This document provides an amendment to a solicitation for the Dworshak Monolith Joint 16/17 Repair project. The amendment closes discussions and invites final proposal revisions due no later than August 28, 2020. It also includes an updated wage determination. Offerors are asked to clearly indicate revised portions of their initial proposals. The project involves repair work at the Dworshak Dam monolith for the U.S. Army Corps of Engineers, Walla Walla District. The solicitation number is W912EF20R0028 and seeks to award a contract to provide construction services for repair of the dam joints.

View the file

Other files

File Type Posted
W912EF20R0028-0002.pdf PDF
Dworshak DM No.6.pdf PDF
W912EF20R0028-0001.pdf PDF
TECHSPECS_20R0028_Amendment 0001 .pdf PDF
Dworshak-1998 remedial foundation grouting.pdf PDF
Site Visit Attendee list 20R0028.pdf PDF
20R0028_Plans.pdf PDF
W912EF20R0028.pdf PDF
TECHSPECS_20R0028-DW Mono Joint 16-17 Repair.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to close discussions and invite for Final Proposal Revisions. Final proposal Revisions are due not later than 4:00 p.m. PST on 28 August 2020.

Also, to include an update w age decision No. ID20200065 dated 14 August 2020.

1. CONTRACT ID CODE PAGE OF PAGES

1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF20R0028

X 9B. DATED (SEE ITEM 11)

10-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

LEANNE WALLING

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF20R0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 21-Jul-2020 04:00 PM to 28-Aug-2020 04:00 PM.

The Issued By organization has changed from

USAED, WALLA WALLA - CONTRACTING DIV.

KARLYN HOLLAND

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

to

USAED, WALLA WALLA - CONTRACTING DIV.

LEANNE WALLING

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

SUMMARY OF CHANGES AMEND #3

Summary of Changes for Dworshak Monolith Joint 16/17 Repairs (amendment 0003)

Discussions have been concluded. Offerors in the competitive range are invited to submit a Final Proposal Revision.

Final Proposal Revisions shall be in writing, submitted as Volume I (Technical) and Volume II (Price). The number of hard copies of the final proposal revision is the same as the initial proposal.

IN ORDER TO FACILITATE EVALUATION OF THE FINAL PROPOSAL REVISION,

THE OFFEROR MUST CLEARLY STATE WHICH SPECIFIC PARTS OF THE

INITIAL PROPOSAL WERE REVISED. After receipt of Final Proposal Revisions, the Government intends to make award without obtaining further revisions.

Final Proposal Revisions must be received by the Government no later than 4:30pm, Pacific Time, on 28 August 2020. NOTE: The late proposals provision at FAR 52.215-1, Alternate I, Paragraph (c)(3) applies to receipt of final proposal revisions.

Offerors must acknowledge receipt of this amendment. See Block No. 11 of Standard Form 30 for methods of acknowledging solicitation amendments.

Proposal Submission instructions for final proposal revisions:

All Final Proposal Revisions Shall be submitted electronically:

The offerors’ revised proposal shall provide the date for proposal submittal.

The offerors’ proposal shall consist of two (2) volumes. The Volumes are:

Volume I – Technical Proposal (Technical Approach, Experience and Past Performance) Volume II – Price & Administrative Proposal (Price, Solicitation, Offer and Award Documents and Certifications/Representations.)

Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.

Proposals shall be submitted electronically only. The electronic files shall contain identical information to the hard copy files.

All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aid in the Price evaluation shall be submitted in Microsoft Office Excel Read/Write format. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable. **Both electronic and hard copies shall be the same.

a. To submit proposals electronically via DoD SAFE, email Contract Specialist, Leanne Walling at Leanne.R.Walling@usace.army.mil and Contracting Officer, Hillary Morgan at hillary.a.morgan@usace.army.mil for a unique code with valid email address and point of contact for your company. Ms. Walling will provide you with your unique code, then you will need to go to the following website: https://safe.apps.mil/ At the DoD SAFE website select “Drop-Off, then enter your unique code, and submit your proposal(s). When your proposal is submitted via the DOD SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipient will be: Leanne Walling, Leanne.R.Walling@usace.army.mil

a. When your files have been “picked-up”, you will receive an email notification. If you have not received a notification, and it has been more than one business day since your “drop-off” – please contact Leanne Walling at Leanne.R.Walling@usace.army.mil

For the purposes of determining whether the proposal was received “late” in accordance with FAR 15.208, the date and time the file(s) are uploaded into the DoD SAFE website as identified in the DoD Safe e-mail sent to the Contract Specialist(s)/Contracting Officer will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal.

NOTE: ONLY in the unusual case that the DoD SAFE website is “down” (not operational); the Offeror should email their proposal to the following individuals prior to the proposal due date and time: Leanne Walling whose email address is Leanne.R.Walling@usace.army.mil. Email submissions larger than 20MB should be broken into multiple emails to ensure receipt. Separation of files larger than 20MB is the responsibility of the offeror.

SUBMISSION DEADLINE - Proposals shall be received by the USACE Contracting Activity no later than the time and date specified in the amendment. Official time will be established by the clock located in the area where proposals are received. Late proposals may not be accepted.

In an effort to ensure timely proposal submission, offerors are encouraged to request unique codes not later than two (2) hours prior to the submission deadline.

Issuance of unique codes is NOT instantaneous. It is the responsibility of the offeror to ensure timely proposal submission.

Specifications:

No changes

Drawings:

No changes

The following have been deleted:

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

UPDATED WAGE DETERMINATION #1

General Decision Number: ID20200065 08/14/2020

Superseded General Decision Number: ID20190065

State: Idaho

Construction Type: Heavy HEAVY CONSTRUCTION, Including water and sewer line construction and heavy construction projects on treatment plants and industrial (power plants, manufacturing plants, processing plants, etc.) sites

Counties: Benewah, Clearwater and Latah Counties in Idaho.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/28/2020 2 03/06/2020 3 08/14/2020

CARP0001-045 06/01/2019

Rates Fringes

CARPENTER (Form Work Only).......$ 35.47 16.88

ELEC0073-011 01/01/2020

Rates Fringes

ELECTRICIAN......................$ 36.05 19.23

ENGI0370-035 06/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe (45,000 gw & under), Cranes (25 tons & under), Drill (8 in bit and over

GROUP 5....................$ 28.76 15.95

Backhoe (45,000-110,000 gw), Crane (25-45 tons), Bulldozer (D-6 and over), Grader/Blade, Front-End Loader(4-8 yds), Paver, Scrapers (all)

GROUP 6....................$ 29.04 15.95

Backhoe (over 110,000 gw), Cranes (45-85 tons), Heavy Duty Mechanic, Front End Loader (8-10 yds)

GROUP 7....................$ 29.31 15.95

Bulldozer (up to D-6)

GROUP 3....................$ 28.44 15.95

Cranes (85 tons & over), Front End Loader (10 yds & over)

GROUP 8....................$ 30.41 15.95

Front End Loader (under 4 yds)

GROUP 4....................$ 28.60 15.95

Rollers (all)

GROUP 1....................$ 27.51 15.95

ZONE PAY:

ZONE CENTERS: SPOKANE, PASCO, LEWISTON

ZONE 1: 0-45 Miles: Free ZONE 2: 45 Miles & Over: $2.00

BOOM PAY (ALL CRANES):

(A): 180'-250': $.50 over scale (B): over 250': $.80 over scale

* IRON0014-006 07/01/2020

IRONWORKER, REINFORCING AND

STRUCTURAL.......................$ 30.10 34.59

LABO0238-028 06/01/2017

Rates Fringes

LABORER (PIPELINE ONLY)

COMMON......................$ 26.28 12.15

LABO0238-031 07/01/2019

Rates Fringes

LABORER

Asphalt Includes Raker, Shoveler, Spreader, and Distributor Group 4....................$ 28.48 13.00 Flagger Group 1A...................$ 25.84 13.00

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

PLAS0072-003 06/01/2018

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH

PARALLEL), KOOTENAI, LATAH, LEWIS AND NEZ PERCE AND SHOSHONE

COUNTIES

ZONE 1:

CEMENT MASON/CONCRETE FINISHER...$ 29.07 14.13

Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0-45 radius miles from the main post office

Zone 2: Over 45 radius miles from the main post office

PLUM0044-015 06/01/2019

Rates Fringes

PLUMBER

Zone 1......................$ 37.71 23.44

TEAM0690-002 06/01/2019

Rates Fringes

TRUCK DRIVER (DUMP)

6 yds and under.............$ 26.68 17.40 over 6 yds..................$ 27.12 17.40

SUID2010-058 08/08/2012

Rates Fringes

CARPENTER, Excludes Form Work....$ 29.92 5.20

LABORER: Common or General......$ 23.75 8.98

LABORER: Landscape..............$ 22.13 11.13

LABORER: Pipelayer..............$ 17.67 7.26

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 20.97 0.00

OPERATOR: Concrete Batch Plant............................$ 24.94 11.96

OPERATOR: Forklift..............$ 21.20 0.00

TRUCK DRIVER: Lowboy Truck......$ 21.00 12.10

TRUCK DRIVER: Water Truck.......$ 24.48 11.67

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .