27BA001_Supplementary_Drawings.pdf

PDF 10 MB Posted

Attached to
Dworshak Powerhouse Roof Replacement
Solicitation number
W912EF27BA001
Issued by

About this file

This document is a comprehensive set of architectural and engineering drawings for the Dworshak Dam and Reservoir Powerhouse and Miscellaneous Structures located in Idaho, prepared by the U.S. Army Corps of Engineers.

The drawings depict detailed as-constructed designs for multiple facility components including exterior elevations, generator bays and transverse sections, roof framing details, control structure concrete outlines, stair and elevator shafts, roof plans, roof details, and miscellaneous mechanical and HVAC systems. Key structural elements shown include the powerhouse control structure with concrete and structural steel framing, generator bays (numbered 1-3), circuit breaker gallery, roof systems with polyurethane coatings and insulation, elevator and stairwell configurations, and penthouse roof modifications. The drawings specify materials such as structural steel, reinforced concrete, corrugated metal decking, and mechanical systems for air handling, cooling, heating, and exhaust ventilation. Control and monitoring systems are detailed for split-system heat pumps, indoor air handlers, and remote condensing units serving various machine rooms and operational areas throughout the facility. The documentation includes comprehensive notes on construction standards, material specifications, and mechanical general notes addressing system performance, installation requirements, and operational procedures. Electrical components depicted include new elevator control systems, thermostats, and circuit breaker modifications. The drawings serve as reference documentation for the facility's as-constructed condition for the hydroelectric powerhouse operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-C -0

-C -0

Supplemental Package
01 c79v2025
02 a79v2013 (1)
03 b79v2002
04 b79v2003
05 P-RF-a-PM-001
06 DWP-1-4-3_6 (Powerhouse Control Structure - Concrete Outline Roof plan)
07 DWP-1-4-3_9 (Powerhouse Control Structure - Concrete Outline Stair and Elevator Shaft)
08 DWP-1-4-3_11 (Powerhouse Control Structure - Concrete Outline Stair Sections and Details)
09 00c43002
10 00c43003
11 00c43004
12 00c43005
13 00C0043 Reroof Contract - Contractor Asbuilts-01
00s43sd1
14 00C0043 Reroof Contract - Contractor Asbuilts-02
00s43sd2
15 00C0043 Reroof Contract - Contractor Asbuilts-03
00s43sd3
16 78C0068 Handrail Contract
Combined Resource Files.pdf
15-c-33_33
15-c-33_43
A-101
dwe1a-101xxx
DWD-1-2-2S11 A102 Elevator Room Roof Plan
DWD-1-2-2S13 A302 Elevator Room Elevation
DWD-1-3-2S5 M-001 Elevator Machine Room Cooling
DWD-1-3-2S6 M-101 Elevator Machine Room
DWD-1-3-2S7 M-401 Exhaust Access Platform
DWP-1-3-7S14

File details come from the government source that posted it. Updated .