This document provides details for a forthcoming federal construction solicitation from the U.S. Army Corps of Engineers Walla Walla District. The solicitation will upgrade the direct current systems and low voltage switchgear at Lower Monumental Dam in Franklin County, Washington. Upgrades include replacing DC system panels, preferred AC panels, chargers, battery boards and installing a load bank. The project will also replace 480-volt switchgear, motor control centers, and panelboards. All new equipment must be from the same manufacturer. The solicitation will be issued as a 100% small business set-aside best value tradeoff request for proposals for a single firm fixed-price construction contract with an estimated value between $10-25 million under NAICS 238210. Proposals will be due approximately 30 days after posting to sam.gov in September 2021. Offerors must register in SAM and contact the point of contact for any questions. On-site work will require safety plans and hazardous energy control training in compliance with EM 385-1-1.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004 W912EF21R0018.pdf | ||
| Amendment 0004 PLANS W912EF21R0018.pdf | ||
| Amendment 0004 TECH SPECS W912EF21R0018.pdf | ||
| Site Visit Attendee List W912EF21R0018.pdf | ||
| Amendment 0003 W912EF21R0018.pdf | ||
| Sol Amendment W912Ef21R0018-0002.pdf | ||
| 21R0018_PLANS_AMEN-002.pdf | ||
| 21R0018 - Amend-0002 Tech Specs.pdf | ||
| Amendment 0001 W912EF21R0018.pdf | ||
| COVID Questionnaire.docx | DOCX document | |
| 21R0018_PLANS_Vol3.pdf | ||
| 21R0018_PLANS_Vol1.pdf | ||
| W912EF21R0018 Tech Specs .pdf | ||
| 21R0018_PLANS_Vol5.pdf | ||
| Brand Name Determination for SEL Bus Relays W912EF21R0018.pdf | ||
| 21R0018_Plans_FIO_set04.pdf | ||
| 21R0018_Plans_FIO_set03.pdf | ||
| Site Visit Info W912EF21R0018.pdf | ||
| 21R0018_PLANS_Vol4.pdf | ||
| 21R0018_PLANS_Vol2.pdf | ||
| 21R0018_Plans_FIO_set02.pdf | ||
| 21R0018_Plans_FIO_set01.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TITLE: Low er Monumental DC System and LV Sw itchgear Upgrades
LOCATION: Low er Monumental Lock and Dam, Kahlotus, Washington
DAVID C. BOONE 509-527-7205
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Sep-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________See 00 70 00
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________22 Oct 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, WALLA WALLA - CONTRACTING DIV.
DAVID C BOONE 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
509-527-7802FAX:TEL: 509-527-7205 TEL: FAX:
W912EF21R0018 70
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912EF21R0018
Section 00 01 10 - Table of Contents
INDEX
Section 00 10 00, Solicitation Contract Form Section 00 21 00, Instructions Section 00 45 00, Representations and Certifications Section 00 70 00, Conditions of the Contract Section 00 73 00 Supplementary Conditions Technical Specifications Drawings
Section 00 21 00 - Instructions
BID SCHEDULE
Walla Walla District Corps of Engineers Lower Monumental DC System and Low Voltage Switch Gear Upgrades
The magnitude of construction is estimated to be between $10,000,000 and $25,000,000
ITEM DESCRIPTION QTY U/M U/P AMOUNT
Base Items
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB XXXXX $_______
0002 REMOVE AND DISPOSE OF EXISTING TRANSFORMERS AND
480V AC SWITCHGEAR SQO, SQ1, and SQ2 1 JOB XXXXX $_______
0003 REMOVE AND DISPOSE OF EXISTING MAIN UNIT AUXILIARY
BOARDS SU1 - SU6 AND CP1-6 1 JOB XXXXX $_______
0004 REMOVE AND DISPOSE OF EXISTING MOTOR CONTROL
CENTERS CQO1, CQO4, CQO5, SH AND THE SH TRANSFORMER 1 JOB XXXXX $_______
0005 REMOVE AND DISPOSE OF EXISTING PANELBOARDS CQO3,
FCQ1, and FCQ2 1 JOB XXXXX $_______
0006AA REMOVE AND DISPOSE OF EXISTING 4160 VOLT GOVERNOR
OIL PUMP MOTORS. UNITS 1 - 3 1 JOB XXXXX $_______
0006AB REMOVE AND DISPOSE OF EXISTING 4160 VOLT GOVERNOR
OIL PUMP MOTORS. UNITS 4 - 6 1 JOB XXXXX $_______
0007 REMOVE AND DISPOSE OF EXISTING BATTERY CHARGERS
BC1, BC2, AND BC3 1 JOB XXXXX $_______
REMOVE AND DISPOSE OF EXISTING PREFFERED-AC
INVERTERS THEN FURNISH AND INSTALL NEW PREFERRED-AC
INVERTERS
1 JOB XXXXX $_______
0009 REMOVE AND DISPOSE OF EXISTING DC SWITCHBOARDS,
PANELBOARDS AND PREFERRED AC PANELS 1 JOB XXXXX $_______
0010 REMOVE AND DISPOSE OF EXISTING CONDUCTORS, CONDUIT
RISERS, AND EXPOSED CONDUIT 1 JOB XXXXX $_______
0011 REMOVE AND DISPOSE OF EXISTING HEADCOVER, TURBINE
BEARING OIL PUMP STARTERS AND CONTROLS 1 JOB XXXXX $_______
FURNISH AND INSTALL NEW 480V AC SWITCHGEAR AND
TRANSFORMER LINEUPS SQO, SQ1, SQ2 AND SQ3, INCLUDING
NEW FEEDER CABLES
0013 FURNISH AND INSTALL NEW UNIT MOTOR CONTROL CENTERS
SU1 - SU6, INCLUDING NEW FEEDER CABLES 1 JOB XXXXX $_______
FURNISH AND INSTALL NEW STATION SERVICE MOTOR
CONTROL CENTERS CQO1, CQO4, CQO5 AND SH INCLUDING
NEW FEEDER CABLES, AND MODIFY DCQ2
0015 FURNISH AND INSTALL NEW PANELBOARDS CQO3, FCQ1,
FCQ2, AND CQO8 1 JOB XXXXX $_______
0016AA FURNISH AND INSTALL NEW 480 VOLT GOVERNOR OIL PUMP
MOTORS IN UNITS 1 - 3 1 JOB XXXXX $_______
0016AB FURNISH AND INSTALL NEW 480 VOLT GOVERNOR OIL PUMP
MOTORS IN UNITS 4 - 6 1 JOB XXXXX $_______
0017 FURNISH AND INSTALL NEW 125V BATTERY CHARGERS BC1,
BC2 AND BC3 1 JOB XXXXX $_______
FURNISH AND INSTALL NEW BATTERY, BATTERY MONITORING
COMPUTER, CART, DIAGNOSTIC EQUIPMENT, WIRING,
BATTERY MONITORING HARDWARE & SOFTWARE PACKAGE
FURNISH AND INSTALL NEW BATTERY SWITCHBOARDS, DC
DISTRIBUTION PANELBOARDS, 120V AC DISTRIBUTION
PANELBOARDS, AND MANUAL BREAKER TRANSFER PANELS
INCLUDING NEW FEEDER CABLES
0020 BATTERY ROOM MODIFICATIONS 1 JOB XXXXX $_______
0021 FURNISH AND INSTALL SQ REMOTE CONTROL PANELS 1 JOB XXXXX $_______
0022 FURNISH AND INSTALL SBC PANEL 1 JOB XXXXX $_______
0023 FURNISH SPARE PARTS AND ACCESSORIES 1 JOB XXXXX $_______
0024 CORE DRILLING AND CONCRETE WORK 1 JOB XXXXX $_______
0025 FURNISH O&M MANUALS 1 JOB XXXXX $_______
0026 FURNISH FINAL RECORD DRAWINGS 1 JOB XXXXX $_______
0027 FURNISH COMMISSIONING SERVICES AND TRAINING 1 JOB XXXXX $_______
0028 FIRESTOPPING 1 JOB XXXXX $_______
SCHEDULE TOTAL $_________
IMPORTANT: See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
U/M* = Unit of Measure U/P* = Unit Price
EVALUATION FACTORS
A. BASIS FOR AWARD
The award will be made based on the best overall (i.e., best value-tradeoff) proposal that is determined to be the most beneficial to the Government, based on an integrated assessment, with appropriate consideration given to the four (4) evaluation factors: Technical Experience; Technical Approach; Past Performance; and Price.
Factor 1, Technical Experience is equally important as Factor 2, Technical Approach and Factor 3, Past Performance. When combined, the non-price factors (Factors 1, 2, and 3) are significantly more important than Factor 4, Price.
Sub-Factors 1A and 1B, are of equal importance.
The following paragraphs B through E cover the Factors and Sub-factors to be evaluated, the evaluation approach for each Factor and Sub-factor to include factor rating tables, proposal submission requirements and final discussion guidance.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors and sub-factors will be used to evaluate each proposal.
1. FACTOR 1 Technical Experience – Installation and Commissioning
The technical evaluation will be comprised of two (2) Sub-factors. Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor or sub-factor ratings.
Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance.
Sub-factor 1A: Electrical Industrial Installation Experience Sub-factor 1B: Electrical Industrial Commissioning Experience
Evaluation of the offeror’s proposal shall address each sub-factor as it applies to the scope of work. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section.
During evaluations of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.
2. FACTOR 2 Technical Approach - Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor rating. Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance.
3. FACTOR 3 Past Performance - Each offeror’s current and past performance will be reviewed to determine relevancy and confidence.
4. FACTOR 4 Price - The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.
C. EVALUATION APPROACH
All proposals will be evaluated by the Source Selection Evaluation Board (SSEB). The following sections define the information to be provided and describe how the information for each factor and sub-factor will be evaluated and rated.
1. Factor 1 Technical Experience - This factor is comprised of the following sub-factors:
a. Sub-factor 1A: Electrical Industrial Installation Experience
Proposals will be evaluated to determine experience with electrical industrial installation relevant with the scope and complexity required in the solicitation. Offerors shall provide sufficient information to clearly demonstrate the breadth and depth of the Offeror’s electrical industrial installation experience. Proposals shall conform to the solicitation requirements, to include all stated terms, conditions, representations, certifications, and all other information required of this solicitation.
Offerors shall submit the following for Sub-factor 1A:
I. Offerors must demonstrate electrical industrial installation experience by providing up to four (4) examples, performed within the past ten (10) years that collectively demonstrate each of the elements identified below. If more than four (4) examples are provided, only the first four (4) examples will be evaluated.
• At least 80% physically complete at the time of proposal submission or was completed within the last ten (10) years. If project is not complete, provide invoice to demonstrate 80% physically complete.
• Complete equipment upgrade of at least a 5 MVA system that collectively include the following:
o 480V switchgear, motor control centers, panelboards and motors and o Minimum 50V DC and 120V Preferred AC system (battery chargers, load bank, switchboards, and panelboards) and o Medium voltage (5 kV) lines and o Conduit and o Temporary equipment/switchgear and o Instrumentation and controls (Programmable Logic Contoller (PLC))
• Use Attached “Offeror Experience Form” to describe the projects in which the Offeror has relevant installation experience. Project experience shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
b. Sub-factor 1B: Electrical Industrial Commissioning Experience
Proposals will be evaluated to determine commissioning experience for relevant projects of the scope and complexity required in the solicitation. Offerors shall provide sufficient information to clearly demonstrate the breadth and depth of the Offeror’s electrical industrial commissioning experience. Proposals shall conform to the solicitation requirements to include all stated terms, conditions, representations, certifications, and all other information required by this solicitation.
Offerors shall submit the following for Sub-factor 1B:
I. Offerors must demonstrate electrical industrial commissioning experience by providing up to four (4) examples, performed within the past ten (10) years that collectively demonstrate each of the elements identified below. If more than four (4) examples are provided, only the first four (4) examples will be evaluated.
• At least 80% physically complete at the time of proposal submission or was completed within the last ten (10) years. If project is not complete, provide invoice to demonstrate 80% physically complete.
• Complete equipment upgrade of at least a 5 MVA system that collectively include o 480V switchgear, motor control centers, panelboards and motors and o Minimum 50V DC and 120V Preferred AC system (battery chargers, inverters, load bank, switchboards, and panelboards) and o Medium voltage (5 kV) lines and o Conduit and o Temporary equipment/switchgear and o Instrumentation and controls (PLC)
• Use Attached “Offeror Experience Form” to describe the projects in which the Offeror has relevant commissioning experience. Project experience shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
2. Factor 2 Technical Approach
This sub-factor evaluates the offeror’s understanding of the required scope of work and evaluates the offerors capabilities and availability of resources necessary to complete all requirements. Proposals shall conform to the solicitation requirements to include all stated terms, conditions, representations, certifications, and all other information required by this solicitation.
Offerors shall submit the following for Factor 2:
I. Provide a work plan / schedule
1) Work plan / Schedule shall reflect the planned activities, task dependencies and durations proposed to successfully accomplish the entire project from notice to proceed to final commissioning, and contract close-out. Contractor should assume, for evaluation purposes only, a notice to proceed of 20 October 2021. At a minimum, the schedule shall include the following:
a. Pre-Construction Submittals submitted/approved within 85 calendar days from Notice To Proceed being issued
b. Compliance with Work Sequencing Specification (01 12 16.00 28) and acknowledgement of outage requirements.
c. Major Activities
i. Pre-construction submittals
ii. Unit outages
iii. Cutover plan for 480 VAC Switchgear, 480 VAC MCC, diesel generator and 125 VDC battery
iv. Demolition
v. Installation
vi. Contractor and Government Commissioning
2) Discuss how work to complete one task may impact or be impacted by work to complete other tasks.
3) Document capabilities and availability of resources (equipment and personnel) necessary to complete all required major tasks above.
4) List all major subcontractors with their respective role and responsibility to complete all major tasks. * See subcontractor identification in submission requirements.
5) Include an organization chart to show the communication process between superintendent, project manager, safety officer, and quality control personnel.
The Technical Factor Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical sub-factor requirements.
Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
3. Factor 3 - Past Performance
There are three aspects to the past performance evaluation: Recency, Relevancy (including context of data) and Quality (including general trends in the contractor performance and source of information).
The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the scope of work. Proposals shall conform to the solicitation requirements to include all stated terms, conditions, representations, certifications, and all other information required by this solicitation.
a. The Government will focus its inquiries on the offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of sub-contractors. Major sub-contractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, signed letters of commitment shall be included for all major subcontractors for their past performance to be considered.
Offerors are reminded to include the most recent and relevant efforts (within the past ten years) in their proposal. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State, or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System (NAICS) 238210, Power Distribution, and Specialty Transformer Manufacturing. Data submitted by the offeror or gathered from other sources by the government in conducting performance risk assessments shall not extend past ten years prior to the issue date of the request for proposal, but may include performance data generated during the past ten years without regard to the contract award date. CPARS data is limited to the past 6 years. Offeror’s should provide additional performance data for projects beyond six years.
b. Offerors should submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past ten years, from the issue date of this request for proposal, which are relevant to the efforts required by this solicitation.
c. The past performance factor considers each offeror’s demonstrated current and relevant past record of performance in supplying products and services that meet the contract requirements.
d. RECENCY: The Government will evaluate recency by examining the offerors’ record of past performance and to assess the time period during which the offeror’s past performance is considered relevant.
e. RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the Offeror's current and past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the Offeror’s submitted subcontracting plan for this project and the Offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2)
Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.
Past Performance Relevancy Ratings
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
f. QUALITY: The third aspect of the past performance evaluation is to establish the overall quality of the offeror’s past performance. The quality past performance evaluations conducted gathers information from offeror’s customers to determine how well the offeror performed those past contracts. This quality assessment will be reflected in the overall confidence assessment described below.
g. PERFORMANCE CONFIDENCE ASSESSMENT: The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror. Because this source selection requires a greater level of discrimination with the past performance evaluation, evaluators shall use the ratings in the chart below. This rating considers the assessed quality of the relevant/current efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment). Ensure the rationale for the conclusions reached are included.
Performance Confidence Assessments
Rating Definition
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
4. Factor 4 – Price
Offerors must submit completed Contract Line Item Numbers (CLINs) with unit price, quantity, and extended price.
All extensions of the unit prices shown will be subject to verification by the Government. In case of discrepancy between the unit price and the extended price, the unit price will govern. For the purpose of evaluating proposals, the following will be used to resolve arithmetic discrepancies found on the face of the pricing schedule as submitted by the offeror:
a. Obviously misplaced decimal points will be corrected;
b. In a discrepancy between unit price and extended price, the unit price will govern;
c. Calculation errors in extension of unit prices will be corrected;
d. Calculation errors in the addition of lump-sum and extended prices will be corrected.
An evaluation will be performed on the proposed prices. The evaluation will not be assigned an adjectival rating.
However, it will be evaluated for completeness and reasonableness in accordance with FAR 15.305 and FAR 15.404.
D. PROPOSAL SUBMISSION
1. Introduction. The offeror’s proposal shall be submitted electronically, as set forth below. The solicitation shall provide the Government address and receipt date for proposal submission. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
The offeror’s proposal shall consist of two (2) volumes. The Volumes are:
Volume I - Technical, Past Performance Volume II – Price, Solicitation, Offer and Award Documents and Certifications/Representations.
Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. Proposal Submission Requirements.
a. Each volume shall be submitted as a separate PDF or ZIP file. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated.
b. Printing shall be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or Times New Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
c. The following volumes of material shall be submitted:
VOLUME TITLE PRINTED COPIES ELECTRONIC COPIES
Volume I Printed copies not required. 1 Volume II Printed copies not required. 1
d. Proposals may be rejected for failure to adhere to the proposal preparation requirements.
e. Proposals shall conform to the solicitation requirements to include all stated terms, conditions, representations, certifications, and all other information required of this solicitation.
f. To submit proposals electronically via DoD SAFE, email Contract Specialist, David Boone at david.c.boone@usace.army.mil and Contracting Officer, Jani Long at jani.c.long@usace.army.mil for a unique code with valid email address and point of contact for your company. Mr. Boone will provide you with your unique code, then you will need to go to the following website: https://safe.apps.mil/
At the DoD SAFE website select “Drop-Off,” then enter your unique code and submit your proposal(s). When your proposal is submitted via the DoD SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipient will be: David C.
Boone, david.c.boone@usace.army.mil
• When your files have been “picked-up,” you will receive an email notification. If you have not received a notification and it has been more than one business day since your “drop-off” – please contact David Boone at david.c.boone@usace.army.mil
For the purposes of determining whether the proposal was received “late” in accordance with FAR 15.208, the date and time the file(s) are uploaded into the DoD SAFE website as identified in the DoD SAFE email sent to the Contract Specialist(s)/Contracting Officer will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous.
Please make allowances for delays in transmittal.
NOTE: ONLY in the unusual case that the DoD SAFE website is “down” (not operational); the Offeror should email their proposal to the following individuals prior to the proposal due date and time: David Boone whose email address is david.c.boone@usace.army.mil.
SUBMISSION DEADLINE – Proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Official time will be established by the clock located in the area where proposals are received. Late proposals may not be accepted.
3. Proposal Files.
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. Scans must be in color and at least 600 dpi. All files created in MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
NOTE: 11X17 folded pages are acceptable for tables/graphic representations. The following additional restrictions apply:
mailto:david.c.boone@usace.army.mil mailto:jani.c.long@usace.army.mil https://safe.apps.mil/
File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and submitted electronically via DoD SAFE. Files shall be in read-only format, using PDF files. All price breakdown information to aid in the Price evaluation shall be submitted in Microsoft Office Excel Read/Write format.
**Please note – Self extracting exe files are not acceptable.
b. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file.
Proprietary information shall be clearly marked.
Sub-Contractor Identification:
a. Offerors should clearly identify the firm(s) that will be utilized during performance of the contract or work that will be self-performed. Ensure the proposal is clear as to which function the Offeror or subcontractor will be performing. If the prime contractor proposes to use a subcontractor, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.
a. If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects.
b. If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the joint venture entity working successfully together previously on relevant projects.
(i) VOLUME I, TAB 1 –Technical Experience. The volume shall be organized into the following sections:
(1) Section 1 – Sub-factor 1A: Electrical Industrial Installation Experience
(2) Section 2 – Sub-factor 1B: Electrical Industrial Commissioning Experience
(i) VOLUME I, TAB 2 –Technical Approach
(iii) VOLUME I, TAB 3 – Past Performance. This tab shall contain current and past performance information regarding similar contracts. Offerors shall submit Government and/or commercial contracts for the prime offeror and each major contract currently in performance or awarded during the past ten (10) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation.
Relevant efforts are defined as services/efforts that are the same as or similar to the effort required by the RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, signed letters of commitment shall be included for all major subcontractors for their past performance to be considered.
This tab shall be organized into the following sections:
(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format. Ensure all information is current and accurate.
(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS
Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).
(b) Government contracting activity, (or private firm) and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.
(c) Technical representative/COR and current email address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative
Contracting Officer’s name, current e-mail address, telephone and fax number.
(e) Government contract administration activity’s Pre-Award point of contact name, and current e-mail address, telephone and fax numbers.
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order/Task Order Numbers.
(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
(h) Awarded price.
(i) Final or projected final price.
(j) Original delivery schedule, including dates of start and completion or work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
(2) Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 - Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the offeror shall provide data on all manufacturing warranty returns.
Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the offeror’s delivered product.
(3) Section 3 – Subcontracts. Offerors shall provide an outline of how the effort required by the RFP will be assigned for performance within the offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime offeror and each proposed major subcontractor shall include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government technical specification. This includes all subcontractors and suppliers who will be providing critical hardware/services or whose subcontract is for more than 10% of the total proposed Price.
(4) Section 4 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited to demonstrate the relevancy of experience and past performance with this solicitation. Information should be included in the files described in the sections above. Signed Letters of Commitment shall be included in the proposal for these employees in order to be considered. Letters of Commitment must be signed both by the company official and the employee.
(5) Section 5-Past Performance Questionnaire. For all contracts identified in Section 1 - Contract Descriptions, complete a Past Performance Questionnaire for any project that has not received a formal Contractor Performance Assessment Reporting System (CPARS) evaluation. The offeror shall complete Part I of the Past Performance Questionnaire and E-mail the questionnaire to the technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to David.C.Boone@usace.army.mil. The offeror shall submit, with its proposal, a list of all the POCs who were sent questionnaires. The POC List shall be submitted in Word for Windows Table Format to include the following fields:
Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mail to POC (month/day).
(6) Section 6-Submissions. Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency points of contact (POC) in lieu of subcontract numbers or prime contract POCs in situations as described above.
(iii) VOLUME II, TAB 1 – Price. This tab shall consist of all information, required to support proposed prices. Certified pricing data is not currently required; however, the Government reserves the right to request such data prior to award. There are no page limitations for this tab.
The offeror shall ensure that the information submitted in this tab is consistent with and fully supports the amounts set forth in the SF33 and continuation sheets.
(iv) VOLUME II, TAB 2– SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND
CERTIFICATIONS/REPRESENTATIONS
Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF1442 and all certifications requiring original signature.
An Acrobat PDF file shall be created to capture the signatures for submission.
Section 00 21 00 – Standard Form 1442 Solicitation, Offer and Award Section 00 45 00 – Representations, Certification, and Other Statements of Offerors
Solicitations, Offer and Award Documents and Certifications/Representations shall not be submitted separately from that submitted in VOLUME II – SOLICITATIONS, OFFER AND AWARD
DOCUMENTS AND CERTIFICATIONS /REPRESENTATIONS.
E. DISCUSSIONS
1. GENERAL INFORMATION. In accordance with FAR provision 52.215-1, the Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
mailto:David.C.Boone@usace.army.mil
ATTENTION TO OFFERORS
ATTENTION TO OFFERORS
Offerors(s) may be asked to provide the following information for the Government’s use in the determination of offerors(s) responsibility, pursuant to FAR Part 9.
QUALIFICATIONS
1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal year and certified by an officer of the company.
2. The name of your banking firm, telephone number and the name of the individual to contact for a line-of-credit reference.
Banking Institution ______________________________________________
Telephone Number ______________________________________________
Person to Contact ______________________________________________
Email Address ______________________________________________
3. Tax ID Number ___________________________________
4. Years of experience (in the field of the proposed work). _______________________ Indicate similarity of work currently under way to work required for this project.
5. List of present work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
6. List of previous work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
7. Percentage of work under this contract to be subcontracted _______________ %
Return completed form with all attachments to:
Email: david.c.boone@usace.army.mil
OR
Physical/Mailing Address: Walla Walla District Corps of Engineers, ATTN: CT David Boone, 201 North Third Avenue, Walla Walla, WA 99362-1876.
Offerors shall price all line items of the bid schedule.
AWARD will be made, as a whole, to one offeror.
BONDS: If the successful bidder, upon acceptance of its offer by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed payments bonds or alternate payment protection within 10 Calendar days after receipt of the contract award forms by the offeror, the Contracting Officer may terminate the contract for default.
ARTHMETIC DISCREPANCIES:
(a) For the purposes of evaluating proposals, the following will be used to resolve arithmetic discrepancies found on the face of the Bid Schedule as submitted by the offeror:
a. Obviously misplaced decimal points will be corrected.
b. In a discrepancy between unit price and extended price, the unit price will govern;
c. Calculation errors in extension of unit prices will be corrected;
d. Calculation errors in the addition of lump-sum and extended prices will be corrected.
(b) For the purpose of proposal evaluation, the government will proceed on the assumption that the offeror intends his proposal to be evaluated on the basis of unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above the proposal will be so reflected on the abstract of offers.
(c) These correction procedures shall not be used to resolve any ambiguity in the proposal
OFFER QUANTITIES: Proposals for less than the specified quantities of each item in the bid schedule will not be considered.
CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY
In order to determine a contractor’s responsibility for purposes of contract award the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work.
(See the Attention to Bidders form included in this solicitation.) In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must –
(a) Have adequate financial resources to perform the contract, or the ability to obtain them;
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(c) Have a satisfactory performance record. (A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history except as provided in FAR 9.104-2);
(d) Have a satisfactory record of integrity and business ethics;
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them;
and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
BIDDER INQUIRY
All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.
TIMING OF BIDDER INQUIRIES: Bidders are encouraged to submit their bidder inquiries promptly. The Government will make every effort to answer all bidder inquiries; however, the closer to the bid or proposal due date an inquiry is received, the less likely it is that a timely response can be provided.
https://www.projnet.org/
The Bidder Inquiry Key is: SGG5RN-48P5DM
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for Entering Questions:
1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example; if the question is about an electrical drawing or specification select: “Electrical” from the pull down list.
d.) Sheet. Enter the sheet number of the drawing you are asking about.
e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.
f.) Specification. Enter the Specification number and paragraph number.
g.) File. Use this if you are going to attach a pdf file.
h.) Question. Enter your question here.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.