W912EF21B0011 Bid Opening Results - UPDATE.pdf
PDF 197 KB Posted
- Attached to
- McNary Intake Bulkheads Replacement Federal contract opportunity
- Solicitation number
- W912EF21B0011
About this file
This document contains bid opening results and details for a federal contract opportunity to replace intake bulkheads at the McNary Lock and Dam. Hydro Partners Joint Venture submitted the lowest bid of $3,375,800, while bids ranged from $3,375,800 to $6,054,264. The contract requires fabrication of two intake bulkheads that are approximately 23 feet wide, 55 feet tall, 3 feet deep and weigh 140,000 pounds each. The bulkheads must be delivered as complete units and installed onsite. The contractor must have American Institute of Steel Construction fabrication certifications and Society for Protective Coatings painting certifications. The performance period is estimated at $5,000,000 to $10,000,000. The solicitation was issued by the U.S. Army Corps of Engineers Walla Walla District as a total small business set-aside for firms with average annual receipts less than $39,500,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EF21B0011 Bid Opening Results.pdf | ||
| B.08.03 Plans_21B0011_amd0002.pdf | ||
| B.08.03 TECHSPECS_21B0011_amd0002_24Mar21.pdf | ||
| B.08.03 W912EF21B0011 Amendment 0002.pdf | ||
| Site Visit Attendee List - W912EF21B0011 MNA Bulkheads.pdf | ||
| B.08.03 W912EF21B0011 Amendment 0001.pdf | ||
| B.08.02 McNary Bulkheads Resource Drawings_21B0011.pdf | ||
| B.08.02 McNary Bulkheads Contract Drawings_21B0011.pdf | ||
| B.08.02 Technical Specifications MNA Bulkheads_21B0011.pdf | ||
| B.08.02 Solicitaton - W912EF21B0011 MNA Bulkheads.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPDATED BID OPENING WORKSHEET – 1 April 2021, 3:00 PM
Updated to include the composition of Hydro Partners JV Solicitation Number: W912EF21B0011 AMENDMENTS: 2 CONSTRUCTION: MNA Bulkheads
CONTRACT SPECIALIST: Karlyn Holland
CONTRACTOR Acknowledge Amendments
TOTAL BID
(Base Schedule plus
Optional Items)
BCI Construction USA, Inc.
Y 4,318,852
Derian, Inc. Y 4,361,660
Hydro Partners Joint Venture (Willamette Technical Fabricators, LLC and Precision Build Solutions LLC)
Y 3,375,800
King Fabrication LLC Y 3,917,509
Northbank Civil and Marine, Inc.
Y 3,691,300
Steward Machine Company, Inc.
6,054,264
Thompson Metal Fab
4,186,177
Transco Ind.
Y 5,460,152
WHH Nisqually-Garco JV Y 4,299,949.00
GOVERNMENT ESTIMATE
$4,324,940.00