Text version
Little Goose Fish Ladder Cooling Alternate Power W912EF19B0007 amendment 0003
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 FOR INFORMATION ONLY DRAWINGS (FIO)
-- End of Section Table of Contents --
DOCUMENT 00 01 15.00 28 Page 1
G4EDDMTJ
Line
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
FILE NUMBER SHEET
NUMBER
DESCRIPTION Revision Number
Date
GENERAL
LGG-1-0-1/424 G-001 COVER SHEET AND LOCATION
MAPS
LGG-1-0-1/425 G-002 INDEX TO DRAWINGS
ELECTRICAL
LGF-1-6-3/10 E-001 ELECTRICAL LEGEND
LGF-1-6-3/11 ED101 EL 634 GALLERY TO LSP2
ROOM - PLAN - REMOVAL
LGF-1-6-3/12 E-101 POWERHOUSE - GENERAL PLAN
- EL 621 / 634
LGF-1-6-3/13 E-102 EL 634 GALLERY TO LSP2
ROOM - PLAN - INSTALL
LGF-1-6-3/14 E-103 NAVIGATION LOCK - LSP2
ROOM - PLAN AND SECTIONS
LGF-1-6-3/15 E-201 XJ7 AND XJO1 - ELEVATION
- INSTALL
LGF-1-6-3/16 E-501 XJ8 AND XJO2 LAYOUT -
ELEVATION 621
A 2/1/19
LGF-1-6-3/17 E-502 XJ8 AND XJO2 LAYOUT -
PLAN VIEW AND SECTION
LGF-1-6-3/18 E-601 POWERHOUSE - MAIN ONELINE
DIAGRAM
LGF-1-6-3/19 E-602 SCHEMATIC - MAIN UNITS
4-6 - ANNUNCIATOR -
LGF-1-6-3/20 E-603 SCHEMATIC - XJ8
PROTECTION AND TRAPPED
LGF-1-6-3/21 E-604 SCHEMATIC - XJ8 CONTROLS
- INSTALL
LGF-1-6-3/22 E-605 WIRING DIAGRAM - 13.8 KV
SERVICE - INSTALL
DOCUMENT 00 01 15.00 28 Page 2
G4EDDMTJ
Line
LGF-1-6-3/23 E-606 CONTROL SCHEMATIC - XJO2
AND ZJ5 - INSTALL
LGF-1-6-3/24 E-607 WIRING DIAGRAM -
SWITCHBOARD S5R2 - INSTALL
LGF-1-6-3/25 E-608 SCHEMATIC - GOVERNOR
INTERPOSING RELAYS -
LGF-1-6-3/26 E-609 SCHEDULE - GOVERNOR
INTERPOSING RELAYS -
LGF-1-6-3/27 E-610 WIRING DIAGRAM -
SWITCHBOARD S5R1 - SHEET
LGF-1-6-3/28 E-611 WIRING DIAGRAM -
SWITCHBOARD S5R1 - SHEET
LGF-1-6-3/29 E-612 WIRING DIAGRAM -
SWITCHBOARD S5R1 - SHEET
LGF-1-6-3/30 E-613 WIRING DIAGRAM -
SWITCHBOARD S5R1 - SHEET
LGF-1-6-3/31 E-614 DIAGRAM - MAIN UNITS 5-6
- ONE LINE - INSTALL
LGF-1-6-3/32 E-615 DIAGRAM - MAIN UNITS 5-6
- THREE LINE - INSTALL
LGF-1-6-3/33 E-616 SCHEDULE - CABLE AND
CONDUIT
LGF-1-6-3/34 E-617 WIRING - XJ8 - INSTALL
LGF-1-6-3/35 E-618 WIRING - XJ02 - INSTALL
LGF-1-6-3/36 E-901 ELECTRICAL - MAIN UNITS
1-3 - ISOMETRIC
LGF-1-6-3/37 E-902 ELECTRICAL - MAIN UNITS
4-6 - ISOMETRIC
LGF-1-6-3/38 E-903 ELECTRICAL - PHOTOGRAPHS 1
LGF-1-6-3/39 E-904 ELECTRICAL - PHOTOGRAPHS 2
LGF-1-6-3/40 E-905 ELECTRICAL - PHOTOGRAPHS 3
LGF-1-6-3/41 E-906 ELECTRICAL - PHOTOGRAPHS 4
Microstation V8 is the only CAD system used by Walla Walla District.
Contract drawings created on CAD in Microstation V8 will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing.
The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD
ROM.
1.3 FOR INFORMATION ONLY DRAWINGS (FIO)
These FIO drawings are included with the drawings for information. The
DOCUMENT 00 01 15.00 28 Page 3
Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
FIO drawings are as follows:
FILE NUMBER SHEET
NUMBER
DESCRIPTION Revision Number
Date
LGP-1.9-6-1G1/6 R-001 POWERHOUSE UNITS 4-6 - MAIN
UNIT GALLERY & INTAKE DECK
LGP-1.37-6-9A24
/25
R-002 DIGITAL GOVERNOR UPGRADE -
STATION SERVICE XJO2
BREAKER & ZJ5 DISCONNECT -
7683-18-1 R-003 13.8 KV STATION SERVICE
XJO2
7683-23-1 R-004 13.8 KV STATION SERVICE
TAP NO 2
73918-1 R-005 OUTLNE DIAGRAM - LITTLE
GOOSE SUBSTATION - 13.8 KV
73918-2A R-006 SCHEMATIC DIAGRAM - LITTLE
GOOSE SUBSTATION - METERING
73918-4A R-007 WIRING DIAGRAM - LITTLE
GOOSE SUBSTATION - BUS
73918-4B R-008 WIRING DIAGRAM - LITTLE
GOOSE SUBSTATION - BREAKER
LPG-1.1-6-1A11/4 R-009 EQUIPMENT INSTALLATION -
INTAKE GALLERY - EL 637
E-401 R-010 UC-1 - POWERHOUSE EL. 634 -
FLOOR PLAN AND SECTIONS
LGP-1-4-2/36 R-011 POWERHOUSE - GENERATOR BAYS
- CONCRETE - OUTLINE -
LGP-1-4-2/87 R-012 POWERHOUSE - GENERATOR BAYS
- REINFORCEMENT - INTAKE
LGP-1-4-2/88 R-013 POWERHOUSE - GENERATOR BAYS
- REINFORCEMENT - INTAKE
LGP-1.9-4-4/19 R-014 POWERHOUSE UNIT 4-6 -
REINFORCEMENT - INTAKE
LGP-6-0-0/5 R-015 POWERHOUSE - ARRANGEMENT -
GENERATOR BAY - PLAN
LGP-1.1-6-1A11/1 R-016 POWERHOUSE - ELECTRICAL -
METAL TRAY SYSTEM -
LGP-1.9-6-1A11/3 R-017 POWERHOUSE - UNITS 4-6 -
ELECTRICAL EQUIPMENT -
METAL TRAY SYSTEM -
SCHEMATIC DIAGRAM
LGP-1-4-2/30 R-018 GENERATOR PAYS-CONCRETE
OUTLINE UPSTREAM WALL ABOVE
EL. 542
-- End of Document --
DOCUMENT 00 01 15.00 28 Page 4
| PROJECT TABLE OF CONTENTS |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| LIST OF DRAWINGS |
| LIST OF DRAWINGS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 CONTRACT DRAWINGS |
| 1.3 FOR INFORMATION ONLY DRAWINGS FIO |