10. Map Overview.pdf
PDF 2 MB Posted
- Attached to
- Pest Control
- Solicitation number
- W912EF25QA012
About this file
The file is an aerial map overview of McNary Dam, detailing the facility's infrastructure and layout. The map includes precise measurements and locations of multiple structures such as the spillway (1700'), navigation lock (900'), intake and tailrace decks, various cranes, buildings, and auxiliary facilities. Key structures noted include the Navlock building, Bascule Bridge House, multiple warehouses, a Juvenile Fish Facility (JFF), Training Center, Powerhouse offices, and a guard shack. The map provides a comprehensive spatial representation of the dam's complex, showing both water and land-based infrastructure, with labeled distances and directional indicators for each significant structure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MCN Bldgs Measurements.docx | DOCX document | |
| Solicitation Amendment W912EF25QA0120001 SF 30.pdf | ||
| McNary Pest Control Site Pictures.pdf | ||
| Solicitation - W912EF25QA012.pdf | ||
| Wage Determination.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spillway 1700'
N av lo ck
0' WAFL entrance 100'
WAFL exit 325'
ORFL N and Annex 200' Tailrace deck 1600'
Intake deck 1450'
O
RF
L So ut h
Navlock building --->
Bascule Bridge House --> Crane 7
Crane 6
Crane 5
Upstream Lock Stand -->
Downstream Lockstand --> Derrick Crane 1 -->
<--Derrick Crane 2
<--Theater Bldg<--Training Center
ORFL Exit 340'
Juvenile Fish
Facili ty (JF
F)
Quonset Hut
Warehouse 2-->
Warehouse 1 -->
General Maintenance Bldg -->
Turbine Storage Bldg -->
Sabota Bldg -->
Crane 4
GM Conex Boxes -->
<--Guard shack
-P ow er ho us e o ffi ce s
File details come from the government source that posted it. Updated .