AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add a part number to the Performance Work Statement. All other terms and contitions of this solicitation remain unchaged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF22Q0130
X 9B. DATED (SEE ITEM 11)
17-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2022
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PRESTON E JONES
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF22Q0130
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 31-May-2022 11:00 AM to 02-Jun-2022 11:00 AM.
The following have been modified:
PERFORMANCE WORK STATEMENT
Part 1 – General Information
1.1 Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to repair the McNary powerhouse HVAC Controllers as defined in this Performance Work Statement (PWS). These HVAC controllers are used for automatic temperature control, system component status, and for in the event of a smoke emergency at McNary Project. The powerhouse HVAC system works hand in hand with project life safety requirements. The Contractor shall perform to the standards in this PWS.
1.2 Purpose: Repair existing Honeywell AX temperature control system. At present time, McNary does not have automatic control of the system, cannot see any equipment and/or device status from the field, and it cannot automatically operate in an emergency smoke situation, which is detrimental to life safety.
1.3 Scope: Paragraph 4.1 of this document details the specific requirements of this contract.
1.4 Period of Performance: The Period of Performance (POP) for this work is four weeks (thirty-one days) after award of contract. If more time is required, it will be communicated before contract is awarded.
1.5 Place of Performance: The Honeywell AX temperature control system to be repaired, tested, and commissioned onsite in McNary Powerhouse, Umatilla OR 97882.
1.6 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall submit a repair work report for the Honeywell AX Temperature Control System. The report shall be provided to the Technical Point of Contact (TPOC) upon completion of the HVAC Control system repair. Forms used for quality control reports are subject to the approval of the Contracting Officer Representative.
The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved. In this contract the quality control program is the driver for product quality. The Contractor shall develop a comprehensive program of surveillances and monitoring actions. The first major step to ensuring a "self-correcting" contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.
1.7 Government Quality Assurance: The Government will monitor the Contractor's performance under this contract using quality assurance procedures developed by the Government. Typical procedures might include random sampling, checklists, customer complaints, and observations.
1.7.1 The Government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
1.7.2 If any of the services do not conform to contract requirements, the Government will request the Contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may (1) require the Contractor to take necessary action to ensure future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.7.3 If the Contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may by contract, or otherwise (1) perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.
1.8 Contractor Personnel:
1.8.1 Employees who perform this work shall be qualified repair technicians. All Contractor employees, and any required subcontractors, shall be at least 18 years of age.
1.9 Security:
1.9.1 AT Level 1 Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.9.2 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.9.3 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.9.4 OPSEC Training: All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
1.9.5 All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.9.6 E-verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify ) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.9.7 All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Part 2 – Contractor Furnished Items and Services
2.1 General: The Contractor shall furnish all tools, materials, supplies, equipment, and services required to perform work under this contract.
Part 3 – Government Furnished items and Services
3.1 General: The Government is responsible for providing access to Honeywell AX Temperature equipment. Providing HECP training. Execute necessary switching operations via McNary Control Room in accordance with district HECP.
Part 4 – Specific Tasks
4.1 Specific Contract Requirements: The Contractor shall, during normal business hours, migrate and upgrade existing AX database to N4 latest version. Remove existing AX JACE and NDIO. Install new N4 WEB-8000 JACE with upgraded I/O. Remove (6) existing touch screens, install new larger touch screens compatible with the N4 platform. Provide new Honeywell P350 Direct Digital Control (DDC) controls center module. Commission and test operation of the system, note deficiencies for future repair. Update as-built documentation.
The contractor is responsible for all material, software and licenses (5-year subscriptions), and devices and device licensing purchases. All materials, parts, and equipment shall be new and warranted by the manufacturer warranty.
The contractor shall provide training to two (2) electronics technicians after commissioning of system, including troubleshooting techniques.
Part 5 – Coordination and Access
5.1 Contracting Officer Representative (COR). The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
performs inspections necessary in connection with contract performance: maintains written and oral communications with the Contractor concerning technical aspects of the contract: issues written interpretations of technical requirements, monitors Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
5.2 Technical Point of Contact (TPOC). The TPOC functions as the Government point of contact for any/all technical aspects of this work. TPOC is responsible for ensuring the Contractor performs this work IAW all applicable local, state and federal guidelines. TPOC will also monitor the Contractor for compliance with the Contractor’s Quality Control Plan to ensure the work is accomplished IAW this PWS. The TPOC will notify the COR of any/all Contractor issues.
Part 6 – Performance Requirements Schedule
PERFORMANCE
INDICATOR
PERFORMANCE
STANDARD
ASSURANCE QUALITY
LEVEL METHOD OF
SURVEILANCE
Complete HVAC System Function
100% Submit Repair Results & Review
Testing and commissioning per industry standard
100% Reports to TPOC upon completion of full HVAC System commissioning
6.1 Surveillance. Surveillance will be accomplished using the above Performance Criteria Analysis. If performance in not satisfactory to the percentage listed in the AQL, the COR will notify the contractor's site manager, with a telephone call, as soon as practicable and ask the contractor to correct the problem.
If a safety issue arises from the Contractor's unacceptable performance, the Contractor will be given notification and 4 hours to correct the unacceptable performance. The COR may approve additional time, if needed. If it is not a safety issue the contractor will have three days to correct any deficiencies. The COR will notate on the Performance Criteria Analysis the date, time, and location of the deficiency and send a copy to the Contractor to sign and return to the COR within 3 business days.
6.1.1 If the Contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may by contract, or otherwise (1) perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.
Part 7 – Safety Requirements
7.1 Safety Requirements: The Contractor’s employees may be working in areas containing control systems vital to the operation of the Project. The Contractor shall protect all existing structures, utilities and work of any kind against damage or interruption of service. To ensure the safety of Contractor employees and Project personnel, the Contractor shall be trained in the required aspects of the Project safety standards.
7.2 USACE Safety Manual: The Contractor must apply risk management strategies to ensure personnel safety and must comply with safety requirements articulated in EM 385-1-1, the US Army Corps of Engineers Safety Manual. The Safety Manual can be accessed at:
http://140.194.76.129/publications/eng-manuals/.
7.3 Safe Clearance Training: COE EM 385-1-1 Safe Clearance Procedure (hazardous energy control plan) is used by Project personnel to ensure continuity of service and safety to personnel and equipment. The Project requires that the Contractor submit the names of individuals who will have the authority to request and release clearances.
7.3.1 Lockout/Tagout (LOTO)-Safe Clearance or Hazardous Energy Control (HEC) Program
A. All contractor work on site shall meet the requirements of "Safety and Occupational Health Office; Safe Clearance Program for the Control of Hazardous Energy, NWWP 385-1-20". A digital copy may be obtained at the web address shown below in paragraph, Safe Clearance Training. Safe Clearance procedures are used by Project and Contractor personnel to protect personnel, equipment and the environment as well as ensuring continuity of service. Any work performed by the Contractor that requires taking project operated equipment out of service shall be done only after a formal clearance is obtained through the Government. Violations will be reported to the Issuing Authority and violations may result in disciplinary action ranging from retraining to removal of safe clearance authorization.
For jobs with multiple tasks that require AHA's, the Contractor shall prepare and submit an Activity Hazard Analysis (AHA) on the first feature of work that requires a clearance request. A comprehensive AHA is required for smaller jobs. The following applies to LOTO and HEC procedures:
B. The Government will provide Safe Clearance Tags and will issue Isolation Locks to
Contractors for clearances using the Government Safe Clearance Procedures. The contractor shall provide their own personal safety locks, meeting OSHA standards, for use with the government's safe clearance procedures.
C. Government HEC procedures shall be used on equipment/systems owned by the
Government. It shall also be used on all points interfacing with Government owned equipment/systems. In instances where equipment is owned by the Contractor, not yet turned over to the Government, or Equipment which is not tied into Government energy sources, the Contractor may use their own Lockout/Tagout Program.
Contractor Programs shall be pre-approved by the Contracting Officer.
D. The names of Authorized Individuals shall be submitted to the Contracting Officer prior to the Post-Award Meeting. Project-specific training will be given by the Operations Chief or designee and will be no more than 30 minutes in length. Project-specific training will be provided only to the Contractor's Authorized Individuals. The Authorized Individuals shall be required to brief their work crews and subcontractors of any project-specific clearance information. Training is only required once per year and is, with the exception of project-specific training, valid for every facility within the Walla Walla District.
7.3.2 Safe Clearance Training: Contractor, subcontractor, vendors and visitors shall take the appropriate level of HEC Program training commensurate with their job duties.
Contractors shall have, at a minimum, two individuals per shift trained as
a. Authorized Individuals. All contractor personnel working in areas under a Safe Clearance shall be trained as Affected Persons. Any non-working personnel, vendors and visitors that will be entering an area under Safe Clearance shall take awareness level training. Training and written tests for the modules below shall be completed on-line prior to commencing on-site work. Time estimates for training follow:
1. Awareness Level Training: Approximately 1 hour (vendors and visitors).
2. Affected Persons: Approximately 1 hour in addition to Awareness Level Training.
3. Authorized Individuals: Approximately 1 hour in addition to Awareness Level Training and Affected Personnel Training.
A copy of the Safe Clearance Program for the Control of Hazardous Energy (NWWP 385-1-20) can be found on the Walla Walla District Internet site at:
http://www.nww.usace.army.mil/Portals/28/docs/contracting/OP385120.pdf . Vivid Training/Testing modules can be found at: http://engineerstrainingonline.com/ . All costs for this training shall be considered incidental to the work, and therefore, no additional payment will be made. Training is an annual requirement and will expire one year from completion date. Training is provided by Vivid Learning Systems and is available on line at http://Hecp.vividlms.com. Cost for the training is displayed on the home page. Submit the training completion certification a minimum of seven days prior to the individual’s arrival at site. Maintain training documentation on site, including the individual's name and date of training completion, in accordance with NWWP 385-1-20.
Submit Contractor Employee names and level of required training a minimum of one week prior to commencing on-site work to the COR.
(End of Summary of Changes)