Solicitation.pdf

PDF 319 KB Posted

Attached to
Video Production
Solicitation number
W912EF-16-Q-0094
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Amendment_2.pdf PDF
Amendment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912EF-16-Q-0094 13-May-2016

b. TELEPHONE NUMBER

509-527-7222

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 13 Jun 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

RUTH A JOHNSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W68SBV60818287

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USAED, WALLA WALLA - CONTRACTING DIV.

RUTH A. JOHNSON

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1976

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE G4R0QM0 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

MCNARY PROJECT

82790 DEVORE ROAD

UMATILLA OR 97882-1230

TEL: FAX:

509-527-7802FAX:

TEL: 509-527-7222 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$32,500,000

NAICS:

512110

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF54

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912EF-16-Q-0094

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Video

FFP

In accordance with the Performance Work Statement.

FOB: Destination

MILSTRIP: W68SBV60818287

PURCHASE REQUEST NUMBER: W68SBV60818287

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Each

TV

FFP

70" In accordance with the Performance Work Statement.

FOB: Destination

MILSTRIP: W68SBV60818287

PURCHASE REQUEST NUMBER: W68SBV60818287

NET AMT

INFORMATION TO OFFERORS

If you have any questions or concerns regarding the Request for Quote, please contact Ruth Johnson (Telephone 509-527-7222) or send an email to ruth.a.johnson@usace.army.mil).

Offerors are cautioned to clearly print prices for all line items. Be especially careful placing decimal points, as a mistake in your offer may render it unresponsive. Your quote must be good for 30 days. Please include shipping costs in the quoted price of each item.

Registration at www.sam.gov is required. If not registered, please do so. Step-by-step help information on how to register is detailed on the website, along with frequently asked questions (FAQs). Lack of registration in the SAM database may make an offeror ineligible for award.

Completion of the required FAR 52.212-3 Alt. I, Offeror Representations and Certifications – Commercial Items is required. When you complete your SAM registration, the link to complete your Reps and Certs is also available.

Please do not hesitate to contact me or the SAM web site if you need assistance or have questions.

In accordance with FAR 52.229.3, State and Local Taxes, and per Title 4 of the US Code 104-107, the Government is exempt from paying local and state taxes. Exempt Tax Identification Number 91-0828090.

General Contract Information:

Delivery Date________________________________________________

Offeror’s Name (Printed) _________________________________________

Offeror’s Contact Telephone Number_______________________________

Offeror’s Email Address___________________________________________

Federal Tax Identification No. ____________________________________________

CAGE Code __________________ DUNS No. ______________________________

Is your company registered on-line in SAM (www.sam.gov)? YES NO

To ensure receipt of your quote, please send to the attention of Ruth Johnson at:

Email: ruth.a.johnson@usace.army.mil

ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

Submission of Price Quote – Contractor shall submit the following in 1 copy:

1. Signed and dated Standard Form 1449 (Solicitation / Contract / Order for Commercial Items).

2. Signed and dated Standard Form 30, if applicable, for any Amendments to the Solicitation

3. Completed schedule (pricing information) for all line items listed in the solicitation / amendments.

4. Completed Clause 52.212-3 and Alt I, “Offeror Representations and Certifications – Commercial Item’s” As noted above.

5. Any information required to evaluate the quote, as stated in FAR Clause 52.212-2.

PERFORMANCE WORK STATEMENT

1.0 SCOPE

The contractor shall furnish all necessary personnel, materials, equipment and related services as necessary to research, design, produce and deliver a new 5-7 minute high-definition (HD) video for use in the Pacific Salmon Visitor Information Center at McNary Lock and Dam in Umatilla, OR. This video shall tell a short history of the area, showcase the purpose and benefits of the Corps’ Fish Recovery Implementation Program, a brief summary of the salmon life cycle including adult salmon upstream migration and juvenile salmon downstream migration, and the challenges that salmon must overcome to migrate to and from the ocean in the Columbia-Snake river basin.

2.0 TECHNICAL REQUIREMENTS

2.1 Contractor will create and deliver a 5- to 7minute finished video with visuals and soundtrack. This video is intended to Replace the current outdated 6-minute ‘Pacific Salmon’ video (See Appendix A for script reference) with a high-definition video titled “The Salmon Story and Corps Fish Recovery on the Columbia-Snake Rivers.”

2.2 PRODUCTION PHASES: Contractor will complete the following production phases according to the schedule in Section 3.0 below:

2.2.1 Initial pre-production consultation with Corps representative to better understand scope of work, technical details and related information.

2.2.2 First draft scriptwriting and associated research. Review of existing Corps video footage and/or still photos for possible incorporation in script and final video. See Appendices A, B, C and D for references.

2.2.3 Delivery of first draft script for Corps review; consultation with Corps on first draft.

2.2.4 Second draft scriptwriting.

2.2.5 Delivery of second draft script for Corps review; consultation with Corps on second draft.

2.2.6 Delivery of final draft script that is mutually agreed upon by Corps and Contractor.

2.2.7 Preparation of shot lists:

2.2.7.1 Anticipated existing video/photos to be used in the final video, for Corps approval.

2.2.7.2 New video-needed and photos-needed shot list for Corps review and approval.

2.2.8 Shooting of new video/photos by Contractor. Coordination with Corps personnel and working schedules will be required.

2.2.9 Editing of all new and existing video into a first edit of full-length program. Review this first edit with Corps.

2.2.10 Second edits of video to meet Corps POC approval.

2.2.11 Delivery of final video

2.2.12 Return of all Corps-provided video, photos or other material used to create the new video.

2.2.13 Equipment and installation for playback of video in Pacific Salmon Visitor Information

Center Theater at McNary Lock and Dam, Umatilla, Oregon.

2.3 SCRIPTING: Contractor will create a new 5- to 7-minute video script.

2.3.1 The contractor shall prepare a video script for review and approval by the government representative. The contractor will make necessary changes to drafts and get final script approval from the government representative.

2.3.2 Contractor is to review the previous “Pacific Salmon” script/storyline (see script in Appendix A). This serves as a starting reference point for scriptwriting.

2.3.3 The script will include:

2.3.3.1 Salmon life-cycle including both 1) upstream-migrating adult salmon and steelhead and 2) downstream-migrating juvenile salmon and steelhead.

2.3.3.2 Adult fish ladders for upstream-migrating adults.

2.3.3.3 Juvenile fish bypass system components for downstream-migrating juvenile fish.

2.3.4 Rather than an on-screen narrator, script and final video will include an off-camera narrator.

2.3.4.1 Contractor will obtain a signed talent release for narrator plus any other non-

Corps personnel appearing in or speaking in this new HD video. No release is required for DOD civilians performing their official jobs.

2.3.5 Include other appropriate script content needed to tell the full story of the Pacific Salmon from the introduction of man, arrival of Lewis & Clark, etc. up to today. (Include new and improved Pacific Salmon Juvenile Bypass system and improvement through the Corps’ Fish Recovery Implementation Project)

2.4 SHOOTING:

2.4.1 Shoot all needed current shots in HD format (1920x1080) using professional HD camera, professional lighting and sound recording equipment.

2.4.2 Replace historic images Shoot and edit in HD (1920X1080) video format. Shoot interviews of Corps staff to include but not limited to Operations Project Manager overview, Fish Biologists and/or other Natural Resource personnel.

2.4.3 Contractor shooting of video shall be limited to normal McNary business hours of

Monday-Friday 7:00am-4:00pm excluding holidays. Contractor agrees to be escorted by government personnel at all times during shooting and follow all safety regulations including wearing all necessary safety equipment (Provided by the Corps).

2.4.4 Contractor agrees to maintain security during shooting. No security measures (cameras, fence lines, avenues of access, guards, weapons, for example) will be shot.

2.4.4.1 Dept. of Defense policy prohibits modification of images except for security or personal privacy reasons. Contractor agrees not to alter visual images without Corps approval.

2.5 EDITING/POST-PRODUCTION

2.5.1 Custom animations and videos may be needed to illustrate both the history of the area and its impact on salmon habitat and the current Corps of Engineering efforts to help mitigate issues for both upstream-migrating adult fish and downstream-migrating juvenile fish passage over the dam.

2.5.2 Any associated music and video used in production must be permanently royalty-free, licensed for this production, with fee paid for by contractor.

2.6 FINAL DELIVERY FORMAT

2.6.1 Final production to be delivered in HD format (1920x1080) as .mov file in both Captioned and Non-Captioned versions.

2.6.2 The final video product will be owned by the U.S. Army Corps of Engineers and may be repurposed as desired by the Corps with no additional fees.

2.7 REVIEWS PROCESS

2.7.1 Scripts, video footage and content reviews will be needed by the Government Point of Contact throughout the contract (see Deliverables)

2.7.2 Standard Army and Dept. of Defense review of publicly releasable material including this video follows “SAPP” process (below), which contractor will also follow, in descending order:

2.7.2.1 “S – Security” – Maintain security at all times.

2.7.2.2 “A – Accuracy” – Public information provided must be accurate.

2.7.2.3 “P – Policy” – Public information must conform to all applicable policies.

Examples: Corps of Engineers must retain exclusive ownership of the video;

Corps logos artwork/usage must conform to current policy.

2.7.2.4 “P – Propriety” – The government considers propriety or appropriateness of releasing information prior to public release. Inappropriate information may not be released.

2.8 PRODUCT OWNERSHIP

2.8.1 The U.S. Army Corps of Engineers will retain exclusive ownership of all video footage or products produced on Corps owned property, under this contract.

2.8.2 The Army will not be required to pay royalties, recurring license or run-time fees, use tax, or similar additional payments for any production or associated materials developed for the Army.

2.8.3 Contractor may not use video footage shot on Corps owned property during this production for any other purpose

2.8.4 Contractor will not be responsible for distribution under this contract, and shall not otherwise profit from this contract effort.

2.9 COPYRIGHT (per DA PAM 25-91, 7-22, 1 July 2014)

2.9.1 Separate clearances are always required to use copyrighted material. Generally both music and programs recorded off the air are copyrighted. Possession of the source recording or score does not confer any right to reproduce, transfer, or otherwise use or perform the material recorded or scored thereon, either in whole or in part. A specific license for each application to use copyrighted material, must be obtained from the copyright owner. A license to use or perform music or other copyrighted material in connection with DOD productions will generally—

2.9.1.1 (1) Convey to the U.S. Government the perpetual right to duplicate, distribute, publish, exhibit, use, or transmit all or parts of the music or other copyrighted material concerned as incorporated in the production for which the license was acquired, or in any future use incorporating a part or the whole of the production.

2.9.1.2 (2) State that the U.S. Government and its officers, agents, servants, and employees, when acting in their official capacities, are lawfully reproducing, distributing, exhibiting, or otherwise using the production or any portion thereof for which the license was acquired.

2.10 VIDEO DISPLAY EQUIPMENT AND INSTALLATION

2.10.1 Provide 70” touchscreen display, computer controller and software for showing video in the Pacific Salmon Visitor Information Center Theater. This system including mounting brackets to be installed by Corps personnel upon delivery. Display and mounts will be delivered at least two weeks prior to the final video delivery to allow time for installation by Corps personnel.

2.10.2 Touchscreen software and programming for controller and touchscreen for the new video (both Captioned and Non-Captioned versions) along with software training (min.

1 day).

3.0 SCHEDULE

3.1 Schedule of Deliverables

3.1.1 Initial pre-production consultation with Corps representatives – No later than 7 days after contract award.

3.1.2 Contractor review of existing Corps video footage and/or still photos for possible incorporation in script and final video. – No later than 14 days after contract award.

3.1.3 Delivery of first, second or other draft scripts for Corps review; consultation with Corps

– As determined mutually by Contractor and Corps, but to allow final script delivery within 45 days after contract award (see below).

3.1.4 Delivery of final script to Corps- 45 days after contract award.

3.1.5 Corps approval of final script – Within 7 days of receipt.

3.1.6 Contractor preparation of existing and new shot lists – 60 days after contract award.

3.1.7 Shooting of new video/photos by Contractor – As mutually agreed by Contractor and

Corps, but to allow completion of first rough edit within 120 days after contract award (see below).

3.1.8 Delivery of first rough edit to Corps (3 DVDs) – 120 days after contract award.

3.1.9 Delivery of second edits of video to meet Corps approval (3 DVDs) – 150 days after contract award.

3.1.10 Delivery of final edited version of video (5 DVDs) – 170 days after contract award.

3.1.11 Return of all Corps-provided video, photos or other material used to create the new video

– 175 days after contract award.

3.1.12 Delivery of equipment for playback of video in the Pacific Salmon Visitor Information Center Theater at McNary Lock and Dam, Umatilla, Oregon – 160 days after contract award.

3.1.13 Delivery of all signed talent releases, written copyright permissions for any stock footage used in the final video, and statement of right of the Corps to reproduce and distribute the video and all Corps-owned components of the video – 175 days after contract award and prior to final contract payment.

3.1.14 On site install of both non-captioned and captioned (to meet American Disabilities Act guidelines) videos onto touchscreen display along with software training for Corps staff that will be using the display.

4.0 SHIPMENT AND DELIVERY

The contractor shall coordinate their delivery schedule of final products with the Project POC a minimum of 1 week prior to commencing delivery. The contractor shall be limited to normal business hours of Monday-Thursday 7:00am-4:00pm excluding holidays. The 70” touchscreen display with components will be delivered to McNary Dam, 82790 Devore Road, Umatilla, OR 97882. All work shall be completed 180 days after contract is awarded.

Appendix A FOR REFERENCY ONLY; this contract is to replace this older video:

“PACIFIC SALMON” VIDEO SCRIPT

NARRATOR (Female):

1My family has lived in the northwest for generations and we have seen a lot of changes, but not nearly as many as the salmon /

2Salmon that were here long before the people / 3hatching in cool mountain streams / growing there into young fish called Smolts / 4Then something happens, a signal in their body, a change tells them to move with the current downstream / 5into the Columbia River, down to where the river meets the sea /

6And after adjusting to salt water the salmon journey out into the ocean / 7growing large in the food rich waters of the Pacific. After a long stay in the deep ocean waters, usually more than a year / 8the end of one journey begins another / 9one of nature’s most awesome migrations.

10Leaving the ocean, salmon return as a group to retrace the route they took as juveniles / 11Now fully grown, the fish stop feeding and battle their way up the river / 12to the streams of their birth.

Here the cycle begins anew / 13The females, turning on their sides dig nests with their tails / 14as males battle for access to females. Together they release milt and eggs. The female covers the nest with gravel, and for some species / 15both, completely exhausted, die.

16FADE / / / 1:55 ♫

17Then came the people / 18For thousands of years the salmon the Columbia and Snake rivers provided

Indians in the region with / 19bountiful food, and a spiritual link to the natural world / 20And for thousands of years the Indians did not substantially alter the habitat that salmon needed for survival.

21FADE / / 2:22 ♫

22Then with the coming of the Euro-Americans, the pressures on the salmon grew / 23Entrepreneurs followed the settlers in the 1800’s setting up canneries / 24Fish were caught by the millions in nets, fish traps / 25weirs / 26and fish wheels. Harvesting peaked in the 1880’s as fish runs dropped drastically / 27and spawning habitat was being reduced / 28at an alarming rate.

29FADE / / / 2:53 ♫

In the 20th century dams were built / 30creating additional / 31obstructions and hazards for salmon. The salmon runs were further depleted / 32by over harvesting / 33forest practices / 34grazing / 35and other habitat degrading activities/

36All this contributed to reducing the salmon runs in the Columbia River to below 3 million per year down from as many as 16 million/

NARRATOR:

37What’s being done to help the salmon? Well, many groups are looking at ways of perpetuating the migration:

commercial and sports anglers, timber companies, farmers and numerous government agencies/

38The Walla Walla District of the US Army Corps of Engineers helps by moving salmon around the dams and cooperates with the National Marine Fisheries Service, the US Fish and Wildlife Service / 39and other agencies to transport young fish down river to help them avoid hazards.

Let’s listen to Corps of Engineers Fishery Biologist [____________] /

BIOLOGIST:

40The main purpose of the juvenile bypass system here at McNary is to divert the fish as they are migrating to the ocean, on their seaward journey from hazards associated with the dam, both as they pass through the dam and as they pass from dam to dam in the river

41They are collected by diverting the fish away from the turbine intakes through special guiding screens, up into a slot inside the dam, or a channel. They exit the slots through some 12 inch ports into a common collection channel which then funnels down into a 36 inch pipe that you see here behind me. That pipe then carries the fish down to a sorting facility that can /

/ 42sort the fish by size, divert a portion of them into a sample where we can examine them for health, condition, size, and species composition. Then a major portion of the fish are /

/ 43loaded into holding ponds / 44waiting to be loaded onto barges or trucks for transport below the other dams. To date, the salmon transport program seems to be one of the best protective measures we can / 45undertake in order to ensure survival of salmon in the future. It is unfortunate that the dams which are so beneficial /

/ 46to the people of the Northwest in providing power for light and heat and industry and doing so much good for the economy and the livelihood of the people, have caused so many negative problems with the fish /

NARRATOR:

47As you can see, it is a challenge. Pacific Salmon are one of our greatest resources, and their migration one of nature’s most amazing sights. To keep them the remaining salmon runs in the Pacific Northwest we must all cooperate to ensure healthy habitat for salmon, and help with their migration. But we must also take into account the needs of people. It is a tricky balance, but the US Army Corps of Engineers is proving that there are solutions.

Appendix B Notional New Video Script Outline

A. Inject Walla Walla District fish program key messages into script as appropriate and as opportunity allows

– See Appendix C

B. Life Cycle

a. Adult salmon and steelhead migrate seasonally upstream using fish ladders constructed when

McNary and other Corps dams were built.

b. Adult salmon spawn when they reach their birthplace spawning grounds.

c. Juveniles migrate seasonally downstream to spend 2-5 years in the ocean before returning upstream as adults.

d. Update current video script and video

C. History 1 (Native American)

a. Fine tune current video script and video

D. History 2 ( Euro Americans)

E. History 3 (Dams)

b. Point out dams provide fish migration pathways both upstream and downstream

c. Note other benefits of dams including hydropower, recreation, commercial navigation (avoid

“flood risk reduction” since McNary and LSR are run-of-river dams)

F. What is being done to help the salmon?

a. Adult fish ladders to help adult salmon migrate upstream were built when McNary and lower

Snake River dams were constructed.

b. Juvenile bypass systems help juvenile fish migrate downstream either over, through or around the dam.

i. Spill for downstream-migrating juvenile fish

1. Spillway weirs (RSW/TSW)

2. Juvenile bypass system

a. Juvenile Fish Facility

3. Corner Pocket (Bonneville Dam)

4. Summer Spill Program

c. Fish-Friendly Turbines

G. Complexity

a. Wind Integration for power production

b. Lamprey

c. Other

H. Closing

Appendix C

Walla Walla District Fish Program Key Messages

The Corps is a good environmental steward o The Corps has completely overhauled dams along the Snake and Columbia Rivers for the benefit of fish.

The Walla Walla District adaptive fish management program is part of an overall fish management program o NOAA Fisheries is the lead federal regulatory agency overseeing ESA-listed anadromous salmonid protection and recovery (i.e. salmon, steelhead, sockeye) o US Fish and Wildlife Service is the lead regulatory agency overseeing ESA-listed resident salmonid protection/recovery (i.e. bull trout and other candidate species such as pacific lamprey) o We partner/consult with regional Native American nations and states as we move forward on implementing actions for the benefit of fish

We let science tells us what works best for fish o Our cutting-edge research program has guided fish actions.

o Essentially, we let the science tells us what’s best for juvenile fish as they swim to the Pacific

Ocean.

o As part of this overhaul, we’ve modified spillways on our dams, created bypass systems, and transported young fish downstream in barges.

o These efforts help juvenile fish travel efficiently, quickly, and safely.

o When adult fish return from the ocean years later, our fish ladders help them swim past the dams.

Our adaptive management and fish recovery efforts are working o Juvenile fish survival at our dams has improved dramatically over the years.

o We’ve seen record returns of adult steelhead, sockeye and Chinook salmon in recent years.

We plan to build on our success o In 2008, the Corps committed $50 million during the next 10 years to improve lamprey passage conditions at our operating projects o We look forward to building our collaborative relationship with our tribal partners as we implement important lamprey passage improvements.

The Corps is involved in three of the four “H”’s of salmon management o Habitat – A critical factor.

o Hydro System (Dams) – The Corps operates dams on the Columbia/Snake Rivers for the benefit of fish Juvenile fish facilities Fish ladders Spillway weirs o Hatcheries – Part of an overall plan, but not a sole solution Hatchery fish are different than natural-origin (wild) fish – Not all fish are the same o Harvest – Not up to the Corps; rather, up to other agencies and tribal nations

We’re Openly Communicating o See District website at 10 for information and updates

Appendix D Scriptwriting Resources

Walla Walla District Fish Program page and videos - http://www.nww.usace.army.mil/Missions/FishPrograms.aspx Some of the existing Corps video footage in these videos is available for use in this new video

Corps Northwestern Division Fish Page -http://www.nwd.usace.army.mil/Missions/Environmental/FishManagementOffice.aspx for Fish Management Office.

See fact sheets and more here including fact sheet for “Columbia River Fish Mitigation” at http://www.nwd.usace.army.mil/Media/FactSheets/FactSheetArticleView/tabid/2128/Article/475821/columbia-river-fish-mitigation.aspx: “Columbia River Operations for Fish” at http://www.nwd.usace.army.mil/Media/FactSheets/FactSheetArticleView/tabid/2128/Article/475827/columbia-river-operations-for-fish.aspx

Federal Caucus for fish recovery website – http://www.salmonrecovery.gov/ Ten federal agencies including the Corps work on salmon recovery

USACE Lower Snake River Fish Passage Improvement Plan – Dam Breaching Update: Plan of Study, March 2010 http://www.nww.usace.army.mil/Library/DamBreachingPlanofStudy.aspx The following sections contain useful Corps fish program overview information:

Section 2.1 “Introduction” Section 2.2 “NOAA Fisheries’ 2008 Biological Opinion” Section 2.4 “Corps Role in Salmon Recovery”

NOAA Fisheries website -http://www.westcoast.fisheries.noaa.gov/protected_species/salmon_steelhead/recovery_planning_and_implementati on/ The National Oceanic and Atmospheric Administration (NOAA) Fisheries office is in the federal lead on salmonid fish recovery, and the Corps of Engineers supports that effort by implementing fish recovery.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.212-1 Instructions to Offerors--Commercial Items OCT 2015

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-10 Waste Reduction Program MAY 2011 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.203-7996 (Dev) Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements - Representation (Deviation 2016-O0003)

OCT 2015

252.204-7008 Compliance With Safeguarding Covered Defense Information Controls

DEC 2015

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information

DEC 2015

252.204-7012 (Dev) Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2015

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.213-7000 Notice to Prospective Suppliers on Use of Past Performance

Information Retrieval System--Statistical Reporting in Past Performance Evaluations

JUN 2015

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

BASIS FOR AWARD

This award will be made based on the best overall (i.e., Best Value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the four (4) evaluation factors: Experience, Technical Approach, Past Performance, and Price. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Experience, Technical Approach, and Past Performance Factors (to include all sub-factors). Offerors are cautioned that the award may not necessarily be made to the lowest price offered.

Non-priced factors, when combined, are significantly more important than price. However, when the proposals are of relatively equal merit, price becomes more important.

FACTORS AND SUB-FACTORS TO BE EVALUATED

Award will be made to the Offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors described below. During evaluations of each proposal, the Government will assign each factor and sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.

Factor 1 Experience Submit information regarding recent and relevant projects with similar scope and complexity as outlined in the Technical Specifications. Submittals may include photographs, drawings, etc.

Minimum requirement for acceptability: Evidence of two videos with similar scope and complexity.

Evaluation Methodology for Factor 1 shall use Combined Technical/Risk Ratings as follows:

Rating Description

Outstanding

Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good

Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal

Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable

Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.

Factor 2 Technical Approach

A) Approach and Methodology: submit an explanation of your proposed approach to this requirement as outlined in the Technical Specifications. Describe in detail your proposed solution for the video.

Submittal of sketches, photographs, and/or drawings to convey your idea is encouraged.

Minimum requirement for acceptability: A proposed solution that addresses the requirements in the Technical Specifications and appears feasible in comparison to the budget range.

Evaluation Methodology for Factor 2, including all sub-factors shall use Combined Technical/Risk Ratings as follows:

Outstanding

Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good

Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal

Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable

Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.

Factor 3 Past Performance Submit three (3) references from past clients for similar projects.

The past performance evaluation will result in an assessment of the offeror’s probability of meeting the solicitation requirements. Offerors will be evaluated based on the information provided in the proposal and any other available information determined appropriate by the Government.

The Government reserves the right to verify claims made by the Offeror and not to consider relevant those projects that are not substantiated.

Unavailability of Past Performance Information: IAW FAR Part 15.305(a)(2)(iv), in the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

Evaluation Methodology for Factor 3, using the following 4-point relevance scale:

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant

Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant

Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Each Offeror will be assigned a Performance Confidence Assessment Ratings as follows:

Substantial Confidence

Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror's recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence

Based on the offeror's recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence

Based on the offeror's recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

Factor 4 Price

An evaluation will be performed on the proposed prices. The evaluation will not be assigned an adjectival rating, yet it will be evaluated for completeness and reasonableness as follows:

1. Completeness: To be complete, the Offeror must provide all data that is requested and necessary to evaluate the price. The Government will assess the extent to which the proposed prices comply with the content and format requirements set forth in this solicitation.

2. Reasonableness: The Offeror’s proposal is evaluated through price analysis techniques as described in FAR Subpart 15.305(a)(1). For Price to be reasonable, it must represent a price that provides best value to the Government when consideration is given to prices in the market (market conditions may be evidenced by other competitive proposals), technical, and functional capabilities of the Offeror. The Offeror's price will be evaluated to determine if any are unreasonably high or low in relation to the anticipated work under the contract, as well as with current industry standards.

EVALUATION APPROACH

The overarching evaluation approach for all factors and sub-factors is as follows:

1. Adequacy of Response. The proposal will be evaluated to determine whether the offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP.

2. Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which successful performance is contingent upon proven devices and techniques. The proposal will be evaluated to determine the extent to which the offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.

Relative Importance of Evaluation Factors and Sub-factors

Under Factor 2, sub-factors are equal in importance.

Non-price Factor/Sub-factors, when combined, are significantly more important than Factor 4.

Definitions

Deficiency: A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

Recency: A measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.

Relevancy: A measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance for work that is similar in nature, magnitude, and complexity to the current requirement.

Risk: The potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or criterion may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

Significant Strength: An aspect of an offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

Strength: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (APR 2016)

ALTERNATE I (OCT 2014)

The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (r) of this provision.

(a) Definitions. As used in this provision--

“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

“Forced or indentured child labor” means all work or service—

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C.

395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

Sensitive technology—

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

“Service-disabled veteran-owned small business concern”—

(1) Means a small business concern—

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

“Small business concern” means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.

“Small disadvantaged business concern, consistent with 13 CFR 124.1002,” means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and

(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and

(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

“Subsidiary” means an entity in which more than 50 percent of the entity is owned—

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

“Veteran-owned small business concern” means a small business concern—

(1) Not less than 51 percent of which is owned by one or more veterans(as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

“Women-owned business concern” means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of the its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.

“Women-owned small…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .