B.08.03_Tech_Spec_Amend-0001.pdf
PDF 39 KB Posted
- Attached to
- Jackson Hole Levee Repair and Rehabilitation III
- Solicitation number
- W912EF19B0014
About this file
Amendment 0001 - Technical Specifications
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jackson Hol e Levee Rehab I I I W912EF19B0014 Amend-0001
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15. 00 28 LI ST OF DRAWI NGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00. 00 28 GENERAL REQUI REMENTS
01 11 00. 00 28 SUMMARY OF WORK
01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS
01 22 00. 00 28 MEASUREMENT AND PAYMENT
01 33 00 SUBMI TTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 01 28 CONTRACTOR QUALI TY CONTROL ( SHORT FORM)
01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 57 20. 01 28 ENVI RONMENT PROTECTI ON
01 78 00. 00 28 CLOSEOUT SUBMI TTALS
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 41 10. 61 28 LEVEE REPAI R
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1 g4ecdbas Line
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00. 00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 MEASUREMENT FOR PAYMENT
1. 3 I TEM X001AA - X001AD STAGI NG ON LEVEES
1. 4 I TEM X002AA - X002AH CLEARI NG AND GRUBBI NG LEVEES
1. 5 I TEM X003AA - X003AB REPAI R LEVEE TOE AND REVETMENT
1. 6 I TEM X004 REKEY RI PRAP
1. 7 I TEM X005AA - X005AB RE- ESTABLI SH LEVEE PROFI LE
1. 8 I TEM X006AA - X006AB RE- ESTABLI SH LEVEE PROFI LE AT ALTERNATE SI TES
1. 9 I TEM X007AA - X007AB REPAI R LEVEE TOE AND REVETMENT AT ALTERNATE
SITES
1. 10 I TEM X008 CLEARI NG AND GRUBBI NG LEVEES AT ALTERNATE SI TES
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON ( Not Appl i cabl e)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00. 00 28
SECTI ON 01 22 00. 00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Scal e Cer t i f i cat i on Document ; G C
1. 2 MEASUREMENT FOR PAYMENT
a. Ri pr ap and Fi l l mat er i al wi l l be measur ed f or payment by t he t on ( 2, 000 pounds) by wei ghi ng each t r uckl oad t o t he near est 0. 1 t on.
b. I t wi l l be measur ed f or payment by bei ng wei ghed on appr oved scal es bef or e bei ng pl aced i n t he wor k. Pr ovi de sel f - pr i nt i ng scal es and pr ovi de t he scal e t i cket s t o t he Gover nment Of f i c i al .
c. The scal es shal l be cer t i f i ed annual l y f or accur acy wi t hi n 1 per cent t hr oughout t he r ange of t he scal es by an accept abl e scal e company r epr esent at i ve or by a st at e i nspect or pr i or t o wei ghi ng any mat er i al s.
Submit scal e cer t i f i cat i on document f or appr oval .
d. Wei gh each t r uck empt y each week. Pr ovi de l egi bl e i dent i f i cat i on number s on each t r uck and on each wei ght t i cket . The t r uck i dent i f i cat i on number s shal l cor r espond t o t he pr ovi ded equi pment l i s t .
See SECTI ON 01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS, par agr aph
EQUI PMENT LI ST.
d. Submi t wei ght t i cket s t o t he Gover nment Of f i c i al wi t hi n 24 hour s of hauling.
1. 3 I TEM X001AA - X001AD STAGI NG ON LEVEES
St agi ng on Levees wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. X001AA X001AE, " St agi ng on Levees" , payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o i ni t i al l y st age equi pment on t he Levees, i ncl udi ng mobi l i zat i on and demobi i zat i on, compl et e, as speci f i ed and appr oved.
SCHEDULE A - BASE YEAR
I TEM 0001AA Gr os Vent r e Levees ( JOB) I TEM 0001AB Wal t on l evee ( JOB) I TEM 0001AC Mor gan or Feder al Ext ensi on l evee ( JOB) I TEM 0001AD Al t er nat e Levees ( Up t o 20 mi l es f r om t he mai n quar r y s i t e ( EA)
SECTI ON 01 22 00. 00 28
SCHEDULE B - FI RST YEAR OPTI ON
I TEM 1001AA Gr os Vent r e Levees ( JOB) I TEM 1001AB Wal t on l evee ( JOB) I TEM 1001AC Mor gan or Feder al Ext ensi on l evee ( JOB) I TEM 1001AD Al t er nat e Levees ( Up t o 20 mi l es f r om t he mai n quar r y s i t e ( EA)
SCHEDULE C - SECOND YEAR OPTI ON
I TEM 2001AA Gr os Vent r e Levees ( JOB) I TEM 2001AB Wal t on l evee ( JOB) I TEM 2001AC Mor gan or Feder al Ext ensi on l evee ( JOB) I TEM 2001AD Al t er nat e Levees ( Up t o 20 mi l es f r om t he mai n quar r y s i t e ( EA)
1. 4 I TEM X002AA - X002AH CLEARI NG AND GRUBBI NG LEVEES
Cl ear i ng and gr ubbi ng Levees wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. X002AA X002AH. Payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or c l ear i ng, gr ubbi ng and di sposi ng of veget at i on f or Levee, compl et e, as speci f i ed and appr oved. See t he t abl e f or i ndi v i dual di st ances f or Cl ear i ng and Gr ubbi ng.
Levee Locat i on Li neal Di st ance ( LF)
Nel son Levee 3318 l i neal f eet ( LF) - end st at i on 33+18
Gol f Cour se Levee 1, 582 LF - end st at i on 15+82
Hanson Levee 6, 200 LF - end st at i on 62+00
Lucas l evee 6, 663 LF - end st at i on 66+63
Wal t on Levee 8, 021 LF - end st at i on 80+21
Mor gan Levee St a. 0+00 t o St a 100+0
10, 000 LF - end st at i on 100+00
Mor gan Levee St a. 100+00 t o St a. 184+66
8, 466 LF - end st at i on 184+66
Feder al Ext ensi on Levee 2, 335 LF - end st at i on 23+35
SCHEDULE A - BASE YEAR
I TEM 0002AA Nel son Levee ( JOB) I TEM 0002AB Gol f Cour se Levee ( JOB) I TEM 0002AC Hanson Levee ( JOB) I TEM 0002AD Lucas l evee ( JOB) I TEM 0002AE Wal t on Levee ( JOB) I TEM 0002AF Mor gan Levee, St a. 0+00 t o St a 100+0 ( JOB) I TEM 0002AG Mor gan Levee, St a. 100+00 t o St a. 184+66 ( JOB)
SECTI ON 01 22 00. 00 28
I TEM 0002AH Feder al Ext ensi on Levee ( JOB)
SCHEDULE B - FI RST YEAR OPTI ON
I TEM 1002AA Nel son Levee ( JOB) I TEM 1002AB Gol f Cour se Levee ( JOB) I TEM 1002AC Hanson Levee ( JOB) I TEM 1002AD Lucas Levee ( JOB) I TEM 1002AE Wal t on Levee ( JOB) I TEM 1002AF Mor gan Levee, St a. 0+00 t o St a 100+0 ( JOB) I TEM 1002AG Mor gan Levee, St a. 100+00 t o St a. 184+66 ( JOB) I TEM 1002AH Feder al Ext ensi on Levee ( JOB)
SCHEDULE C - SECOND YEAR OPTI ON
I TEM 2002AA Nel son Levee ( JOB) I TEM 2002AB Gol f Cour se Levee ( JOB) I TEM 2002AC Hanson Levee ( JOB) I TEM 2002AD Lucas Levee ( JOB) I TEM 2002AE Wal t on Levee ( JOB) I TEM 2002AF Mor gan Levee, St a. 0+00 t o St a 100+0 ( JOB) I TEM 2002AG Mor gan Levee, St a. 100+00 t o St a. 184+66 ( JOB) I TEM 2002AH Feder al Ext ensi on Levee ( JOB)
1. 5 I TEM X003AA - X003AB REPAI R LEVEE TOE AND REVETMENT
Repai r l evee t oe and r evet ment f or t he Gr os Vent r e Levees, t he Wal t on Levee, t he Mor gan Levee and t he Feder al Ext ensi on Levee wi l l be measur ed f or payment by t he number of t ons of r i pr ap pl aced.
I t em Number X003AA i s f or Cont r act or del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k, i ncl udi ng l oadi ng, wei ghi ng, and haul i ng mat er i al f r om t he mai n quar r y s i t e t o t he wor k s i t e and al l wor k r equi r ed t o pl ace r i pr ap, f r om t he l evee t oe t o t he t op of t he desi gned gr ade f or r i pr ap, compl et e, as speci f i ed and appr oved.
I t em X003AB i s f or Gover nment del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o pl ace r i pr ap, f r om t he l evee t oe t o t he t op of t he desi gned gr ade f or r i pr ap, compl et e, as speci f i ed and appr oved. The mat er i al s wi l l be haul ed t o t he wor ksi t e by t he Gover nment .
Payment wi l l be made at t he uni t pr i ce ( TONS) f or I t em Number X003AA -
X003AB.
SCHEDULE A - BASE YEAR
I t em 0003AA Repai r Levee Toe And Revet ment ( TONS) - Cont r act or Del i ver ed.
I t em 0003AB Repai r Levee Toe And Revet ment ( TONS) - Gover nment Del i ver ed.
SCHEDULE B - FI RST YEAR OPTI ON
I t em 1003AA Repai r Levee Toe And Revet ment ( TONS) - Cont r act or Del i ver ed.
I t em 1003AB Repai r Levee Toe And Revet ment ( TONS) - Gover nment Del i ver ed.
SCHEDULE C - SECOND YEAR OPTI ON
I t em 2003AA Repai r Levee Toe And Revet ment ( TONS) - Cont r act or Del i ver ed.
I t em 2003AB Repai r Levee Toe And Revet ment ( TONS) - Gover nment Del i ver ed.
1. 6 I TEM X004 REKEY RI PRAP
Rekeyi ng of t he exi st i ng r i pr ap wi l l be measur ed f or payment by t he number of 50 l i near f oot segment s ( EA) of l evee on whi ch t he r ock i s r ekeyed.
Payment wi l l be made at t he uni t pr i ce f or I t em Number X004. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o r ekey exi st i ng r i pr ap, i ncl udi ng al l wor k t o pul l back t he exi st i ng r i pr ap f r om t he l evee pr of i l e, r e- i nst al l at i on ( r ekeyi ng) t he exi st i ng r i pr ap and keyi ng any addi t i onal r i pr ap haul ed t o t he s i t e, compl et e, as speci f i ed and appr oved.
SCHEDULE A - BASE YEAR
I t em 0004 Rekey Ri pr ap ( EA)
SCHEDULE B - FI RST YEAR OPTI ON
I t em 1004 Rekey Ri pr ap ( EA)
SCHEDULE C - SECOND YEAR OPTI ON
I t em 2004 Rekey Ri pr ap ( EA)
1. 7 I TEM X005AA - X005AB RE- ESTABLI SH LEVEE PROFI LE
Re- est abl i sh l evee pr of i l e f or t he Gr os Vent r e Levees, t he Wal t on Levee, t he Mor gan Levee and t he Feder al Ext ensi on Levee and wi l l be measur ed f or payment by t he number of t ons of f i l l pl aced.
I t em Number X005AA i s f or Cont r act or del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k, i ncl udi ng l oadi ng, wei ghi ng, haul i ng, pl acement and compact i on of f i l l mat er i al f r om t he mai n st ockpi l e s i t e t o t he s i t e, wor k r equi r ed t o r est or e t he desi gn pr of i l e of t he l evees per t he pl an sheet s, and t he compact i on of t he f i l l , compl et e, as speci f i ed and appr oved.
I t em X005AB i s f or Gover nment del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o r est or e t he desi gn pr of i l e of t he l evees per t he pl an sheet s, and t he compact i on of t he f i l l , compl et e, as speci f i ed and appr oved The mat er i al s wi l l be haul ed t o t he wor ksi t e by t he Government.
Payment wi l l be made at t he uni t pr i ce ( TONS) f or I t em Number X005AA -
X005AB.
SCHEDULE A - BASE YEAR
I t em 0005AA Re- Est abl i sh Levee Pr of i l e ( TONS) - Cont r act or Del i ver ed I t em 0005AB Re- Est abl i sh Levee Pr of i l e ( TONS) - Gover nment Del i ver ed
SCHEDULE B - FI RST YEAR OPTI ON
I t em 1005AA Re- Est abl i sh Levee Pr of i l e ( TONS) - Cont r act or Del i ver ed I t em 1005AB Re- Est abl i sh Levee Pr of i l e ( TONS) - Gover nment Del i ver ed
SCHEDULE C - SECOND YEAR OPTI ON
I t em 2005AA Re- Est abl i sh Levee Pr of i l e ( TONS) - Cont r act or Del i ver ed I t em 2005AB Re- Est abl i sh Levee Pr of i l e ( TONS) - Gover nment Del i ver ed
1. 8 I TEM X006AA - X006AB RE- ESTABLI SH LEVEE PROFI LE AT ALTERNATE SI TES
Re- est abl i sh l evee pr of i l e at Al t er nat e Si t es f or l evees up t o 20 mi l es f r om mai n spockpi l e s i t e, as i ndi cat ed on t he dr awi ngs, and wi l l be measur ed f or payment by t he number of t ons of f i l l pl aced.
I t em Number X006AA i s f or Cont r act or del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k, i ncl udi ng l oadi ng, wei ghi ng, haul i ng, pl acement and compact i on of f i l l mat er i al f r om t he mai n st ockpi l e s i t e t o t he s i t e, wor k r equi r ed t o r est or e t he desi gn pr of i l e of t he l evees per t he pl an sheet s, and t he compact i on of t he f i l l , compl et e, as speci f i ed and appr oved.
I t em X006AB i s f or Gover nment del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o r est or e t he desi gn pr of i l e of t he l evees per t he pl an sheet s, and t he compact i on of t he f i l l , compl et e, as speci f i ed and appr oved. The mat er i al s wi l l be haul ed t o t he wor ksi t e by t he Gover nment .
Payment wi l l be made at t he uni t pr i ce ( TONS) f or I t em Number X006AA -
X006AB.
SCHEDULE A - BASE YEAR
I t em 0006AA Re- Est abl i sh Levee Pr of i l e ( TONS) - Cont r act or Del i ver ed I t em 0006AB Re- Est abl i sh Levee Pr of i l e ( TONS) - Gover nment Del i ver ed
SCHEDULE B - FI RST YEAR OPTI ON
I t em 1006AA Re- Est abl i sh Levee Pr of i l e ( TONS) - Cont r act or Del i ver ed I t em 1006AB Re- Est abl i sh Levee Pr of i l e ( TONS) - Gover nment Del i ver ed
SCHEDULE C - SECOND YEAR OPTI ON
I t em 2006AA Re- Est abl i sh Levee Pr of i l e ( TONS) - Cont r act or Del i ver ed I t em 2006AB Re- Est abl i sh Levee Pr of i l e ( TONS) - Gover nment Del i ver ed
1. 9 I TEM X007AA - X007AB REPAI R LEVEE TOE AND REVETMENT AT ALTERNATE SI TES
Repai r l evee t oe and r evet ment at Al t er nat e Si t es f or l evees up t o 20 mi l es f r om t he mai n st ockpi l e s i t e and wi l l be measur ed f or payment by t he number of t ons ( TONS) of r i pr ap pl aced.
I t em Number X007AA i s f or Cont r act or del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k, i ncl udi ng l oadi ng, wei ghi ng, and haul i ng mat er i al f r om t he mai n quar r y s i t e t o t he wor k s i t e and al l wor k r equi r ed t o pl ace r i pr ap, f r om t he l evee t oe t o t he t op of t he desi gned gr ade f or r i pr ap, compl et e, as speci f i ed and appr oved.
I t em X007AB i s f or Gover nment del i ver ed mat er i al s. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o pl ace r i pr ap, f r om t he l evee t oe t o t he t op of t he desi gned gr ade f or r i pr ap, compl et e, as speci f i ed and appr oved. The mat er i al s wi l l be haul ed t o t he wor ksi t e by t he Gover nment .
Payment wi l l be made at t he uni t pr i ce ( TONS) f or I t em Number X007AA -
X007AB.
SCHEDULE A - BASE YEAR
I t em 0007AA Repai r Levee Toe And Revet ment ( TONS) - Cont r act or Del i ver ed.
I t em 0007AB Repai r Levee Toe And Revet ment ( TONS) - Gover nment Del i ver ed.
SCHEDULE B - FI RST YEAR OPTI ON
I t em 1007AA Repai r Levee Toe And Revet ment ( TONS) - Cont r act or Del i ver ed.
I t em 1007AB Repai r Levee Toe And Revet ment ( TONS) - Gover nment Del i ver ed.
SCHEDULE C - SECOND YEAR OPTI ON
I t em 2007AA Repai r Levee Toe And Revet ment ( TONS) - Cont r act or Del i ver ed.
I t em 2007AB Repai r Levee Toe And Revet ment ( TONS) - Gover nment Del i ver ed.
1. 10 I TEM X008 CLEARI NG AND GRUBBI NG LEVEES AT ALTERNATE SI TES
Cl ear i ng and gr ubbi ng l evees at al t er nat e s i t es wi l l be measur ed f or payment by t he number of 50 l i near f oot segment s ( EA) of l evee cl ear ed and gr ubbed. Payment wi l l be made at t he uni t pr i ce f or I t em Number X008. Pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed f or c l ear i ng and gr ubbi ng al l bushes, smal l t r ees and l ar ge t r ees at al l al t er nat e wor k s i t es ( l evees) , compl et e, as speci f i ed and appr oved.
SCHEDULE A - BASE YEAR
I t em 0008 Cl ear i ng And Gr ubbi ng Levees At Al t er nat e Si t es ( EA)
SCHEDULE B - FI RST YEAR OPTI ON
I t em 1008 Cl ear i ng And Gr ubbi ng Levees At Al t er nat e Si t es ( EA)
SCHEDULE C - SECOND YEAR OPTI ON
I t em 2008 Cl ear i ng And Gr ubbi ng Levees At Al t er nat e Si t es ( EA)
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON ( Not Appl i cabl e)
- - End of Sect i on - -
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 22 00.00 28 - MEASUREMENT AND PAYMENT |
| MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 MEASUREMENT FOR PAYMENT |
| 1.3 ITEM X001AA - X001AD STAGING ON LEVEES |
| 1.4 ITEM X002AA - X002AH CLEARING AND GRUBBING LEVEES |
| 1.5 ITEM X003AA - X003AB REPAIR LEVEE TOE AND REVETMENT |
| 1.6 ITEM X004 REKEY RIPRAP |
| 1.7 ITEM X005AA - X005AB RE-ESTABLISH LEVEE PROFILE |
| 1.8 ITEM X006AA - X006AB RE-ESTABLISH LEVEE PROFILE AT ALTERNATE SITES |
| 1.9 ITEM X007AA - X007AB REPAIR LEVEE TOE AND REVETMENT AT ALTERNATE SITES |
| 1.10 ITEM X008 CLEARING AND GRUBBING LEVEES AT ALTERNATE SITES |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION Not Applicable |
File details come from the government source that posted it.