This Sources Sought synopsis is for Motor Control Center (MCC) and electrical upgrades for fish pumps at Lower Granite Lock and Dam. The U.S. Army Corps of Engineers is conducting market research to identify potential contractors for a competitive, firm-fixed price contract involving the replacement of existing 4,160V MCCs with new systems that include soft starters and a PLC-based control and annunciation system. The project involves three fish pumps: two 800 horsepower single-speed motors and one two-speed 350/800 horsepower motor.

The Sources Sought notice seeks responses from small businesses, including Small Business (SB), 8(a), Small Disadvantaged Business (SDB), Woman-Owned Business, Service-Disabled Veteran Owned Small Business (SDVOSB), and HUBZone contractors within the NAICS code 335312 (Motor and Generator Manufacturing). Interested firms must submit a five-page capabilities package by 11:00 AM PST on 7 April 2025, addressing specific survey questions about their ability to meet technical specifications and certification requirements. The solicitation type and set-aside status will depend on the responses received, with the potential for an unrestricted competition if sufficient small business interest is not demonstrated.

View the file

Other files

File Type Posted
Sources Sought Notice - Action 3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

LOWER GRANITE LOCK AND DAM

FISH PUMP REWIND AND BEARING REDESIGN

1.0 INTENT

These specifications outline the requirements for the rewind and bearing redesign of fish pumps at Lower Granite Dam. The aim is to improve the reliability and performance of the pumps, ensuring uninterrupted fish passage.

This Technical Specification serves as the basis for solicitation of bids. Lower Granite Project staff will install the items listed below.

2.0 SCOPE

There are three fish pumps at Lower Granite Lock and Dam. Two of these pumps are driven by 800 horsepower single speed motors and the third driven using a two-speed 350/800 horsepower motor. The Contractor shall be required to deliver the items to Lower Granite by the date shown in Section 5.0 Delivery Requirements. The Contractor shall provide documentation and other items as stated in the specifications.

3.0 ACTIONS:

3.1 ACTION 3: PROVIDE MCCS

The contractor will provide new Motor Control Centers (MCCs) for the rewound motors replaced in-kind, incorporating soft starters and a PLC-based control and annunciation system. Contract drawings and specifications will be limited to those necessary for the manufacturer to provide the required equipment.

The existing 4,160V Cutler-Hammer Medium-Voltage MCCs are over 50 years old and no longer in production.

The new MCCs will include:

Soft Starters: Added to limit inrush current, reducing motor strain and extending motor life.

PLC-based Control and Annunciation System: A modern system integrated to improve monitoring, control, and diagnostics, enhancing operational efficiency and reducing downtime risk.

Motor Specifications:

One 4,160V dual-wound induction motor:

o First stage: 350hp, 500 RPM o Second stage: 800hp, 705 RPM

Two 4,160V, 800hp, 720 RPM single-wound induction motors

Summary of Work:

MCC Replacement: Replace the existing 4,160V MCCs with a new system incorporating soft starters and a PLC-based control and annunciation system.

Installation: The work will be performed in-house, with contractors responsible for supplying the new MCCs.

4.0 COMMERCIAL PACKAGING AND SHIPMENT REQUIREMENTS

4.1 ASTM-A700-14 – Standard Guide of Packaging, Marking, and Loading Methods for Steel Products for

Shipment.

4.2 ASTM-D3951-18 – Standard Practice for Commercial Packing.

5.0 DELIVERY REQUIREMENTS

Shipments are only allowed during normal business hours of Monday – Thursday 7:00am to 4:00pm. No shipments shall be made accepted on Federal Holidays. All shipments shall be delivered to:

Lower Granite Lock and Dam Pomeroy, WA 99347

5.1 Action 3 (Provide MCCs): Provide the best estimate for the delivery of materials identified herein to

FOB Destination, following the approval of the submittal packages.

5.2 General: These estimated timelines provide a clearer understanding of current industry lead times and will assist in guiding the overall project completion timeline.

7.0 SECURITY REQUIREMENTS

7.1 General Security Requirements and Guidance. The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of the contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative. Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements, all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g. email or memorandum) to the Government representative. The documentation shall include the names of the contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable Walla Walla District (NWW) plans and procedures – this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of the contract, should the FPCON and/or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in the local policies or procedures.

7.2 Physical Security and Access Control Requirements. All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshall/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contractor personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of NWW.

7.3 Pre-Screen Candidates Using E-Verify Program. Contractors shall comply with the requirements set forth in FAR 52.222-54 Employment Eligibility Verification and FAR 22.18 in using the E-Verify Program to meet the contract employment eligibility requirements. An initial list of verified/eligible candidates shall be provided to the KO no later than three business days after receipt of Notice of Award. Submit pre-screening results to the KO via email as a password protected pdf file. Submit updates to list of verified/eligible candidates within three business days of new verifications. The Contractor shall maintain a current list of verified/eligible employees as part of their contract files and provide copies to the KO upon request. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.