Amendment_0001.pdf
PDF 599 KB Posted
- Attached to
- MCL - Vegetation management Federal contract opportunity
- Solicitation number
- W912EF-18-Q-0058
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| Conformed_Copy_W912EF18Q00580002.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to address question and answ ers. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 103
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF18Q0058
X 9B. DATED (SEE ITEM 11)
29-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Apr-2018
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
LC THAMES
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF18Q0058
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q&A 4.18.18 Paragraph 1.2.7 AT Level I Training (page 52 of 106). This paragraph provides two options for completing AT Level 1 Training, either through the use of (a) an on-line training course or
(b) training to be provided by the RA ATO in presentation form.
a. Is it the intent of the Corps of Engineers to provide this training to contractor employees by the RA ATO in presentation form?
b. During our review of the PWS, we have been unable to access the training site https://jko.jten.mil/courses/atl1/launch.html from our computer systems outfitted with either Windows 7 or Windows 10 using Microsoft Internet Explorer or Microsoft Edge browsers. If it is the intent of the government that the contractor complete AT Level I training using the listed website:
i. Which computer operating systems and internet browsers are supported by the jko.jten.mil website?
ii. What browser security settings are required to access the site?
Required OPSEC Training (page 53 of 106). Is it the intent of the government that this training requirement shall be provided to contractor employees by the RA OPSEC Officer in presentation form?
It is not the District’s intent to tell the contractor how they must complete the training (either AT Level I or OPSEC Level I). We can provide the training if desired, but there will be scheduling and coordination conducted in order to do this. I did find out that cutting and pasting into the address bar didn’t get me to the site but the active link in the AT/OPSEC sheet did. The link provided should work. If it doesn’t, I included a screen shot and an attachment to aid in browser settings.
AT
http://jko.jten.mil/courses/atl1/launch.html
OPSEC
https://www.iad.gov/ioss/
OR
https://www.cdse.edu/catalog/operations‐security.html
Paragraph C-1.8.4 Pest Management. This paragraph states that the contractor “will comply with the Corps of Engineers Pest Management Implementation Instructions which is provided in Appendix A.” However, it appears than Appendix A is not included in the solicitation package. Will the government please include Appendix A with the solicitation package?
Appedix A is the integrated pest management plan which can be found at:
http://www.nww.usace.army.mil/Missions/Projects/Pest-Management/
Paragraph C-5.1 Current Conditions. This paragraph lists the current conditions as of 15 October 2018.
Shouldn’t this read that the conditions listed are current as of 15 October 2017?
Current conditions as of 15 October 2017
Five – One Acre Food Plots. This item states that the five food plots located throughout the property “have been established, but have been since overgrown with weeds.”.
However, haven’t these five food plots been maintained, planted and fertilized for the past few years and are not, in fact, overgrown with weeds?
Contractor is correct they have been well maintained over the past few years, this language was left over from the last time the contract was advertised.
Paragraph C-5.2 Vegetation Management. This paragraph states that “Applications the base year, option year 2, and option year 4 should be a mixture of broadleaf killer and grass killer. Applications during option year 1 and option year 3 should be Glyphosate”.
However, the Bid Schedule only requires the contractor to use broadleaf/grass killer (base, option year 2 and option year 4) or Glyphosate (option year 1 and option year
3) for work performed under CLINs x001, Paved Roads/Trails and CLINs x002, Paved Parking Areas.
a. Should the contractor interpret Paragraph C-5.2 to indicate that the requirement to use broadleaf and grass killers during certain contract years and Glyphosate during other contract years only applies to work performed on the Paved Roads/Trails (CLINs x001) and Paved Parking Areas (CLINs x002)?
CLINS x001 through x006
b. Should the contractor assume that work performed under CLINs x003 through x018 may be accomplished using herbicides deemed most effective for the task being performed, in keeping with the restrictions and requirements outlined in the IPMP?
If CLINS do not specify a chemical then the only requirement is that it is in keeping with the restrictions and requirements outlined in the IPMP. Additional CLINs are needed and have been identified throughout this document and will hopefully clear up this question.
Paragraph C-5.2.1 Pesticide Application – Total Control. The final item under this section lists
“Christmas Tree Piles”. However, we do not see a corresponding line item in the Bid Schedule. Will the Bid Schedule be adjusted to allow the contractor to bill the government for this work requirement?
CLIN has been added
Paragraph C-5.2.2 Broadleaf Boom Spray. Paragraph C-5.2.2 calls for 30 acres of broadleaf boom spray work. However, the Bid Schedule, CLINs 0007, 1007, 2007, 3007 and 4007 allow for the invoicing of 10 acres of broadleaf boom spray work. Should the contractor interpret this to mean that there is a potential area of 30 acres in which broadleaf boom spray work may occur, but the contractor will only perform 10 acres of broadleaf boom spray work per year within this area?
CLIN updated to 30 Acres
Paragraph C-5.2.2 Broadleaf Spot Spray. Paragraph C-5.2.2 calls for 5 acres of broadleaf boom spray work.
However, the Bid Schedule, CLINs 0008, 1008, 2008, 3008 and 4008 allow for the invoicing of 2 acres of broadleaf boom spray work. Should the contractor interpret this to mean that there is a potential area of 5 acres in which broadleaf spot spray work may occur, but the contractor will only perform 2 acres of broadleaf spot spray work per year within this area?
CLIN updated to 5 acres
Paragraph C-5.2.2 Outside Levee Slope. Is it the government’s intent that work described under “Outside
Levee Slope” be invoiced under CLINs x015 and x016?
CLIN added
Paragraph C-5.2.3 Plantings – Alfalfa Food Plot. In order to produce a successful crop, alfalfa should be planted early in the Spring. Given the timeframe in which this Contract is likely to be awarded, would the government consider planting the alfalfa food plot into another food crop for the Base Year with the intent of replanting it in alfalfa early Spring 2019?
The Government would consider alternative planting for the alfalfa food plot to any of the other crops in the contract given the timing of the base year.
Paragraph C-5.2.3 Plantings – Native Pollinator Mix. The PWS states that one food plot will be planted with a “native pollinator mix”. Please define the specifications for the "native pollinator mix", including the common name (variety) of each seed included in the mix, and the number of pounds of pure live seed (PLS) per acre for each seed variety.
Acceptable species in no greater than 20% PLS per variety can include:
Blanketflower, Gaillardia aristata Arrowleaf balsamroot, Balsamorhiza sagittata Snow buckwheat, Eriogonum niveum Annual wild sunflower, Helianthus annuus Purple prairie clover, Dalea ornata Purple coneflower, Echinacea purpurea Blue flax, Linum lewisii Silky lupine, Lupinus sericeus Biscuitroot fernleaf, Lomatium dissectum Fleabane daisy, Erigeron annuus Oregon sunshine, Eriophyllum lanatum Desert globemallow (orange), Sphaeralcea munroana Sticky/wild geranium, Geranium viscosissimum Western white yarrow, Achillea millefolium
Fireweed, Chamaenerion angustifolium Roundleaf alumroot, Heuchera cylindrica Indian paintbrush, Castilleja sp.
Canada goldenrod, Solidago canadensis Rocky Mountain Beeplant, Cleome serrulata Rocky Mountain Iris, Iris missouriensis CA Poppy, Eschscholzia californica Little Sunflower, Helianthus pumilus Yarrow, Achillea millefolium
Paragraph C-5.2.3 Appendix B. The PWS states that the contractor should refer to Appendix B for the locations of all five food plots. We are unable to find an Appendix B in the solicitation package. However, we assume that Appendix B should be the map at the end of the solicitation package. Would that assumption be correct?
Bottom half of map
Paragraph C-5.2.3 Plantings - Broadcast Seeding. This paragraph states that the contractor shall broadcast seed twenty acres during the fall throughout the Project Area, consisting of a "dryland native grass seed mix." Please define the specifications for the "dryland native grass seed mix", including the common name (variety) of each seed included in the mix, and the number of pounds of pure live seed (PLS) per acre for each seed variety.
Dryland Native Grass Seed mix broadcast planting.
Mix will include Bluebunch Wheatgrass (Agropyron spicatum) 20% PLS Indian Ricegrass (Oryzopsis hymenoides) 20% PLS Needle and Thread Grass (Stipa comata) 20% PLS Big Bluegrass (Poa ampla) 20% PLS Wild rye (Leymus cinereus) 20% PLS
Paragraph C-5.2.3 Plantings – Broadcast Seeding. The dryland native grass seed mix mentioned in this paragraph includes Needle and Thread Grass (Stipa Comata) as part of the seed mix.
Since this particular seed is extremely expensive and difficult to obtain, DeRuwe, Inc.
would recommend substituting Bottlebrush Squirreltail (Elymus elymoides) or a similar product in order to make the seeding effort more economical. Would the government consider making changes to the composition of the “dryland native grass seed mix”?
Government would prefer Needle and Thread Grass unless it becomes unavailable.
Paragraph C-5.2.3 Dryland Grass Seeding Acreage. Paragraph C-5.2.3 calls for 20 acres of broadcast seeding during the fall using a dryland native grass seed mix. However, the Bid Schedule, CLINs 0010, 1010, 2010, 3010 and 4010 allow for the invoicing of 10 acres of dryland native grass seeding.
a. Which standard is the contractor required to follow, the Bid Schedule (10 acres) or the Performance Work Statement (20 acres)?
CLIN Updated
b. If the contractor is required to seed 20 acres in dryland native grass seed each year, will the Bid Schedule be adjusted to allow the contractor to bill the government for this work?
CLIN updated to 20 acres
Paragraph C-5.2.4 Mowing. The first task lists as the “Unit” “20 Acres of Mowing Grassland”. However, the Bid Schedule shows a total of 10 acres of Mowing for each Contract Year (2 AC under CLIN x011, 3 AC under CLIN x014AA, and 5 AC under CLIN x014AB).
Should the contractor interpret this to mean that there is a potential area of 20 acres in which mowing may occur, but the contractor will only perform 10 acres of mowing per year within this area?
CLIN updated to 20 acres
Paragraph C-5.2.4 Flail Mowing. The second task in the section covers 1 acre of mowing with a flail mower of Christmas tree piles, blackberries, or high-density brush areas. We do not see a corresponding item in the Bid Schedule to cover this work requirement. Does the government intend to add a CLIN to the Bid Schedule for invoicing this work or is this work item intended to be billed under the “Mowing” CLINs in the Bid Schedule (x011, x014AA or x014AB)?
CLIN Added
Paragraph C-5.2.5 Biological Control. This section of the PWS covers the release of various bio-control agents to treat Puncture Vines, Poison Hemlock, and Yellow Star-thistle. However, we do not see a corresponding item in the Bid Schedule to cover this work requirement. Does the government intend to add a CLIN to the Bid Schedule for invoicing this work?
Paragraph C-5.2.6 Cut and Paint False Indigo, Tree of Heaven, Japanese Knotweed. The PWS indicates that the contractor will cut and paint pesticide on the stems of 2 acres of False Indigo plants, 1 acres of Tree of Heaven, and 2 acres of Japanese Knotweed. However, CLIN x012 of the Bid Schedule only provides for 0.5 acres of False Indigo cutting/removal per year.
a. Should the contractor interpret this to mean that there is a potential area of 5 acres of False Indigo Bush, Tree of Heaven and Japanese Knotweed, but the contractor will only perform 0.5 acres of cutting/painting/removal per year within this area?
CLIN Updated to 2 acres CLIN added for 1 acres of tree of heaven CLIN added for 2 acres of Japanese Knotweed
b. How is an acre of Tree of Heaven calculated: by canopy coverage, number of stems, or some other measure?
Canopy coverage
c. How is an acre of Japanese Knotweed calculated: by canopy coverage, number of stems, or some other measure?
Canopy coverage
Paragraph C-5.2.7 Stem Injections – Japanese Knotweed and Tree of Heaven. This section of the PWS covers injecting pesticides into each stem of a Japanese Knotweed stand or a Tree of Heaven. However, we do not see a corresponding item in the Bid Schedule to cover this work requirement.
Does the government intend to add a CLIN to the Bid Schedule for invoicing this work?
Paragraph C-5.2.9 Aquatic Pesticide Application. This section of the PWS covers the treatment of aquatic broadleaf weeds, Reed Canary Grass, and Eurasian Mill Foil in the Project Area. This work requirement is very specialized and requires the use of aquatic herbicides which are far more expensive than the terrestrial broadleaf herbicides used for other work requirements outlined in the solicitation. We do not see a corresponding item in the Bid Schedule to cover this work requirement. Does the government intend to add a CLIN to the Bid Schedule for invoicing this work?
Page 106 of 106 Project Area Map. It does not appear that the map provided by the Corps of Engineers includes the southern end of the Project Area. Will the government please provide a complete map of the Project Area?
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Provide mixture of broadleaf killer and grass killer application along paved roads and trails In accordance with the Performance Work
To:
accordance with the Performance Work C-5.2.1
CLIN 0002
CLIN 0003
Provide weed control for gravel roads in accordance with the enclosed Performance Work Statement.
Statement. C-5.2.1
CLIN 0004
Provide weed spraying in gravel parking areas in accordance with the enclosed Performance Work Statement.
Work Statement. C-5.2.1
CLIN 0005
Provide weed control for the Bennington Lake Dam area in accordance with the enclosed Performance Work Statement.
Performance Work Statement. C-5.2.1
CLIN 0006
Provide weed control for the wet side of the Diversion Dam in accordance with the enclosed
CLIN 0007
Provide weed control for ten acres within the Mill Creek Project in accordance with the enclosed
Performance Work Statement. C-5.2.2
The pricing detail quantity has increased by 20.00 from 10.00 to 30.00.
CLIN 0008
Provide broadleaf spot spraying for two acres within the Mill Creek Project inaccordance with the enclosed Performance Work Statement.
Provide broadleaf spot spraying for two acres within the Mill Creek Project in accordance with the enclosed Performance Work Statement. C-5.2.2
The pricing detail quantity has increased by 3.00 from 2.00 to 5.00.
CLIN 0009
The CLIN type priced has been deleted.
The CLIN description has changed from Food Plot to Plantings - Food Plot.
The CLIN extended description has changed from:
Plant, prepare and fertilize five one acre food plots within the Mill Creek Project in accordance with the enclosed Performance Work Statement.
with the enclosed Performance Work Statement. C-5.2.3 The pricing detail quantity 5.00 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 561730 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 0010
Provide Dryland Native Grass Seed mix broadcast planting in accordance with the enclosed
Performance Work Statement. C-5.2.3
The pricing detail quantity has increased by 10.00 from 10.00 to 20.00.
CLIN 0011
Provide one time mowing service for grassland within the Mill Creek Project inaccordance with
One Time mowing of Wild dryland grass field mowing encompassing Bluebunch Wheatgrass (Agropyron spicatum) Indian Ricegrass (Oryzopsis hymenoides) Needle and Thread Grass (Stipa comata) Big Bluegrass (Poaampla); wild rye (Leymus cinereus);in accordance with the enclosed Performance Work Statement.
The pricing detail quantity has increased by 18.00 from 2.00 to 20.00.
CLIN 0012
The CLIN extended description has changed from:
Cut and Removal of false indigo bush in accordance with the enclosed Performance Work
In accordance with the enclosed Performance Work Statement. C-5.2.6 The pricing detail quantity 0.50 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 0013
The CLIN description has changed from Broadleaf Spot Spray (False Indigo) to Biological Control.
In accordance with the Performance Work
Biological control shall be applied in order to manage puncture vine, poisonhemlock, and yellowstar thistle. In accordance with the Performance Work C-5.2.5 The pricing detail quantity has decreased by 1.00 from 2.00 to 1.00.
The unit of issue has changed from Acre to Job.
CLIN 0014
The CLIN description has changed from Mowing to Aquatic Pesticide Application.
SUBCLIN 0014AA
The CLIN description has changed from Mowing to Inside Slope of Levee.
The inside levee slope of the north and south levees of Mill Creek area is 4acres. This area is within 15’ of the OHWM.In accordance with the Performance Work
The pricing detail quantity has increased by 1.00 from 3.00 to 4.00.
SUBCLIN 0014AB
The CLIN description has changed from Mowing to Reed Canary Grass.
Remove old/current growth Reed Canary grass then apply aquatic pesticide to new emergent grass once it starts growing again In accordance with the Performance Work
The pricing detail quantity has decreased by 4.75 from 5.00 to 0.25.
CLIN 0015
The CLIN description has changed from Broadleaf Spot Spray 15'-50' (Levee) to Stem injections.
Stem injections – Japanese Knotweed and tree of heaven In accordance with the Performance Work C-5.2.7 The pricing detail quantity has decreased by 4.50 from 5.50 to 1.00.
CLIN 0016
The CLIN description has changed from Broadleaf Spot Spray 0'-15' (Levee) to Fertilizer Rooks Lawn.
Purchase and apply fertilizer the lawn area with a 16-16-16 lawn fertilizer following the manufacturer’s recommendations. Coordinate watering of thelawn with the COR. In accordance with the Performance Work C-5.2.8
The pricing detail quantity has increased by 5.50 from 0.50 to 6.00.
CLIN 0017
The CLIN description has changed from Broadleaf Boom Spray - Rooks to Christmas Tree Piles.
2 acres of Christmas Tree piles In accordance with the Performance Work C-5.2.1
The pricing detail quantity has decreased by 4.00 from 6.00 to 2.00.
CLIN 0018
The CLIN description has changed from Fertilize Rooks Park to Outside Levee Slope.
The outside levee slope of the north and south levees of Mill Creek area is 6 acres. This area is within 15’-50’ of the OHWM. The slope of the leveewill vary through the first 2 or 3 years of this contract as it is being repaired to a 4:1 slope. In accordance with the Performance Work - 5.2.2 The pricing detail quantity has decreased by 5.00 from 6.00 to 1.00.
CLIN 1001
Provide Glyphosate application along paved roads and trails in accordance with the enclosed
CLIN 1002
Provide Glyphosate application along paved parking areas and all cracks within the paved parking areas in accordance with the enclosed Performance Work Statement.
parking areas in accordance with the enclosed Performance Work Statement. C-5.2.1
CLIN 1003
CLIN 1004
CLIN 1005
Performance Work Statement. C-5.2.1 The pricing detail quantity 1.00 has been added.
The unit of issue Job has been added.
CLIN 1006
CLIN 1007
Performance Work Statement. C-5.2.2
CLIN 1008
the enclosed Performance Work Statement. C-5.2.2
CLIN 1009
The CLIN description has changed from Food Plot to Planting - Food Plot.
The CLIN extended description has changed from:
with the enclosed Performance Work Statement. C-5.2.3 The pricing detail quantity 5.00 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1010
Performance Work Statement. C-5.2.3
CLIN 1011
the enclosed Performance Work Statement.FOB: Destination
(Agropyron spicatum) Indian Ricegrass (Oryzopsis hymenoides) Needle and Thread Grass (Stipa comata) Big Bluegrass (Poaampla); wild rye (Leymus cinereus);in accordance with the enclosedPerformance Work Statement.
CLIN 1012
In accordance with the Performance Work C-5.2.6 The pricing detail quantity 0.50 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1013
Biological Control.
yellowstar thistle. In accordance with the Performance Work C-5.2.5
CLIN 1014
In accordance with the Performance Work C-5.2.9
SUBCLIN 1014AA
within 15’ of the OHWM.In accordance with the Performance Work
SUBCLIN 1014AB
grass once it starts growing again In accordance with the Performance Work
CLIN 1015
Injections.
Work C-5.2.7
CLIN 1016
Fertilizer Rooks Lawn.
manufacturer’s recommendations. Coordinate watering of thelawn with the COR. In accordance with the Performance Work C-5.2.8
CLIN 1017
Tree Piles.
CLIN 1018
within 15’-50’ of the OHWM. The slope of the leveewill vary through the first 2 or 3 years of this contract as it is being repaired to a 4:1 slope. In accordance with the Performance Work C- 5.2.2
CLIN 2001
CLIN 2002
CLIN 2003
SUBCLIN 2003AA
The pricing detail quantity 1.00 has been added.
The unit of issue Job has been added.
CLIN 2004
CLIN 2005
CLIN 2006
CLIN 2007
Performance Work Statement. C-5.2.2
CLIN 2008
the enclosed Performance Work Statement. C-5.2.2
CLIN 2009
The CLIN description has changed from Food Plot to Plantings - Food Plot.
The CLIN extended description has changed from:
with the enclosed Performance Work Statement. C-5.2.3 The pricing detail quantity 5.00 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2010
Performance Work Statement. C-5.2.3
CLIN 2011
(Agropyron spicatum) Indian Ricegrass (Oryzopsis hymenoides) Needle and Thread Grass (Stipa comata) Big Bluegrass (Poaampla); wild rye (Leymus cinereus);in accordance with the enclosedPerformance Work Statement
CLIN 2012
The pricing detail quantity 0.50 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2013
Biological Control.
yellowstar thistle. In accordance with the Performance Work C-5.2.5
CLIN 2014
SUBCLIN 2014AA
within 15’ of the OHWM.In accordance with the Performance Work
SUBCLIN 2014AB
grass once it starts growing again In accordance with the Performance Work
CLIN 2015
Injections.
Work C-5.2.7
CLIN 2016
Fertilizer Rooks Lawn.
manufacturer’s recommendations. Coordinate watering of thelawn with the COR. In accordance with the Performance Work C-5.2.8
CLIN 2017
Tree Piles.
CLIN 2018
The outside levee slope of the north and south levees of Mill Creek area is 6 acres. This area iswithin 15’-50’ of the OHWM. The slope of the leveewill vary through the first 2 or 3 years ofthis contract as it is being repaired to a 4:1 slope. In accordance with the Performance Work C- 5.2.2
CLIN 3001
CLIN 3002
parking areas in accordance with the enclosed Performance Work Statement.
parking areas in accordance with the enclosed Performance Work Statement. C-5.2.1
CLIN 3003
CLIN 3004
CLIN 3005
CLIN 3006
CLIN 3007
Performance Work Statement. C-5.2.2
CLIN 3008
the enclosed Performance Work Statement. C-5.2.2
CLIN 3009
The CLIN description has changed from Food Plot to Plantings - Food Plot.
The CLIN extended description has changed from:
with the enclosed Performance Work Statement. C-5.2.3 The pricing detail quantity 5.00 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 3010
Performance Work Statement. C-5.2.3
CLIN 3011
(Agropyron spicatum) Indian Ricegrass (Oryzopsis hymenoides) Needle and Thread Grass (Stipa comata) Big Bluegrass (Poaampla); wild rye (Leymus cinereus);in accordance with the enclosedPerformance Work Statement
CLIN 3012
The pricing detail quantity 0.50 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 3013
Biological Control.
yellowstar thistle. In accordance with the Performance Work C-5.2.5
CLIN 3014
SUBCLIN 3014AA
within 15’ of the OHWM.In accordance with the Performance Work
SUBCLIN 3014AB
grass once it starts growing again In accordance with the Performance Work
CLIN 3015
Injections.
Work C-5.2.7
CLIN 3016
Fertilizer Rooks Lawn.
manufacturer’s recommendations. Coordinate watering of thelawn with the COR. In accordance with the Performance Work C-5.2.8
CLIN 3017
Tree Piles.
CLIN 3018
within 15’-50’ of the OHWM. The slope of the leveewill vary through the first 2 or 3 years of this contract as it is being repaired to a 4:1 slope. In accordance with the Performance Work C- 5.2.2
CLIN 4001
CLIN 4002
CLIN 4003
CLIN 4004
CLIN 4005
CLIN 4006
CLIN 4007
Performance Work Statement. C-5.2.2
CLIN 4008
the enclosed Performance Work Statement. C-5.2.2
CLIN 4009
The CLIN extended description has changed from:
with the enclosed Performance Work Statement. C-5.2.3
The pricing detail quantity 5.00 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 4010
Performance Work Statement. C-5.2.3
CLIN 4011
(Agropyron spicatum) Indian Ricegrass (Oryzopsis hymenoides) Needle and Thread Grass (Stipa comata) Big Bluegrass (Poaampla); wild rye (Leymus cinereus);in accordance with the enclosedPerformance Work Statement
CLIN 4012
In accordance with the enclosed Performance Work Statement.
In accordance with the enclosed Performance Work Statement. C-5.2.6 The pricing detail quantity 0.50 has been deleted.
The unit of issue Acre has been deleted.
The FOB Destination has been deleted.
The FSC code F019 has been deleted.
The PROG code C9E has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 4013
Biological Control.
yellowstar thistle. In accordance with the Performance Work C-5.2.5
CLIN 4014
SUBCLIN 4014AA
within 15’ of the OHWM.In accordance with the Performance Work
SUBCLIN 4014AB
grass once it starts growing again In accordance with the Performance Work
CLIN 4015
Injections.
Work C-5.2.
CLIN 4016
Fertilizer Rooks Lawn.
manufacturer’s recommendations. Coordinate watering of thelawn with the COR. In accordance with the Performance Work C-5.2.8
The unit of issue has changed from Access Lines to Acre.
CLIN 4017
Tree Piles.
CLIN 4018
The outside levee slope of the north and south levees of Mill Creek area is 6 acres. This area iswithin 15’-50’ of the OHWM. The slope of the leveewill vary through the first 2 or 3 years ofthis contract as it is being repaired to a 4:1 slope. In accordance with the Performance Work C- 5.2.2 The pricing detail quantity has decreased by 5.00 from 6.00 to 1.00.
SUBCLIN 0009AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009AA 1 Acre Plant/Prepare/Fertilize Alfalfa Food Pl
FFP
One Acre Food Plots established with drought tolerant alfalfa.
Base year only.
FOB: Destination
NET AMT
SUBCLIN 0009AB is added as follows:
0009AB 5 Acre Plant/Prepare/Fertilize Food Plots
FFP
Plant/Prepare/Fertilize Four One Acre Food Plots Four – One Acre Food Plots established with Sorghum, wheat, sunflowers, and COR approved pollinator mix.
SUBCLIN 0009AC is added as follows:
0009AC 4 Acre Control weeds in nonalfalfa food plots
FFP
Four - One acre food plots established with sorghum, wheat, sunflowers, and pollinator mix. Pesticides to control pest/noxious weeds should be applied according to manufacturer’s recommendation.
SUBCLIN 0009AD is added as follows:
0009AD 1 Acre Control weeds, and fertilize Alfalfa plo
FFP
Alfalfa will be maintained in such a way that it continues to offer habitat for wildlife
SUBCLIN 0009AE is added as follows:
0009AE 1 Acre Mow Alfalfa plot
FFP
mow the Alfalfa plot in late summer (August or September)
SUBCLIN 0012AA is added as follows:
0012AA 2 Acre False Indigo
FFP
Cut and paint pesticide on the stems of False Indigo Plants. Cuttings will be properly disposed of by the contractor.
SUBCLIN 0012AB is added as follows:
0012AB 1 Acre Tree of Heaven
FFP
Cut and paint pesticide on the stems of Tree of Heaven. Cuttings under 4” diameter will be disposed of by the contractor. Cuttings over 4” diameter will be disposed of by the government.
SUBCLIN 0012AC is added as follows:
0012AC 2 Acre Japanese Knotweed
FFP
Cut and paint stems of Japanese Knotweed. Cutting will be properly disposed of by contractor.
SUBCLIN 0014AC is added as follows:
0014AC .25 Acre Eurasian Mill Foil Treatment
FFP
Treat Eurasian Mill Foil in Mill Creek with aquatic pesticide In accordance with the Performance Work
CLIN 0019 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0019 6 Acre
Broadleaf Boom Spray Irrigated Lawn Rook
FFP
Broadleaf Boom Spray –Irrigated Lawn Rook’s Park Target Species may include Clover, Dandelions, Ground Ivy, Broadleaf Plantain. Areas to be sprayed include Rooks Park lawn areas. Increased signage will be required for this work as there are many access points. In accordance with the Performance Works Statement C-5.2.2 FOB: Destination
NET AMT
SUBCLIN 1009AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1009AA 1 Acre
Plant/Prepare/Fertilize Alfalfa Food Pl
FFP
One Acre Food Plots established with drought tolerant alfalfa.
Base year only FOB: Destination
NET AMT
SUBCLIN 1009AB is added as follows:
OPTION
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1009AB 5 Acre
Plant/Prepare/Fertilize Food Plots
FFP
Plant/Prepare/Fertilize Four One Acre Food Plots Four – One Acre Food Plots established with Sorghum, wheat, sunflowers, and COR approved pollinator mix.
FOB: Destination
NET AMT
SUBCLIN 1009AC is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1009AC 4 Acre
Control weeds in nonalfalfa food plots
FFP
Four - One acre food plots established with sorghum, wheat, sunflowers, and pollinator mix. Pesticides to control pest/noxious weeds should be applied according to manufacturer’s recommendation FOB: Destination
NET AMT
SUBCLIN 1009AD is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1009AD 1 Acre
Control weeds, and fertilize Alfalfa plo
FFP
Alfalfa will be maintained in such a way that it continues to offer habitat for wildlife FOB: Destination
NET AMT
OPTION
SUBCLIN 1009AE is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1009AE 1 Acre
Mow Alfalfa plot
FFP
mow the Alfalfa plot in late summer (August or September) FOB: Destination
NET AMT
SUBCLIN 1012AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1012AA 2 Acre
False Indigo
FFP
Cut and paint pesticide on the stems of False Indigo Plants. Cuttings will be properly disposed of by the contractor.
FOB: Destination
NET AMT
SUBCLIN 1012AB is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1012AB 1 Acre
Tree of Heaven
FFP
Cut and paint pesticide on the stems of Tree of Heaven. Cuttings under 4” diameter will be disposed of by the contractor. Cuttings over 4” diameter will be disposed of by the government.
FOB: Destination
NET AMT
OPTION
SUBCLIN 1012AC is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1012AC 2 Acre
Japanese Knotweed
FFP
Cut and paint stems of Japanese Knotweed. Cutting will be properly disposed of by contractor.
FOB: Destination
NET AMT
SUBCLIN 1014AC is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1014AC .25 Acre
Eurasian Mill Foil Treatment
FFP
Treat Eurasian Mill Foil in Mill Creek with aquatic pesticide In accordance with the Performance Work FOB: Destination
NET AMT
CLIN 1019 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1019 6 Acre OPTION Broadleaf Boom Spray Irrigated Lawn Rook
FFP
Broadleaf Boom Spray –Irrigated Lawn Rook’s Park Target Species may include Clover, Dandelions, Ground Ivy, Broadleaf Plantain. Areas to be sprayed include Rooks Park lawn areas. Increased signage will be required for this work as there are many access points. In accordance with the Performance Works Statement C-5.2.2 FOB: Destination
NET AMT
SUBCLIN 2009AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2009AA 1 Acre OPTION Plant/Prepare/Fertilize Alfalfa Food Pl
FFP
One Acre Food Plots established with drought tolerant alfalfa.
Base year only.
FOB: Destination
SUBCLIN 2009AB is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2009AB 5 Acre OPTION Plant/Prepare/Fertilize Food Plots
FFP
Plant/Prepare/Fertilize Four One Acre Food Plots Four – One Acre Food Plots established with Sorghum, wheat, sunflowers, and COR approved pollinator mix.
FOB: Destination
NET AMT
SUBCLIN 2009AC is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2009AC 4 Acre OPTION Control weeds in nonalfalfa food plots
FFP
Four - One acre food plots established with sorghum, wheat, sunflowers, and pollinator mix. Pesticides to control pest/noxious weeds should be applied according to manufacturer’s recommendation.
FOB: Destination
NET AMT
SUBCLIN 2009AD is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2009AD 1 Acre OPTION Control weeds, and fertilize Alfalfa plo
FFP
Alfalfa will be maintained in such a way that it continues to offer habitat for wildlife
SUBCLIN 2009AE is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2009AE 1 Acre OPTION Mow Alfalfa plot
FFP
mow the Alfalfa plot in late summer (August or September) FOB: Destination
NET AMT
SUBCLIN 2012AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2012AA 2 Acre OPTION False Indigo
FFP
Cut and paint pesticide on the stems of False Indigo Plants. Cuttings will be properly disposed of by the contractor.
FOB: Destination
SUBCLIN 2012AB is added as follows:
2012AB 1 Acre OPTION Tree of Heaven
FFP
Cut and paint pesticide on the stems of Tree of Heaven. Cuttings under 4” diameter will be disposed of by the contractor. Cuttings over 4” diameter will be disposed of
SUBCLIN 2012AC is added as follows:
2012AC 2 Acre OPTION Japanese Knotweed
FFP
Cut and paint stems of Japanese Knotweed. Cutting will be properly disposed of by
SUBCLIN 2014AC is added as follows:
2014AC .25 Acre OPTION Eurasian Mill Foil Treatment
FFP
Treat Eurasian Mill Foil in Mill Creek with aquatic pesticide In accordance with
CLIN 2019 is added as follows:
2019 6 Acre OPTION Broadleaf Boom Spray Irrigated Lawn Rook
FFP
Broadleaf Boom Spray –Irrigated Lawn Rook’s Park Target Species may include Clover, Dandelions, Ground Ivy, Broadleaf Plantain. Areas to be sprayed include Rooks Park lawn areas. Increased signage will be required for this work as there are many access points. In accordance with the Performance Works Statement C-5.2.2
SUBCLIN 3009AA is added as follows:
3009AA 1 Acre OPTION Plant/Prepare/Fertilize Alfalfa Food Pl
FFP
One Acre Food Plots established with drought tolerant alfalfa.
SUBCLIN 3009AB is added as follows:
3009AB 5 Acre OPTION Plant/Prepare/Fertilize Food Plots
FFP
Plant/Prepare/Fertilize Four One Acre Food Plots Four – One Acre Food Plots established with Sorghum, wheat, sunflowers, and
SUBCLIN 3009AC is added as follows:
3009AC 4 Acre OPTION Control weeds in nonalfalfa food plots
FFP
Four - One acre food plots established with sorghum, wheat, sunflowers, and pollinator mix. Pesticides to control pest/noxious weeds should be applied
SUBCLIN 3009AD is added as follows:
3009AD 1 Acre OPTION Control weeds, and fertilize Alfalfa plo
FFP
Alfalfa will be maintained in such a way that it continues to offer habitat for
SUBCLIN 3009AE is added as follows:
3009AE 1 Acre OPTION Mow Alfalfa plot
FFP
SUBCLIN 3012AA is added as follows:
3012AA 2 Acre OPTION False Indigo
FFP
Cut and paint pesticide on the stems of False Indigo Plants. Cuttings will be
SUBCLIN 3012AB is added as follows:
3012AB 1 Acre OPTION Tree of Heaven
FFP
Cut and paint pesticide on the stems of Tree of Heaven. Cuttings under 4” diameter will be disposed of by the contractor. Cuttings over 4” diameter will be disposed of
SUBCLIN 3012AC is added as follows:
3012AC 2 Acre OPTION Japanese Knotweed
FFP
Cut and paint stems of Japanese Knotweed. Cutting will be properly disposed of by
SUBCLIN 3014AC is added as follows:
3014AC .25 Acre OPTION Eurasian Mill Foil Treatment
FFP
Treat Eurasian Mill Foil in Mill Creek with aquatic pesticide In accordance with
CLIN 3019 is added as follows:
3019 6 Acre OPTION Broadleaf Boom Spray Irrigated Lawn Rook
FFP
Broadleaf Boom Spray –Irrigated Lawn Rook’s Park Target Species may include Clover, Dandelions, Ground Ivy, Broadleaf Plantain. Areas to be sprayed include Rooks Park lawn areas. Increased signage will be required for this work as there are many access points. In accordance with the
SUBCLIN 4009AA is added as follows:
4009AA 1 Acre OPTION Plant/Prepare/Fertilize Alfalfa Food Pl
FFP
One Acre Food Plots established with drought tolerant alfalfa.
SUBCLIN 4009AB is added as follows:
4009AB 5 Acre OPTION Plant/Prepare/Fertilize Food Plots
FFP
Plant/Prepare/Fertilize Four One Acre Food Plots Four – One Acre Food Plots established with Sorghum, wheat, sunflowers, and
SUBCLIN 4009AC is added as follows:
4009AC 4 Acre OPTION Control weeds in nonalfalfa food plots
FFP
Four - One acre food plots established with sorghum, wheat, sunflowers, and pollinator mix. Pesticides to control pest/noxious weeds should be applied
SUBCLIN 4009AD is added as follows:
4009AD 1 Acre OPTION Control weeds, and fertilize Alfalfa plo
FFP
Alfalfa will be maintained in such a way that it continues to offer habitat for
SUBCLIN 4009AE is added as follows:
4009AE 1 Acre OPTION Mow Alfalfa plot
FFP
SUBCLIN 4012AA is added as follows:
4012AA 2 Acre OPTION False Indigo
FFP
Cut and paint pesticide on the stems of False Indigo Plants. Cuttings will be
SUBCLIN 4012AB is added as follows:
4012AB 1 Acre OPTION Tree of Heaven
FFP
Cut and paint pesticide on the stems of Tree of Heaven. Cuttings under 4” diameter will be disposed of by the contractor. Cuttings over 4” diameter will be disposed of
SUBCLIN 4012AC is added as follows:
4012AC 2 Acre OPTION Japanese Knotweed
FFP
Cut and paint stems of Japanese Knotweed. Cutting will be properly disposed of by
SUBCLIN 4014AC is added as follows:
4014AC .25 Acre OPTION Eurasian Mill Foil Treatment
FFP
Treat Eurasian Mill Foil in Mill Creek with aquatic pesticide In accordance with
CLIN 4019 is added as follows:
4019 6 Acre OPTION Broadleaf Boom Spray Irrigated Lawn Rook
FFP
Broadleaf Boom Spray –Irrigated Lawn Rook’s Park Target Species may include Clover, Dandelions, Ground Ivy, Broadleaf Plantain. Areas to be sprayed include Rooks Park lawn areas. Increased signage will be required for this work as there are many access points. In accordance with the
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0007 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
960560
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0008 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule for CLIN 0009 has been deleted:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0010 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0011 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule for CLIN 0012 has been deleted:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A N/A
The following Delivery Schedule item for CLIN 0013 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for SUBCLIN 0014AA has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for SUBCLIN 0014AB has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0015 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0016 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0017 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 0018 has been changed from:
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-MAY-2018 TO
31-DEC-2018
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 1005 has been changed from:
CAGE
POP 01-JAN-2019 TO
31-DEC-2019
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-JAN-2019 TO
31-DEC-2019
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 1007 has been changed from:
CAGE
POP 01-JAN-2019 TO
31-DEC-2019
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
CAGE
POP 01-JAN-2019 TO
31-DEC-2019
N/A ARMY CORPS OF ENGINEERS
OPERATIONS MANAGER
MILL CREEK PROJECT OFFICE
3211 RESERVOIR ROAD
WALLA WALLA WA 99362-8400
509-527-7161
The following Delivery Schedule item for CLIN 1008 has been changed from:
CAGE
POP 01-JAN-2019 TO
31-DEC-2019
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.