W912EF21B0009 Construction Specifications.pdf

PDF 4 MB Posted

Attached to
General Construction Services for Clover Island Ecosystem Restoration Federal contract opportunity
Solicitation number
W912EF21B0009
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This solicitation document describes a construction project for ecosystem restoration on Clover Island in Kennewick, Washington. The scope of work includes selective demolition, earthwork, landscaping, shoreline restoration, and other site improvements. The contract will be a firm fixed-price construction contract with an estimated value between $5-10 million. The project has a 100% small business set-aside and will be awarded in mid-late July 2021. The contractor will be responsible for safety, quality control, and using the government's RMS system to record and submit project information. Work must be performed according to EM 385-1-1 safety standards and include development of an accident prevention plan and activity hazard analyses. A pre-bid site visit is scheduled as detailed in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to General Construction Services for Clover Island Ecosystem Restoration, newest first.
File Type Posted
Bid Opening Summary.pdf PDF
W912EF21B0009-0002 SF1442.pdf PDF
W912EF21B0009-0002 Amendment.pdf PDF
W912EF21B0009-0001 Amendment.pdf PDF
Site_Visit_Attendance_List_21B0009 .pdf PDF
W912EF21B0009 Construction Plans.pdf PDF
W912EF21B0009 Invitation for Bid.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cl over I s l and 1135 Ecosyst em Rest or at i on W912EF21B0009

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 32 01. 00 28 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 51 00. 00 28 TEMPORARY UTI LI TI ES

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

26 05 19. 10 10 I NSULATED WI RE AND CABLE

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 10 00 CLEARI NG FOR CI VI L WORKS

31 11 00 CLEARI NG AND GRUBBI NG

31 32 00 STABI LI ZATI ON SYSTEM

31 32 39 BI OENGI NEERI NG PRACTI CES FOR STREAM BANK AND SHORELI NE

STABILIZATION

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 13. 62 ASPHALT SURFACE TREATMENT

32 05 33 LANDSCAPE ESTABLI SHMENT

32 16 19 CONCRETE CURBS, GUTTERS AND SI DEWALKS

32 84 24 I RRI GATI ON SPRI NKLER SYSTEMS

32 92 19 SEEDING

32 92 26 SPRIGGING

32 93 00 EXTERI OR PLANTS

PROJECT TABLE OF CONTENTS Page 1

32 96 00 TRANSPLANTI NG EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR

STRUCTURES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 2

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

1. 3 RESOURCE DRAWI NGS ( R)

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28

This page intentionally left blank

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

SHEET

NUMBER

DESCRIPTION FI LE NUMBER Rev.

Num.

Date

GENERAL

GI101 COVER SHEET AND LOCATI ON MAPS POB-329-1/1

GI102 SHEET I NDEX POB-329-1/2

GI103 ABBREVIATIONS POB-329-1/3

GI104 PROJECT EXTENTS AND WORK AREA POB-329-1/4

GC101 CONTRACTOR STAGI NG AREAS, BANK

ACCESS AREAS FOR HEAVY EQUI PMENT &

TESC PLAN

POB-329-1/5

CIVIL

CI101 EXI STI NG SI TE PLAN - 1 POB-329-1/6

CI102 EXI STI NG SI TE PLAN - 2 POB-329-1/7

CI103 EXI STI NG SI TE PLAN - 3 POB-329-1/8

CD101 DEMOLI TI ON PLAN - 1 POB-329-1/9

CD102 DEMOLI TI ON PLAN - 2 POB-329-1/10

CD103 DEMOLI TI ON PLAN - 3 POB-329-1/11

CD104 DEMOLI TI ON PLAN - 4 POB-329-1/12

SHEET

NUMBER

DESCRIPTION FI LE NUMBER Rev.

Num.

Date

CD105 DEMOLI TI ON PLAN - 5 POB-329-1/13

CD106 DEMOLI TI ON PLAN - 6 POB-329-1/14

CG101 GRADI NG PLAN - 1 POB-329-1/15

CG102 GRADI NG PLAN - 2 - EMERGENT WETLAND

I N NOTCH

POB-329-1/16

CG103 GRADI NG PLAN - 3 POB-329-1/17

CG104 GRADI NG PLAN - 4 POB-329-1/18

CG105 GRADI NG PLAN - 5 POB-329-1/19

CG106 GRADI NG PLAN - 6 POB-329-1/20

CG301 SHORELI NE SECTI ONS - 1 - TARGET

GRADING

POB-329-1/21

CG302 SHORELI NE SECTI ONS - 2 TARGET GRADI NG POB-329-1/22

CG303 SHORELI NE SECTI ONS - 3 - TARGET

GRADING

POB-329-1/23

CG304 SHORELI NE SECTI ONS - 4 - TARGET

GRADING

POB-329-1/24

CG305 SHORELI NE SECTI ONS - 5 - TARGET

GRADING

POB-329-1/25

CG306 SHORELI NE SECTI ONS - 6 - TARGET

GRADING

POB-329-1/26

CG307 SHORELI NE SECTI ONS - 7 - TARGET

GRADING

POB-329-1/27

CG308 SHORELI NE SECTI ONS - 8 - TARGET

GRADING

POB-329-1/28

CG309 SHORELI NE SECTI ONS - 9 - TARGET

GRADING

POB-329-1/29

CG310 SHORELI NE SECTI ONS - 10 - TARGET

GRADING

POB-329-1/30

CG501 SHORELI NE ENLARGED DETAI LS - 1 POB-329-1/31

CG502 SHORELI NE ENLARGED DETAI LS - 2 POB-329-1/32

CG503 MARI NE MATTRESS DETAI LS POB-329-1/33

PAVING

CP001 CONCRETE NOTES POB-329-1/34

CP101 WALKWAY PLAN - 1 POB-329-1/35

CP102 WALKWAY PLAN - 2 POB-329-1/36

CP501 WALKWAY DETAI LS - 1 POB-329-1/37

NUMBER

DESCRIPTION FI LE NUMBER Rev.

Num.

Date

LANDSCAPE

LL101 EARTHWORK TREATMENT PLAN - 1 POB-329-1/38

LL102 EARTHWORK TREATMENT PLAN - 2 POB-329-1/39

LL103 EARTHWORK TREATMENT PLAN - 3 POB-329-1/40

LL104 EARTHWORK TREATMENT PLAN - 4 POB-329-1/41

LL105 EARTHWORK TREATMENT PLAN - 5 POB-329-1/42

LL106 EARTHWORK TREATMENT PLAN - 6 POB-329-1/43

LI001 LANDSCAPE I RRI GATI ON NOTES AND

SCHEDULES

POB-329-1/44

LI101 LANDSCAPE I RRI GATI ON PLAN - 1 POB-329-1/45

LI102 LANDSCAPE I RRI GATI ON PLAN - 2 POB-329-1/46

LI103 LANDSCAPE I RRI GATI ON PLAN - 3 POB-329-1/47

LI104 LANDSCAPE I RRI GATI ON PLAN - 4 POB-329-1/48

LI105 LANDSCAPE I RRI GATI ON PLAN - 5 POB-329-1/49

LI106 LANDSCAPE I RRI GATI ON PLAN - 6 POB-329-1/50

LI501 LANDSCAPE I RRI GATI ON DETAI LS - 1 POB-329-1/51

LI502 LANDSCAPE I RRI GATI ON DETAI LS - 2 POB-329-1/52

LI503 LANDSCAPE I RRI GATI ON DETAI LS - 3 POB-329-1/53

LP101 LANDSCAPE PLANTI NG PLAN - 1 POB-329-1/54

LP102 LANDSCAPE PLANTI NG PLAN - 2 POB-329-1/55

LP103 LANDSCAPE PLANTI NG PLAN - 3 POB-329-1/56

LP104 LANDSCAPE PLANTI NG PLAN - 4 POB-329-1/57

LP105 LANDSCAPE PLANTI NG PLAN - 5 POB-329-1/58

LP106 LANDSCAPE PLANTI NG PLAN - 6 POB-329-1/59

LP501 LANDSCAPE PLANTI NG NOTES POB-329-1/60

LP502 LANDSCAPE PLANTI NG DETAI LS POB-329-1/61

NUMBER

DESCRIPTION FI LE NUMBER Rev.

Num.

Date

ELECTRICAL

ES001 ELECTRI CAL SYMBOLS AND ABBREVI ATI ONS PB-329-1/62

ES101 ELECTRI CAL PLAN - 1 PB-329-1/63

ES102 ELECTRI CAL PLAN - 2 PB-329-1/64

ES103 ELECTRI CAL PLAN - 3 PB-329-1/65

ES104 ELECTRI CAL DETAI LS AND PANEL SCHEDULE PB-329-1/66

ES105 I RRI GATI ON CONTROL POWER CONNECTI ON PB-329-1/67

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

a. No Resour ce ( R) ( " For I nf or mat i on Onl y" ) dr awi ngs ar e avai l abl e on

CAD.

b. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD drawings.

c. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey DGN format.

d. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.

The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.

1. 3 RESOURCE DRAWI NGS ( R)

These R dr awi ngs ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on onl y. The Gover nment does not war r ant t he accur acy of t he R dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of R dr awi ngs.

Resour ce ( R) dr awi ngs ar e as f ol l ows:

SHEET

NUMBER

DESCRIPTION FI LE NUMBER Rev.

Num.

Date

RESOURCE

NUMBER

DESCRIPTION FI LE NUMBER Rev.

Num.

Date

RESERVED

- - End of Document - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an Empl oyment I nf or mat i on http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al https://duckduckgo.com/l/?kh=-1&uddg=https%3A%2F%2Fwww.ebenefits.va.gov%2Febenefits-portal%2Fdownloads%2Fveterans-hiring-guide-2014.pdf

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

1. 4 DEFI NI TI ONS

1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL

1. 6 EQUI PMENT LI ST

1. 7 TESTI NG OF EQUI PMENT

1. 8 DI SPOSI TI ON OF REMOVED MATERI ALS AND EQUI PMENT

1. 9 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 10 PRE- CONSTRUCTI ON AND POST- CONSTRUCTI ON ON- SI TE I NSPECTI ON

1. 11 CONSTRUCTI ON PROGRESS PHOTOS

1. 12 PROJECT SUPERI NTENDENT

1. 13 KEY PERSONNEL SUBSTI TUTI ON

1. 14 POST AWARD MEETI NGS

1. 14. 1 RMS Or i ent at i on Meet i ng

1. 15 WEEKLY PRODUCTI ON MEETI NGS

1. 15. 1 Mi nut es

1. 16 ADDI TI ONAL MEETI NGS

1. 17 PARTNERI NG

1. 17. 1 Gener al

1. 17. 2 Par t ner i ng Meet i ngs

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Weekl y Meet i ng Agenda

Look-Ahead

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON

01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Equi pment Li st ; I , C

Pr e- Const r uct i on On- Si t e I nspect i on and Repor t ; I , C

Pr oj ect Super i nt endent ; I , C

SD- 07 Cer t i f i cat es

Key Per sonnel Subst i t ut i on; G, C

SD- 11 Cl oseout Submi t t al s

Post - Const r uct i on On- Si t e I nspect i on and Repor t ; I , C

Weekl y Pr ogr ess Phot ogr aphs; G, C

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs t hat af f ect new const r uct i on.

Any devi at i ons shal l be updat ed as per SECTI ON 01 78 00. 00 28, CLOSEOUT SUBMI TTALS, par agr aphs WORKI NG AS- BUI LT DRAWI NGS.

1. 4 DEFINITIONS

a. Qual i f i ed Per son.

As def i ned i n EM 385- 1- 1; " DEFI NI TI ONS" , unl ess ot her wi se specified.

b. F. O. B.

An abbr evi at i on f or f r ee on boar d, whi ch means t hat a vendor or consi gnor wi l l del i ver goods on a r ai l r oad car , t r uck, vessel , or ot her conveyance wi t hout any expense t o t he pur chaser or consi gnee.

1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL

Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.

1. 6 EQUI PMENT LI ST

Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect 30 days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i ncl ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .

1. 7 TESTI NG OF EQUI PMENT

Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.

Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.

1. 8 DI SPOSI TI ON OF REMOVED MATERI ALS AND EQUI PMENT

Unl ess ot her wi se speci f i ed i n ot her sect i ons of t he speci f i cat i ons, al l exi st i ng equi pment r emoved and not r ei nst al l ed shal l become t he pr oper t y of t he Cont r act or , r emoved f r om t he Pr oj ect s i t e, and di sposed of i n a l egal manner . Mat er i al s t hat cannot be r emoved dai l y may be t empor ar i l y st or ed on- si t e at an appr oved ar ea. Sal vaged mat er i al s shal l not be sol d on t he pr oj ect s i t e.

1. 9 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

Ref er ence FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s ( Apr 1984) .

1. 10 PRE- CONSTRUCTI ON AND POST- CONSTRUCTI ON ON- SI TE I NSPECTI ON

Conduct a Pr e- Const r uct i on On- Si t e I nspect i on of exi st i ng condi t i ons, pr i or t o st ar t of on- s i t e wor k, and a Post - Const r uct i on On- Si t e I nspect i on dur i ng pr oj ect c l oseout , wi t h t he Cont r act i ng Of f i cer Repr esent at i ve, of t he f aci l i t i es at t he wor k ar ea. Document exi st i ng s i t e condi t i ons pr i or t o Const r uct i on by di gi t al phot ogr aphs, and/ or v i deos al ong wi t h descr i pt i ve nar r at i ve r epor t t o t he Cont r act i ng Of f i cer ( KO) wi t hi n f i ve ( 5) days af t er completion.

1. 11 CONSTRUCTI ON PROGRESS PHOTOS

Dur i ng on s i t e const r uct i on act i v i t i es r ecor d const r uct i on pr ogr ess wi t h weekl y pr ogr ess phot ogr aphs. Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Gover nment .

a. Phot os shal l be submi t t ed at t he end of each wor k week.

b. Fur ni sh di gi t al phot ogr aphs, Ut i l i ze JPEG f i l e f or mat f or al l phot ogr aph and i mage f i l es.

c. Pr ovi de f ul l - col or phot os wi t h phot o r esol ut i on of not l ess t han 4 megapi xel s and not mor e t han 12 megapi xel s. Phot os shal l show t he sequence and pr ogr ess of wor k.

d. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect .

e. Submi t di gi t al phot ogr aphs weekl y f or use at t he Weekl y Pr oduct i on Meet i ng. See par agr aph WEEKLY PRODUCTI ON MEETI NGS f or addi t i onal information.

Ensur e t hat t he phot ogr aphs ar e di gi t al l y dat ed. Log shal l be f ur ni shed f or each phot ogr aph t hat r ecor ds t he f ol l owi ng i nf or mat i on:

a. Phot ogr aph number ( t he speci f i c f or mat shoul d be t i ed t o t he f i l ename of t he el ect r oni c phot ogr aph) .

b. Dat e t he phot ogr aph was t aken.

c. A br i ef descr i pt i on of t he l ocat i on, what t he phot ogr aph depi ct s, and t he or i ent at i on of t he v i ew.

1. 12 PROJECT SUPERI NTENDENT

The Cont r act or ' s Pr oj ect Super i nt endent shal l be on t he wor ksi t e dur i ng per f or mance of wor k on t hi s cont r act . The Pr oj ect Super i nt endent i s r equi r ed on t he wor ksi t e, at al l t i mes wor k i s bei ng per f or med, unt i l wor k on t hi s cont r act i s compl et ed and accept ed. Assi gn a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.

1. 13 KEY PERSONNEL SUBSTI TUTI ON

I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , CQC Syst em Manager , or CQC st af f Member s) t hey must have t he appr oval of t he Cont r act i ng Of f i cer . Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t hi s cont r act f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east 15 cal endar days i n advance of dat e of r epl acement .

1. 14 POST AWARD MEETI NGS

1. 14. 1 RMS Or i ent at i on Meet i ng

a. An RMS ( Resi dent Management Syst em) Or i ent at i on Meet i ng wi l l be hel d wi t hi n Fi f t een ( 15) cal endar days af t er r ecei pt of Not i ce t o Pr oceed. See SECTI ON 01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or addi t i onal i nf or mat i on. Or i ent at i on meet i ng wi l l be at Di st r i c t Headquar t er s, and may occur i n conj unct i on wi t h, but not at t he same t i me as, t he Pr e- Wor k meet i ng. Coor di nat e meet i ng dat e and t i me wi t h t he Cont r act i ng Of f i cer a mi ni mum of 7 cal endar days pr i or t o t he meet i ng.

b. At a mi ni mum, t he Cont r act or ' s RMS- CM Admi ni st r at or and QC syst em manager shal l at t end t he RMS Or i ent at i on meet i ng. A Gover nment Repr esent at i ve wi l l l ead t he or i ent at i on. Ant i c i pat e t he f ol l owi ng at t he meet i ng:

1. Al l ow f or a maxi mum 4 hour dur at i on.

2. Cover t he f ol l owi ng t opi cs, at a mi ni mum, i n RMS Cont r act or Mode ( CM) :

i . Cont r act or use of RMS ( CM) syst em.

i i . Cont r act or Dat a.

i i i . Qual i t y Cont r ol Repor t s.

i v . Submi t t al s.

v. RFI s.

v i . Payment .

3. Recei ve a f ol l ow- up handout / gui de f or r ef er ence on t he above items.

c. Cont r act or empl oyees shal l br i ng a comput er wi t h Wi - Fi capabi l i t y ( t o gai n access t o t he I nt er net ) , wi t h RMS pr e- l oaded.

d. The RMS Or i ent at i on Meet i ng i s r equi r ed f or Cont r act or s wi t h no pr i or RMS exper i ence. The RMS Or i ent at i on Meet i ng, i s opt i onal , but may be r equest ed, f or al l ot her Cont r act or s.

1. 15 WEEKLY PRODUCTI ON MEETI NGS

Dur i ng al l f abr i cat i on and onsi t e const r uct i on wor k, hol d a weekl y pr oduct i on meet i ng t o br i ef t he Gover nment on t he st at us of t he pr oj ect .

a. Use t he at t ached " Weekl y Meet i ng Agenda" and di scuss al l el ement s of t hi s agenda.

b. Pr ovi de a t hr ee ( 3) week ' l ook ahead' . The " Look- Ahead" shal l be gener at ed i n P6 and t hen copi ed i nt o Excel f or mor e det ai l ( see l ook- ahead exampl es at t he end of t hi s sect i on) .

1. Descr i be al l pl anned const r uct i on act i v i t i es, on- si t e and of f - s i t e over t he next t hr ee ( 3) weeks.

2. ENSURE t hese act i v i t i es al i gn t o t he over al l const r uct i on SCHEDULE submi t t ed under SECTI ON 01 32 01. 00 28 PROJECT SCHEDULE.

3. RECORD any changes t o t he Pr oj ect Schedul e AND I NCLUDE I N t he next schedul ed updat e.

c. Key member s of t he Cont r act or ' s st af f i ncl udi ng t he Qual i t y Cont r ol Syst em Manager and t he SI TE SAFETY AND HEALTH OFFI CER shal l at t end.

d. The Qual i t y Cont r ol Syst em Manager shal l di scuss al l QC aspect s out l i ned i n SECTI ON 01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL.

e. The Gover nment r eser ves t he r i ght t o r equi r e any per son f r om t he Cont r act or ' s st af f such as t he Pr oj ect Manager , Engi neer , Schedul er or Key Subcont r act or Per sonnel t o at t end t he meet i ng.

f . Submi t each meet i ng agenda, al ong wi t h Const r uct i on Pr ogr ess Phot os, t o t he COR 24 hour s pr i or t o t he meet i ng. See par agr aph CONSTRUCTI ON PROGRESS PHOTOS f or addi t i onal i nf or mat i on.

1. 15. 1 Minutes

The Cont r act or shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 16 ADDI TI ONAL MEETI NGS

Recor d t he mi nut es of al l meet i ngs, i ncl udi ng al l conf er ence cal l s, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Cont r act i ng Of f i cer f or concur r ence.

E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.

1. 17 PARTNERING

1. 17. 1 General

The Gover nment i nt ends t o encour age t he f oundat i on of a cohesi ve par t ner shi p wi t h t he Cont r act or and i t s subcont r act or s by i nf or mal l y par t ner i ng t hi s cont r act . Thi s par t ner shi p wi l l be st r uct ur ed t o dr aw on t he st r engt hs of each or gani zat i on t o i dent i f y and achi eve r eci pr ocal goal s. The obj ect i ves ar e ef f ect i ve and ef f i c i ent cont r act per f or mance wi t h t he i nt ent t o achi eve a saf e compl et i on of t he wor k - wi t hi n budget , on schedul e, and i n accor dance wi t h pl ans and speci f i cat i ons. Thi s par t ner shi p woul d be bi l at er al i n makeup and par t i c i pat i on wi l l be t ot al l y vol unt ar y. I f Par t ner i ng i s pur sued, meet i ngs woul d be hel d as i dent i f i ed i n t he f ol l owi ng par agr aph.

1. 17. 2 Par t ner i ng Meet i ngs

Wi t hi n 30 cal endar days of r ecei pt of Not i ce t o Pr oceed, t he i ni t i al par t ner i ng meet i ng wi l l be schedul ed i f t he meet i ng i s r equest ed by t he Cont r act or . The Cont r act or ' s key per sonnel wi l l at t end a f ace- t o- f ace par t ner i ng meet i ng ( t ypi cal l y one day i n dur at i on) t oget her wi t h key Gover nment per sonnel , t o di scuss pr oj ect goal s and communi cat i on.

Fol l ow- up meet i ngs wi l l be hel d per i odi cal l y , as r equi r ed, t hr oughout t he dur at i on of t he cont r act , as agr eed t o by t he Cont r act or and t he Gover nment .

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

Activity ID Activity Name Original Duration

Remaining Duration

Start Finish Physical

C l t

Total Float Critical

TotalTotal 32d 32d 26-Feb-15 11-Apr-15 194d

3 Week Look A3 Week Look Ahead 32d 32d 26-Feb-15 11-Apr-15 194d

Preparatory & AdPreparatory & Admin 5d 5d 26-Feb-15 02-Mar-15 311d 0001 Dive Operations 5d 5d 26-Feb-15 02-Mar-15 0% 311d

PreconstructionPreconstruction 20d 20d 26-Feb-15 25-Mar-15 167d Design & SubmitDesign & Submittals 20d 20d 26-Feb-15 25-Mar-15 162d

0002 Tests,Insp, and Verifications 20d 20d 26-Feb-15 25-Mar-15 0% 162d ProcurementProcurement 0d 0d 0d Fabrication & MaFabrication & Machining 0d 0d 0d Pre-Work CoordiPre-Work Coordination 0d 0d 0d

Field WorkField Work 16d 16d 26-Feb-15 19-Mar-15 210d Unit AUnit A 0d 0d 0d Unit BUnit B 0d 0d 0d Unit CUnit C 16d 16d 26-Feb-15 19-Mar-15 210d

Unit C Pre-RehUnit C Pre-Rehab Inspections 0d 0d 0d Unit C Box #1 Unit C Box #1 Removal 13d 13d 26-Feb-15 16-Mar-15 205d

0006 Remove Box 1 Screen 2d 2d 26-Feb-15 27-Feb-15 0% 93d 0007 Remove Box 2 Screen 2d 2d 02-Mar-15 03-Mar-15 0% 93d 0008 Remove Box 3 Screen 2d 2d 04-Mar-15 05-Mar-15 0% 93d 0009 Screen Slot 1 Measurement 1d 1d 06-Mar-15 06-Mar-15 0% 205d 0010 Install shafts 21-24 4d 4d 09-Mar-15 12-Mar-15 0% 205d 0011 Pressure Wash Slot 2 1d 1d 13-Mar-15 13-Mar-15 0% 205d 0012 Pressure Wash Slot 3 1d 1d 16-Mar-15 16-Mar-15 0% 205d

Unit C Box #2 Unit C Box #2 Removal 10d 10d 06-Mar-15 19-Mar-15 100d 0013 Lower Lifting Beam & Attach 2d 2d 06-Mar-15 09-Mar-15 0% 93d 0014 Raise Screen to Deck & Support 1d 1d 10-Mar-15 10-Mar-15 0% 93d 0015 Fuel Removal 1d 1d 11-Mar-15 11-Mar-15 0% 93d 0016 Fuel Screen Inspect & Measure 1d 1d 12-Mar-15 12-Mar-15 0% 93d 0017 Separate Widget from Screen 1d 1d 13-Mar-15 13-Mar-15 0% 93d 0018 Haul Screen to Laydown 1d 1d 16-Mar-15 16-Mar-15 0% 103d 0019 Remove Box 4 Screen 2d 2d 16-Mar-15 17-Mar-15 0% 93d 0020 Remove Box 5 Screen 2d 2d 18-Mar-15 19-Mar-15 0% 93d

Unit C Box #3 Unit C Box #3 Removal 0d 0d 0d Unit C Fuel ScUnit C Fuel Screen Field Modifications 14d 14d 26-Feb-15 17-Mar-15 103d

0039 Position Screen 1 on Slab 1d 1d 26-Feb-15 26-Feb-15 0% 116d 0040 Position Screen 2 on Slab 1d 1d 17-Mar-15 17-Mar-15 0% 103d

Unit C Wagner Unit C Wagner Horn Plugs Installation 0d 0d 0d Unit C Fish ScUnit C Fish Screens Installatin 0d 0d 0d Unit C Fish ScUnit C Fish Screen Slot Closure 0d 0d 0d

Unit DUnit D 0d 0d 0d Unit D Pre-RehUnit D Pre-Rehab Inspections 0d 0d 0d Unit D Screen Unit D Screen #1 Removal 0d 0d 0d

A S O N D J F M A M J J A S O N D J F 2015 2016

11-Apr-15, Total

11-Apr-15, 3 Week Look Ah

02-Mar-15, Preparatory & Admi Dive Operations

25-Mar-15, Preconstruction 25-Mar-15, Design & Submitt Tests,Insp, and Verifications

19-Mar-15, Field Work

19-Mar-15, Unit C

16-Mar-15, Unit C Box #1 Rem Remove Box 1 Screen Remove Box 2 Screen Remove Box 3 Screen Screen Slot 1 Measurement Install shafts 21-24 Pressure Wash Slot 2 Pressure Wash Slot 3 19-Mar-15, Unit C Box #2 Rem

Lower Lifting Beam & Attach Raise Screen to Deck & Suppo Fuel Removal Fuel Screen Inspect & Measur Separate Widget from Screen Haul Screen to Laydown Remove Box 4 Screen Remove Box 5 Screen

17-Mar-15, Unit C Fuel Scree Position Screen 1 on Slab

Position Screen 2 on Slab

3 Week Look Ahead Three Week Look Ahead 02-Mar-15 10:02

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary Page 1 of 3 TASK filter: 3 Week Look Ahead.

© Oracle Corporation

Weekly Meeting agenda template

Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review

Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters

Coordination - Clearances required over the next week, include the following:

A description of the work to be performed under the Clearance.

Determine the correct energy isolation points needed to perform the work safely.

Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.

Determine the procedure and method of testing for stored energy if applicable.

The date and time the Clearance shall be required.

The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.

Coordination issues

Safety- Review of AHA’s for ongoing work Pending AHA’s

Required for new work Status of Gov’t approval

Safety issues

QC -

Preparatory meetings Held over last week- status of meeting minutes

Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 BI OGRAPHI CAL I NFORMATI ON SUBMI TTAL

1. 3 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .

Thi s cont r act does not r equi r e access t o secur ed and r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment .

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , C

Bi ogr aphi cal I nf or mat i on; G, C

1. 2 BI OGRAPHI CAL I NFORMATI ON SUBMI TTAL

Submi t Bi ogr aphi cal I nf or mat i on t o t he COR vi a emai l as a passwor d pr ot ect ed pdf f i l e or usi ng t he DoD SAFE si t e f or al l per sonnel r equi r i ng unescor t ed access or r equi r i ng access t o gover nment i nf or mat i on syst ems.

See par agr aph " ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES" f or addi t i onal i nf or mat i on and det ai l s on i t ems t o submi t .

1. 3 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

The Cont r act or must pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am ( http://www.uscis.gov/e-verify ) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. The Vendor must ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o enr ol l ment t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y syst em.

Addi t i onal t i me may be r equi r ed f or f or i egn nat i onal s t o pr e- scr een.

An i ni t i al l i s t of ver i f i ed/ el i gi bl e Candi dat es must be pr ovi ded t o t he cont r act i ng of f i cer , no l at er t han 30 busi ness days af t er r ecei pt of Not i ce t o Pr oceed.

* When cont r act s ar e wi t h i ndi v i dual s, t he i ndi v i dual s wi l l be r equi r ed t o compl et e a For m I - 9, Empl oyment El i gi bi l i t y Ver i f i cat i on, wi t h t he desi gnat ed Gover nment r epr esent at i ve. Thi s For m wi l l be pr ovi ded t o t he Cont r act i ng Of f i cer and shal l become par t of t he of f i c i al cont r act f i l e.

Submi t pr e- scr eeni ng r esul t s t o t he COR vi a emai l as a passwor d pr ot ect ed pdf f i l e.

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 RETAI NAGE OF PAYMENT

1. 2 BASE I TEMS

1. 3 I TEM NO. 0001 SI TE WORK AND DEMOLI TI ON

1. 4 EARTHWORK

1. 4. 1 I TEM NO. 0002 EROSI ON CONTROL BLANKET

1. 4. 2 I TEM NO. 0003 GEOWEB wi t h ANCHORI NG

1. 4. 3 I TEM NO. 0004 MARI NE MATTRESSES WI TH GEOGRI D EXTENSI ON

1. 4. 4 I TEM NO> 0005 MARI NE MATTRESSES W/ OUT GEOGRI D EXTENSI ON

1. 4. 5 I TEM NO. 0006 QUARRY SPALLS- RI PRAP BEDDI NG

1. 4. 6 I TEM NO. 0007 RI PRAP

1. 4. 7 I TEM NO. 0008 GRAVEL BORROW FI LL

1. 4. 8 I TEM NO. 0009 SAND- SI LT SURFACE FI LL

1. 4. 9 I TEM NO. 0010 COMMON FI LL

1. 4. 10 I TEM NO. 0011 TOPSOI L

1. 4. 11 I TEM NO. 0012 COMPOST SOI L AMENDMENT

1. 4. 12 I TEM NO. 0013 BASE COURSE

1. 4. 13 I TEM NO. 0014 TOP COURSE

1. 4. 14 I TEM NO. 0015 12" COBBLES

1. 4. 15 I TEM NO. 0016 8" COBBLES

1. 4. 16 I TEM NO. 0017 6" COBBLES

1. 4. 17 I TEM NO. 0018 LANDSCAPE ROCK

1. 5 I TEM NO. 0019 ASPHALT

1. 6 I TEM NO. 0020 CONCRETE WALKWAYS

1. 7 I TEM NO. 0021 ELECTRI CAL

1. 8 I TEM NO. 0022 I RRI GATI 0N

1. 9 I TEM NO. 0023 SEEDI NG

1. 10 I TEM NO. 0024 PLANTI NG

1. 11 OPTI ONAL I TEMS

1. 12 I TEM NO. 1001 SI TE WORK AND DEMOLI TI ON ( Opt i onal )

1. 13 EARTHWORK ( Opt i onal )

1. 13. 1 I TEM NO. 1002 EROSI ON CONTROL BLANKET ( Opt i onal )

1. 13. 2 I TEM NO. 1003 GEOWEB wi t h ANCHORI NG ( Opt i onal )

1. 13. 3 I TEM NO> 1004 MARI NE MATTRESSES W/ OUT GEOGRI D EXTENSI ON

(Optinal)

1. 13. 4 I TEM NO. 1005 QUARRY SPALLS- RI PRAP BEDDI NG ( Opt i onal )

1. 13. 5 I TEM NO. 1006 RI PRAP ( Opt i onal

1. 13. 6 I TEM NO. 1007 COMMON FI LL ( Opt i onal )

1. 13. 7 I TEM NO. 1008 TOPSOI L ( Opt i onal )

1. 13. 8 I TEM NO. 1009 FLEXI BLE GROWTH MEDI UM ( Opt i onal )

1. 13. 9 I TEM NO. 1010 COMPOST SOI L AMENDMENT ( Opt i onal )

1. 13. 10 I TEM NO. 1011 BASE COURSE ( Opt i onal )

1. 13. 11 I TEM NO. 1012 12" COBBLES ( Opt i onal )

1. 13. 12 I TEM NO. 1013 8" COBBLES ( Opt i onal

1. 13. 13 I TEM NO. 1014 6" COBBLES ( Opt i onal )

SECTI ON 01 22 00. 00 28

1. 13. 14 I TEM NO. 1015 4" COBBLES ( Opt i onal

1. 13. 15 I TEM NO. 1016 LANDSCAP ROCK ( Opt i onal )

1. 14 I TEM NO. 1017 ELECTRI CAL ( Opt i ona)

1. 15 I TEM NO. 1018 I RRI GATI ON ( Opt i onal )

1. 16 I TEM NO. 1019 SEEDI NG ( Opt i onal )

1. 17 I TEM NO. 1020 PLANTI NG ( Opt i onal )

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on Tabl e of Cont ent s - -

MEASUREMENT AND PAYMENT

PART 1 GENERAL

I n each i nst ance, t he cont r act pr i ce f or an i t em shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i al s, and f or per f or mi ng al l oper at i ons r equi r ed t o compl et e t he wor k i ncl uded i n t he i t em as her ei n speci f i ed, or as ot her wi se appr oved.

1. 1 RETAI NAGE OF PAYMENT

Ret ai nage i n t he amount of 10 per cent of or i gi nal cont r act awar d amount wi l l be wi t hhel d unt i l t he f i nal submi t t al s, l i s t ed bel ow, have been appr oved by t he Gover nment . The 10 per cent r et ai nage f or f i nal submi t t al s wi l l be hel d unt i l such t i me as t he Cont r act or has ear ned 90 per cent of t he or i gi nal cont r act val ue. See SECTI ON 01 78 00. 00 28 " CLOSEOUT SUBMI TTALS" .

a. Fi nal Shop Dr awi ngs.

b. Fi nal As- bui l t Dr awi ngs.

c. Fi nal Recor d Dr awi ngs.

1. 2 BASE I TEMS

To i ncl ude west end of Cl over I s l and f r om exi st i ng l i ght house, t hr ough t he not ch ar ea and cont i nui ng t o j ust east of exi st i ng v i ewi ng pl at f or m near t he r est aur ant .

1. 3 I TEM NO. 0001 SI TE WORK AND DEMOLI TI ON

Si t e wor k and demol i t i on wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0001, " Si t e Wor k and Demol i t i on, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or s i t e wor k and demol i t i on and al l r el at ed i t ems and f eat ur es, compl et e, as speci f i ed and appr oved. Feat ur es i ncl uded wi t h t hi s i t em wi l l i nc l ude, but not be l i mi t ed t o:

a. per mi t act i v i t i es

b. f l agger s and si gnage

c. secur i t y f enci ng

d. dust cont r ol measur es

e. c l ear i ng, gr ubbi ng, and di sposal f . al l wor k not cover ed under ot her bi d i t ems

1. 4 EARTHWORK

1. 4. 1 I TEM NO. 0002 EROSI ON CONTROL BLANKET

Tr anspor t and pl acement of Er osi on Cont r ol Bl anket wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0002 " Er osi on Cont r ol Bl anket , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Er osi on Cont r ol Bl anket , compl et e, as speci f i ed and appr oved.

1. 4. 2 I TEM NO. 0003 GEOWEB wi t h ANCHORI NG

Tr anspor t and pl acement of Geoweb wi t h Anchor i ng wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0003 " Geoweb wi t h Anchor i ng, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Geoweb wi t h Anchor i ng, compl et e, as speci f i ed and appr oved.

1. 4. 3 I TEM NO. 0004 MARI NE MATTRESSES WI TH GEOGRI D EXTENSI ON

Tr anspor t and pl acement of Mar i ne Mat t r esses wi t h Geogr i d Ext ensi on wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) Mar i ne Mat t r esses pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0004 " Mar i ne Mat t r ess wi t h Geogr i d Ext ensi on, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng, pl acement and anchor i ng of Mar i ne Mat t r esses wi t h Geogr i d Ext ensi on, compl et e, as speci f i ed and appr oved.

1. 4. 4 I TEM NO> 0005 MARI NE MATTRESSES W/ OUT GEOGRI D EXTENSI ON

Tr anspor t and pl acement of Mar i ne Mat t r esses wi t hout Geogr i d Ext ensi on wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) Mar i ne Mat t r esses pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No.

0005 " Mar i ne Mat t r ess wi t hout Geogr i d Ext ensi on, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng, pl acement and anchor i ng of Mar i ne Mat t r esses wi t hout Geogr i d Ext ensi on, compl et e, as speci f i ed and appr oved.

1. 4. 5 I TEM NO. 0006 QUARRY SPALLS- RI PRAP BEDDI NG

Tr anspor t and pl acement of Quar r y Spal l s- Ri pr ap Beddi ng wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced.

Payment wi l l be made at t he uni t pr i ce f or I t em No. 0006 " Quar r y Spal l s- Ri pr ap Beddi ng, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Quar r y Spal l s- Ri pr ap Beddi ng, compl et e, as speci f i ed and appr oved.

1. 4. 6 I TEM NO. 0007 RI PRAP

Tr anspor t and pl acement of Ri pr ap wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0007 " Ri pr ap, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Ri pr ap, compl et e, as speci f i ed and appr oved.

1. 4. 7 I TEM NO. 0008 GRAVEL BORROW FI LL

Tr anspor t and pl acement of Gr avel Bor r ow Fi l l wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0008 " Gr avel Bor r ow Fi l l , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Gr avel Bor r ow Fi l l , compl et e, as speci f i ed and appr oved.

1. 4. 8 I TEM NO. 0009 SAND- SI LT SURFACE FI LL

Tr anspor t and pl acement of Sand- Si l t Sur f ace Fi l l wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0009 " Sand- Si l t Sur f ace Fi l l , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Sand- Si l t Sur f ace Fi l l , compl et e, as speci f i ed and appr oved.

1. 4. 9 I TEM NO. 0010 COMMON FI LL

Tr anspor t and pl acement of Common Fi l l wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0010 " Common Fi l l , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Common Fi l l , compl et e, as speci f i ed and approved.

1. 4. 10 I TEM NO. 0011 TOPSOI L

Tr anspor t and pl acement of Topsoi l wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0011 " Topsoi l , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of t opsoi l , compl et e, as speci f i ed and appr oved.

1. 4. 11 I TEM NO. 0012 COMPOST SOI L AMENDMENT

Tr anspor t and pl acement of Compost Soi l Amendment wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0012 " Compost Soi l Amendment , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Compost Soi l Amendment , compl et e, as speci f i ed and appr oved.

1. 4. 12 I TEM NO. 0013 BASE COURSE

Tr anspor t and pl acement of Base Cour se wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0013 " Base Cour se, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Base Cour se, compl et e, as speci f i ed and approved.

1. 4. 13 I TEM NO. 0014 TOP COURSE

Tr anspor t and pl acement of Top Cour se wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0014 " Top Cour se, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Top Cour se, compl et e, as speci f i ed and approved.

1. 4. 14 I TEM NO. 0015 12" COBBLES

Tr anspor t and pl acement of 12" Cobbl es wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0015 " 12" Cobbl es, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of 12" Cobbl es, compl et e, as speci f i ed and approved.

1. 4. 15 I TEM NO. 0016 8" COBBLES

Tr anspor t and pl acement of 8" Cobbl es wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0016 " 8" Cobbl es, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of 8" Cobbl es, compl et e, as speci f i ed and approved.

1. 4. 16 I TEM NO. 0017 6" COBBLES

Tr anspor t and pl acement of 6" - Mi nus Cobbl es wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0017 " 6" Cobbl es, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of 6" Cobbl es, compl et e, as speci f i ed and approved.

1. 4. 17 I TEM NO. 0018 LANDSCAPE ROCK

Tr anspor t and pl acement of Landscape Rock wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 0018 " Landscape Rock, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Landscape Rock, compl et e, as speci f i ed and approved.

1. 5 I TEM NO. 0019 ASPHALT

Pl acement of new asphal t wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0019 " ASPHALT, " whi ch pr i ce and payment wi l l be f ul l compensat i on f or al l wor k per f or med, compl et e, as speci f i ed and appr oved.

1. 6 I TEM NO. 0020 CONCRETE WALKWAYS

Const r uct i on of new concr et e wal kways wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0020 " Concr et e Wal kways, " whi ch pr i ce and payment wi l l be f ul l compensat i on f or al l wor k per f or med, compl et e, as speci f i ed and appr oved.

1. 7 I TEM NO. 0021 ELECTRI CAL

El ect r i cal wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) .

Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0021 " El ect r i cal , " whi ch pr i ce and payment wi l l be f ul l compensat i on f or al l el ect r i cal wor k r equi r ed f or t hi s cont r act , compl et e, as speci f i ed and appr oved.

1. 8 I TEM NO. 0022 I RRI GATI 0N

I r r i gat i on syst em wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0022 " I r r i gat i on syst em, " whi ch pr i ce and payment wi l l be f ul l compensat i on f or al l i r r i gat i on wor k r equi r ed f or t hi s cont r act , compl et e, as speci f i ed and approved.

1. 9 I TEM NO. 0023 SEEDI NG

Seedi ng wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0023 " Seedi ng, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l l abor , equi pment and mat er i al s r equi r ed f or seedi ng, compl et e, as speci f i ed and appr oved.

1. 10 I TEM NO. 0024 PLANTI NG

Pl ant s wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0024 " Pl ant i ng, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l l abor , equi pment and mat er i al s r equi r ed t o f ur ni sh and pl ant al l pl ant s i ndi cat ed, compl et e, as speci f i ed and appr oved. Al l wor k r equi r ed t o ensur e est abl i shment of t he i ndi cat ed pl ant s shal l be i ncl uded i n t he i t em.

1. 11 OPTI ONAL I TEMS

TO i ncl ude j ust east of exi st i ng v i ew pl at f or m near t he r est aur ant and cont i nui ng east war d t hr ough t o t he east end of Cl over I s l and.

1. 12 I TEM NO. 1001 SI TE WORK AND DEMOLI TI ON ( Opt i onal )

Si t e wor k and demol i t i on wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0001, " Si t e Wor k and Demol i t i on, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or s i t e wor k and demol i t i on and al l r el at ed i t ems and f eat ur es, compl et e, as speci f i ed and appr oved. Feat ur es i ncl uded wi t h t hi s i t em wi l l i nc l ude, but not be l i mi t ed t o:

a. per mi t act i v i t i es

b. f l agger s and si gnage

c. secur i t y f enci ng

d. dust cont r ol measur es

e. c l ear i ng, gr ubbi ng, and di sposal f . al l wor k not cover ed under ot her bi d i t ems

1. 13 EARTHWORK ( Opt i onal )

1. 13. 1 I TEM NO. 1002 EROSI ON CONTROL BLANKET ( Opt i onal )

Tr anspor t and pl acement of Er osi on Cont r ol Bl anket wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) t r anspor t ed and pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 1002 " Er osi on Cont r ol Bl anket , " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Er osi on Cont r ol Bl anket , compl et e, as speci f i ed and appr oved.

1. 13. 2 I TEM NO. 1003 GEOWEB wi t h ANCHORI NG ( Opt i onal )

Tr anspor t and pl acement of Geoweb wi t h Anchor i ng wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No. 1003 " Geoweb wi t h Anchor i ng, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng and pl acement of Geoweb wi t h Anchor i ng, compl et e, as speci f i ed and appr oved.

1. 13. 3 I TEM NO> 1004 MARI NE MATTRESSES W/ OUT GEOGRI D EXTENSI ON ( Opt i nal )

Tr anspor t and pl acement of Mar i ne Mat t r esses wi t hout Geogr i d Ext ensi on wi l l be measur ed f or payment as t he number of squar e yar ds ( SY) Mar i ne Mat t r esses pl aced. Payment wi l l be made at t he uni t pr i ce f or I t em No.

1004 " Mar i ne Mat t r ess wi t hout Geogr i d Ext ensi on, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or f ur ni shi ng, t r anspor t i ng, pl acement and anchor i ng of Mar i ne Mat t r esses wi t hout Geogr i d Ext ensi on, compl et e, as speci f i ed and appr oved.

1. 13. 4 I TEM NO. 1005 QUARRY SPALLS- RI PRAP BEDDI NG ( Opt i onal )

Tr anspor t and pl acement of Quar r y Spal l s- Ri pr ap Beddi ng wi l l be measur ed f or payment as t he number of cubi c yar ds ( CY) t r anspor t ed and pl aced.

Payment wi l l be made at t he uni t pr i ce f or I t em No. 1005 " Quar r y Spal l s- Ri pr ap Beddi ng, " whi ch pr i ce and…