W912EK-16-T-0057
QUESTIONS AND ANSWERS
Brandon Road Sewer Inspection
1. Multi- Sensor video, laser, Sonar, hydrogen sulfide concentration, air temp, dissolved oxygen, and water temp will not all function if the pipe being inspected is fully or 95% full. Will these sections that are fully submerged be removed from the scope?
Answer: For sections of pipe >95% full, it is understood that video, laser, hydrogen sulfide, and air temperature data collection is not possible and is not required. Sonar, dissolved oxygen, and water temperature data is still to be gathered when the pipe is >95% full.
2. Will the Army Corp help locate MH’s if the contractor can’t find them?
Answer: This can be coordinated with the COR after contract award.
3. Are there any restrictions with using a boat to stage my equipment to access the MH’s along the project?
Answer: The COR can be coordinated with in areas where fleeting occurs. If a specific manhole must be accessed, coordination in advance is recommended. Boat operations are allowed in the vicinity of the dam during working hours. No boat shall be moored overnight within 1500ft of the dam. Also, refer to Appendix D which provides hydrographic survey data.
4. What is the Engineers estimate for this project?
Answer: The Government will not provide the estimate.