A22_-_W912EK-16-T-0057.pdf

PDF 701 KB Posted

Attached to
Multi-Sensor Sewer Inspection - Brandon Road Lock and Dam, Joliet Floodwall
Solicitation number
W912EK-16-T-0057
Issued by

About this file

Solicitation for Multi-Sensor Sewer Inspection Services at Brandon Road Lock Dam Joliet IL.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers Brandon Road Joliet Sewer Inspection

W912EK-16-T-0057

Attn: Elizabeth Dennison 1500 Rock Island Drive Rock Island, Illinois 61201 Email: elizabeth.a.dennison@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to Contact

Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Please submit required documentation as outlined in 52.212-2 Evaluation- Commercial Items.

4.Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the

Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

5. Complete and submit the SF1449, Bid Schedule.

6. Please fill out the below information completely and include this cover page with your offer, along with the above items that need to be filled out.

7. Include the Solicitation Number on the outside of your envelope, cover sheet, or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received by the POC identified above.

8. Technical questions must be submitted via email to elizabeth.a.dennison@usace.army.mil CAGE Code is required to submit a question.

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: Taxpayer ID Number: ____________________________ CAGE Code (SAM):_______________________________ Point of Contact: _________________________________ Phone & Email: _________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Elizabeth Dennison: 309-794-5293 or Email: elizabeth.a.dennison@usace.army.mil mailto:elizabeth.a.dennison@usace.army.mil mailto:elizabeth.a.dennison@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK-16-T-0057 28-Jul-2016

b. TELEPHONE NUMBER

309-794-5293

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 08 Aug 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ELIZABETH A DENNISON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

96514761162359

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 965147 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CONSTRUCTION BRANCH

EC-C

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

TEL: FAX:

--- --- ---- REF BLOCK 18A)FAX:

TEL: 309-794-5613 (INVOICES SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

NAICS:

541990

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF120

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912EK-16-T-0057

Section SF 1449 - CONTINUATION SHEET

SCHEDULE OF PRICES

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE BID

0001 Mobilization and Demobilization 1 JOB XXXXXXXX $ -

0002 Multi-Sensor Inspection 11,050 LF $ - $ -

0003 Report and Inspection Results 1 JOB XXXXXXXX $ -

TOTAL OF ESTIMATED AMOUNTS

(ITEM NOS. 0001 THROUGH 0003, INCL.)

LF = LINEAL FEET JOB = LUMP SUM

PLEASE ENSURE THAT UNIT PRICE AND AMOUNT LINES FOR ALL

ITEMS

HAVE BEEN COMPLETED.

SCOPE OF WORK

SCOPE OF WORK

FOR

MULTI-SENSOR SEWER INSPECTION

BRANDON ROAD LOCK AND DAM

JOLIET FLOODWALL

24 JUNE 2016

1. GENERAL SCOPE

This Scope of Work (SOW) includes a description of the services required by the Government to inspect the sewer integral to the Joliet Floodwall in Joliet, IL. The locations to be inspected are presented in Appendix A. The locations are an approximately 10,400ft run of 78” x 102” arched sewer along the east Joliet Floodwall on the Des Plaines River and a 650ft stretch of 30” to 42” arched sewer along the western Joliet Floodwall. Appendix B presents available drawings from the original wall construction. Actual sewer dimensions may vary.

Figure 1. Vicinity map of sewer inspection in Joliet, IL.

The multi-sensor inspection shall gather video, laser, sonar, hydrogen sulfide (H2S) concentration, air temperature, water temperature, and dissolved oxygen (DO) concentration continuously for the length of the sewer. The sewer outfalls into the Des Plaines River below Brandon Road Dam and is submerged. Inspection equipment shall be able to operate in fully- and partially-surcharged pipe conditions.

Access to the sewer line is by manhole. Manholes are located and spaced as shown in Appendix A. The top of manhole may be up to 50ft above the sewer invert. At some locations, the manhole openings are elevated more than six feet above the adjacent ground. Additionally, some landside access is at the top of steep, heavily wooded slopes. Government right-of-way exists only for the wall itself and coordination with landowners would be required by the Contractor for land access. Access to the manholes may be made by floating plant.

The following manholes, as identified in Appendix A were inspected for access conditions. The Contractor may use any manhole required for access to the sewer and is not restricted to those identified below. Because the floodwall was built in stages and subsequently raised, manhole access conditions vary from location to location. It shall be the Contractor’s responsibility to ensure there is adequate space for equipment mobilization to the sewer. Photos of the manholes are presented in Appendix C.

Manhole 17112. There is a ladder for sewer access at this location. The distance between the ladder and the opposite side of the manhole opening is 1.5ft.

Manhole 17119. There is no ladder for sewer access. The limiting dimension for sewer access at this location is the 2.5ft diameter manhole opening.

Manhole 17129. There is a platform midway down the manhole riser to the sewer at this location. There is no ladder at this location. There is a second manhole lid at the platform with a dimension of 1.5ft which will limit equipment access.

Manhole 17133. There is a platform midway down the manhole riser to the sewer at this location. There is a ladder at this location. The ladder limits the opening for equipment access to about 1.3ft.

Manhole 19934. There is a ladder for sewer access at this location. The distance between the ladder and the opposite side of the manhole opening is 2.0ft.

Hydrographic survey results, showing only 3ft of water depth near Brandon Road Dam are presented in Appendix D. Photos taken during a recent Government concrete coring project are presented for reference in Appendix E. These photos are not representative of conditions along the entire length of the wall.

2. BACKGROUND

On its east side, the Joliet Floodwall extends from Brandon Road Lock and Dam upstream to W Jackson St, a distance of about two miles. On its west side, the wall in the area of interest extends between Spring St and Bridge St. The walls were constructed during the early 1930’s. The walls contain an integral arched sewer formed into the wall base. Construction drawings for the sewer are presented in Appendix B. As part of the Government’s maintenance responsibilities, a multi-sensor inspection of the sewer within the floodwall is required. The inspection goal is to provide a complete picture of the condition of the concrete sewer along its entire circumference and length.

Any section loss, cracks, or other defects are to be documented to allow the Government to target maintenance money at potentially damaged locations.

3. EQUIPMENT

The following equipment and sensors are required to perform the inspection work. The sewer is anticipated to be partially- to fully-surcharged. The inspection will continue regardless of pipe surcharge conditions. The multi-sensor inspection is to capture video, sonar, laser, H2S concentrations, air temperature, water temperature, and DO concentration, as appropriate for pipe surcharge conditions. Due to the differences in sewer sizes between the east and west sewers, more than one type of equipment may be used. Other than sizes of pipe the equipment is capable of inspecting, all other equipment requirements are to be the same.

3.1 Video

A CCTV system designed and constructed for pipe inspection is to be used. The camera shall be capable of panning 360 degrees and tilting at least 270 degrees. The camera shall capture video at a minimum 720p resolution. The camera shall have a light and be equipped with zoom capability. All video is to be captured in color. The camera shall be angled to include the complete soffit, forward view, and invert of the pipeline.

Digital pan and tilt shall be available in the post-processed video data play mode or within any still single image.

3.2 Sonar

The sonar system shall be designed for pipeline condition assessment by scanning of submerged and semi-submerged pipelines utilizing high resolution, short range sonar technology. These scans shall allow for accurate determinations of conditions below the fluid level in partially or fully surcharged pipelines. The system must be capable of producing a usable image, displaying detailed measurements relative to size, corrosion, debris build-up, and other conditions, as well as generating a report of findings.

The sonar scanning equipment shall be capable of directly measuring distances to objects and surfaces inside pipelines from 10ft wide and up to 10ft tall. The sonar shall take a 360 degree profile of the surcharged pipe surface at 1 slice per second. The Sonar Profile data shall be integrated with the laser and video data to provide a complete pipeline picture.

3.3 Laser

The laser profiler shall provide for pipeline condition assessment of the pipe walls above the fluid level. The laser profile data shall be combined with sonar data to create a complete, accurate, forward-facing three-dimensional model of the pipeline interior above and below the fluid level. The laser profiler shall take a 360 degree profile of the exposed pipe surface at 12 slices per second.

The laser scanning equipment shall be capable of directly measuring distances to objects and surfaces inside pipelines from 10ft wide and up to 10ft tall. The laser profiler measurements shall be accurate to 3mm at a distance of 3m. The profiler laser shall be Class 2 and certified eye-safe per the IEC 60825-1 standard.

3.4 Hydrogen Sulfide Concentration and Air Temperature

The H2S sensor shall operate in a temperature range of -50F (-10C) to 104F (+40C) at pressures that vary from atmospheric by +/- 10%. The sensor will perform in 15-90% non-condensing humidity with a 90% response time of less than sixty seconds. The Sensor Dynamic Range shall be from 0 ppm to 200 ppm with a maximum theoretical range from 0 ppm to 999.9 ppm. Sensor Measurement Resolution shall be 0.1 ppm.

The Sensor Measurement Accuracy shall be +/- 1.0 ppm at standard temperature and pressure.

3.5 Water Temperature

The water temperature sensor shall operate in a temperature range of 30F to 100F with an accuracy of +/- 2 degrees.

3.6 DO Concentration

The DO sensor may be of either the optical or electrochemical type. The sensor shall be capable of measuring concentrations ranging from 0 to 15mg/L with an accuracy of +/- 2% of the reading.

4. WORK PLAN

The Contractor will supply a work plan to the Contracting Officer (KO). The plan will describe the means and methods for mobilizing the inspection equipment to the sewer.

The plan is to also include a list of all equipment to be provided by the Contractor to perform the work as described. Work plan is also to address Contractor schedule, including proposed start date and the duration of the on-site portion of the inspection.

Manhole access to the sewer is from the top of a floodwall. Access to the manholes may be provided by floating plant. Note that there is significant siltation near Brandon Road Dam itself and water depth is approximately three feet. Available hydrographic survey data is available in Appendix D.

If a pipe blockage is encountered, the equipment is to be retrieved, and an inspection will be conducted from a downstream manhole in an upstream direction to document the extents of the blockage. Any considerations related to this upstream inspection should be included in the Work Plan.

If any difficulties related to height of manholes, operation of the inspection from floating plant, if used, or other site layout issues are anticipated, they should be noted in the Work Plan. Photos of concrete coring work along the floodwall from winter 2016 are included in Appendix E for reference only.

Work is adjacent to but outside the navigation channel, contractor operations are not to interfere with the navigation industry.

If requested, two parking spots can be provided at Brandon Road Lock and Dam for Contractor parking.

5. SITE PREPARATION AND CLEAN-UP

The Contractor shall be responsible for all site preparation and all site clean-up. When the work is complete, remove any trash, debris, or other material related to the inspection and restore the site to its original condition.

6. MAJOR WORK TASKS

The contractor will be responsible for performing the following to perform the inspection:

6.1. Provide all materials, equipment, permits, fees, and personnel necessary to perform the sewer inspection. Personnel to perform the work shall have NASSCO PACP coding certification. The multi-sensor inspections shall identify the manholes and pipe segments using the nomenclature included in the figures in Appendix A.

6.2. The sewer pipe gathers storm water runoff from the City of Joliet. There is the potential for trash and other debris to gather at the water line within manholes. Perform any incidental removal of debris required to mobilize the inspection equipment. There is also suspected cross-connection between the City of Joliet sanity sewers with the storm sewers entering the storm sewer line to be inspected. There is the potential to encounter sanitary sewer waste water in this storm water line.

6.3. The video inspection shall be performed, and reports shall be prepared in accordance with the NASSCO PACP CCTV Inspection and Defect Coding Program.

The Contractor shall utilize the latest version of the PACP/NASSCO approved software at the time the contract is awarded.

The camera shall be moved through the line segment starting from the upstream manhole and proceed at a rate not to exceed 30 feet per minute. Stop when necessary to permit proper audio and written documentation of cleanliness of the pipe and any visible operational and structural defects.

6.4. The sonar inspection shall document pipe conditions below the water line in pipes which are partially or fully surcharged. Observations shall be recorded according to the procedures detailed in the NASSCO PACP CCTV Inspection and Defect Coding Program Manual. Sonar inspection results shall be used to determine the extent of sedimentation in the pipe and if any section loss has occurred.

The sonar scanner shall scan a continuous, full 360 degree profile of the surcharged pipe surface at one (1) slice per second and shall operate in real-time mode. A thorough understanding of pipe eccentricity, corrosion, and debris build-up shall be provided as a result of processed sonar cross-sectional images. Each image shall contain multiple sonar scans at a particular location. The information from the multiple scan shall be combined to create a more complete picture of the pipe condition. Each dwell scan shall be viewable as an image. In each image, bright colors shall represent strong returns.

The sonar inspection shall be conducted simultaneously with other inspection technologies described herein.

6.5. The laser inspection shall reveal and document sewer line operational and structural conditions above the water line in pipes that are flowing partially full.

The laser equipment must be certified for calibration before use on the project. Laser scans shall be complete and continuous through the entire inspection length. The laser data must be logged in a digital format to enable extraction of any relevant information, such as internal pipe diameter, ovality, mortar loss, concrete loss, etc. Laser inspection shall be conducted simultaneously with other inspection technologies described herein.

6.6 The gas and air temperature inspection shall capture H2S concentrations and air temperature measurements continuously along the pipe length using an electrochemical hydrogen sulfide sensor. The atmospheric temperature inside the pipeline shall be recorded during the inspection.

6.7. The water temperature and DO inspection shall capture water temperature and DO concentration continuously along the pipe length.

6.8. Provide a draft report presenting the collected information. Refer to Section 7 for draft report requirements. Incorporate any Government comments and submit a final report.

6.9. Provide all digital files necessary for the Government to view and analyze all data collected during the inspection.

7. SUBMITTALS

Prepare and submit the following items for Government approval. All submittals are to be made electronically. A Government approval/non-approval of each submittal will be provided within five (5) work days of the date of receipt.

7.1. Personnel Qualifications. Submit NASSCO PACP coding certification and E- Verify documentation of those Contractor personnel who will perform the inspection.

7.2. Pre-Inspection Meeting. Schedule and conduct a pre-inspection teleconference with the Government. Government personnel to be invited to be identified at contract award. Teleconference will be to discuss Contractor and Government’s understanding of how the work is to proceed, schedule, and final deliverables. Meeting minutes shall be considered the submittal for this item.

7.3 Work Plan. Submit a work plan addressing the requirements of Section 4 of this Scope of Work.

7.4. Accident Prevention Plan. Develop and submit an Accident Prevention Plan (APP). Refer to Section 11 for further requirements. The APP must be submitted a minimum of 10 work days prior to work beginning on the site.

7.5. Draft Report. The draft report shall present the multi-sensor inspection results as discussed below. The report shall also include the following:

- Figures showing where the inspection was performed utilizing the manhole and pipe segment nomenclature identified in the figures in Appendix A.

- Figures showing the as-built cross-section of the pipe, the inspection-measured dimensions, and the sedimentation encountered.

- A description of the equipment used.

- Identification of any joints, cracks, exposed rebar, or other defects noted in the concrete.

- Any obstructions encountered.

- A graph identifying changes in water level and sediment height.

- A determination of the volume of sediment within the pipeline.

- A description of any unusual conditions encountered that are not addressed elsewhere.

The following multi-sensor inspection results are to be presented in the draft report. The results must be able to be viewed and manipulated on a Government computer without the need to purchase any additional software. Government computer specifications can be provided upon request.

Video. The purpose of the video recordings is to supply a visual and audio record of all line segments. The digital video playback speed shall be at the same speed that it was recorded. Pan and tilt, digital zoom, slow motion, and stop motion playback features shall be supplied as part of the contract.

Sonar. The purpose of the sonar inspection is to supply a visual record of the sewer line. The digital video playback speed shall be at the same speed that it was recorded.

Slow motion and stop motion playback features shall also be supplied as part of the contract.

Laser. The purpose of the laser inspection is to supply a visual record of the sewer line and measure corrosion/buildup in the sewer. Corrosion/buildup graphs shall be used in conjunction with the integrated and detailed views generated to precisely quantify internal pipe wall material loss or gain at a given location. Pipe cross-sections obtained from precision high resolution scans shall be used to provide quantitative information of pipe inside diameter including ovality and eccentricity.

An integrated overview of Corrosion and Buildup data revealed from laser scanning is to be presented in a color coded format as an unrolled illustration of the pipe condition above the waterline over the length of the inspection segment. Measured pipe dimensions that coincide with expected values must be coded green. Material loss, as measured by increasing pipe dimensions must be colored on a yellow/red color scale, with red indicating advanced material loss. Material gain as measured by decreasing pipe dimensions must be on a blue color scale.

Precision high resolution laser scan views shall be presented in a color coded format as an unrolled illustration of the pipe condition to include the entire pipe circumference as well as a cross-section view where precision scans are taken during the pipe inspection survey. Color coding shall be identical to the aforementioned requirements. Where the presence of fluids in the pipe necessitates interpolation and estimation calculations to fill gaps and complete the full circumference view, the method and calculations used to support these assumptions must be presented. Sonar or as-built data, if used for these calculations, must be identified in the report.

H2S and Air Temperature. The draft report shall provide the locations where the inspected pipe contains average concentrations of H2S above the 2.0 ppm level necessary for the production of sulfuric acid (H2SO4). In addition, the overall average of the concentration of H2S gas in all sections of pipe in ppm must be illustrated in graph and table format. The draft report shall present the temperature levels over distance in a line graph.

Water Temperature and DO. The draft report shall present the temperature levels and DO concentration levels over distance on a line graph. The report shall note areas where changes in water temperature or DO could indicate infiltration of water into the pipe.

The draft report is to include everything the Contractor plans to include in the final report. MVR will review the draft report and provide comments, if necessary, within five business days.

7.6. Final Report. The final report, incorporating any Government comments from its draft report review, shall be submitted by the Contractor five work days after receipt of the comments.

In addition to or included within the final report, the Contractor will deliver to the Government in electronic format all tables, charts, drawings, or other suitable documentation of all data collected during the project at the time that the final report is submitted.

8. SCHEDULE

Upon receipt of the Notice to Proceed (NTP), the Contractor’s performance period commences. Field work and demobilization offsite is to be accomplished within 45 work days of NTP, and the final report is to be produced within 60 work days of NTP. No allowance will be made for adverse weather.

Table 1 lists key activities and their schedule for completion.

Table 1. Contract Schedule.

Activity Work Days after NTP Submit Personnel Qualifications 3 Conduct Pre-Inspection Meeting 10 Submit Work Plan for Approval 15 Submit Accident Prevention Plan 15 On-Site Work and Demobilization Complete 45 Submit Sewer Inspection Draft Report and Inspection Results Electronically 50 Submit Sewer Inspection Final Report and Inspection Results Electronically 60

9. PROJECT MANAGER

The Contractor will assign a Project Engineer or Project Manager to oversee the coordination of the entire project and to answer or obtain answers to all questions during and after the work. If this scope of work or project instructions do not cover a specific condition in question, the Project Engineer or Project Manager will contact the KO before proceeding with the work item.

10. COORDINATION AND AUTHORIZED CHANGES

Prior to the start of work, the Contractor shall coordinate site inspections and all work with the KO. During performance of the work coordinate any major changes to the work plan with the KO prior to making the change.

The Contractor shall accept instructions only from the KO or his/her duly appointed representative. Only a warranted KO acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the KO attempts to make changes to the terms and conditions of this contract, the Contractor shall not proceed with the change and shall immediately notify the KO.

Coordination of routine technical matters with Government personnel will be accomplished through the Government’s Contracting Officer Representative (COR).

The COR for this task order will be designated at the time of contract award.

11. SAFETY

Prepare a site-specific Abbreviated Accident Prevention Plan (APP) in accordance with the format and requirements of the most recent version of EM 385-1-1 and as supplemented herein. Cover all applicable paragraph and subparagraph elements in EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan." Specific requirements for some of the APP elements are described below. The APP is to be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP is to interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and make site-specific. The APP shall be signed by the person who prepared it and the designated Site Safety and Health Officer (SSHO).

The Contractor shall identify an employee to serve as the SSHO. This person’s responsibilities will be to: perform a daily safety inspection, maintain the APP on-site during the work, and implement and enforce the APP. The SSHO shall be present at the Pre-Inspection Meeting and discuss the APP as a part of the agenda.

Identify the route to the nearest hospital should emergency medical treatment be required. When emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers at the location, at least 2 or more employees on each shift shall be qualified to administer first aid and CPR (Cardiopulmonary Resuscitation). Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.

Format Activity Hazard Analyses (AHAs) in accordance with EM 385-1-1 and include with the APP. These analyses shall be used during daily inspections to ensure the implementation and effectiveness of the activity’s safety and health controls.

Once accepted and approved, the APP and attachments will be enforced as part of the Contract. Disregarding the provisions of this Contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.

Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate and/or remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel and the environment.

12. REQUEST FOR PAYMENT

Prior to the first pay estimate a proposed schedule of values based on the tasks to be performed as part of the SOW shall be submitted for review and approved by the COR.

The payment requests shall be submitted on the Payment Estimate-Contract

Performance, ENG Form 93. All requests for payment shall be sent to the COR. The Contractor shall include a progress report along with the Payment Estimate – Contract Performance, ENG Form 93 as justification for the amount of payment requested. The progress report shall include in narrative form a summary of activities, estimated percentage complete, project schedule evaluation, and problems and recommended solutions. Table 1 lists the deliverables for this task order. Deliverables from the Contractor must be reviewed and approved by the COR before payments are made.

13. GOVERNMENT PROVIDED INFORMATION

The information provided in this SOW should provide the needed relevant information on the layout of the site and expected conditions. These figures are thought to be the most relevant information available to perform the work. Any additional information requested, if available, can be provided by the Government.

14. USE OF INFORMATION

The information developed, gathered, assembled, and reproduced by the Contractor, his consultants, sub-contractors, or their associates in fulfillment of the contract requirements as defined or related to the scope of work will become the complete property of the Government and will not be used by the Contractor for any purpose at any time without the written consent of the KO.

15. RELEASE OF INFORMATION

The information developed, gathered, and assembled in fulfillment of the contract requirements will not be released by the Contractor or their associates without prior coordination and written approval by the KO.

16. CONTRACTOR LIABILITY

The Contractor assumes all liability for damages to either property or equipment caused by the completion of this project, including damages incurred onsite, in the laboratory, or during the transportation of equipment. The Contractor also assumes the responsibility to ensure the safety of its personnel while on-site.

17. ANTI-TERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

17.1 Pre-screen candidates using E-Verity Program

The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed.

*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

17.2 Access and General Protection Policy and Procedures

All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party. The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO).

Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance.

Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short term employee.

3) Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).

4) Each contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-verify requirements E-verify paragraph).

3) Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.

4) Each contractor employee can sponsor only one short term foreign national at a time.

Personnel Change Request Form

Contract #_______________ Date___________ We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date): ________________

(Insert signature block)

Appendix A

Location Plan

Appendix B

Reference Drawings

Appendix C

Manhole Photos

Appendix D

Hydrographic Survey

Appendix E

Site Photos

CLAUSES INCORPORATED BY FULL TEXT

MVR.02

QUESTION AND ANSWER

Questions must be submitted via email to the following individuals:

elizabeth.a.dennison@usace.army.mil & justine.a.womboldt@usace.army.mil

Subject: QUESTION W912EK‐16‐T‐0057 – Brandon Road Sewer Inspection

The ability to submit questions is available to industry up to three (3) days prior to the Closing (or Response) Date established by the Solicitation/Amendment.

52.202-1 DEFINITIONS (NOV 2013)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless--

(a) The solicitation, or amended solicitation, provides a different definition;

(b) The contracting parties agree to a different definition;

(c) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning; or

(d) The word or term is defined in FAR Part 31, for use in the cost principles and procedures.

(End of clause)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(a) The Contractor warrants that no person or agency has been employed or retained to solicit or obtain this contract upon an agreement or understanding for a contingent fee, except a bona fide employee or agency. For breach or violation of this warranty, the Government shall have the right to annul this contract without liability or, to deduct from the contract price or consideration, or otherwise recover, the full amount of the contingent fee.

(b) "Bona fide agency," as used in this clause, means an established commercial or selling agency, maintained by a contractor for the purpose of securing business, that neither exerts nor proposes to exert improper influence to solicit or obtain Government contracts nor holds itself out as being able to obtain any Government contract or contracts through improper influence.

"Bona fide employee," as used in this clause, means a person, employed by a contractor and subject to the contractor's supervision and control as to time, place, and manner of performance, who neither exerts nor proposes to exert improper influence to solicit or obtain Government contracts nor holds out as being able to obtain any Government contract or contracts through improper influence.

"Contingent fee," as used in this clause, means any commission, percentage, brokerage, or other fee that is contingent upon the success that a person or concern has in securing a Government contract.

"Improper influence," as used in this clause, means any influence that induces or tends to induce a Government employee or officer to give consideration or to act regarding a Government contract on any basis other than the merits of the matter.

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(a) Except as provided in (b) of this clause, the Contractor shall not enter into any agreement with an actual or prospective subcontractor, nor otherwise act in any manner, which has or may have the effect of restricting sales by such subcontractors directly to the Government of any item or process (including computer software) made or furnished by the subcontractor under this contract or under any follow-on production contract.

(b) The prohibition in (a) of this clause does not preclude the Contractor from asserting rights that are otherwise authorized by law or regulation.

(c) The Contractor agrees to incorporate the substance of this clause, including this paragraph (c), in all subcontracts under this contract which exceed the simplified acquisition threshold.

52.203-7 ANTI-KICKBACK PROCEDURES. (MAY 2014)

(a) Definitions.

"Kickback," as used in this clause, means any money, fee, commission, credit, gift, gratuity, thing of value, or compensation of any kind which is provided to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for the purpose of improperly obtaining or rewarding favorable treatment in connection with a prime contract or in connection with a subcontract relating to a prime contract.

"Person," as used in this clause, means a corporation, partnership, business association of any kind, trust, joint-stock company, or individual.

"Prime contract," as used in this clause, means a contract or contractual action entered into by the United States for the purpose of obtaining supplies, materials, equipment, or services of any kind.

"Prime Contractor," as used in this clause, means a person who has entered into a prime contract with the United States.

"Prime Contractor employee," as used in this clause, means any officer, partner, employee, or agent of a prime

Contractor.

"Subcontract," as used in this clause, means a contract or contractual action entered into by a prime Contractor or subcontractor for the purpose of obtaining supplies, materials, equipment, or services of any kind under a prime contract.

"Subcontractor," as used in this clause, (1) means any person, other than the prime Contractor, who offers to furnish or furnishes any supplies, materials, equipment, or services of any kind under a prime contract or a subcontract entered into in connection with such prime contract, and (2) includes any person who offers to furnish or furnishes general supplies to the prime Contractor or a higher tier subcontractor.

"Subcontractor employee," as used in this clause, means any officer, partner, employee, or agent of a subcontractor.

(b) 41 U.S.C. chapter 87, Kickbacks, prohibits any person from--

(1) Providing or attempting to provide or offering to provide any kickback;

(2) Soliciting, accepting, or attempting to accept any kickback; or

(3) Including, directly or indirectly, the amount of any kickback in the contract price charged by a prime Contractor to the United States or in the contract price charged by a subcontractor to a prime Contractor or higher tier subcontractor.

(c)(1) The Contractor shall have in place and follow reasonable procedures designed to prevent and detect possible violations described in paragraph (b) of this clause in its own operations and direct business relationships.

(2) When the Contractor has reasonable grounds to believe that a violation described in paragraph (b) of this clause may have occurred, the Contractor shall promptly report in writing the possible violation. Such reports shall be made to the inspector general of the contracting agency, the head of the contracting agency if the agency does not have an inspector general, or the Attorney General.

(3) The Contractor shall cooperate fully with any Federal agency investigating a possible violation described in paragraph (b) of this clause.

(4) The Contracting Officer may (i) offset the amount of the kickback against any monies owed by the United States under the prime contract and/or (ii) direct that the Prime Contractor withhold, from sums owed a subcontractor under the prime contract, the amount of any kickback. The Contracting Officer may order the monies withheld under subdivision (c)(4)(ii) of this clause be paid over to the Government unless the Government has already offset those monies under subdivision (c)(4)(i) of this clause. In either case, the Prime Contractor shall notify the Contracting Officer when the monies are withheld.

(5) The Contractor agrees to incorporate the substance of this clause, including this subparagraph (c)(5) but excepting subparagraph (c)(1), in all subcontracts under this contract which exceed $150,000.

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT

2010)

(a) Definitions. As used in this clause--

Agency means executive agency as defined in Federal Acquisition Regulation (FAR) 2.101.

Covered Federal action means any of the following actions:

(1) Awarding any Federal contract.

(2) Making any Federal grant.

(3) Making any Federal loan.

(4) Entering into any cooperative agreement.

(5) Extending, continuing, renewing, amending, or modifying any Federal contract, grant, loan, or cooperative agreement.

Indian tribe and tribal organization have the meaning provided in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450b) and include Alaskan Natives.

Influencing or attempting to influence means making, with the intent to influence, any communication to or appearance before an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any covered Federal action.

Local government means a unit of government in a State and, if chartered, established, or otherwise recognized by a State for the performance of a governmental duty, including a local public authority, a special district, an intrastate district, a council of governments, a sponsor group representative organization, and any other instrumentality of a local government.

Officer or employee of an agency includes the following individuals who are employed by an agency:

(1) An individual who is appointed to a position in the Government under Title 5, United States Code, including a position under a temporary appointment.

(2) A member of the uniformed services, as defined in subsection 101(3), Title 37, United States Code.

(3) A special Government employee, as defined in section 202, Title 18, United States Code.

(4) An individual who is a member of a Federal advisory committee, as defined by the Federal Advisory Committee Act, Title 5, United States Code, appendix 2.

Person means an individual, corporation, company, association, authority, firm, partnership, society, State, and local government, regardless of whether…

This is the start of the file's text. The full file is on GovTribe.