This document contains a federal contract solicitation and related opportunity notice for the Lower Monumental DC and LV Switchgear Upgrades project. The U.S. Army Corps of Engineers Walla Walla District will issue a best value tradeoff request for proposals to upgrade the direct current systems, low voltage switchgear, and station service at Lower Monumental Dam in Washington. Key work includes replacing DC system panels, preferred AC panels, battery chargers and boards; installing a battery load bank; upgrading 480V switchgear, transformers, motor control centers and panelboards; and integrating new systems with the existing PLC and control room. The small business set-aside solicitation seeks fixed-price construction bids due by November 23, 2021 for work estimated between $10-25 million. Offerors must be experienced with low voltage equipment installation, 125VDC systems, and commissioning. The contractor must implement extensive safety protocols per Corps requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004 PLANS W912EF21R0018.pdf | ||
| Amendment 0004 TECH SPECS W912EF21R0018.pdf | ||
| Site Visit Attendee List W912EF21R0018.pdf | ||
| Amendment 0003 W912EF21R0018.pdf | ||
| 21R0018 - Amend-0002 Tech Specs.pdf | ||
| Sol Amendment W912Ef21R0018-0002.pdf | ||
| 21R0018_PLANS_AMEN-002.pdf | ||
| Amendment 0001 W912EF21R0018.pdf | ||
| Brand Name Determination for SEL Bus Relays W912EF21R0018.pdf | ||
| 21R0018_Plans_FIO_set04.pdf | ||
| 21R0018_Plans_FIO_set03.pdf | ||
| Site Visit Info W912EF21R0018.pdf | ||
| 21R0018_PLANS_Vol4.pdf | ||
| 21R0018_PLANS_Vol2.pdf | ||
| 21R0018_Plans_FIO_set02.pdf | ||
| 21R0018_Plans_FIO_set01.pdf | ||
| COVID Questionnaire.docx | DOCX document | |
| 21R0018_PLANS_Vol3.pdf | ||
| 21R0018_PLANS_Vol1.pdf | ||
| W912EF21R0018 Tech Specs .pdf | ||
| 21R0018_PLANS_Vol5.pdf | ||
| Solicitation W912EF21R0018.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912EF21R0018, Low er Monumental DC System and LV Sw itchgear Upgrades
The solicitation is amended as follow s:
See Continuation Sheet for details.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF21R0018
X 9B. DATED (SEE ITEM 11)
22-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Nov-2021
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
DAVID C BOONE 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF21R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
Summary of changes for Amendment 0004 Lower Monumental DC System and LV Switchgear Upgrades
Solicitation W912EF21R0018
1. Revised the following Specifications:
a. SECTION 01 22 00.00 28 MEASUREMENT AND PAYMENT
Revised paragraph 1.21 CLIN 0018 - FURNISH AND INSTALL BATTERY MONITORING
COMPUTER, CART, DIAGNOSTIC EQUIPMENT, WIRING, BATTERY MONITORING
HARDWARE & SOFTWARE PACKAGE.
Added paragraph 1.33 CLIN 0030 - FURNISH AND INSTALL NEW SCHWEITZER
ELECTRIC LABORATORIES (SEL) RELAYS FOR SQ3.
b. SECTION 01 45 04.00 28 MEASUREMENT AND PAYMENT
Revised paragraph 3.4.2 CQC System Manager
c. SECTION 01 78 23.00 28 OPERATION AND MAINTENANCE DATA
Revised paragraph 1.4.5 Data Package 5.
d. SECTION 09 90 00.00 28 PAINTS AND COATINGS Revised paragraph title 3.7.1.1 to MPI DIVISION 4: Interior Concrete Masonry Units Paint Table.
e. SECTION 26 23 10.10 28 480 VOLT SWITCHGEAR AND TRANSFORMERS
Revised paragraph 3.1(a) EQUIPMENT INSTALLATION.
Revised paragraph 3.7 QUALIFICATIONS OF FIELD ENGINEERING SERVICE
PERSONNEL.
See revised specifications for details.
2. Revised the following Drawings:
a. Vol 1 Sheet E-506: Updated wire and cable requirements
b. Vol 1 Sheet E-515: Updated cable routing information
c. Vol 1 Sheet E-801: Updated cable sizes
d. Vol 1 Sheet E-802: Updated cable sizes
e. Vol 1 Sheet E-803: Updated cable sizes
f. Vol 1 Sheet E-804: Updated cable sizes
g. Vol 1 Sheet E-805: Updated cable sizes
h. Vol 1 Sheet E-806: Updated cable sizes
i. Vol 1 Sheet E-807: Updated cable sizes
j. Vol 1 Sheet E-808: Updated cable sizes
k. Vol 1 Sheet E-809: Updated cable sizes
l. Vol 1 Sheet E-810: Updated cable sizes
m. Vol 1 Sheet E-811: Updated cable sizes
n. Vol 1 Sheet E-812: Updated cable sizes
o. Vol 3 Sheet E-604: CAD Corrections/updated install requirements
p. Vol 5 Sheet E-301: Updated cable routing information
q. Vol 5 Sheet E-601: Updated cable sizes
r. Vol 5 Sheet E-603: Updated cable sizes
s. Vol 5 Sheet E-604: Updated cable sizes
See revised drawings for details.
3. Revised the Bid Schedule.
See revised bid schedule for details.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 19-Nov-2021 03:00 PM to 23-Nov-2021 03:00 PM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers Lower Monumental DC System and Low Voltage Switch Gear Upgrades
The magnitude of construction is estimated to be between $10,000,000 and $25,000,000
ITEM DESCRIPTION QTY U/M U/P AMOUNT
Base Items
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB XXXXX $_______
REMOVE AND DISPOSE OF EXISTING TRANSFORMERS AND
480V AC SWITCHGEAR SQO, SQ1, and SQ2
1 JOB XXXXX $_______
REMOVE AND DISPOSE OF EXISTING MAIN UNIT AUXILIARY
BOARDS SU1 - SU6 AND CP1-6
REMOVE AND DISPOSE OF EXISTING MOTOR CONTROL
CENTERS CQO1, CQO4, CQO5, SH AND THE SH TRANSFORMER
REMOVE AND DISPOSE OF EXISTING PANELBOARDS CQO3,
FCQ1, and FCQ2
0006AA
REMOVE AND DISPOSE OF EXISTING 4160 VOLT GOVERNOR
OIL PUMP MOTORS. UNITS 1 - 3
0006AB
REMOVE AND DISPOSE OF EXISTING 4160 VOLT GOVERNOR
OIL PUMP MOTORS. UNITS 4 - 6
REMOVE AND DISPOSE OF EXISTING BATTERY CHARGERS
BC1, BC2, AND BC3
REMOVE AND DISPOSE OF EXISTING PREFFERED-AC
INVERTERS THEN FURNISH AND INSTALL NEW PREFERRED-AC
INVERTERS
REMOVE AND DISPOSE OF EXISTING DC SWITCHBOARDS,
PANELBOARDS AND PREFERRED AC PANELS
REMOVE AND DISPOSE OF EXISTING CONDUCTORS, CONDUIT
RISERS, AND EXPOSED CONDUIT
REMOVE AND DISPOSE OF EXISTING HEADCOVER, TURBINE
BEARING OIL PUMP STARTERS AND CONTROLS
FURNISH AND INSTALL NEW 480V AC SWITCHGEAR AND
TRANSFORMER LINEUPS SQO, SQ1, SQ2 AND SQ3, INCLUDING
NEW FEEDER CABLES
FURNISH AND INSTALL NEW UNIT MOTOR CONTROL CENTERS
SU1 - SU6, INCLUDING NEW FEEDER CABLES
FURNISH AND INSTALL NEW STATION SERVICE MOTOR
CONTROL CENTERS CQO1, CQO4, CQO5 AND SH INCLUDING
NEW FEEDER CABLES, AND MODIFY DCQ2
FURNISH AND INSTALL NEW PANELBOARDS CQO3, FCQ1,
FCQ2, AND CQO8
0016AA
FURNISH AND INSTALL NEW 480 VOLT GOVERNOR OIL PUMP
MOTORS IN UNITS 1 - 3
0016AB
FURNISH AND INSTALL NEW 480 VOLT GOVERNOR OIL PUMP
MOTORS IN UNITS 4 - 6
FURNISH AND INSTALL NEW 125V BATTERY CHARGERS BC1,
BC2 AND BC3
FURNISH AND INSTALL BATTERY MONITORING COMPUTER,
CART, DIAGNOSTIC EQUIPMENT, WIRING, BATTERY
MONITORING HARDWARE & SOFTWARE PACKAGE.
FURNISH AND INSTALL NEW BATTERY SWITCHBOARDS, DC
DISTRIBUTION PANELBOARDS, 120V AC DISTRIBUTION
PANELBOARDS, AND MANUAL BREAKER TRANSFER PANELS
INCLUDING NEW FEEDER CABLES
0020 BATTERY ROOM MODIFICATIONS 1 JOB XXXXX $_______
0021 FURNISH AND INSTALL SQ REMOTE CONTROL PANELS 1 JOB XXXXX $_______
0022 FURNISH AND INSTALL SBC PANEL 1 JOB XXXXX $_______
0023 FURNISH SPARE PARTS AND ACCESSORIES 1 JOB XXXXX $_______
0024 CORE DRILLING AND CONCRETE WORK 1 JOB XXXXX $_______
0025 FURNISH O&M MANUALS 1 JOB XXXXX $_______
0026 FURNISH FINAL RECORD DRAWINGS 1 JOB XXXXX $_______
0027 FURNISH COMMISSIONING SERVICES AND TRAINING 1 JOB XXXXX $_______
0028 FIRESTOPPING 1 JOB XXXXX $_______
0029 FURNISH AND INSTALL NEW CABLE TRAYS 1 JOB XXXXX $_______
FURNISH AND INSTALL NEW SCHWEITZER ELECTRIC
LABORATORIES (SEL) RELAYS FOR SQ3.
SCHEDULE TOTAL $_________
IMPORTANT: See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
U/M* = Unit of Measure U/P* = Unit Price