W912EF-15-Q-0175_Techspecs.pdf
PDF 284 KB Posted
- Attached to
- Amendment 02 Federal contract opportunity
- Solicitation number
- W912EF-15-Q-0175
About this file
W912EF-15-Q-0175 Technical Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-Q-0175-00002.pdf | ||
| 15-Q-0175_Revised_Drawing_M-402.pdf | ||
| 15-Q-0175-0001.pdf | ||
| M-401_rev_Amend01.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| W912EF-15-Q-0175_Plans.pdf | ||
| W912EF-15-Q-0175_LPA_Roller_Chains.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lucky Peak Intake Gate Roller Chain Replacement W912EF-15-Q-0175
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
DIVISION 05 - METALS
05 50 00.20 28 METALWORK FABRICATION - ROLLER CHAIN COMPONENTS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
This page intentionally left blank
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 28
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 00 00.00 28 Page 1
SECTION 01 00 00.00 28
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx
Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/
Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/
Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/
Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 00 00.00 28 Page 2
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00.90 28
INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
PART 1 GENERAL
1.1 SUBMITTALS
1.2 PRE-SCREENING OF CONTRACTOR EMPLOYEES
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 14 00.90 28 Page 1
SECTION 01 14 00.90 28
INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
PART 1 GENERAL
The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS. This contract does not require access to or handling of classified material.
This contract does not require access to restricted areas, sensitive information, or equipment. The restricted areas, sensitive information, or equipment consists of everything inside the security fence at the project.
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. The designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Pre-Screening Of Contractor Employees; I, SLE
1.2 PRE-SCREENING OF CONTRACTOR EMPLOYEES
All Contractors must pre-screen all employees using the E-verify Program ( http://www.dhs.gov/E-Verify) website to ensure that workers meet the established employment eligibility requirements. The Contractor must ensure that the individuals undergoing screening have two valid forms of Government issued identification prior to pre-screening to ensure that the correct information is entered into the E-verify system. An initial list of verified/eligible employees must be provided to the contracting officer no later than 10 business days after receipt of Notice of Award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 14 00.90 28 Page 2
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTAL IDENTIFICATION
1.1.1 Submittal Descriptions (SD)
1.1.2 Action Elements for Submittal Approval
1.2 SUBMITTALS
1.3 SUBMITTAL OF SHOP DRAWINGS
1.4 QUANTITY OF SHOP DRAWINGS
1.5 SHOP DRAWINGS
1.5.1 Approval of Shop Drawings
1.5.2 Shop Drawings Approved by Contractor
1.5.3 Shop Drawings Approved by Contracting Officer
1.6 GENERAL SUBMITTAL REQUIREMENTS
1.6.1 Required Submittals
1.6.2 Submittals
1.6.2.1 Submittal of Shop Drawings
1.6.2.2 Sequence of Submission
1.6.2.3 Single Transmittal
1.6.2.4 Succeeding Submittals
1.6.3 Drawing Dimensions
1.6.4 Quantity of Shop Drawings
1.7 STANDARD MANUFACTURED ITEMS
1.8 TRADE-NAMED MATERIALS AND EQUIPMENT
1.9 SUBMITTAL REGISTER
1.10 SUBMITTAL SUMMARY SHEETS (ENG FORM 4025)
1.11 APPROVALS OR DISAPPROVAL
1.11.1 Satisfactory Submittals
1.11.2 Unsatisfactory Submittals
1.11.3 Drawing Dimensions and Format
1.11.4 Government Review Period
1.12 Final Approved Versions of Contractor Prepared Drawings
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTAL IDENTIFICATION
1.1.1 Submittal Descriptions (SD)
Submittals required are identified by SD numbers and titles as follows:
SD-01 Prefabrication Submittals
This is for pre-fabrication and before delivery submittals.
SD-02 Shop Drawings
SD-03 Product Data
SD-04 Samples
SD-06 Test Reports
SD-07 Certificates
SD-11 Closeout Submittals
1.1.2 Action Elements for Submittal Approval
ME Engineering & Construction Division, Mechanical Design GE Engineering & Construction Division, General Engineering
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with this SECTION:
SD-01 Prefabrication Submittals
Submittal Register; G ME
SD-11 Closeout Submittals
Final Approved Versions of Contractor Prepared Drawings; G ME
1.3 SUBMITTAL OF SHOP DRAWINGS
Submittal of shop drawings as may be required by applicable requirements of the CONTRACT CLAUSES, the various sections of the TECHNICAL SPECIFICATIONS, and as indicated on the contract drawings shall be in accordance with the following additional requirements.
SECTION 01 33 00 Page 2
1.4 QUANTITY OF SHOP DRAWINGS
Quantity of shop drawings to be submitted shall be two copies.
1.5 SHOP DRAWINGS
A shop drawing is a Contractor's or manufacturer's drawing, brochure, sample, certificate, calculation, warranty, or other submittal which provides detail for fabrication and quality control of permanent work.
1.5.1 Approval of Shop Drawings
All shop drawings shall be Contractor approved; however, certain specified submittals will also require Contracting Officer approval.
1.5.2 Shop Drawings Approved by Contractor
Contractor shall review and correct all drawings to make them complete and in accordance with the contract. Approval by Contractor shall be indicated on each drawing by an "Approved" stamp with Contractor's name, signature, and date. Names and titles of individuals authorized by Contractor to approve drawings shall be provided prior to any submission. All shop drawings shall be submitted. Submittals which are for information only do not require Contracting Officer approval but will be monitored and spot checks will be made. When such checks indicate noncompliance, the Contractor will be notified by the same method used for Contracting Officer approvals.
1.5.3 Shop Drawings Approved by Contracting Officer
Before submission, the Contractor shall review all shop drawings prepared by subcontractors, suppliers, and himself, for completeness and compliance with plans and specifications, and shall certify completeness and compliance with an approval stamp on each drawing or item of printed material. Red markings are reserved for Contracting Officer. Suppliers' or subcontractors' certifications are not acceptable as meeting this requirement. Submittals which meet these requirements will be reviewed and processed as specified in paragraph APPROVALS OR DISAPPROVAL.
1.6 GENERAL SUBMITTAL REQUIREMENTS
1.6.1 Required Submittals
The Contractor shall submit all items listed on the Submittal Register. In addition to the listed submittals the Contracting Officer may request submittals for items in the specifications or items shown on the drawings when deemed necessary to adequately describe the work covered in the specifications and drawings.
1.6.2 Submittals
1.6.2.1 Submittal of Shop Drawings
Submittals of shop drawings, shall be complete in detail; shall indicate materials, fastenings, design criteria, stress computations, design calculations, test curves, and wiring diagrams; shall indicate, when applicable, dimensions, thicknesses, types, grade, class, gage, and working and test pressures; shall indicate fabrication details, reinforcement and
SECTION 01 33 00 Page 3 anchorage, and methods of installation and erection with relation to appurtenant fabrication; and shall include all required detailed information necessary to indicate full compliance with the plans and specifications. Shop drawings shall be supported by sufficient descriptive literature such as certified laboratory test reports, laboratory test labels, catalogs, cuts, diagrams, and other data published by the manufacturer to demonstrate conformance with the contract drawings and specifications. Manufacturer's designations and model numbers alone will not be acceptable unless same as the designation or model number referenced in the plans and specifications.
1.6.2.2 Sequence of Submission
The sequence of submission of drawings shall be such that all information is available for checking each drawing when it is received. All items shall be adequately identified to show where they will be used, and shall be referenced to applicable contract drawings and specification section.
1.6.2.3 Single Transmittal
All shop drawings submitted on a single transmittal (ENG form 4025) shall pertain to only one specification section. Where drawings are submitted for either (1) assemblies consisting of more than one piece of equipment, or (2) systems consisting of numerous components dependent one on the other for matching or compatible characteristics, complete information shall be submitted on all such related components at the same time.
1.6.2.4 Succeeding Submittals
All revisions on a drawing, after the original submittal, shall be shown by number, date, and subject in the revision block. Shop drawings for all items and equipment which are of special manufacture or fabrication shall consist of complete assembly and detail drawings.
1.6.3 Drawing Dimensions
All shop drawings prepared by the Contractor for this contract shall conform dimensionally to Drawing No. WWD-40-33-01 (attached at the end of this SECTION).
1.6.4 Quantity of Shop Drawings
Two copies of each shop drawing along with one copy of ENG Form 4025 shall be sent to:
District Commander ATTN: CENWW-EC-D-ME, David Kloewer Walla Walla District Corps of Engineers 201 North Third Avenue Walla Walla, WA 99362-1876
1.7 STANDARD MANUFACTURED ITEMS
Shop drawings for all standard catalog items and equipment manufactured on a repetitive basis shall include complete outline and installation data.
When more than one size, rating, or type appears on the catalog sheet, each item to be used shall be clearly identified by marking the applicable data
SECTION 01 33 00 Page 4 with a heavy black arrow at each side.
1.8 TRADE-NAMED MATERIALS AND EQUIPMENT
If items called for in the contract are identified by trade name or equal description, such identification is intended to be descriptive, but not restrictive, and indicates the quality and characteristics of products that will meet contract requirements. Equal products proposed for use will be considered for approval if such products are clearly identified in submittals and are determined by the Government to be equal in all material respects to the specified trade-name products. Determination as to equality of the product offered is the responsibility of the Government and will be based on information furnished by the Contractor in his submittal.
1.9 SUBMITTAL REGISTER
At the end of this SECTION is the Submittal Register which is a listing of each item of equipment and material for which submittals are required by the specifications. Columns "c" thru "f" have been completed by the Government.
1.10 SUBMITTAL SUMMARY SHEETS (ENG FORM 4025)
This form is used to transmit all submittals listed on the Submittal Register or otherwise required by this contract. This form will be made available to the Contractor by the Government. Each transmittal shall contain the following information:
(1) Project title, contract number, and Contractor's name.
(2) Subcontractor, supplier, or manufacturer's name, as applicable.
(3) Applicable specification paragraph number or numbers.
(4) Contract drawing numbers and sheet numbers.
(5) Transmittal number. Transmittals shall be numbered in continuously ascending order by specification section. For example, the first transmittal from specification 26 00 00.00 40 would be numbered 26 00 00.00 40-1. The second transmittal would be 26 00 00.00 40-2, etc. Any resubmittal, either required by previous rejection or for Contractor convenience shall be numbered with the original number plus a digit in the decimal place. For example, the first resubmittal of 26 00 00.00 40-1 would be 26 00 00.00 40-1.1 and the second resubmittal would be 26 00 00.00 40-1.2.
(6) Items submitted for approval. The Contractor shall certify with each submittal that he has reviewed the submittal in detail and that they are correct and in conformance with the contract requirements.
The certificate may be simply a signed statement by the Contractor attesting to the above requirements. Suppliers' or subcontractors' certificates are not acceptable as meeting this requirement; however, they may be attached to the Contractor's certificate to complete the submittal. The Contractor shall also certify, with each information copy of each Contractor approved submittal, as to the correctness and compliance of the submittal as specified above.
SECTION 01 33 00 Page 5
1.11 APPROVALS OR DISAPPROVAL
1.11.1 Satisfactory Submittals
If the submittal documents as submitted are complete and the contents satisfy contract requirements, one copy will be returned stamped "APPROVED." Such approval shall not be construed as authorizing any deviation from the plans and specifications, unless these deviations are brought to the attention of the Contracting Officer in the letter, which transmits the shop drawings and are also shown on the shop drawings. If corrections are necessary, but in the opinion of the Contracting Officer are of a minor nature, the Government will revise and return one copy stamped, "APPROVED AS CORRECTED." If the Contractor objects to the revisions, he shall resubmit the submittal, including alternative revisions. He shall set forth his objections in accompanying correspondence.
1.11.2 Unsatisfactory Submittals
If the submittals are incomplete or contents plus available supplemental information do not illustrate compliance with contract requirements, they will be appropriately marked showing items of noncompliance and one print will be returned stamped "RETURNED FOR CORRECTION" with reasons therefore if otherwise not obvious. The Contractor shall make any corrections required by the Contracting Officer, and shall resubmit the documents and data including the same number of prints as required for approval in the same manner as before. Every revision shall be shown by number, date, and subject in a revision block. If revisions are made by the Contractor after a drawing has been approved, the Contractor shall again resubmit for approval as noted above. The time consumed in preparing, submitting, and obtaining approval of submittals shall be included in the time allowed for completion of the contract.
1.11.3 Drawing Dimensions and Format
Shop drawings submitted under this section of the specifications which do not conform to the requirements as to size and format will be returned without action.
1.11.4 Government Review Period
The Contractor shall allow the Government 30 days to review submittals and for each resubmittal. The 30-day period shall commence at date of receipt of transmittals from the Contractor by the Government and the period shall end at date of signature of Approving Authority on ENG Form 4025.
1.12 Final Approved Versions of Contractor Prepared Drawings
Upon completion of the work under this contract, the Contractor shall submit for review and approval by the Contracting Officer, hard copies (black and white prints) of the final approved versions of the drawings.
All paper drawings submitted to the Contracting Officer shall comply with the size indicated on Drawing No. WWD-40-33-01 attached at the end of this section. The drawings shall show all changes and revisions, including any
SECTION 01 33 00 Page 6 field changes, made up to the time that the work is completed and accepted.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
SECTION 01 33 00 Page 7
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
W912EF-15-Q-0175
Lucky Peak Intake Gate Roller Chain Replacement
01 14 00.90 28 SD-01 Preconstruction Submittals
1.2 I SLEPre-Screening Of Contractor
Employees 01 33 00 SD-01 Preconstruction Submittals
1.9 G MESubmittal Register
SD-11 Closeout Submittals
1.12 G MEFinal Approved Versions of
Contractor Prepared Drawings
05 50 00.20 28 SD-02 Shop Drawings
2.1 G MEShop Fabrication Drawings
SD-03 Product Data
2.1 G MEShop Fabricated Metal Items
2.2Heat Treatment Procedure
SD-04 Samples
2.4 G MERoller chain components
SD-06 Test Reports
2.1 G MEShop Fabricated Metal Items
3.2Quality Control Reports
SD-07 Certificates 2.3Material Certifications 3.3Independent Lab Test
Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
ASME INTERNATIONAL (ASME)
Three Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-854-7179 or 800-843-2763 Fax: 212-591-7674 E-mail: infocentral@asme.org Internet: http://www.asme.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9585 Fax: 610-832-9555 E-mail: service@astm.org Internet: http://www.astm.org
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
SECTION 01 42 00 Page 2
DIVISION 05 - METALS
SECTION 05 50 00.20 28
METALWORK FABRICATION - ROLLER CHAIN COMPONENTS
PART 1 GENERAL
1.1 DESCRIPTION
1.2 REFERENCES
1.3 SUBMITTALS
PART 2 PRODUCTS
2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES
2.2 HEAT TREATMENT PROCEDURE
2.3 CERTIFICATIONS
2.4 ROLLER CHAIN COMPONENTS
2.4.1 Rollers
2.4.2 Roller Shafts
2.4.3 Side Bars Modified Side Bars and Master Links
2.4.4 Retaining Rings
PART 3 EXECUTION
3.1 FABRICATION AND WORKMANSHIP
3.1.1 Machine Work
3.1.1.1 Finished Surfaces
3.1.2 Cleaning of Corrosion-Resisting Steel
3.2 QUALITY CONTROL SYSTEM
3.3 TESTING AND TEST REPORTS
3.3.1 Crack Test
3.3.2 Hardness Tests
3.3.3 Surface Roughness Test
3.3.4 Dimensional Tolerance
3.4 PROTECTION OF MATERIAL AND WORK
3.5 PACKAGING, MARKING AND SHIPMENT
SECTION 05 50 00.20 28 Page 1
SECTION 05 50 00.20 28
METALWORK FABRICATION - ROLLER CHAIN COMPONENTS
PART 1 GENERAL
1.1 DESCRIPTION
This SECTION specifies the requirements for materials and fabrication of headgate roller chain components. Contractor shall fabricate and deliver four (4) intake gate roller chain assembles to Lucky Peak Dam, Boise, ID.
Each chain assembly has 119 ea, 5" diameter, 7" long rollers. Each roller chain assembly consists of rollers, shafts, side bars and retaining rings as shown on the Contract drawings. There are two headgates at Lucky Peak Dam. Each headgate reqires two roller chain assemblies.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A 276 (2002) Stainless Steel Bars and Shapes
ASTM A 484/A 484M (2000) General Requirements for Stainless Steel Bars, Billets, and Forgings
ASTM A 564/A 564M (2002a) Hot-Rolled and Cold-Finished Age-Hardening Stainless Steel Bars and Shapes
ASTM A 380 (2006) Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems
ASTM A 693 (2003) Standard Specification for Precipitation-Hardening Stainless and Heat-Resisting Steel Plate, Sheet, and Strip
ASME INTERNATIONAL (ASME)
ASME B18.27 1999) Tapered and Reduced Cross Section Retaining Rings (Inch Series)
ASME B4.1 (1967; R 2004) Preferred Limits and Fits for Cylindrical Parts
ASME B46.1 (2002) Surface Texture (Surface Roughness, Waviness and Lay)
SECTION 05 50 00.20 28 Page 2
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
The submittals shall be submitted in two packages:
(1) Prefabrication - SD-02 Shop Drawings, SD-03 Product Data, and SD-07 Material certifications
(2) Post-fabrication - SD-06 Test Reports, SD-07 Independent lab test certification
SD-02 Shop Drawings
Shop Fabrication Drawings; G ME Contractor shall submit detail shop fabrication drawings for metalwork and machine work, prior to fabrication. Elements of fabricated items inadvertently omitted on contract drawings shall be detailed by the Contractor and indicated on the detailed drawings.
SD-03 Product Data
Shop Fabricated Metal Items; G ME Lists of materials, and records which identify the disposition of approved certified material for each fabricated item shall be submitted for approval and approved prior to fabrication of the components.
Heat Treatment Procedure Procedure shall identify heat treatment process and applicable standards. Submitted prior to fabrication of rollers.
SD-04 Samples
Roller chain components; G ME The Contractor shall furnish a sample consisting of two rollers, two roller shafts with retaining rings, and four side bars to the Government for approval prior to the fabrication of the remaining components. The sample shall be submitted with documentation required in SD-06 Test Reports and SD-07 Certificates. The sample shall conform to the specifications and contract drawings. The sample will not be returned.
SD-06 Test Reports
Shop Fabricated Metal Items; G ME Materials tests reports and analysis shall be submitted for approval prior to shipment of items.
Quality Control Reports Reports form Contractor's quality control system. Shall be submitted prior to shipment of items.
SECTION 05 50 00.20 28 Page 3
SD-07 Certificates
Material Certifications Certifications from mill shall be submitted for all chain component materials prior to commencing fabrication.
Independent Lab Test Certification Test report from independent testing laboratory.
PART 2 PRODUCTS
2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES
Miscellaneous shop fabricated metal items shall conform to the respective specifications and other designated requirements. Sizes shall be as specified or shown. Where material requirements are not specified, materials furnished shall be suitable for the intended use and shall be subject to approval. The Contractor shall prepare and submit for approval shop fabrication drawings for all chain components prior to the start of work. All stainless steel components shall be pacified after final heat treatment and machining in accordance with ASTM A 380.
2.2 HEAT TREATMENT PROCEDURE
The procedure shall identify heat treatment process when applicable for item and applicable standards. The procedure shall be submitted prior to fabrication of components.
2.3 CERTIFICATIONS
Where material is specified, the Contractor shall submit mill material certifications report for raw materials.
2.4 ROLLER CHAIN COMPONENTS
With the exception of the retaining rings, all roller chain components shall be fabricated by one manufacturer. All components shall have "pacified" treatment after final machining and heat process in accordance with ASTM A 380.
2.4.1 Rollers
Rollers shall be ASTM A 564/A 564M, UNS S17400 Type 630 or S45000 Type XM-25, age-hardened heat treated to obtain a Brinell hardness range of 331 minimum to 401 maximum. Heat treatment of rollers shall not commence until the heat treatment procedure is submitted. Roller outer surface shall be cold-finished per ASTM A 484/A 484M, Class C or hot-rolled and machine-finished to meet tolerances specified. Roller inner hole shall be bored and reamed to meet 63 micro-inch finish requirements.
2.4.2 Roller Shafts
Roller shafts shall be "Nitronic 60" or ASTM A 276, UNS S21800, Condition A, minimum Brinell hardness 205, with 63 micro-inch cold ground finished.
Threshold galling stress 50 ksi with ASTM A 564/A 564M, UNS S17400 Type
630. Retaining ring groove shall be machined per manufacture's dimensions and tolerances.
SECTION 05 50 00.20 28 Page 4
2.4.3 Side Bars Modified Side Bars and Master Links
Shall be ASTM A 276, UNS S30400 Condition A, cold-finished per ASTM A 484/A 484M, Class C or hot rolled and machine-finish to meet tolerances specified.
2.4.4 Retaining Rings
Retaining rings for roller shafts and links shall be corrosion-resistant stainless steel ASTM A 693-03, S15700 Condition RH950 , conforming to ASME B18.27-NA4 "heavy duty" external series type with nominal shaft size as shown on the contract drawings. Retaining rings shall be provided from a manufacturer that has least 5 years of experience in the fabrication of industrial retaining rings.
PART 3 EXECUTION
3.1 FABRICATION AND WORKMANSHIP
Workmanship shall be of the highest grade and in accordance with the best modern practices to conform with the specifications for the item of work being furnished.
3.1.1 Machine Work
Tolerances, allowances and gauges for metal fits between plain, non-threaded, cylindrical parts shall conform to ASME B4.1 for the class of fit shown or required unless otherwise shown on approved detail drawings.
Where fits are not shown they shall be suitable as approved. Tolerances for machine-finished surfaces designated by non-decimal dimensions shall be within 1/64 inch. Sufficient machining stock shall be allowed on placing pads to ensure true surfaces of solid material. Finished contact or bearing surfaces shall be true and exact to secure full contact. Journal surfaces shall be polished and all surfaces shall be finished with sufficient smoothness and accuracy to ensure proper operation when assembled.
3.1.1.1 Finished Surfaces
Surface finishes indicated or specified shall be in accordance with ASME B46.1. Values of required roughness heights are arithmetical average deviations expressed in micro-inches. These values are maximum. Lesser degrees will be satisfactory unless otherwise indicated. Compliance with surface requirements shall be determined by sense of feel and visual inspection of the work compared to Roughness Comparison Specimens in accordance with the provisions of ASME B46.1. Values of roughness width and waviness height shall be consistent with the general type of finish specified by roughness height. Where the finish is not indicated or specified it shall be that which is most suitable for the particular surface, provide the class of fit required and be indicated on the detail drawings by a symbol which conforms to ASME B46.1 when machine finishing is provided. Flaws such as scratches, ridges, holes, peaks, cracks or checks which will make the part unsuitable for the intended use will be cause for rejection.
3.1.2 Cleaning of Corrosion-Resisting Steel
Oil, paint and other foreign substances shall be removed from corrosion-resisting steel surfaces after fabrication. Cleaning shall be
SECTION 05 50 00.20 28 Page 5 done by vapor degreasing or by the use of cleaners of the alkaline, emulsion or solvent type. After the surfaces have been cleaned they shall be given a final rinsing with clean water followed by a 24 hour period during which the surfaces are intermittently wet with clean water and then allowed to dry for the purpose of inspecting the clean surfaces. The surfaces shall be visually inspected for evidence of paint, oil, grease, welding slag, heat treatment scale, iron rust or other forms of contamination. If evidence of foreign substance exist the surface shall be cleaned in accordance with the applicable provisions of ASTM A 380. The proposed method of treatment shall be furnished for approval. After treatment the surfaces shall be visually reinspected. Brushes used to remove foreign substances shall have only stainless steel or nonmetallic bristles. Any contamination occurring subsequent to the initial cleaning shall be removed by one or more of the methods indicated above.
3.2 QUALITY CONTROL SYSTEM
The Contractor/manufacturer shall utilize a quality control system to insure all supplied components meet all specifications and requirements.
The Contractor shall submit Quality Control Reports for Government approval prior to shipment of components.
3.3 TESTING AND TEST REPORTS
The Contractor shall be responsible for all labor, materials, and costs associated with testing. A sample of three (3) percent of all machined components shall be randomly selected from each lot for examination and testing by an independent certified testing laboratory. An independent lab test certification report shall identify component tested, specification, measured property, pass/fail, name of laboratory, equipment used, and submitted for review. Failure of a sample component will result in the rejection of that entire lot. Errors or defects disclosed shall be remedied by the Contractor at no additional cost to the Government and the batch shall be retested. The Contractor shall be responsible for cost of retesting. The following tests shall be performed on each sample.
3.3.1 Crack Test
Items shall be free of cracks as determined by dye penetrant inspection tests.
3.3.2 Hardness Tests
Each sample shall be tested for Brinell hardness and compared to applicable standard.
3.3.3 Surface Roughness Test
Contractor shall test surface requirements by comparing sample to roughness comparison specimen as per ASME B46.1.
3.3.4 Dimensional Tolerance
Dimensional tolerances shall be compared to components specified requirements.
3.4 PROTECTION OF MATERIAL AND WORK
At all times prior to delivery, and as also specified in paragraph 3.5, all
SECTION 05 50 00.20 28 Page 6 materials, supplies, and equipment of every description including property which may be Government-owned and all work performed shall be protected and preserved. All reasonable requests from the Government to enclose or specially protect such property shall be complied with. If, as determined, material, equipment, supplies, and work performed are not adequately protected,such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payment due.
3.5 PACKAGING, MARKING AND SHIPMENT
(1) All material and articles shall be prepared and loaded for shipment in such manner as to protect them from damage in transit, and any and all damage shall be made good until the equipment is delivered to the Government at the specified delivery point. Where necessary, heavy parts or machines shall be mounted on skids or shall be crated, and any articles or materials that might otherwise be lost shall be boxed or wired in bundles and plainly marked for identification. All parts exceeding two hundred
(200) pounds of gross weight shall be prepared for shipment so that slings for handling by the crane may be readily attached while the parts are on the car or transport truck. Boxed parts, where it is unsafe to attach slings to the box, shall be packed with slings attached to the part, the slings to project through the box or crate so that attachment to the hoisting equipment can be readily made.
(2) No material or equipment shall be shipped until after it has been inspected and accepted for shipment by the Government, or unless inspection of the equipment has been waived in writing. The Government shall be notified at least 15 days in advance as to the expected shipment dates of the equipment.
(3) The Government will accept delivery of materials and equipment when delivered at the specified delivery point in accordance with enclosed provisions.
(4) Each container shall be labeled in such a way that the markings will be permanent and not fade. The labels at a minimum shall contain the following;
(a) Manufacturer
(b) Contract and delivery order number.
(5) As soon as each shipment is made shipping notices shall be submitted on which shall be shown, in addition to the usual data, a description of the article furnished, the item number of the contract schedule to which the article applies, the shipping weight of each item, the number of pieces, the total weight, and if shipped by railroad the car number.
SECTION 05 50 00.20 28 Page 7
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 00 00.00 28 - GENERAL REQUIREMENTS |
| 01 00 00.00 28 - GENERAL REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 14 00.90 28 - INTEGRATING ANTITERRORISM AT AND OPERATIONS SECURITY OPSEC |
| 01 14 00.90 28 - INTEGRATING ANTITERRORISM AT AND OPERATIONS SECURITY OPSEC |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 PRE-SCREENING OF CONTRACTOR EMPLOYEES |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| 01 33 00 - SUBMITTAL PROCEDURES |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTAL IDENTIFICATION |
| 1.1.1 Submittal Descriptions SD |
| 1.1.2 Action Elements for Submittal Approval |
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL OF SHOP DRAWINGS |
| 1.4 QUANTITY OF SHOP DRAWINGS |
| 1.5 SHOP DRAWINGS |
| 1.5.1 Approval of Shop Drawings |
| 1.5.2 Shop Drawings Approved by Contractor |
| 1.5.3 Shop Drawings Approved by Contracting Officer |
| 1.6 GENERAL SUBMITTAL REQUIREMENTS |
| 1.6.1 Required Submittals |
| 1.6.2 Submittals |
| 1.6.2.1 Submittal of Shop Drawings |
| 1.6.2.2 Sequence of Submission |
| 1.6.2.3 Single Transmittal |
| 1.6.2.4 Succeeding Submittals |
| 1.6.3 Drawing Dimensions |
| 1.6.4 Quantity of Shop Drawings |
| 1.7 STANDARD MANUFACTURED ITEMS |
| 1.8 TRADE-NAMED MATERIALS AND EQUIPMENT |
| 1.9 SUBMITTAL REGISTER |
| 1.10 SUBMITTAL SUMMARY SHEETS ENG FORM 4025 |
| 1.11 APPROVALS OR DISAPPROVAL |
| 1.11.1 Satisfactory Submittals |
| 1.11.2 Unsatisfactory Submittals |
| 1.11.3 Drawing Dimensions and Format |
| 1.11.4 Government Review Period |
1.12 Final Approved Versions of Contractor Prepared Drawings
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 05 - METALS |
| 05 50 00.20 28 - METALWORK FABRICATION - ROLLER CHAIN COMPONENTS |
| 05 50 00.20 28 - METALWORK FABRICATION - ROLLER CHAIN COMPONENTS |
| PART 1 GENERAL |
| 1.1 DESCRIPTION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES |
| 2.2 HEAT TREATMENT PROCEDURE |
| 2.3 CERTIFICATIONS |
| 2.4 ROLLER CHAIN COMPONENTS |
| 2.4.1 Rollers |
| 2.4.2 Roller Shafts |
| 2.4.3 Side Bars Modified Side Bars and Master Links |
| 2.4.4 Retaining Rings |
| PART 3 EXECUTION |
| 3.1 FABRICATION AND WORKMANSHIP |
| 3.1.1 Machine Work |
| 3.1.1.1 Finished Surfaces |
3.1.2 Cleaning of Corrosion-Resisting Steel
| 3.2 QUALITY CONTROL SYSTEM |
| 3.3 TESTING AND TEST REPORTS |
| 3.3.1 Crack Test |
| 3.3.2 Hardness Tests |
| 3.3.3 Surface Roughness Test |
| 3.3.4 Dimensional Tolerance |
| 3.4 PROTECTION OF MATERIAL AND WORK |
| 3.5 PACKAGING, MARKING AND SHIPMENT |