’ 2’ 3’
A N
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R S -5 x x x .d g n
:4
:5
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
H O
W N
S
IS
S
IP
P I
R
IV
E R B
A
FAIRLEAD
TOW HAULAGE
NEW
NEW 90° FITTING
POST
EXISTING HANDRAIL
GALVANIZED PIPE
2" X-STRONG
NEW HANDRAIL
TURN EXISTING FITTING 90°
EXISTING HANDRAIL POST
S-504
W E
K -1
-R -0
M R
B
M R
S -5 x x x .d
C
K A
N D D
A M
D U
B U
Q U
E
IA
IN
S
T A
L L R
E L
IE
F W
E L
GENERAL SHEET NOTES
P
T
IO
N A
HANDRAIL DETAIL OPTION A
A1
APPROVAL.
ACTUAL FIELD MEASUREMENTS AND SUBMIT FOR
CONTRACTOR SHALL DETERMINE HANDRAIL LAYOUT BY
A GENERAL IDEA OF NEW HANDRAIL REQUIREMENTS.
3. HANDRAIL LAYOUT SHOWN IS TO GIVE THE CONTRACTOR
LOCATION. COLD GALVANIZE PIPE AFTER CUTTING.
2. CONTRACTOR SHALL FIELD CUT PIPE TO FIT EXISTING
AND ONE FOR THE DOWNSTREAM END.
X-STRONG GALVANIZED PIPE, ONE FOR THE UPSTREAM
FOR THE UPSTREAM END AND TWO 10’ LENGTHS OF 2"
HANDRAIL WILL TAKE TWO 90° CAST ALUMINUM FITTINGS
CONTRACTOR SHALL ASSUME RECONFIGURATION OF 1.
H A
N D
R A
IL
D
E T
A
IL
"4
6’-0" (SEE NOTE 3)
"4 11’-
E O J
A J
G
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
S I
D c p w w o rk in g \m v r\ b e d d ll h \d
\B
M
R E -0 x x x .d g n
:4
:0
P
M
B E
D D
L L
H
D
A T
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M R
E -0 x x x .d g n
D U
B U
Q U
E
IA
L O
C K A
N D D
A M
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
B
M R
R
E-001
T A
L L R
E L
IE
F W
E L L S
N .T .S
W E
K -1
-R -0
G E
N E
R A
L E
L E
C T
R
IC
A L N
O T
E S
GENERAL ELECTRICAL NOTES
B G
R
A J
G
ELECTRICAL NOTE 9.
REFERENCE DRAWINGS REGARDING INFORMATION ON DUCT BANK SIZE, EMBEDDED CONDUITS, AND ARRANGEMENT. SEE GENERAL
BOARDS, OR PANELBOARD. SEE REFERENCE DRAWINGS FOR LOCK 11 ELECTRICAL EQUIPMENT CONNECTIONS. REFER TO LOCK 11
11. RE-TERMINATE CABLES TO THEIR RESPECTIVE LOAD EQUIPMENT CONNECTIONS, LOWER RIGHT CONTROL STAND TERMINAL
LABELS OR CABLE TAGS IN SAME KIND AS EXISTING.
IDENTIFICATION WIRE LABELS AND CABLE TAGS EXISTING ON ALL PERMANENT CABLES. REPLACE ANY BROKEN OR LOST WIRE
10. LOCATE AND IDENTIFY ALL PERMANENT CABLES REQUIRED TO BE TEMPORARILY REMOVED. MAINTAIN AND PROTECT
WERE ORIGINALLY REMOVED.
IN THE SAME DUCT FROM WHICH IT WAS REMOVED. RE-INSTALL ALL PERMANENT CABLE’S IN THE SAME DUCTS FROM WHICH THEY
OR DEMOLISHING ANY CONCRETE. DUCTS AND CONDUITS SHALL BE NOTED AND RECORDED SO THAT EACH CABLE IS RE-INSTALLED
9. THE CONTRACTOR SHALL VERIFY DUCT AND EMBEDDED CONDUITS LOCATION OF EACH CABLE PRIOR TO REMOVING ANY CABLES
SOURCE TO THE LOAD AND WILL BE REPLACED AT THE CONTRACTOR’S EXPENSE.
SPLICES. IF A CABLE IS DAMAGED THE CONTRACTOR SHALL REPLACE THE ENTIRE CABLES CONTINUOUS LENGTH FROM THE CABLE
PERMANENT SPLICES IN EXISTING CABLE WILL NOT BE ALLOWED OTHER THAN SPECIFIED TO RESTORE ORIGINAL CABLE TAP
CABLE AND CONDUCTOR INSULATION. EXCESS CABLE SLACK MAY BE INADEQUATE TO CUT OUT SPLICED CABLE AND RE-TERMINATE.
8. TEMPORARY SPLICES AND SPLICE CAPS SHALL BE CAREFULLY REMOVED IN SUCH A WAY AS TO PREVENT DAMAGE TO THE EXISTING
INSTALL SPLICE CAPS ON THE THU…