Mississippi River, Lock and Dam 14, LeClaire Iowa, LD 14 Auxiliary Bulkheads
Solicitation number
W912EK-16-R-0017
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
W912EK-16-R-0017_Amendment_0004.pdf PDF
W912EK-16-R-0017_Amendment_0003.pdf PDF
W912EK-16-0017_Amendment_0001.pdf PDF
A02.16-R-0017_Solicitation_Plans.pdf PDF
W912EK-16-R-0017.pdf PDF
A22.APPENDIX_D_PPQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Mississippi River Basin Lock and Dam 14, LeClaire, Iow a - Auxiliary Bulkheads

The follow ing changes are made to SECTION 05 50 14.

All other terms and conditions have remained the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK-16-R-0017

X 9B. DATED (SEE ITEM 11)

20-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2016

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK-16-R-0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0002

The following modifications are made to SECTION 05 50 14.

SECTION 05 50 14

PAGE 05 50 14-6. Delete page 05 50 14-6, in its entirety, and substitute therefore revised and new page 05 50 14-6, Amendment No. 0002, dated 9 August 2016, attached hereto.

ATTACHMENT: 05 50 14-6.

Solicitation No.: W912EK-16-R-0017 materials, as appropriate. All FCM, including attachments that meet the FCM definition, must be identified on the shop drawings. All anticipated temporary and tack welds must be identified on the shop drawings. Each member must be identified following the numbering scheme shown on the drawings. Provide a table containing a list of all members and a reference to each material certificate and test report that applies to that member.

Shop drawings must identify weld procedures and NT required for each weld.

Any and all splices must be included in the shop drawings and "clouded" for approval.

1.4.2.1 Revised Detail Models and Drawings

As approved detail drawings are returned to the Fabricator, incorporate the corrections in red and approved deletions/additions/revisions including RFI into their original electronic models and detail drawings. The revisions on the electronic detail drawings must be annotated using clouds and revision triangles with numbering associated to sequential revisions to a specific drawing.

Within ten days after Government approval of all the detail drawings for a phase of work, submit the Revised Detail Models and Drawings - one set electronic in the original software format used to make the models and detail drawings and one set electronic Adobe Acrobat (.pdf) format full-size detail drawings - for Government review and approval. These provisions apply to and include the detail drawings required by SECTION

05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES.

1.4.2.2 As-Fabricated Models and Drawings

As-fabricated Models and drawings must comply with the following:

a. When final revisions have been completed, the cover sheet drawing must show the wording "AS-FABRICATED DRAWING" followed by the name of the Fabricator in letters at least 3/16 inch high. All other as-fabricated drawings must be marked "AS-FABRICATED DRAWING" in the revision block.

b. Within 30 days after the Government approval of the revised detail models and drawings for a phase of work, submit the as-fabricated Models and Drawings - one electronic set in the original software format used to the make the models and detail drawings, one electronic set of the models and detail drawings translated from their original software format into AutoCAD (.dwg) or Microstation (.dgn) format and one set electronic full-size detail drawing set in Adobe Acrobat (.pdf) format. Model and drawing files including the storage media submitted will become the property of the Government upon final approval.

1.4.3 Qualification of Structural Steel Fabricator

The fabricating plant(s) and fabricator(s) must be certified under the AISC (American Institute of Steel Construction) Quality Certification Program, Advanced Bridges or Intermediate Bridges certification with Supplemental Requirement F-Requirements for Fabricators of Bridges with Fracture-Critical Members (or the Category III, Major Steel Bridges (CBR) category with Fracture Critical endorsement (F)) and sophisticated paint system endorsement (P) and possess five years documented experience on projects of similar scope. Similar scope means projects of similar size and similar amounts of welding and detail types. Submit AISC certificate indicating that the fabrication plant(s) meets the

05 50 14-6

AMEND 0002

9 AUG 2016

16-R-0017 Amend 0002 Specs 9AUG16.pdf
00 00 00 Narrative Page
05 50 14