Bid Opening Summary.pdf

PDF 73 KB Posted

Attached to
General Construction Services for Clover Island Ecosystem Restoration
Solicitation number
W912EF21B0009
Issued by

About this file

This document summarizes a bid opening for a construction contract opportunity with the U.S. Army Corps of Engineers. The bid opening worksheet provides pricing information from six bidders for the Clover Island Ecosystem Restoration project located in Kennewick, Washington, with an estimated value between $5 million to $10 million. Glen Mar Construction, Inc. provided the apparent low bid of $10,604,164, while TDX Power Services offered the apparent second low bid of $4,065,760. The opportunity is a 100% set-aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million. The pre-bid site visit information and solicitation documents are available on beta.sam.gov. The project scope involves general construction services for selective demolition, earthwork, landscaping and in-water habitat restoration. The performance period is approximately 256 calendar days from notice to proceed, and in-water work must occur between November 15, 2021 and February 28, 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING WORKSHEET

SOL. NO: W912EF21B0009 AMENDMENTS: 2

CONSTRUCTION: CLOVER ISLAND ECOSYSTEM RESTORATION IFB

ISSUE DATE: 20 May 2021

CONTRACTING OFFICER: Jani Long REVISED BID SCHEDULE: NO

Number VENDOR Order TOTAL BID 1 Glen Mar Construction, Inc.

$10,604,164.00 2 TEK Construction, Inc.

$4,407,349.00 3 DGR Grant Construction, Inc.

$6,878,456.00 4 TDX Power Services

$4,065,760.00 5 Advanced Technology Construction, Inc.

$12,500,335.91

GOVERNMENT ESTIMATE

$5,330,924.00

Number: BIDS ARE READ IN THE ORDER IN WHICH THEY ARE RECEIVED Order: 1 = Apparent Low Bidder, 2 = Apparent 2nd Low Bidder, and 3 = Apparent 3rd Low Bidder. Placement is preliminary, dependent on final audit.