MNA - Navlock Power & Controls Upgrade Federal contract opportunity
Solicitation number
W912EF23B0011
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This solicitation is for a firm-fixed-price construction contract valued between $10-25 million to upgrade the electrical power and control systems for the McNary Navigation Lock located at McNary Dam in Oregon. The scope of work includes replacing feeders, transformers, switchgear, motor control centers, branch circuits, and control systems for the lock gates, valves, bridge and other equipment. It also involves installing new control stands, cameras, radio systems and network infrastructure. The contractor must complete all work by June 18, 2025, including outages in January-March 2024 and February-March 2025 for lock upgrades. The pre-solicitation notice states the solicitation will be posted in April 2023. A site visit will be offered approximately two weeks later. The response due date will be in the issued solicitation. The competition is unrestricted and the NAICS code is 238210.

View the file

Other files for this federal contract opportunity

Other files attached to MNA - Navlock Power & Controls Upgrade, newest first.
File Type Posted
Plans Amendment 0004.pdf PDF
W912EF23B0011 A0004.pdf PDF
Tech Specs Amendment 0004.pdf PDF
W912EF23B0011 A0003.pdf PDF
TECHSPECS 23B0011 Amendment 0003.pdf PDF
TECHSPECS Amendment 0002.pdf PDF
Plans Amendment 002.pdf PDF
W912EF23B0011 A00001.pdf PDF
23B0011_Plans 81-173.pdf PDF
23B0011_Plans 1-80.pdf PDF
Resource Plans Pages 221-230.pdf PDF
Resource Plans Pages 131-160.pdf PDF
Resource Plans Pages 1-25.pdf PDF
Plans Pages 34-45.pdf PDF
Plans Pages 22-33.pdf PDF
TECHSPEC McN Power Controls.pdf PDF
Resource Plans Pages 231-45.pdf PDF
Plans PAges 1-10.pdf PDF
Resource Plans Pages 100-30.pdf PDF
Resource Plans Pages 48-73.pdf PDF
B.08.03 W912EF23B0011.pdf PDF
Resource Plans Pages 161-200.pdf PDF
Resource Plans Pages 201-220.pdf PDF
Resource Plans Pages 74-99.pdf PDF
Resource Plans Pages 26-47.pdf PDF
Plans Pages 11-21.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

467365

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment extends the bid due date to August, 11; 2:00 PM. Additionally, this amendment removes the requirement to include examples of fish sampling permits and reports. Additionally, this amendment updates the specifications and plans. Additionally, this amendment revises the dates to 52.211-10.

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF23B0011

X 9B. DATED (SEE ITEM 11)

15-Jun-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2023

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

SEAN MOLINA

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF23B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 31-Jul-2023 02:00 PM to 11-Aug-2023 02:00 PM.

The following have been modified:

ATTENTION TO BIDDERS

1. Responsibility Criteria IAW FAR Subpart 9.1: To ensure award is made to the responsible bidder, a determination of responsibility will be conducted. As part of this responsibility determination, the Contracting Officer will utilize the guidance contained in FAR Subpart 9.1, Responsible Prospective Contractors. In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must:

(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see form below);

(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

(c) Have a satisfactory performance record, similar in scope and magnitude of that stated in the contract requirements;

(d) Have a satisfactory record of integrity and business ethics;

(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;

(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

2. ATTENTION: Definitive Responsibility Criteria (DRC): In addition to examining the criteria in FAR

9.104-1 as listed above, the Contracting Officer will also examine whether the low bidder can meet the requirements of the definitive responsibility criteria mentioned in section 1) below. THIS INFORMATION WILL BE REQUESTED AFTER BID OPENING. The apparent low bidder will be required to meet the following experience requirements:

Definitive Responsibility Criteria (DRC):

1) Provide a minimum of (2) projects completed* within the last (6) years** that include experience in electrical industrial installation and commissioning similar to the scope and complexity required in the solicitation. ***

a) Offerors shall submit the following:

i) Completed equipment upgrade of 5kVA-5000kVA power distribution system that collectively include the following:

(1) Medium voltage (1kV-69kV) and low voltage (below 1kV) switchgear/switchboard, low voltage motor control center, panelboards and motors.

(2) Medium voltage oil filled/dry type transformer installation.

(3) Medium voltage (2.4kV-35kV) conductors and conduits/trays.

(4) Low voltage (Below 1kV) conductors and conduits/trays.

ii) Completed equipment upgrade of 24VDC, 480/120VAC industrial control systems that collectively include the following:

(1) Fiber & Ethernet Industrial network

(2) Instrumentation, Programmable Logic Controller (PLC) & Human-Machine Interface (HMI)

(3) Variable frequency drive (VFD) motion control

(4) Close-circuit television (CCTV) system

FOR THE DRC ABOVE:

* All project examples must include documentation that show a minimum of 75% complete in order to be considered.

** Define “6 years” as 6 years from the date solicitation is posted.

*** If submitting experience of a subcontractor, a letter of commitment must be included for their experience to be considered.

2) The Contracting Officer will verify the submitted projects meet the definitive responsibility criteria as part of the responsibility determination.

3) Along with the Definitive Responsibility Criteria above, the apparent low bidder will be required to provide the following information for the Government’s use in the determination of Bidder(s) responsibility (See 1

(a) above).

a) Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal/calendar year and certified by an officer of the company.

b) The name of your banking institution, telephone number and the name of the individual to contact for a line-of-credit reference. (If you are the apparent low bidder, please contact your bank reference to let him/her know our office will be calling for financial information.)

Bank Institution ________________________________

Telephone Number ______________________________

Contact ________________________________________

Email Address __________________________________

Tax Identification Number ________________________

c) List of present work to include agency or firm name, address, telephone number, and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)

Will performance of the present work inhibit your ability to perform this contract? ___________

Offeror’s email address: ____________________________________

Please return completed information listed above with all attachments copies of education and experience credentials that document Definitive Responsibility Criteria information from #2 above to:

Email: sean.molina@usace.army.mil

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

The following have been added by full text:

SUMMARY OF CHANGES

Summary of Changes for McNary Power & Controls Upgrade(23B0011) and 0002

52.211-10:

Revised dates in para (6)f and (6)k ii.

Specifications:

01 14 00.10 28 PROJECT SITE RESTRICTIONS

1.3: Revised start time for item 4 1.3: Added item 8 to list.

01 33 16.01 28 ADVANCED MODELING REQUIREMENTS

Section has been removed.

01 78 00.00 28 CLOSEOUT SUBMITTALS

1.2: Added new submittal for “Final Model Files” 3.5: Added new subpart “FINAL MODEL FILES” to require the Contractor to submit any model files used in the development of electrical drawings.

13 34 23.00 28 PREFABRICATED STRUCTURES (CONTROL STANDS)

2.1.6: Added one sentence to allow for aluminum window frame alternative.

26 05 00.00 28 GENERAL ELECTRICAL WORK

1.4.6: Added 2nd paragraph.

26 24 13 SWITCHBOARDS

1.6.4.2: Revised 1st paragraph. Added 2nd paragraph.

26 24 19.00 40 MOTOR CONTROL CENTERS

2.1.4: Revised 1st paragraph. Added 2nd paragraph.

2.4.1.6: Revised requirements for NEMA 4X Non-Walk In Enclosures

26 29 23 VARIABLE FREQUENCY DRIVES UNDER 600 VOLTS

2.4 Added 2nd paragraph.

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

2.2: Revised service organization location and support requirements.

35 01 41.00 10 ELECTROMECHANICAL OPERATING MACHINERY FOR LOCKS AND DAMS

2.3: Provided additional information for the shafts.

2.4: Provided additional information for the shaft couplings.

2.5: Provided additional information for the electric motors.

40 94 43.01 28 PROCESS CONTROLLERS – PROGRAMMABLE LOGIC CONTROLLERS (PLC)

1.2.1: Corrected typos in 1st paragraph. Added 2nd paragraph.

1.4.1: Revised requirement for manufacturer certified service engineer location.

Drawings:

MD401: Note changes

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the dates listed below.

(1) The Contractor shall complete all work for the McNary Navigation Lock Power and Controls Upgrade by not later than June 18, 2025.

(2) Onsite construction at McNary Dam may begin any time after the contractor receives Notice to Proceed (NTP), all preconstruction contract requirements are completed, and all required preconstruction submittals are approved, subject to restrictions outlined below. See SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS for additional information and restrictions related to work windows listed below.

(3) Pre-Outage Work Window .

a. The Pre-Outage Work Window will start after NTP and end January 14, 2024

b. Navigation Lock Feeders: Work can be done and one feeder taken out of service if the other feeder to the navigation lock remains in-service to operate the lock.

c. The following equipment shall remain in-service (outage is not permissible unless approved for short outages by the Government): Bascule Bridge, Miter Gates, Upstream & Downstream Control Stands, and Bridge Control Stand.

d. The navigation lock shall remain in-service unless approved for short outages by the Government.

(4) Navigation Lock Outage 1 Work Window.

a. The Navigation Lock Outage 1 Work Window will start 6:30 am on January 15, 2024, and end 5:00 pm on March 29, 2024.

b. The following items may be taken out of service starting 6:30 am on January 15, 2024:

Upstream Control Stand and Upstream Gate, Bascule Bridge and Bridge Control Stand.

c. The following items may be taken out of service once the Downstream Miter Gate has been jacked-up (see item j below): Tainter valves, Downstream Miter Gate, Navigation Lock Feeders and Downstream Control Stand.

d. The Bascule Bridge shall remain in the lowered position the entire duration of this outage.

e. Power shall be provided to the Drainage and Unwatering Pumps and Derrick Cranes the entire duration of this outage.

f. Power and Controls shall be restored to the Navigation Lock Downstream Gate not later than

March 14, 2024.

g. Dry testing and commissioning may commence on any permanent equipment once the

Navigation Lock Downstream Gate and power and controls are restored to operate both gates. Testing and commissioning is not required on any temporary installed equipment or systems.

h. Wet testing and commissioning may commence on any permanent equipment once dry testing and commissioning is completed and the Government has watered up the navigation lock. Testing and commissioning is not required on any temporary installed equipment or systems.

i. At the completion of the outage, the navigation lock and any other item or system taken out of service must be fully operational.

j. The Contractor shall include in their schedule the following Government and McNary Navigation Lock Downstream Gate Gudgeon Anchor Replacement Contractor activities and durations:

i. Starting on day one of the outage, 4 workdays are needed by the Government to unwater the navigation lock.

ii. After the navigation lock is unwatered, 3 workdays are required for the Gudgeon Anchor Replacement Contractor to take measurement and adjust and jack-up the downstream gate.

iii. The Gudgeon Anchor Replacement Contractor shall unjack the Navigation Lock Downstream Gate before March 14, 2024. Two workdays will be required to unjack the gate.

iv. Three (3) workdays are needed by the Government to water up the navigation lock after the completing of dry testing and before wet testing can commence. It is anticipated that this will take place starting March 24, 2024.

(5) Post-Navigation Lock Outage Work Window 1:

a. The Post-Navigation Outage Window will start 6:30 am on March 30, 2024 and ends 5:00 pm on February 21, 2025.

b. Tainter Valves: Work can be done and the valves taken out of service provided at least one drain valve and one fill valve remain in-service to operate the lock. Do not exceed 4 weeks of outage for each valve.

c. Install MCCs (LCQ 1 through 4)

d. Navigation Lock Feeders: Work can be done and one feeder taken out of service if the other feeder to the navigation lock remains in-service to operate the lock.

e. The following equipment shall remain in-service (outage is not permissible unless approved for short outages by the Government): Bascule Bridge, Miter Gates, Upstream & Downstream Control Stands, and Bridge Control Stand.

f. The navigation lock shall remain in-service unless approved for short outages by the Government.

g. Both Navigation Lock Derrick Cranes will be replaced during this period.

(6) Navigation Lock Outage 2 Work Window.

a. The Navigation Lock Outage 2 Work Window will start 6:30 am on February 22, 2025 and ends 11:59 pm on March 29, 2025.

b. The following items may be taken out of service starting 6:30 am on February 22, 2025:

Upstream Control Stand and Upstream Gate, Bascule Bridge and Bridge Control Stand.

c. The following items may be taken out of service once the Downstream Miter Gate has been jacked-up: Tainter valves, Downstream Miter Gate, Navigation Lock Feeders and Downstream Control Stand.

d. The Bascule Bridge shall remain in the lowered position the entire duration of this outage.

e. Power shall be provided to the Unwatering Pumps and Derrick Crane the entire duration of this outage.

f. Power and Controls shall be restored to the Navigation Lock Downstream Gate not later than March 14, 2025.

g. Dry testing and commissioning may commence once the Navigation Lock Downstream Gate and power and controls are restored to operate both gates.

h. Wet testing and commissioning may commence once dry testing and commissioning is completed and the Government has watered up the navigation lock.

i. At the completion of the outage, the navigation lock must be fully operational and all testing and commissioning completed.

k. The Contractor shall include in their schedule the following Government and McNary Navigation Lock activities and durations:

i. Starting on day one of the outage, 4 workdays are needed by the Government to unwater the navigation lock.

ii. Three (3) workdays are needed by the Government to water up the navigation lock after the completing of dry testing and before wet testing can commence. It is anticipated that this will take place starting March 24, 2025.

(7) Post-Navigation Lock Outage Work Window 2:

a. The Post-Navigation Lock Outage Window will start 6:30 am on March 26, 2025 and end 5:00 pm on June 18, 2025.

b. Complete all remaining work.

c. The Navigation Lock will remain in service during this work window

(8)The Contractor shall complete final cleanup and demobilization by not later than 15 calendar days after completion of work in (1) above.

(9) The Contractor shall complete the final, approved submission of the following by not later than 30 calendar days after completion of work in (1) above. See SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS and 01 78 23.00 28 OPERATION AND MAINTENANCE DATA for additional information:

a. O&M manuals.

b. As-Built drawings.

c. Shop Drawings.

d. Record Drawings.

e. Model Files

f. Spare Parts submission.

(End of Clause)