This solicitation requests quotes for wildlife habitat management and maintenance services on lands along the lower Snake River in southeast Washington. The services include planting and irrigating wildlife food plots; establishing and maintaining tree and shrub plots; removing invasive species; installing kiosks; fence and toilet maintenance; litter removal; and erecting structures for waterfowl and gallinaceous birds. The contractor must provide personnel, equipment, vehicles, irrigation system operation and maintenance, and integrated pest management services across approximately 18,000 acres and 100 river miles managed by the Corps of Engineers Clarkston Natural Resources Management team. The North American Industry Classification System code is 712190 and the small business size standard is $8,000,000. The quote due date is February 18, 2020 with contract award anticipated shortly after.

View the file

Other files for this federal contract opportunity

Other files attached to LLA - HMU Wildlife Services, newest first.
File Type Posted
B.08.03 Solicitation Amendment (W912EF20Q00070002).pdf PDF
LSG-1-0-1-454.pdf PDF
LSG-1-0-1-466.pdf PDF
LSG-1-0-1-458.pdf PDF
LSG-1-0-1-461.pdf PDF
LSG-1-0-1-453.pdf PDF
LSG-1-0-1-467.pdf PDF
LSG-1-0-1-468.pdf PDF
55 - Wildlife Contract Map - Riparia-John Henley Hunting Map (27 Jan 2020).pdf PDF
54 - Wildlife Contract Map - Central Ferry Hunting Map (21NOV2013) .pdf PDF
56 - Wildlife Contract Map - Riparia planting areas.pdf PDF
41 - Wildlife Contract Map - New York - Phalen Gulch.pdf PDF
35 - Wildlife Contract Map - Lower Goose Pasture.pdf PDF
06 - Wildlife Contract Map - Steptoe Canyon HMU (21 Jun 2015).pdf PDF
29 - Wildlife Contract Map - Chief Timothy.pdf PDF
B.04.30 SCA Wage Determination (Garfield).pdf PDF
11 - Wildlife Contract Map - New York Island HMU (21 Jun 2015).pdf PDF
43 - Wildlife Contract Map - Rice Bar.pdf PDF
31 - Wildlife Contract Map - Flagpole Gulch.pdf PDF
44 - Wildlife Contract Map - Ridpath.pdf PDF
C - Lower Monumental Pool.pdf PDF
30 - Wildlife Contract Map - Evans - Golf Course Ponds.pdf PDF
13 - Wildlife Contract Map - Schultz Bar HMU (21 Jun 2015).pdf PDF
15 - Wildlife Contract Map - Joso East HMU (21 Jun 2015).pdf PDF
40 - Wildlife Contract Map - New York Bar.pdf PDF
53 - Wildlife Contract Map - Wilma.pdf PDF
16 - Wildlife Contract Map - Riparia - Henley.pdf PDF
12 - Wildlife Contract Map - Phalen Gulch and New York Gulch HMU (21 Jun 2015).pdf PDF
38 - Wildlife Contract Map - Moses.pdf PDF
09 - Wildlife Contract Map - Illia HMU (21 Jun 2015).pdf PDF
51 - Wildlife Contract Map - Wawawai - Transmission Line.pdf PDF
14 - Wildlife Contract Map - Swift Island HMU (21 Jun 2015).pdf PDF
20 - Wildlife Contract Map - Asotin Slough HMU (West).pdf PDF
B.04.30 SCA Wage Determination (Franklin).pdf PDF
B.04.30 SCA Wage Determination (Columbia).pdf PDF
19 - Wildlife Contract Map - Alpowa.pdf PDF
B.04.30 SCA Wage Determination (Whitman).pdf PDF
26 - Wildlife Contract Map - Asotin Creek HMU (14 Nov 2019).pdf PDF
18 - Wildlife Contract Map - Almota - Illia.pdf PDF
32 - Wildlife Contract Map - Hangar - Dry Gulch.pdf PDF
17 - Wildlife Contract Map - Alkali Flat.pdf PDF
35 - Wildlife Contract Map - Lower Goose Pasture~.pdf PDF
34 - Wildlife Contract Map - Knoxway Canyon.pdf PDF
01 - Wildlife Contract Map - Centennial Island (21 Jun 2015).pdf PDF
46 - Wildlife Contract Map - Swift Bar.pdf PDF
02 - Wildlife Contract Map - Confluence Island (21 Jun 2015).pdf PDF
49 - Wildlife Contract Map - Texas Rapids.pdf PDF
42 - Wildlife Contract Map - Purrington.pdf PDF
B.04.30 SCA Wage Determination (Nez Perce).pdf PDF
04 - Wildlife Contract Map - Granite Point HMU (21 Jun 2015).pdf PDF
Show all 50

LLA - HMU Wildlife Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912EF20Q0007

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to update the Performance Work Statement (PWS) and Contract Line Item Numbers (CLINs), as w ell as to add a Bidder Inquiry. See Summary of Changes

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 152

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF20Q0007

X 9B. DATED (SEE ITEM 11)

17-Jan-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Feb-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

ANDREW J SPRYS

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Item No. Supplies/Services Qty Unit Unit Price Amount

Granite Lake Areas 0001AA CXT Vault Toilet Operation and Maintenance 12 MO 0001AB Routine Litter Removal 12 MO

0001AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 518 AC

0001AD Woody Vegetation Hand Removal 10 AC 0001AE Mechanical Tree Removal 1 AC 0001AF Pack It In/Out Bags & Bulletin Boards 12 MO 0001AG Boundary-Wildlife Area Signs 50 EA 0001AH Pastures - Irrigated 13.54 AC 0001AJ Fields - Non Irrigated 20 AC 0001AK Non-Security Fencing and Gates Maintenance 12 MO 0001AL Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 0001AM Irrigation Systems 6 MO

0001AN

Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

0001AP Guzzler Maintenance and Repair 16 EA 0001AQ Food Plots 4.22 AC 0001AR Aerial Grass Seeding (Not to Exceed) 46 AC 0001AS Brush Pile Maintenance/Refurbishment 5 EA 0001AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 0001AU Non-Security Fence Repair (Estimated Quantity) 1200 FT 0001AV Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

0001AW Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

0001AX Irrigation System Repair (Small Job) (Estimated Quantity) 8 EA 0001AY Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA 0001AZ Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

0001BA Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

0001BB Biological Weed Control Releases 10 AC

Total - Granite Lake Areas

Lake Bryan Areas

0002AA CXT Vault Toilet Operation and Maintenance 12 MO 0002AB Routine Litter Removal 12 MO

0002AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 797 AC

0002AD Woody Vegetation Hand Removal 10 AC 0002AE Mechanical Tree Removal 2 AC 0002AF Pack It In/Out Bags & Bulletin Boards 12 MO 0002AG Boundary-Wildlife Area Signs 50 EA 0002AH Pastures - Irrigated 25.28 AC 0002AJ Fields - Non Irrigated 60 AC 0002AK Non-Security Fencing and Gates Maintenance 12 MO 0002AL Wildlife Tree/Shrub Purchasing, Planting, Protection 3 AC 0002AM Irrigation Systems 6 MO

0002AN

Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

0002AP Guzzler Mainrenance and Repair 23 EA 0002AQ Food Plots 71.26 AC 0002AR Aerial Grass Seeding (Not to Exceed) 322 AC 0002AS Goose Nest Structure Maintenance 83 EA 0002AT Brush Pile Maintenance/Refurbishment 1 EA 0002AU Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 0002AV Non-Security Fence Repair (Estimated Quantity) 1500 FT

0002AW Goose Nest Structure Installation/Replacement (Estimated Quantity) 5 EA

0002AX Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

0002AY Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

0002AZ Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA 0002BA Irrigation System Repair (Medium Job) (Estimated Quantity) 3 EA 0002BB Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

0002BC Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

0002BD

Biological Weed Control Releases 10 AC

Total - Lake Bryan Areas

Lake West Areas

0003AA CXT Vault Toilet Operation and Maintenance 12 MO 0003AB Routine Litter Removal 12 MO

0003AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 735 AC

0003AD Woody Vegetation Hand Removal 10 AC

0003AE Mechanical Tree Removal 1 AC 0003AF Pack It In/Out Bags & Bulletin Boards 12 MO 0003AG Boundary-Wildlife Area Signs 50 EA 0003AH Fields - Non Irrigated 20 AC 0003AJ Non-Security Fencing and Gates Maintenance 12 MO 0003AK Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 0003AL Irrigation Systems 6 MO

0003AM

Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

0003AN Guzzler Mainrenance and Repair 17 EA 0003AP Food Plots 11.93 AC 0003AQ Aerial Grass Seeding (Not to Exceed) 205 AC 0003AR Goose Nest Structure Maintenance 5 EA 0003AS Brush Pile Maintenance/Refurbishment 1 EA 0003AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 0003AU Non-Security Fence Repair (Estimated Quantity) 300 FT

0003AV Goose Nest Structure Installation/Replacement (Estimated Quantity) 2 EA

0003AW Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

0003AX Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 1 EA

0003AY Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA 0003AZ Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA 0003BA Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

0003BB Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

0003BC

Biological Weed Control Releases 10 AC

Total - Lake West Areas

TOTAL PRICE BASE YEAR

Item No. Supplies/Services Qty Unit Unit Price Amount

Granite Lake Areas 1001AA CXT Vault Toilet Operation and Maintenance 12 MO

1001AB Routine Litter Removal 12 MO

1001AC

Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 518 AC

1001AD Woody Vegetation Hand Removal 10 AC

1001AE Mechanical Tree Removal 1 AC

1001AF Pack It In/Out Bags & Bulletin Boards 12 MO 1001AG Boundary-Wildlife Area Signs 50 EA 1001AH Pastures - Irrigated 13.54 AC

1001AJ Fields - Non Irrigated 20 AC

1001AK Non-Security Fencing and Gates Maintenance 12 MO 1001AL Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 1001AM Irrigation Systems 6 MO

1001AN Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

1001AP Guzzler Maintenance and Repair 16 EA 1001AQ Food Plots 4.22 AC 1001AR Aerial Grass Seeding (Not to Exceed) 46 AC

1001AS Brush Pile Maintenance/Refurbishment 5 EA

1001AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 1001AU Non-Security Fence Repair (Estimated Quantity) 1200 FT 1001AV Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

1001AW Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

1001AX Irrigation System Repair (Small Job) (Estimated Quantity) 8 EA 1001AY Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA

1001AZ Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

1001BA Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

1001BB Biological Weed Control Releases 10 AC

1002AA CXT Vault Toilet Operation and Maintenance 12 MO 1002AB Routine Litter Removal 12 MO

1002AC

Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 797 AC

1002AD Woody Vegetation Hand Removal 10 AC

1002AE Mechanical Tree Removal 2 AC 1002AF Pack It In/Out Bags & Bulletin Boards 12 MO 1002AG Boundary-Wildlife Area Signs 50 EA 1002AH Pastures - Irrigated 25.28 AC

1002AJ Fields - Non Irrigated 60 AC 1002AK Non-Security Fencing and Gates Maintenance 12 MO

1002AL Wildlife Tree/Shrub Purchasing, Planting, Protection 3 AC 1002AM Irrigation Systems 6 MO 1002AN Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

1002AP Guzzler Mainrenance and Repair 23 EA 1002AQ Food Plots 71.26 AC 1002AR Aerial Grass Seeding (Not to Exceed) 322 AC 1002AS Goose Nest Structure Maintenance 83 EA

1002AT Brush Pile Maintenance/Refurbishment 1 EA 1002AU Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 1002AV Non-Security Fence Repair (Estimated Quantity) 1500 FT

1002AW Goose Nest Structure Installation/Replacement (Estimated Quantity) 5 EA

1002AX Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

1002AY Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

1002AZ Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA 1002BA Irrigation System Repair (Medium Job) (Estimated Quantity) 3 EA

1002BB Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

1002BC Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

1002BD

1003AA CXT Vault Toilet Operation and Maintenance 12 MO 1003AB Routine Litter Removal 12 MO

1003AC

Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 735 AC

1003AD Woody Vegetation Hand Removal 10 AC 1003AE Mechanical Tree Removal 1 AC 1003AF Pack It In/Out Bags & Bulletin Boards 12 MO

1003AG Boundary-Wildlife Area Signs 50 EA

1003AH Fields - Non Irrigated 20 AC 1003AJ Non-Security Fencing and Gates Maintenance 12 MO 1003AK Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC

1003AL Irrigation Systems 6 MO

1003AM Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC 1003AN Guzzler Mainrenance and Repair 17 EA 1003AP Food Plots 11.93 AC

1003AQ Aerial Grass Seeding (Not to Exceed) 205 AC

1003AR Goose Nest Structure Maintenance 5 EA 1003AS Brush Pile Maintenance/Refurbishment 1 EA 1003AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

1003AU Non-Security Fence Repair (Estimated Quantity) 300 FT

1003AV Goose Nest Structure Installation/Replacement (Estimated Quantity) 2 EA

1003AW Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

1003AX Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 1 EA

1003AY Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA

1003AZ Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA 1003BA Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

1003BB Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

1003BC

Biological Weed Control Releases 10 AC

TOTAL PRICE OPTION YEAR 1

Item No. Supplies/Services Qty Unit Unit Price Amount

Granite Lake Areas 2001AA CXT Vault Toilet Operation and Maintenance 12 MO 2001AB Routine Litter Removal 12 MO

2001AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 518 AC

2001AD Woody Vegetation Hand Removal 10 AC 2001AE Mechanical Tree Removal 1 AC 2001AF Pack It In/Out Bags & Bulletin Boards 12 MO 2001AG Boundary-Wildlife Area Signs 50 EA 2001AH Pastures - Irrigated 13.54 AC 2001AJ Fields - Non Irrigated 20 AC 2001AK Non-Security Fencing and Gates Maintenance 12 MO 2001AL Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 2001AM Irrigation Systems 6 MO

2001AN

Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

2001AP Guzzler Maintenance and Repair 16 EA 2001AQ Food Plots 4.22 AC 2001AR Aerial Grass Seeding (Not to Exceed) 46 AC 2001AS Brush Pile Maintenance/Refurbishment 5 EA 2001AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 2001AU Non-Security Fence Repair (Estimated Quantity) 1200 FT 2001AV Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

2001AW Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

2001AX Irrigation System Repair (Small Job) (Estimated Quantity) 8 EA 2001AY Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA 2001AZ Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

2001BA Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

2001BB Biological Weed Control Releases 10 AC

2002AA CXT Vault Toilet Operation and Maintenance 12 MO 2002AB Routine Litter Removal 12 MO

2002AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 797 AC

2002AD Woody Vegetation Hand Removal 10 AC

2002AE Mechanical Tree Removal 2 AC 2002AF Pack It In/Out Bags & Bulletin Boards 12 MO 2002AG Boundary-Wildlife Area Signs 50 EA 2002AH Pastures - Irrigated 25.28 AC 2002AJ Fields - Non Irrigated 60 AC 2002AK Non-Security Fencing and Gates Maintenance 12 MO 2002AL Wildlife Tree/Shrub Purchasing, Planting, Protection 3 AC 2002AM Irrigation Systems 6 MO

2002AN

Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

2002AP Guzzler Mainrenance and Repair 23 EA 2002AQ Food Plots 71.26 AC 2002AR Aerial Grass Seeding (Not to Exceed) 322 AC 2002AS Goose Nest Structure Maintenance 83 EA 2002AT Brush Pile Maintenance/Refurbishment 1 EA 2002AU Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 2002AV Non-Security Fence Repair (Estimated Quantity) 1500 FT

2002AW Goose Nest Structure Installation/Replacement (Estimated Quantity) 5 EA

2002AX Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

2002AY Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

2002AZ Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA 2002BA Irrigation System Repair (Medium Job) (Estimated Quantity) 3 EA 2002BB Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

2002BC Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

2002BD

2003AA CXT Vault Toilet Operation and Maintenance 12 MO 2003AB Routine Litter Removal 12 MO

2003AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 735 AC

2003AD Woody Vegetation Hand Removal 10 AC 2003AE Mechanical Tree Removal 1 AC 2003AF Pack It In/Out Bags & Bulletin Boards 12 MO 2003AG Boundary-Wildlife Area Signs 50 EA 2003AH Fields - Non Irrigated 20 AC

2003AJ Non-Security Fencing and Gates Maintenance 12 MO 2003AK Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 2003AL Irrigation Systems 6 MO

2003AM

Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

2003AN Guzzler Mainrenance and Repair 17 EA 2003AP Food Plots 11.93 AC 2003AQ Aerial Grass Seeding (Not to Exceed) 205 AC 2003AR Goose Nest Structure Maintenance 5 EA 2003AS Brush Pile Maintenance/Refurbishment 1 EA 2003AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB 2003AU Non-Security Fence Repair (Estimated Quantity) 300 FT

2003AV Goose Nest Structure Installation/Replacement (Estimated Quantity) 2 EA

2003AW Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

2003AX Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 1 EA

2003AY Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA 2003AZ Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA 2003BA Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

2003BB Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

2003BC

Biological Weed Control Releases 10 AC

TOTAL PRICE OPTION YEAR 2

3001AA CXT Vault Toilet Operation and Maintenance 12 MO 3001AB Routine Litter Removal 12 MO

3001AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 518 AC

3001AD Woody Vegetation Hand Removal 10 AC 3001AE Mechanical Tree Removal 1 AC 3001AF Pack It In/Out Bags & Bulletin Boards 12 MO 3001AG Boundary-Wildlife Area Signs 50 EA 3001AH Pastures - Irrigated 13.54 AC 3001AJ Fields - Non Irrigated 20 AC 3001AK Non-Security Fencing and Gates Maintenance 12 MO 3001AL Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 3001AM Irrigation Systems 6 MO

3001AN Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

3001AP Guzzler Maintenance and Repair 16 EA 3001AQ Food Plots 4.22 AC 3001AR Aerial Grass Seeding (Not to Exceed) 46 AC 3001AS Brush Pile Maintenance/Refurbishment 5 EA

3001AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

3001AU Non-Security Fence Repair (Estimated Quantity) 1200 FT 3001AV Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

3001AW Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

3001AX Irrigation System Repair (Small Job) (Estimated Quantity) 8 EA

3001AY Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA

3001AZ Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

3001BA Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

3001BB Biological Weed Control Releases 10 AC

3002AA CXT Vault Toilet Operation and Maintenance 12 MO 3002AB Routine Litter Removal 12 MO

3002AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 797 AC

3002AD Woody Vegetation Hand Removal 10 AC 3002AE Mechanical Tree Removal 2 AC 3002AF Pack It In/Out Bags & Bulletin Boards 12 MO 3002AG Boundary-Wildlife Area Signs 50 EA

3002AH Pastures - Irrigated 25.28 AC 3002AJ Fields - Non Irrigated 60 AC 3002AK Non-Security Fencing and Gates Maintenance 12 MO 3002AL Wildlife Tree/Shrub Purchasing, Planting, Protection 3 AC 3002AM Irrigation Systems 6 MO

3002AN Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

3002AP Guzzler Mainrenance and Repair 23 EA 3002AQ Food Plots 71.26 AC 3002AR Aerial Grass Seeding (Not to Exceed) 322 AC 3002AS Goose Nest Structure Maintenance 83 EA 3002AT Brush Pile Maintenance/Refurbishment 1 EA

3002AU Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

3002AV Non-Security Fence Repair (Estimated Quantity) 1500 FT

3002AW Goose Nest Structure Installation/Replacement (Estimated Quantity) 5 EA

3002AX Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

3002AY Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

3002AZ Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA

3002BA Irrigation System Repair (Medium Job) (Estimated Quantity) 3 EA

3002BB Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

3002BC Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

3002BD

3003AA CXT Vault Toilet Operation and Maintenance 12 MO 3003AB Routine Litter Removal 12 MO

3003AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 735 AC

3003AD Woody Vegetation Hand Removal 10 AC 3003AE Mechanical Tree Removal 1 AC 3003AF Pack It In/Out Bags & Bulletin Boards 12 MO 3003AG Boundary-Wildlife Area Signs 50 EA 3003AH Fields - Non Irrigated 20 AC 3003AJ Non-Security Fencing and Gates Maintenance 12 MO

3003AK Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC 3003AL Irrigation Systems 6 MO

3003AM Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

3003AN Guzzler Mainrenance and Repair 17 EA 3003AP Food Plots 11.93 AC 3003AQ Aerial Grass Seeding (Not to Exceed) 205 AC 3003AR Goose Nest Structure Maintenance 5 EA 3003AS Brush Pile Maintenance/Refurbishment 1 EA

3003AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

3003AU Non-Security Fence Repair (Estimated Quantity) 300 FT

3003AV Goose Nest Structure Installation/Replacement (Estimated Quantity) 2 EA

3003AW Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

3003AX Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 1 EA

3003AY Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA

3003AZ Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA

3003BA Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

3003BB Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

3003BC

Biological Weed Control Releases 10 AC

TOTAL PRICE OPTION YEAR 3

4001AA CXT Vault Toilet Operation and Maintenance 12 MO 4001AB Routine Litter Removal 12 MO

4001AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 518 AC

4001AD Woody Vegetation Hand Removal 10 AC

4001AE Mechanical Tree Removal 1 AC

4001AF Pack It In/Out Bags & Bulletin Boards 12 MO 4001AG Boundary-Wildlife Area Signs 50 EA 4001AH Pastures - Irrigated 13.54 AC

4001AJ Fields - Non Irrigated 20 AC

4001AK Non-Security Fencing and Gates Maintenance 12 MO

4001AL Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC

4001AM Irrigation Systems 6 MO

4001AN Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

4001AP Guzzler Maintenance and Repair 16 EA

4001AQ Food Plots 4.22 AC

4001AR Aerial Grass Seeding (Not to Exceed) 46 AC

4001AS Brush Pile Maintenance/Refurbishment 5 EA

4001AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

4001AU Non-Security Fence Repair (Estimated Quantity) 1200 FT 4001AV Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

4001AW Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

4001AX Irrigation System Repair (Small Job) (Estimated Quantity) 8 EA

4001AY Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA

4001AZ Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

4001BA Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

4001BB Biological Weed Control Releases 10 AC

4002AA CXT Vault Toilet Operation and Maintenance 12 MO 4002AB Routine Litter Removal 12 MO

4002AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 797 AC

4002AD Woody Vegetation Hand Removal 10 AC

4002AE Mechanical Tree Removal 2 AC 4002AF Pack It In/Out Bags & Bulletin Boards 12 MO

4002AG Boundary-Wildlife Area Signs 50 EA

4002AH Pastures - Irrigated 25.28 AC

4002AJ Fields - Non Irrigated 60 AC 4002AK Non-Security Fencing and Gates Maintenance 12 MO 4002AL Wildlife Tree/Shrub Purchasing, Planting, Protection 3 AC 4002AM Irrigation Systems 6 MO

4002AN Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

4002AP Guzzler Maintenance and Repair 23 EA

4002AQ Food Plots 71.26 AC 4002AR Aerial Grass Seeding (Not to Exceed) 322 AC 4002AS Goose Nest Structure Maintenance 83 EA 4002AT Brush Pile Maintenance/Refurbishment 1 EA

4002AU Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

4002AV Non-Security Fence Repair (Estimated Quantity) 1500 FT

4002AW Goose Nest Structure Installation/Replacement (Estimated Quantity) 5 EA

4002AX Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

4002AY Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 2 EA

4002AZ Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA

4002BA Irrigation System Repair (Medium Job) (Estimated Quantity) 3 EA

4002BB Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

4002BC Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

4002BD

4003AA CXT Vault Toilet Operation and Maintenance 12 MO 4003AB Routine Litter Removal 12 MO

4003AC Weed Control (All Methods to inlcude phrag, purple losestrife, etc) 735 AC

4003AD Woody Vegetation Hand Removal 10 AC

4003AE Mechanical Tree Removal 1 AC

4003AF Pack It In/Out Bags & Bulletin Boards 12 MO

4003AG Boundary-Wildlife Area Signs 50 EA 4003AH Fields - Non Irrigated 20 AC

BIDDER INQUIRY

Bidder Inquiry:

All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

4003AJ Non-Security Fencing and Gates Maintenance 12 MO

4003AK Wildlife Tree/Shrub Purchasing, Planting, Protection 1 AC

4003AL Irrigation Systems 6 MO

4003AM Additional Planting (Donated Plant Material) (Not to Exceed) 10 AC

4003AN Guzzler Mainrenance and Repair 17 EA 4003AP Food Plots 11.93 AC

4003AQ Aerial Grass Seeding (Not to Exceed) 205 AC

4003AR Goose Nest Structure Maintenance 5 EA

4003AS Brush Pile Maintenance/Refurbishment 1 EA

4003AT Brush Pile Replacement (Optional Item Contingent on Need) 1 JOB

4003AU Non-Security Fence Repair (Estimated Quantity) 300 FT

4003AV Goose Nest Structure Installation/Replacement (Estimated Quantity) 2 EA

4003AW Replace/Rebuild Kiosk (Estimated Quantity) 1 EA

4003AX Replace HMU Name/Information Sign (OPTIONAL) (Estimated Quantity) 1 EA

4003AY Irrigation System Repair (Small Job) (Estimated Quantity) 6 EA

4003AZ Irrigation System Repair (Medium Job) (Estimated Quantity) 2 EA

4003BA Irrigation System Repair (Large Job) (Estimated Quantity) 1 EA

4003BB Irrigation System Repair (Large Job Pump Replacement) (Estimated Quantity) 1 EA

4003BC

Biological Weed Control Releases 10 AC

TOTAL PRICE OPTION YEAR 4

TIMING OF BIDDER INQUIRIES: Bidders are encouraged to submit their bidder inquiries promptly. The Government will make every effort to answer all bidder inquiries; however, the closer to the bid or proposal due date an inquiry is received, the less likely it is that a timely response can be provided.

The Bidder Inquiry Key is: J5PQYP-VX7FBH

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for Entering Questions:

1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example; if the question is about an electrical drawing or specification select: “Electrical” from the pull down list.

d.) Sheet. Enter the sheet number of the drawing you are asking about.

e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.

f.) Specification. Enter the Specification number and paragraph number.

g.) File. Use this if you are going to attach a pdf file.

h.) Question. Enter your question here.

Q&A AMENDMENT 0001 (01-31-20)

Solicitation Amendment W912EF20Q00070001 Questions and Answers

29-JAN-2020

Paragraph C-5.2 Brush Pile Maintenance. The PWS indicates that the Contractor shall be responsible for maintaining up to ten (10) COR-designated brush piles annually. However, a review of the CLINs for each Contract Year show a total quantity of seven (7) Brush Pile Maintenance/Refurbishment tasks in the Contract each year:

xxx1AS – 5 EA (Lower Granite), xxx2AT – 1 EA (Lake Bryan) and xxx3AS– 1 EA (Lake West).

Would the government please either adjust the description in PWS Paragraph C-5.2 or the quantities awarded in the Bid Schedule so that there is no discrepancy between these two items?

The language states UP TO 10 brush piles. The fact that there are currently only 7 does not matter. There is no error, therefore no correction is needed.

Paragraph C-5.3 Litter Removal. This paragraph indicates that there is one (1) vault toilet in Lake Bryan Pool.

Should this item not reflect two (2) vault toilets in Lake Bryan Pool: one at Central Ferry West and one at Rice Bar

HMU?

Yes. There are 2 vault toilets in Lake Bryan. The solicitation should be corrected to reflect this.

PWS Updated

Paragraph C-5.3 Litter Removal. As you are well aware, there have been a number of incidents in which large quantities of automotive debris (tires, waste oil, etc.), household items (appliances, furniture, etc.), or construction debris (cement blocks, brick, scrap wood, etc.) have been illegally dumped at various Habitat Management Units in the Lewiston/Clarkston area.

A. Is there a point beyond which the Corps of Engineers will take responsibility for the removal of “illegally dumped” debris in the HMUs, or should the Contractor bid this item with the understanding that all dumped items will be the responsibility of the Contractor to remove, regardless of quantity or composition?

I believe that the contractor is responsible for removing ALL debris (with the exception of hazardous waste). If there is a special circumstance, such as a vehicle, we will assist.

B. Who will be responsible for the proper removal/disposal of hazardous wastes?

In the event of suspected hazardous waste, notify the COR. The COR will then contact ECC for guidance.

Paragraph C-5.4 Food Plots. There is a discrepancy between the acreages provided in PWS Paragraph C-5.4, the food plot acres outlined in PWS Paragraph C-7.4.2 “Food Plots and Acreages” and the acreage listed in the Bid Schedule.

Lower Granite Pool: 8.90 AC Bid Schedule CLINs xxx1AQ

4.09 AC PWS Paragraph C-5.4

4.22 AC PWS Paragraph C-7.4.2

Lake Bryan Pool: 66.23 AC Bid Schedule CLINs xxx2AQ

57.96 AC PWS Paragraph C-5.4

62.80 AC PWS Paragraph C-7.4.2

Lake West Pool: 12.60 AC Bid Schedule CLINs xxx3AP

10.10 AC PWS Paragraph C-5.4

11.93 AC PWS Paragraph C-7.4.2

Will the government please update the Bid Schedule, PWS Paragraph C-5.4, and/or PWS Paragraph C-7.4.2 to resolve the discrepancies in the food plot acreage shown for Lower Granite Pool, Lake Bryan Pool, and Lake West Pool?

I have added up all the acreages from the food plot planting scheme. LGR = 4.22 AC, LGO = 71.26 AC, LMA = 11.93 AC

PWS and Bid Schedule updated accordingly. I made a statement down in Section C-7.4.2 that the accurate total acreage per pool is provided in Section C-5.4.

Paragraph C-5.6 Fields. There is an apparent discrepancy between the quantities listed in PWS Paragraph C-5.6 and the quantities listed in the Bid Schedule. In particular:

Lake Bryan Pool: PWS Paragraph C-5.7 states that the contractor will mow/hay 40 acres and seed 20 acres annually. The Bid Schedule list a total quantity of 66.41 Acres. Should not the Bid Schedule be adjusted to reflect a total of 60 acres under CLINs xxx2AJ each year?

Mowing / haying acres do not necessarily coincide with seeding. The 40 AC and 20 AC should remain separate.

Upon review of the mowing/seeding description in the PWS, it was not clear to me how I set the bid schedule relative to the task description. I adjusted the quantities as suggested since they matched the PWS for Lake West and Lake Granite.

Lake West Pool: PWS Paragraph C-5.7 states that the contractor will mow/hay 10 acres and seed 10 acres annually. The Bid Schedule list a total quantity of 10 Acres. Should not the Bid Schedule be adjusted to reflect a total of 20 acres under CLINs xxx3AH each year?

See above note. The 10 and 10 should remain separate.

Paragraph C-5.7 Non-Security Fence Maintenance.

A. Lower Granite Pool: PWS Paragraph C-5.7 states that the contractor may repair/replace 300 linear feet of fence each year. However, CLIN xxx1AU lists a quantity of 1200 linear feet. Please adjust either Paragraph C-5.7 or the Bid Schedule, as appropriate, so there is no discrepancy between these two items.

1200 is correct. PWS updated.

B. Lake West Pool: PWS Paragraph C-5.7 states that the contractor may repair/replace 1,200 linear feet of fence each year. However, CLIN xxx3AU lists a quantity of 300 linear feet. Please adjust either Paragraph C-5.7 or the Bid Schedule, as appropriate, so there is no discrepancy between these two items.

300 is correct. PWS updated.

C. PWS Paragraph C-5.7 states that “all fence breaks shall be repaired within three working days after the break is reported to the Contractor.” However, PWS Paragraph C-7.7, Performance Requirements Summary, states simply that “fence panels and gates are to be repaired within 3 days of notification by COR”. Will the government please update the Performance Requirement in Paragraph C-7.7 to indicate that fence panels and gates shall be repaired within 3 working days of notification by the COR?

Yes. Both statements should read "3 WORKING days." PWS has been updated accordingly.

D. Some of the existing boundary fence does not meet current Corps of Engineers specifications. Should a repair be required of a fence which does not meet the specifications listed in Drawing LSG-1-0-1-467.pdf, Fence and Farm Gate Details, shall the Contractor repair that fence section so that it is similar to the surrounding fence (which does not conform to government standards), or should the fence section be repaired to meet the standards outlined in Drawing LSG-1-0-1-467.pdf?

Simple fence repairs may reflect current design of the fence in place. More extensive repairs involving multiple panels should conform to the government standard. This has been clarified in Section C-5.7 of the

PWS.

Paragraph C-5.8 Wildlife Tree and Shrub Purchase, Planting, and Protection. There is no mention in Paragraph C-5.8 of the need for tree cages for the newly planted trees and shrubs. Furthermore, Paragraph C-7.6.3.1 only indicates that no cages will be placed around Coyote Willows and Mackenzie Willows, while Paragraph C-7.6.3.2 indicates that 4 ft. diameter tree cages shall be placed around the Ponderosa Pines.

A. Is it the government’s desire that newly planted trees and/or shrubs will be fitted with tree cages at the time of planting?

B. If it is the government’s intent that tree cages be used, should PWS Paragraph C-5.8 include language similar to the following:

“All plantings will require site preparation, purchasing of plant materials (C-7.6), and temporary (5 years) protection (from herbivore damage to branches, bark, roots, etc. causing significant stress, stunting of growth, or mortality) for Shrubs and Evergreen trees and permanent protection (from herbivore damage) for deciduous trees.”

C. Are there specifications governing tree cages which should be used on this Contract, especially with regard to cage height, diameter, and/or wire mesh size?

The Contractor may propose tree protection material and specs.

D. Shall tree cages be provided by the government, or will the Contractor be responsible for furnishing tree cages which meet the government’s specifications?

The government will not furnish this material unless otherwise stated in the revised PWS.

E. Is there a requirement to provide/install weed mats around the base of newly planted trees and shrubs?

Looking back on our current contract PWS, the tree protection info was included in the Comp Plan planting section that was removed for this new base contract revision.

If I recall correctly, our logic was that the contractor can bid however they want given we have survival AQLs and this is only a 12-month performance period. If it fails, the contractor must replant regardless of why.

Because we are not sure if we removed it intentionally or accidentally, I added the protection language back into the PWS in Section C-5.8.

Paragraph C-5.10 Goose Nesting Structures. Paragraph C-5.10 states that all goose nest maintenance shall be completed by 1 March each year. Due to the fact that the Bid Opening for this Solicitation is currently scheduled for 18 February 2020, and due to the fact that a resultant contract is not likely to be immediately awarded, will the government allow a variance for the Base Year of the Contract so that Goose Nesting Structure maintenance may be undertaken in 2020 shortly after contract award?

Yes. A variance for the base year should be granted. However, if the geese have already started nesting activities, then this action will be canceled for the base year.

Paragraph C-5.11 Irrigation Systems. Paragraph C-5.11.1 states that the irrigation systems will be operated from 1 May through 14 October each year. PWS Paragraph C-5.11.6 indicates that winterization shall be completed by 14 October of each year. Finally, the Performance Requirements Summary in PWS Paragraph C-7.7 indicates that the irrigation season shall be between 1 May and 1 October each year. Is it reasonable for the Contractor to derive from this information that the government’s intent is for the irrigation systems throughout the Project Area to be operated between 1May and 1 October each year with the intent that all winterization of those systems shall be completed no later than 14 October each year?

Yes this is reasonable. Operation from 1 May to 1 October. Winterization to be completed by 14 October.

Paragraph C-5.11.4.7 Irrigation Repairs Small. This item indicates that there may be 8 EA small irrigation repairs in Lower Granite Pool each year. However, the quantity under CLINxxx1AZ in the Bid Schedule shows 6 EA per year. Will the government please update the quantity awarded for “Irrigation Repair Small” for Lower Granite Pool to 8 EA so that it matches the quantity listed in the PWS?

My latest bid schedule and PWS version both show 8, which is what it should be.

Paragraph C-5.12 Tree Removal. The paragraph indicates that the “Contractor shall be responsible for removal of invasive trees (i.e. Russian Olive and Tree-of-heaven) and brush (blackberry and false indigo) from designated areas by mechanical means”. However, removal of an acre of trees (Russian Olive or Tree-of-heaven) requires a significant number of machine hours to accomplish, while brush removal requires relatively few machine hours per acre.

The contract contains a set number of acres for Mechanical Tree Removal (CLINs xxx1AE, xxx2AE and xxx3AE), but no similar line item covering the removal of brush. Would the government consider adding a Mechanical Brush Removal line item for each pool to cover the removal of Blackberries and/or False Indigo Bush, especially since brush removal should be charged at a significantly lower rate per acre due to the number of machine hours required for completion of this work requirement?

This acreage is included in the "mechanical weed treatment" acres listed in Section C-5.13 of the PWS.

Paragraph C-5.13 Weed Control. Total weed control acreage is listed in Paragraph C-5.13.1. Upon review, we understand that the acreage listed in the Bid Schedule under CLINs xxx1AC, xxx2AC and xxx3AC reflect the total of the aerial, boom spray, backpack spray, mechanic weed treatment and wheat planting items. Woody Vegetation Hand Removal is invoiced separately under CLINs xxx1AD, xxx2AD and xxx3AD.

However, there is a discrepancy between the quantities listed under Paragraph C-5.13.1 and the quantities awarded in the Bid Schedule. In particular:

Lower Granite Pool: 517 AC Bid Schedule CLINs xxx1AC 518 AC PWS Paragraph C-5.13.1

Lake Bryan Pool: 796 AC Bid Schedule CLINs xxx2AC 797 AC PWS Paragraph C-5.13.1

Lake West Pool: 734 AC Bid Schedule CLINs xxx3AC 735 AC PWS Paragraph C-5.13.1 actual total of items 807 AC PWS Paragraph C-5.13.1 quantity listed under the heading “Total weed control acreage”

The discrepancy between the bid schedule and PWS was simple rounding between hand calculating and spreadsheet math. I increased the CLINs by 1 acre in the bid schedule to patch the PWS.

The 807 acres listed in the PWS for Lake West was a copy/paste typo from carrying Lake Bryan text down.

This has been corrected to 745 which includes the 10 AC of woody veg hand removal.

Paragraph C-5.13.1 Woody VegetationHand Removal. This item is listed in the PWS and Bid Schedule, but no information is provided which would assist the Contractor in preparing a bid for this work requirement. Would the government please provide the following information regarding this work item:

A. What type of woody vegetation does the government intend to remove under CLINs xxx1AD, xxx2AD and xxx3AD?

Clarified as shrubs, vines and briers in the PWS Section C-5.13

B. Is the intent to simply remove vegetation, or will this work requirement involve both hand removal efforts and follow-up chemical spray applications which should be included in the cost of CLINs xxx1AD, xxx2AD and xxx3AD?

The contractor can bid this line item as they feel appropriate, to include or exclude follow-up chemical applications, to meet the weed control AQL for preventing weed seed production as defined in Section C-7.7

C. Is the work contemplated under these CLINs best performed by hand, or by mechanical means? Does the contractor have flexibility regarding the methods used to remove the woody vegetation (a mix of mechanical and hand removal methods, for example)?

Yes, the contractor has the flexibility to use any method applicable under the Corps Integrated Pest

Management Program (manual, chemical, mechanical, biological). This applies to items xxx1AC, xxx2AC, xxx3AC.

Woody vegetation hand removal only applies to items xxx1AD, xxx2AD, xxx3AD.

D. Is there a specific season or timeframe in which this work must be completed (such as a requirement that this work must be accomplished during low pool, for example)?

Work must be completed consistent with the timelines for weed control provided in the Corps Integrated Pest Management Program AND as appropriate to meet the AQL for preventing weed seed production per PWS Section C-7.7.

E. What is the performance standard for this work requirement?

The performance standard is preventing weed seed production per PWS Section C-7.7.

Paragraph C-5.13.5 Biological Controls. Paragraph C-5.13.5 states that 10 acres of biocontrol will be applied to weed infestations in each of the three pools each year (30 acres total per year). However, corresponding line items have not been added to the Bid Schedule to allow the Contractor to invoice for this work requirement.

A. Will the government please include line items in the Bid Schedule to cover this work requirement?

line items for biological control releases were added

B. What type of weeds might the government be interested in addressing through the use of biological controls?

The COR will determine what species are needed in a given year but species will typcially be limited to

Canada Thistle, Knapweed, Poison Hemlock, Dalmation Toadflax, Saint Johnswort, and Purple Loostrife.

C. What constitutes an “acre” of biological control? Is this defined as a specific number of biocontrol agents?

Is there another measure which will be used in determining how an “acre” of biological control should be calculated?

1 acre of biocontrol is defined as a minimum of 200 agents (critters). The price does not vary much. $75 -

$100 per release of 105-150 critters.

D. Can the government provide any guidance regarding the biological control agents which might be required under this Contract? Due to the wide variety of biocontrol agents available, and the widely varying costs associated with different biocontrol agents, narrowing the number of potential biocontrol agents down would be beneficial in establishing a fair and equitable price for this work requirement.

In the previous contract award, 1 acre of biocontrol is defined as a minimum of 200 agents (critters). We can limit ourselves to : Canada Thistle, Knapweed, Poison Hemlock, Dalmation Toadflax, Saint Johnswort, and Purple Loostrife. The price does not vary much. $75 - $100 per release of 105-150 critters. The COR will guide what to use and where.

Paragraph C-5.14 HMU Vault Toilets. This paragraph states that there are 3 Vault Toilets in Lake Bryan Pool. We are aware of two vault toilets, one at Central Ferry West and one at Rice Bar HMU.

Where is the third vault toilet for Lake Bryan Pool located?

If there is a third vault toilet in Lake Bryan Pool, will the government please update the Facility Inventory (C-7.9) accordingly?

Will the government please provide an update map of the affected HMU to show the location of the new vault toilet?

There are only 2 vault toilets in Goose Pool. Central and Rice. PWS updated to reflect this. Bid schedule was already correct.

Paragraph C-5.16 Boundary Inspection. This paragraph requires the Contractor to walk and inspect 10miles of fence in each pool each year and replace up to 50 signs per pool annually during the inspection process. Since a ten-mile section of boundary fence should have 177 signs (1 sign for every 300 linear feet), it is possible that more than 50 signs may need replacement in any ten-mile section of boundary fence. How does the government wish the contractor to proceed if a ten-mile section of fence requires the replacement of more than 50 signs? Should the contractor stop replacing signs once he has met the 50 sign per pool requirement for the year, or should the contractor contact the COR to determine how best to proceed so as to maximize the effectiveness of the annual fence inspection effort?

The contractor shall stop replacing signs at the 50 sign limit, then notify the COR that they have reached their limit. The COR will decide how to proceed from there. This may include no further action.

Undefined Section Additional Planting – Donated Plant Materials. The Bid Schedule contains CLINs xxx1AN, xxx2AN and xxx3AMwhich provide for the planting of donated plant materials. However, there is no information in the PWS regarding this work requirement.

A. Will the government please define the work requirements for this task in the PWS?

Added a description to the PWS Section C-5.8.2 Donated Plant Material that explains what is to be expected for this planting acreage.

B. Since this plant stock does not necessarily adhere to ANSI Z60.1-2004 and ANSI A300 standards, is there a performance standard (PWS C-7.7) which will apply to this work requirement?

No survival AQL for donated plants. Plant them in areas specified by the COR is the only requirement.

C. Is there a need to provide/install either tree cages or weed mats during the planting process for donated plant materials?

Tree protection using existing cage material that has been removed from former plantings. This is

Government-furnished. I clarified this in the PWS.

Undefined Section Aerial Grass Seeding. There is a requirement in the Solicitation to perform aerial grass seeding.

However, there is no information in the PWS regarding this work requirement.

A. Will the government please define the work requirements for this task in the PWS?

I added a brief description, Section C-5.17 to the PWS.

B. Is there a performance standard (PWS C-7.7) which will apply to this work requirement?

There is no AQL aside from drop the seed when and where defined by the COR.

C. What are the specifications for the seed mix intended for this work requirement?

This has also been attached as Technical Exhibit C-7.13 in the PWS.

D. Is aerial grass seeding intended solely for fire restoration purposes, or are there other instances/situations under which aerial grass seeding might be contemplated?

COR's discretion

Maps and Drawings Drawings. None of the drawings listed at the top of page 177 (drawings LSG-1-0-1- 452.pdf through LSG-1-0-1-468.pdf were included with the Solicitation package. Would the government please make these drawings available?

Maps and Drawings Maps. Maps 1-38 and 40-53 were attached to the Solicitation package. Should there have been a Map 39 attached to the Solicitation package? If so, would the government please make this map available as part of the Solicitation package?

Maps and Drawings Maps. It appears that the following maps were not attached to the Solicitation package:

Central Ferry Hunting Map Nisqually John Riparia Planting areas Riparia Henley Hunting Area

Would the government please make these maps available as part of the Solicitation package?

The maps requested have been posted to beta.SAM.

Wage Determinations As you are well aware, there is a widening gap between the federal requirements outlined in the DOLs included with the Solicitation package, and Washington State requirements.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .