TECHSPECS_19B0007_amd0004.pdf

PDF 37 KB Posted

Attached to
Little Goose Fish Ladder Cooling Alternate Power
Solicitation number
W912EF19B0007
Issued by

About this file

W912EF19B0007 Amend 0004 Tech Specs

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Little Goose Fish Ladder Cooling Alternate Power W912EF19B0007 amendment 0004

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15.00 28 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

01 14 00.10 28 PROJECT SITE RESTRICTIONS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

01 22 00.00 28 MEASUREMENT AND PAYMENT

01 32 16.00 28 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.00 28 CONTRACTOR QUALITY CONTROL

01 51 00.00 28 TEMPORARY UTILITIES

01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20.00 28 ENVIRONMENTAL PROTECTION

01 78 00.00 28 CLOSEOUT SUBMITTALS

01 78 23.00 28 OPERATION AND MAINTENANCE DATA

DIVISION 03 - CONCRETE

03 60 00.01 28 CONCRETE CORE DRILLING, REPAIR OF CONCRETE SURFACES

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00.00 28 FIRESTOPPING

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.00 28 CYBERSECURITY

DIVISION 26 - ELECTRICAL

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 40 MEDIUM-VOLTAGE CABLES

26 05 19.10 10 INSULATED WIRE AND CABLE

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 05 70.00 40 HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICES

26 08 00 APPARATUS INSPECTION AND TESTING

26 18 29.00 28 MEDIUM-VOLTAGE ENCLOSED BUS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

1.3 FOR INFORMATION ONLY DRAWINGS (FIO)

-- End of Section Table of Contents --

DOCUMENT 00 01 15.00 28 Page 1

G4EDDMTJ

Line

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

FILE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

GENERAL

LGG-1-0-1/424 G-001 COVER SHEET AND LOCATION

MAPS

LGG-1-0-1/425 G-002 INDEX TO DRAWINGS

ELECTRICAL

LGF-1-6-3/10 E-001 ELECTRICAL LEGEND

LGF-1-6-3/11 ED101 EL 634 GALLERY TO LSP2

ROOM - PLAN - REMOVAL

LGF-1-6-3/12 E-101 POWERHOUSE - GENERAL PLAN

- EL 621 / 634

1 2/6/19

LGF-1-6-3/13 E-102 EL 634 GALLERY TO LSP2

ROOM - PLAN - INSTALL

LGF-1-6-3/14 E-103 NAVIGATION LOCK - LSP2

ROOM - PLAN AND SECTIONS

LGF-1-6-3/15 E-201 XJ7 AND XJO1 - ELEVATION

- INSTALL

LGF-1-6-3/16 E-501 XJ8 AND XJO2 LAYOUT -

ELEVATION 621

2 2/7/19

LGF-1-6-3/17 E-502 XJ8 AND XJO2 LAYOUT -

PLAN VIEW AND SECTION

1 2/6/19

LGF-1-6-3/18 E-601 POWERHOUSE - MAIN ONELINE

DIAGRAM

LGF-1-6-3/19 E-602 SCHEMATIC - MAIN UNITS

4-6 - ANNUNCIATOR -

LGF-1-6-3/20 E-603 SCHEMATIC - XJ8

PROTECTION AND TRAPPED

LGF-1-6-3/21 E-604 SCHEMATIC - XJ8 CONTROLS

- INSTALL

LGF-1-6-3/22 E-605 WIRING DIAGRAM - 13.8 KV

SERVICE - INSTALL

DOCUMENT 00 01 15.00 28 Page 2

G4EDDMTJ

Line

LGF-1-6-3/23 E-606 CONTROL SCHEMATIC - XJO2

AND ZJ5 - INSTALL

LGF-1-6-3/24 E-607 WIRING DIAGRAM -

SWITCHBOARD S5R2 - INSTALL

LGF-1-6-3/25 E-608 SCHEMATIC - GOVERNOR

INTERPOSING RELAYS -

LGF-1-6-3/26 E-609 SCHEDULE - GOVERNOR

INTERPOSING RELAYS -

LGF-1-6-3/27 E-610 WIRING DIAGRAM -

SWITCHBOARD S5R1 - SHEET

LGF-1-6-3/28 E-611 WIRING DIAGRAM -

SWITCHBOARD S5R1 - SHEET

LGF-1-6-3/29 E-612 WIRING DIAGRAM -

SWITCHBOARD S5R1 - SHEET

LGF-1-6-3/30 E-613 WIRING DIAGRAM -

SWITCHBOARD S5R1 - SHEET

LGF-1-6-3/31 E-614 DIAGRAM - MAIN UNITS 5-6

- ONE LINE - INSTALL

LGF-1-6-3/32 E-615 DIAGRAM - MAIN UNITS 5-6

- THREE LINE - INSTALL

LGF-1-6-3/33 E-616 SCHEDULE - CABLE AND

CONDUIT

LGF-1-6-3/34 E-617 WIRING - XJ8 - INSTALL

LGF-1-6-3/35 E-618 WIRING - XJ02 - INSTALL

LGF-1-6-3/36 E-901 ELECTRICAL - MAIN UNITS

1-3 - ISOMETRIC

LGF-1-6-3/37 E-902 ELECTRICAL - MAIN UNITS

4-6 - ISOMETRIC

LGF-1-6-3/38 E-903 ELECTRICAL - PHOTOGRAPHS 1

LGF-1-6-3/39 E-904 ELECTRICAL - PHOTOGRAPHS 2

LGF-1-6-3/40 E-905 ELECTRICAL - PHOTOGRAPHS 3

LGF-1-6-3/41 E-906 ELECTRICAL - PHOTOGRAPHS 4 1 2/6/19

Microstation V8 is the only CAD system used by Walla Walla District.

Contract drawings created on CAD in Microstation V8 will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing.

The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD

ROM.

1.3 FOR INFORMATION ONLY DRAWINGS (FIO)

These FIO drawings are included with the drawings for information. The

DOCUMENT 00 01 15.00 28 Page 3

Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.

FIO drawings are as follows:

FILE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

LGP-1.9-6-1G1/6 R-001 POWERHOUSE UNITS 4-6 - MAIN

UNIT GALLERY & INTAKE DECK

LGP-1.37-6-9A24

/25

R-002 DIGITAL GOVERNOR UPGRADE -

STATION SERVICE XJO2

BREAKER & ZJ5 DISCONNECT -

7683-18-1 R-003 13.8 KV STATION SERVICE

XJO2

7683-23-1 R-004 13.8 KV STATION SERVICE

TAP NO 2

73918-1 R-005 OUTLNE DIAGRAM - LITTLE

GOOSE SUBSTATION - 13.8 KV

73918-2A R-006 SCHEMATIC DIAGRAM - LITTLE

GOOSE SUBSTATION - METERING

73918-4A R-007 WIRING DIAGRAM - LITTLE

GOOSE SUBSTATION - BUS

73918-4B R-008 WIRING DIAGRAM - LITTLE

GOOSE SUBSTATION - BREAKER

LPG-1.1-6-1A11/4 R-009 EQUIPMENT INSTALLATION -

INTAKE GALLERY - EL 637

E-401 R-010 UC-1 - POWERHOUSE EL. 634 -

FLOOR PLAN AND SECTIONS

LGP-1-4-2/36 R-011 POWERHOUSE - GENERATOR BAYS

- CONCRETE - OUTLINE -

LGP-1-4-2/87 R-012 POWERHOUSE - GENERATOR BAYS

- REINFORCEMENT - INTAKE

LGP-1-4-2/88 R-013 POWERHOUSE - GENERATOR BAYS

- REINFORCEMENT - INTAKE

LGP-1.9-4-4/19 R-014 POWERHOUSE UNIT 4-6 -

REINFORCEMENT - INTAKE

LGP-6-0-0/5 R-015 POWERHOUSE - ARRANGEMENT -

GENERATOR BAY - PLAN

LGP-1.1-6-1A11/1 R-016 POWERHOUSE - ELECTRICAL -

METAL TRAY SYSTEM -

LGP-1.9-6-1A11/3 R-017 POWERHOUSE - UNITS 4-6 -

ELECTRICAL EQUIPMENT -

METAL TRAY SYSTEM -

SCHEMATIC DIAGRAM

LGP-1-4-2/30 R-018 GENERATOR PAYS-CONCRETE

OUTLINE UPSTREAM WALL ABOVE

EL. 542

-- End of Document --

DOCUMENT 00 01 15.00 28 Page 4

PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
LIST OF DRAWINGS
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 FOR INFORMATION ONLY DRAWINGS FIO

File details come from the government source that posted it.