Amendment_2.pdf

PDF 369 KB Posted

Attached to
LLA- Diesel Tanks Federal contract opportunity
Solicitation number
W912EF-17-Q-0107
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment #2 is to answer questions for the LLA -Diesel Tanks. Please see amendment for further details.

View the file

Other files for this federal contract opportunity

Other files attached to LLA- Diesel Tanks, newest first.
File Type Posted
17P0052_LLA_Diesel_Tanks_Award.pdf PDF
17Q01070001.pdf PDF
17Q10107Drawings..pdf PDF
DieselTanks.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84 STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to answ er questions from industry. PLEASE NOTE. You must acknow ledge all amendments w ith your proposal. Failing to acknow ledge may render your proposal non-responsive.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF-17-Q-0107 X 9B. DATED (SEE ITEM 11)18-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jun-2017

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

LEANNE WALLING

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-17-Q-0107

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTIONS AND ANSWERS #2

Q- What style filler cap do you want? Does it need to be a locking type or a flip open type or a threaded type. Can the cap be a 2", since there are way more options than the 2.5". Also can the cap be vented to remove the need for an additional hole for the vent?

A- We are looking to replace with the same configuration we currently have and would like to stick with a 2.5" threaded type capped filler.

Q - Do you want the glance level indicator to be a needle or a floating indicator? Also do you want number of gallons remaining or can it be a simple percentage of the tank left?

A- The level indicator will be installed by the Corps, we just need the tank penetration provided.

Q. - Do the fuel return and supply bungs need caps need to be open or plug them?

A- The fuel supply will come off the bottom of the tank, the return will be Tee'd in with the vent - all piping and connections will be supplied by the Corps, we just need the tank penetrations

Q. - I know you want a 2" vent but what style are you looking for?

A- The Corps will provide the vent piping, we just need the tank penetration for the vent.

Q. - I see that the overall height is 54" but it appears to be at the tank height, do you want the 54" to be from the tallest part of the tank? Meaning the level indicator or lifting hooks?

A- 54" to the top of the tank only.

Q - Is there a specific size of hole you want for the eyes on the lifting mounts?

A- 2-1/2" to 3" holes would be adequate for the lifting eyes.

Q. - How are the mounting legs going to be secured to the ship? Are they going to be welded or bolted?

A- Legs to be welded to the barges by the Corps

Q. - Is there a specific color we need to paint the tanks? I know they need to be galvanized but that will leave them grey.

A- No specific color is required, grey will suffice. Note that the steel tank cannot be galvanized on the interior.

Q. -Lastly, are we responsible for uploading and installing in Washington or just shipping the tanks there?

A- Responsible for shipping the tanks to the project here in Washington. The Corps will install the tanks on the barges.

(End of Summary of Changes)