A.07.23._Solicitation.pdf
PDF 292 KB Posted
- Attached to
- Juvenile Fish Barge Transport Program Federal contract opportunity
- Solicitation number
- W912EF-16-R-0011
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| A.07.23._Solicitation_Attachment_3_Past_Performance_Info.pdf | ||
| A.07.23._Solicitation_Attachment_2_Towboat_Inspection_Checklist.pdf | ||
| A.07.23.__Solicitation_Attachment_1_Map.pdf | ||
| A.07.23._Solicitation_Attachment_4_PastPerformanceQuestionnaires.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912EF-16-R-0011 18-Dec-2015
b. TELEPHONE NUMBER
509-527-7227
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 19 Jan 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EF9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JULIE M MORRIS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USAED, WALLA WALLA - CONTRACTING DIV.
NONA FINCHER
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 960564 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ARMY CORPS OF ENGINEERS
PERFORMANCE SPECIALIST
OPERATIONS DIVISION
201 NORTH 3RD AVENUE
WALLA WALLA WA 99362-1876
TEL: 509-527-7200 FAX: 000-000-0000
FAX:
TEL: 509-527-7220 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
NAICS:
483211
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912EF-16-R-0011
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Rental of Towboat 1
FFP
Rental of towboat from approximately April 20, 2016 through August 15, 2016.
FOB: Destination
NET AMT
0001AA 30 Each Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance Work Statement.
0001AB 2 Each Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0001AC 2 Each Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance Work Statement.
Rental of Towboat 2
FFP
Rental of one towboat from approximately April 22, 2016 through August 15, 2016.
0002AA 30 Each Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0002AB 2 Each Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0002AC 2 Each Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
Rental of Towboat 3
FFP
Rental of towboat from approximately April 24, 2016 through June 4, 2016.
0003AA 10 Each Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0003AB 2 Each Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0003AC 2 Each Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
Rental of Towboat 4
FFP
Rental of towboat from approximately April 24, 2016 through June 4, 2016.
0004AA 10 Each Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0004AB 2 Each Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0004AC 2 Each Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
0005 1 Lot Diesel Fuel - Barges
FFP
Diesel fuel for Government fish barges - Routine Operations. Fuel will be paid at actual costs paid by the contractor and supported by invoices submitted by the Contractor to the Contracting Officer Representative (COR). Offerors shall not price this line item. The line item will be funded at the time of award using a Not to Exceed limitation of 30,000 gallons based on historical fuel usage.
Rental of Towboat - Research
FFP
Rental of one towboat from approximately April 6, 2016 through May 10, 2016.
0006AA 4 Each Full Trip - Research
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
0006AB 1 Each Half Trip - Research
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
OPTION Rental of Towboat 1
FFP
Rental of towboat from approximately April 20, 2017 through August 15, 2017.
1001AA 30 Each OPTION Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1001AB 2 Each OPTION Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1001AC 2 Each OPTION Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
OPTION Rental of Towboat 2
FFP
Rental of towboat from approximately April 20, 2017 through August 15, 2017.
1002AA 30 Each OPTION Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1002AB 2 Each OPTION Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1002AC 2 Each OPTION Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
OPTION Rental of Towboat 3
FFP
Rental of towboat from approximately April 24, 2017 through June 4, 2017.
1003AA 10 Each OPTION Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1003AB 2 Each OPTION Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1003AC 2 Each OPTION Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
OPTION Rental of Towboat 4
FFP
Rental of towboat from approximately April 24, 2017 through June 4, 2017.
1004AA 10 Each OPTION Full Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1004AB 2 Each OPTION Half Trip
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1004AC 2 Each OPTION Deadhead Rate
FFP
Deadhead Rate. Unit of measurement for this Contract Line Item is a trip (fuel
1005 1 Lot OPTION Diesel Fuel - Barges
FFP
Diesel fuel for Government fish barges - Routine Operations. Fuel will be paid at actual costs paid by the contractor and supported by invoices submitted by the Contractor to the Contracting Officer Representative (COR). Offerors shall not price this line item. The line item will be funded at the time of award using a Not to Exceed limitation of 30,000 gallons based on historical fuel usage.
OPTION Rental of Towboat - Research
FFP
Rental of one towboat from approximately April 6, 2017 through May 10, 2017.
1006AA 4 Each OPTION Full Trip - Research
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
1006AB 1 Each OPTION Half Trip - Research
FFP
Rental of one towboat with full operating crew. Unit of measurement for this Contract Line Item is a trip (fuel included) as defined in the enclosed Performance
PERFORMANCE WORK STATEMENT
This contract is a firm fixed price for rental of four towboats with staff to transport Government-owned fish barges in support of the Juvenile Fish Transport Program. The contract term is for a base year and one option year.
1. SAFETY REQUIREMENTS. The towboats, barges, and any other equipment provided by the Contractor shall meet all safety requirements of Coast Guard Regulations, OSHA, and the latest updated version of the Corps of Engineers' Safety and Health Requirements Manual (EM 385-1-1, 30 November 2014). Updates to the Corps’ safety manual are posted at the following website:
http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx Towboats shall be equipped to push barges as described herein. The Contractor shall have all towboats inspected by a marine surveyor or marine architect prior to beginning work on this contract. The marine surveyor/architect will determine seaworthiness, capability of meeting contract requirements, and that towboats provided are safe to operate under weather, wind, and flow conditions prevalent on the Columbia and Snake rivers during the contract period.
Towboats or other equipment which do not pass the safety inspections must be modified to meet the requirements before commencing service, or replaced with equipment that meets the requirements. Complete inspection reports shall be provided to and approved by the Contracting Officer’s Representative prior to the use of any towboat on this contract. See the attached INSPECTION CHECKLIST for power, propulsion, propeller, stability, and other requirements.
2. LOCATION AND EXTENT OF WORK. Work will be performed in the area between Lower Granite Reservoir (near Lewiston, ID) and near Portland, OR on the Columbia River. The Contractor shall provide equipment and perform services for the following operations:
2.1. JUVENILE FISH BARGE TRANSPORT PROGRAM - The Contractor shall provide four towboats, each staffed with crews for 24-hour per day operation, to transport Government-owned fish barges from Lower Granite Juvenile Fish Facility to fish release areas below Bonneville Dam (see map - Attachment 4). Stops will be made at Little Goose and Lower Monumental dams to load additional fish or to pick up an additional fish barge for transport to the release site. The initiation of barging operations is based on runoff projections. During years when runoff is forecasted to be near or above normal or average runoff, barging of fish could begin as late as May 2. During low flow or drought years, barging of fish may begin as early as 21 April.
Transporting of fish by barge from Snake River dams will therefore begin sometime between April 21 and May 2, as directed by the Contracting Officer or Contracting Officer’s Representative, and should last through August 15, but could end earlier depending on fish collection numbers. Unlike past contracts, no provisions are included for the transport of fish from McNary Dam. Early in the season, Towboat 1 (Item numbers 0001, 1001) and Towboat 2 (Item numbers 0002, 1002) will alternate, leaving Lower Granite Dam every-other-day for the trip downriver. As fish numbers increase, Towboat 3 (Item numbers 0003, 1003) and Towboat 4 (Item numbers 0004, 1004) will be placed in service so that a towboat and barge leave Lower Granite Dam daily. Later, when numbers of fish decrease, the program will return to the every-other-day operation. Since every-other-day or daily barge operations begin April 21 or later at Snake River dams, the Corps may direct Towboat 1 (Item numbers 0006, 1006) to barge fish once a week from Lower Granite Dam in support of fish research. The weekly transport of research fish may begin as early as April 6 and will cease at the direction of the Corps or when every-other-day or daily barge operations are in progress. During part or all of the daily Snake River fish barging operation, the Government will be direct-loading fish barges at Little Goose Dam. The Contractor will routinely transport a loaded fish barge from Lower Granite Dam, stop and pick up a loaded fish barge at Little Goose Dam, and then continue on the trip downstream to the release site. On return trips back to Lower Granite Dam, one of the empty barges will be left at Little Goose Dam. Direct loading of fish at Little Goose Dam may also take place during part of the every-other-day barging operation. Barging may continue until approximately mid-August when fish numbers will decline to where trucks will be used for their transport.
2.2. CONSTRUCTION AT LOWER GRANITE DAM. Construction and renovation of the Lower Granite Juvenile Fish Facility is in progress. An early shut down of this facility in support of construction is expected on or about August 1, 2016. Should this occur, juvenile fish transport by barge may be modified or suspended. The Contractor shall assume expenses and miscellaneous costs for the modification or suspension of fish transport operations by barge due to construction activities at Lower Granite Dam.
3. TOWBOAT REQUIREMENTS.
3.1. TOWBOAT INSPECTIONS. As stated in paragraph 1 above, the Contractor is responsible for having a marine surveyor or marine architect inspect all towboats considered for use under this contract, including all towboats that may be used as spare towboats. The marine surveyor/architect shall complete the inspection checklist for each towboat and shall certify that each boat proposed for use under this contract satisfies all requirements of this contract including stability, horsepower, propulsion, and other requirements. All towboats or other equipment which do not pass the safety inspections must be modified to meet the requirements. Towboats that do not meet the requirements of this contract may not be used by the Contractor for work performed under this contract. Certified inspections shall be provided to the Contracting Officer’s Representative by March 29 of the first contract work (base) year. The Contractor must complete all modifications to towboats to correct deficiencies noted in inspections and provide written notice of those modifications to the Contracting Officer’s Representative prior to towboats going into service under this contract. Inspection reports and correction of deficiencies must be approved by the Contracting Officer’s Representative prior to the use of any towboat on this contract. Certified inspections for each towboat may be resubmitted in subsequent option years under this contract. However, if a vessel has been modified, repowered, or have been involved in an accident or incident resulting in damage to the towboat since the initial certification, then another inspection and recertification will be required. Re-inspection results and re-certification documentation must be provided to and reviewed by the Contracting Officer’s Representative prior to the vessel returning to service.
3.2. BARGE PUSHING REQUIREMENTS. For work under paragraph 2.1 above, each towboat provided shall have a minimum total of 1,350 shaft horsepower, be equipped with at least two engines and two propellers, have watertight hatches on main decks, and meet or exceed requirements on the attached Inspection Checklist (Attachment 2). Each towboat shall be capable of routinely moving two to four fully loaded Government owned fish-hauling barges, in any combination of sizes, downstream simultaneously as well as moving up to four empty barges upstream. Other combinations of up to four barges may be moved to and from moorage spaces or to and from dams within the contract area as requested by the Contracting Officer’s Representative.
3.3. FISH BARGE TRANSPORT. For work under paragraph 2.1 above, the towboats shall be capable of maintaining a round trip time from Lower Granite Dam to the release site below Bonneville Dam (Skamania Light/Warrendale area) and back with fish barges not to exceed 79 hours total time. This 79 hour turnaround time shall include 3 hours loading time at Little Goose Dam and 3 hours at Lower Monumental Dam.
Deducting loading time allows 73 hours to progress downstream through seven reservoirs and seven navigation locks to the release site below Bonneville Dam, unload fish, and to return back upstream to Lower Granite Dam. In addition to total turn-around time, the contractor must complete the downstream run from Lower Granite Dam to Little Goose Dam in 5 hours or less and from Little Goose Dam to Lower Monumental Dam in 4 hours or less. The Contractor must consider the fact that substantial river flows, high flow velocities, inclement weather, and strong winds can be anticipated during the contract period. Any delays caused by flow or weather conditions are to be reported immediately to the Contracting Officer's Representative. Lock operators at all Corps dams in the contract area will be notified that fish-hauling barges shall receive first priority when using the various navigation locks.
Lockages, fueling, and crew replacement times are to be considered in the 79 hour transit time. Towboat captains are to request priority lockage on all fish-hauling trips. Any delays in movement of towboats and fish barges caused by the Government will not be charged to the 79-hour turn-around time. Partial trips may be necessary when transiting to Lower Granite Dam from the contractor home point of origin when beginning service ("Deadhead" or not in tow), transitioning to home point of origin upon completion of service ("Deadhead" when not in tow), or when directed to move or transfer barges to a designated moorage location before going out of service. If the duration of the operation is less than 40 hours, then the government shall be invoiced at half the rate of a single trip.
If the operation takes 40 hours or more to complete, then the government may be billed for a single trip. The government shall not be invoiced for partial trips resulting from contractor negligence or equipment failure or for circumstances beyond government control such as inclement weather. A partial trip may also result from special purpose barge movement for repairs or for a special run to return barges to Lower Granite Dam.
3.4. REPLACEMENT TOWBOATS. In the event that the Contractor's towboats are not meeting the maximum turn-around times, the Government reserves the right to require the Contractor to provide alternate towboat(s) that meet the minimum requirements specified in this contract. If the Contractor cannot supply satisfactory replacement towboat(s), the Government reserves the right to supply a replacement and deduct the cost from moneys due to the Contractor.
3.5. TOWBOAT LIVING ACCOMMODATIONS. Under paragraph 2.1, each towboat shall have fully equipped sleeping, cooking, and dining facilities adequate to house a full operating crew and one assigned representative of the Government (barge rider). Towboats shall be equipped with both hot and cold potable water for showering, washing hands in restrooms, cooking, drinking, and washing dishes. The Government representative (barge rider) shall have a private stateroom or bunk room to ensure privacy. The Contractor shall also be responsible for providing all meals for the Government representatives (barge riders) on the towboats. It is acceptable to add temporary living space for the Government representative provided that the living space is secure from weather and elements, securely fastened to the deck, heated and air-conditioned, and not exposed to any more noise and fumes than would be encountered in the boat's normal crew quarters
3.6. COMMUNICATIONS EQUIPMENT. Towboats shall be equipped with adequate communications equipment, including cellular telephones, to ensure contact with the Government representative onboard, navigation locks, and emergency services at all points along the river in the contract area.
3.7. ELECTRICAL AND COMPRESSED AIR REQUIREMENTS FOR TOWBOATS. Towboats are required to supply 120 volt AC power to the barges for running navigation lights, cabin lights, and engine alarms. All towboats must have correct wiring (polarity) as indicated by checking with an approved circuit tester made by a company such as Hubbell, Ideal, or Leviton. Towboats shall provide compressed air to the barges on an as needed basis if required for operating the fish hold opening mechanisms.
4. COMMENCEMENT, PROSECUTION, AND COMPLETION.
4.1. COMMENCEMENT. This contract shall become effective on the date of award and shall continue in full force and effect to and including August 15 of the contract year, unless otherwise provided. Commencement and effective term of the contract shall be the same for any option year if the Government elects to exercise that option.
4.2. PROSECUTION. The Contracting Officer’s Representative shall give the Contractor not less than 3 days (72 hours) notice to provide Towboat 1 at Lower Granite Dam, or other location as specified by the Contracting Officer’s Representative, for the beginning of the juvenile fish transportation program or research operations (Item numbers 0001, 0006, 1001 and 1006). Once the operation has started, additional towboats (Item numbers 0002, 0003, 0004, 1002, 1003 and 1004) shall be provided at Lower Granite Dam within 2 days (48 hours) after notification by the Contracting Officer’s Representative. Deadhead rates as specified in paragraph 6.6 shall be paid for the travel of towboats to where they will connect to Government-owned fish barges.
4.3. COMPLETION. Primary towboat services (Item numbers 0001, 0002, 0003, 0004, 0006, 1001, 1002, 1003, 1004 and 1006) shall be paid at rates shown from the time and date the Contractor's towboat connects to a Government-owned fish barge. Service shall cease when the barge(s) are returned from the fish transportation operation to location(s) specified by the Contracting Officer’s Representative. Demobilized barges shall be returned to Lower Granite Lock and Dam or to other sites as specified by the Contracting Officer’s Representative. When barges are returned to Lower Granite Dam, they shall be moored at the project mooring facility, fully fueled, in the orientation and position specified by project personnel. Deadhead rates as specified in paragraph 6.5 shall be paid for the return of towboats to home ports.
5. BARGES.
5.1. FISH BARGES. The Government owns eight barges that will be used for transporting fish during the course of this contract. Two of the barges (SOCKEYE and BLUEBACK) have a fish carrying capacity of 23,000 pounds and are double bottom three-compartment steel barges, approximately 130 feet long, 30 feet wide, with three diesel-driven pumps and attendant equipment. They weigh approximately 165 tons empty. Two barges (STEELHEAD and COHO) have a fish carrying capacity of 50,000 pounds and are four-compartment steel barges, approximately
150 feet long, 35 feet wide, with three diesel-driven pumps, and weigh approximately 250 tons empty. The other four barges (CHINOOK, KING SALMON, and barges 8107 and 8108) each have a fish carrying capacity of 75,000 pounds and are six-compartment steel barges, approximately 196 feet long, 40 feet wide, with four diesel-driven pumps, and weigh approximately 450 tons empty. All of the barges draft approximately 2 feet when empty and 5 feet when loaded. Pushing knees have been installed on the bow and sterns of all barges to facilitate hooking barges together. The Contractor shall provide pushing protection on the towboat(s) to prevent any damage to the barge(s) while being pushed. The Contractor will be required to provide protection to structural members inside the barge(s) if necessary.
5.2. BARGE ACCESS. Any required walkways or handrails from the towboat(s) to barge(s) shall be furnished and installed by the Contractor. This shall include adequate provisions at the crossover point between the towboats and barges to afford safe passage for the Government barge rider. Safe access to the barge is needed at all hours of the day or night and under all weather conditions. The Contractor may be required to provide assistance such as having a crew member present during crossovers by the Government barge rider.
5.3. BARGE OPERATION. The Contractor shall provide a mechanic or deckhand to assist the Government representative on board the barge(s) in operation and maintenance of the barge engines and/or pumps, if requested.
This shall include starting up and shutting down the diesel pump engines, minor lubrication, and any maintenance of the pump engines, shafts, and machinery on the barges during fish transport and the return trip upriver. The towboat operators shall assist the Government representative on board the barge(s) in monitoring the engines, gages, alarm systems, and subsequent notification of the towboat(s) mechanics in the event abnormal conditions are displayed. If mechanical problems with barge engines and/or pumps are beyond the Contractor's immediate capabilities, the Contracting Officer's Representative shall be notified. Cost of mechanical services incurred by the Contractor shall be included in Item numbers 0001, 0002, 0003, 0004, 0006, 1001, 1002, 1003, 1004 and 1006.
5.4 BARGE FUELING. The Contractor shall provide all diesel fuel for operation of the diesel-engine driven pumps on the Government-owned fish barges. The Contractor shall refuel towboats and barges on the return trips from the release site back to Lower Granite Dam. In April, May and June, the barges shall be refueled on each return trip or on an alternate schedule if it is approved by the Contracting Officer’s Representative. In subsequent months (July and August), barges shall be filled every other trip or on an alternate schedule provided to and approved by the Contracting Officer’s Representative. All barges shall be completely refueled (“topped off”) on the return trip to Lower Granite Dam when being taken out of service for the season (as required under section 4.3 COMPLETION).
The 23,000 pound capacity barges have a fuel holding capacity of 500 gallons, the 50,000 pound capacity barges have a fuel holding capacity of 750 gallons, and the 75,000 pound capacity barges have a fuel holding capacity of 1,650 gallons. After refueling a barge, the Contractor shall inform the Government representative on board the towboat of the number of gallons of diesel fuel added to each fish barge. Cost of fuel and fueling service incurred by the Contractor shall be included in Item numbers 0005 and 1005.
6. PAYMENTS.
6.1. INVOICES. The Contractor shall submit itemized invoices to the addresses shown below. The invoices shall show the number of hours each towboat worked each day and the number of gallons of diesel fuel added to each towboat and fish barge daily. The original and copies of all invoices shall be provided to:
(a) An Original and copy with all supporting documentation to:
Walla Walla District U.S. Army Corps of Engineers ATTN: John Bailey 201 N. Third Ave.
Walla Walla, WA 99362
(b) The Contracting Officer’s Representative will forward a copy of the invoice to CEFC-AO-P for payment.
6.2. RATES. Services of the towboat(s) Contractor furnished barge and moorage be included in Item numbers 0001, 0002, 0003, 0004, 0006, 1001, 1002, 1003, 1004 and 1006.
6.3. BREAKDOWN. No payment will be made for a towboat idled by breakdown of Contractor's equipment when the breakdown exceeds 12 hours. If a towboat breakdown exceeds 12 hours the Contractor shall replace the disabled towboat with a towboat meeting minimum contract requirements. The replacement towboat shall meet all safety and performance requirements of the original towboats (the Contractor may want to have one or more extra towboats certified at the beginning of the contract). In the event the Contractor cannot supply a replacement towboat for the disabled towboat, the Government will replace the disabled towboat with a similar towboat obtained from others. The cost of the replacement towboat will be deducted from the proceeds due the Contractor, until the Contractor can again provide a towboat meeting minimum requirements acceptable to the Contracting Officer’s Representative.
6.4. MEALS. Meals for barge riders are to be included in towboat hourly rates. Barge riders will be present on all fish transport trips.
6.5. DEADHEAD RATES. All costs connected with movement of Contractor's equipment without tow will be paid at the deadhead trip rates shown in the contract (Item numbers 0001AC, 0002AC, 0003AC, 0004AC, 1001AC, 1002AC, 1003AC, 1004AC). Deadhead trip rates are based from point of origin to Lower Granite Dam prior to start of fish barge transport season and from Lower Granite Dam to point of origin at the close of the season.
6.6. MISCELLANEOUS COSTS. The Contractor shall assume expenses and miscellaneous costs for fish barges that must be moored for discontinued or intermittent service, or for scheduling purposes to make the best use of towboats and barges.
6.7. TOWBOAT CREWS. A "Full-Operating Crew" for the towboats pushing fish barges is defined as the number of personnel necessary, under U.S. Coast Guard and other industry regulations, to operate the towboat on a 24-hour basis, including at a minimum two ship operators and two deck hands (four people). Two deck hands must be present during all barge tie-ups and departures from fish loading facilities. Government personnel assigned to the barges will not participate in handling lines or any other operation associated with barge tie-up or departure. A "Minimum-Operating Crew" is defined as the number of personnel required to maintain the towboat in a standby status to permit full operation on 24 hours’ notice. All towboat crew changes, replenishment of supplies, and towboat refueling shall be made on upstream bound trips. Towboat crew changes and replenishments of supplies shall be made within a 1.5 hour time period, if separate from refueling operations.
6.8. FUEL. The Contractor shall provide all diesel fuel for operation of the diesel-engine pumps on the Government owned fish barges (Item numbers 0005 and 1005). The Contractor shall provide itemized billing for the fuel for the fish barges and shall list the number of gallons provided for each fish barge on a daily basis. The fuel for the towboats should be included in the trip price.
7. TIMEKEEPING.
7.1. RECORD KEEPING. The Contracting Officer’s Representative will be responsible for keeping the official record of the hours the Contractor's equipment is operated and approve the Contractor's invoices for payment.
7.2. LOG BOOKS. The Contracting Officer’s Representative, or his authorized representative (barge rider), will certify the Contractor's log (Captains log book) of hours worked each day and the number of trips and half trips completed.
8. GOVERNMENT PERSONNEL. The Government will have one representative on board each barge during fish loading and transportation operations. It shall be the responsibility of the Government representative to monitor the condition of the fish. Additional Government personnel or authorized visitors may also be on the barge periodically to assist in loading operations, ride along as observers, or for training.
9. CREW ASSIST. In the event the Government personnel require assistance on the fish barge(s), towboat personnel may be called upon to render such assistance as necessary. Crews may also be needed during fish loading to help with loading line set up. If a fish barge is moored at a site other than a fish loading facility and the towboat released from service, the Contractor will be responsible for transporting the Government personnel on board to lodging, specified by the Contracting Officer's Representative, in Cascade Locks, Oregon or at a mutually agreed upon location. Cost of these services incurred by the Contractor shall be included in Schedule Item numbers 0001AA, 0002AA, 0003AA, 0004AA, 0006AA, 1001AA, 1002AA, 1003AA, 1004AA and 1006AA.
10. PERMITS AND RESPONSIBILITIES.
10.1. CONTRACTOR RESPONSIBILITY. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and municipal laws, codes, and regulations in connection with the prosecution of the work, including all applicable oil spill contingency plans and training. He shall be similarly responsible for all damages to persons or property that occur as a result of his fault or negligence. He shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others. Failure to obtain necessary permits and licenses shall be cause for termination.
10.2. EXCLUSION. The Contractor shall have no responsibility for condition of the fish.
11. FUEL, OPERATING SUPPLIES, LUBRICATION, ETC. All fuel, lubrication, operating supplies, etc., necessary for the operation of the towboat(s) shall be the responsibility of the Contractor. The Contractor shall also provide all diesel fuel for the diesel-powered pumps on the Government-owned fish barges.
Lubricants and other operating supplies for the diesel-powered pumps on the Government-owned fish barges will be provided by the Government.
12. MISPLACED MATERIAL. Should the Contractor, during the progress of the work, lose, dump, throw overboard, sink, or misplace any material, plant, machinery, or appliance, which in the opinion of the Contracting Officer’s Representative may be dangerous to or obstruct navigation, the Contractor shall recover and remove the same with the utmost dispatch. The Contractor shall give immediate notice, with description and location of such obstructions, to the Contracting Officer’s Representative or inspector, and when required shall mark or buoy such obstructions until the same are removed. Should he refuse, neglect, or delay compliance with the above requirements, such obstructions may be removed by the Contracting Officer, and the cost of such removal may be deducted from any money due or to become due the Contractor. The liability of the Contractor for the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Section 15, 19, and 20 of the River and Harbor Act of 1899 March 03. (33 U.S.C. 410 et seq.).
13. MARINE RISK. The Contractor shall assume all usual risk, including all risks or liability for breach of law or statures for damage caused to other vessels, persons or property.
14. SIGNAL LIGHTS (2014 JAN.). The Contractor shall display signal lights and conduct his operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displaced by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displaced on dredged pipelines, and day signals to be displaced by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as approved by the Secretary of the Army (33 C.F.R. 207.718) and the commandant, U.S. Coast Guard, Homeland Security (33 C.F.R.83.20 - 84.24).
15. PRE-TRANSPORT MEETING. The Contractor shall attend a pre-transport meeting at a location agreed to with the Contracting Officer’s Representative to ensure that all parties involved are aware of the safety requirements and fish transport procedures. This meeting will be held prior to the start of the transport operations at a date each year to be decided.
16. GOVERNMENT-FURNISHED PROPERTY. The Government will furnish to the Contractor the following property. The Contractor shall check the quantity and condition of such Government-furnished property when delivered and shall acknowledge receipt thereof in writing to the Contracting Officer, and, in case of damage to or loss of such property, the Contractor shall, within 24 hours, report in writing such damages and/or loss to the Contracting Officer. At the conclusion of the contract, the Contractor shall return these items to the Government.
Barge Estimated Item Description Quantity Numbers Acquisition Cost:
1. Barge, fish-haul 2 2127, 2817 $500,000 each
2. Barge, fish-haul 2 4382, 4394 $910,000 each
3. Barge, fish-haul 2 8105, 8106 $1,340,000 each
4. Barge, fish-haul 2 8107, 8108 $1,700,000 each
The acquisition cost shall not be included by the Contractor in the contract proposed prices.
17. Performance Requirements Summary
The Contractor service requirements are summarized below into performance objectives that relate directly to mission essential items. The Performance Standard briefly describes the minimum acceptable levels of service for each requirement. The Acceptable Quality Level (AQL) indicates the minimum percentage defect that will still ensure mission success and is based on observed defects (or projected defects, if random sampling is used) per total service days in the given month. The Contractor is responsible to meet all the requirements of this contract.
PWS
Para
Product Standard AQL Method of
Surveillance Remedy
1.
3.1 Towboat Inspections
Meets US Coast Guard and OSHA safety requirements. Meets latest USACE Safety Manual (EM 385 1-1, 30 November 2014) requirements. Pass inspection for power, propulsion, stability and other requirements.
100%
Inspection Certification documents provided to COR prior to start of service.
Towboat does not enter service. Seek service from another vendor until this requirement is met.
2.
3.2 Barge Pushing Requirements
Towboat have minimum of 1350 shaft HP, minimum 2 engines and 2 propellers. Capable of pushing 2 to 4 fully loaded government barges.
100%
Inspection Certification documents provided to COR prior to start of service.
Towboat does not enter service. Seek service from another vendor until this requirement is met.
3.
3.3 Fish Barge Transport – 79 Hour Round Trip
Round trip duration from Lower Granite dam to fish release point less than 79 hours.
90% Barge Rider and fish facility records.
Contact Contractor Supervisor, reduction in payment.
4. 3.3
Fish Barge Transport – Travel time between Lower Granite and Little Goose dams.
Downstream travel from Lower Granite to Little Goose dam less than 5 hours.
90% Barge Rider and fish facility records.
Contact Contractor Supervisor, reduction in payment.
Product Standard AQL Method of
Surveillance Remedy
5. 3.3
Fish Barge Transport – Travel time between Little Goose and Lower Monumental dams.
Downstream travel from Little Goose to Lower Monumental dams less than 4 hours.
90% Barge Rider and fish facility records.
Contact Contractor Supervisor, reduction in payment.
6. 3.5 Towboat Living Accommodations
Private sleeping quarters for barge rider, hot & cold water, showers, cooking dining areas.
100%
Barge Rider Reports and COR random inspection.
Contact Contractor supervisor, payment deductions towboat/quarters replacement.
7. 3.6 Communications Equipment
All Towboats equipped with working Marine Radios and Celluar Phones
100%
Towboat Inspections and Barge Rider / Fish Facility reports
Contact Contractor supervisor.
8. 3.7 Electrical and Compressed Air (Electrical)
Meet all barge lighting/electrical and navigational light needs.
100%
Towboat Inspections and Barge Rider / Fish Facility reports
Contact Contractor supervisor.
9. 3.7 Electrical and Compressed Air (Electrical)
Able to completely fill barge air accumulator tanks in 1 hour.
100%
Towboat Inspections and Barge Rider / Fish Facility reports
Contact Contractor supervisor.
10. 5.3 Barge Operations
Crew member available and capable of assisting Government Representative with barge operations and minor troubleshooting and repairs and maintenance.
100% Barge Rider / Fish Facility reports
Contact Contractor supervisor.
11. 5.4 Barge Fueling
Barge fueling conducted only when fish are not on board in accordance with contract conditions or alternate schedule approved by COR. All barges returned to Lower Granite at end of season with full tanks. No spills.
100%
Barge Rider / Fish Facility reports/COR inquiries.
Contact Contractor supervisor, payment deductions
Product Standard AQL Method of
Surveillance Remedy
12. 6.7 Towboat Crew
Each towboat has full operating crew (minimum 2 ship operators and 2 deckhands). 2 deckhands on duty when tying up barges and when arriving or departing fish facilities.
Government Representative is not permitted to assist with the handling of lines or related duties.
100%
Barge Rider / Fish Facility reports/COR inquiries.
Contact Contractor supervisor,
13. 9. Crew Assist
Crew assisting with fish barge loading operations when requested and transporting government representative to hotel or transfer point when barge or towboats go out of service.
90%
Barge Rider / Fish Facility reports/COR inquiries.
Contact Contractor supervisor,
18. DEDUCTIONS FOR NON-PERFORMANCE. The Government can deduct from a contractor’s payment an amount equal to the required services not performed satisfactorily. Individual towboat trip logs and other supporting evaluation documentation will be examined to determine whether all applicable performance work statement requirements were met. If the contractor has not performed satisfactorily, the contractor shall be notified and given the opportunity to re-perform and meet the performance specifications. The contractor shall have one day after notification to correct any unacceptable performance. If the unsatisfactory performance is not corrected, payment deductions will be made in the following manner: a maximum 10% deduction from the monthly invoice amount may be made when one to three performance work statement specifications are not met; a maximum 20% deduction may be made when 4 to 6 performance work statement specifications are not met, and a maximum 50% deduction may be made when 7 or more performance statement specifications are not met. Deductions that result from services not rendered, or for services not performed in an acceptable manner are non-negotiable once approved by the contracting officer. Anytime a performance standard is not met, it will represent failure on the part of the contractor to meet requirements, and may support cause for termination of the contract. Non-performance may also result in all or part of the work performed under this contract to be performed by another contractor.
19. ANTITERRORISM /OPERATIONS SECURITY.
19.1. AT LEVEL I TRAINING. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website(s):
https://atlevel1.dtic.mil/at. or http://jko.jten.mil/courses/atl1/launch.html. This training can be provided by the RA ATO in presentation form which will be documented via memorandum.
19..2. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
19.3. ACCESS REQUIREMENTS TO A DoD FACILITY OR INSTALLATION. The Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
19.4. SUSPICIOUS ACTIVITY REPORTING TRAINING. The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
19.5. OPERATIONS SECURITY (OPSEC) TRAINING. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
19.6. ESCORTS IN RESTRICTED AREAS. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
19.7. PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
20. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEER CONTRACTS.
In addition to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .