Amendment_0002.pdf
PDF 470 KB Posted
- Attached to
- Dworshak Fish Hatchery Vacuum Degassing Tower Phase 2 Federal contract opportunity
- Solicitation number
- W912EF-15-B-0004
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Results.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0001.pdf | ||
| Site_Visit_Attendees_15-B-0004.pdf | ||
| 15-B-0004_Plans.pdf | ||
| Site_Visit_Information.pdf | ||
| W912EF-15-B-0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV42814585
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Dw orshak Fish Hatchery Vacuum Degassing Tow er Phase 2
The purpose of this amendment is to make the changes indicated in the Summary of Changes.
The bid opening date of January 29, 2015 at 3:00 p.m. remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jan-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-B-0004
X 9B. DATED (SEE ITEM 11)
29-Dec-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jan-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SPECIFICATIONS
40 18 00.00 28 VACUUM SYSTEMS PROCESS PIPING
Added subpart 2.8 Drain Tanks
Added subpart 3.3.4 Installing Drain Tanks
40 05 13.00 28 PIPELINES, LIQUID PROCESS PIPING
Modified subpart 2.3.5.1 24” Flanges
Modified subpart 2.3.5.2 12” Flanges
DRAWINGS
M-301 WATER TREATMENT FACILITY NEW WORK SECTIONS
Updated vacuum header connection line type to existing
MD301 WATER TREATMENT FACILITY DEMOLITION SECTIONS
Revised note indicating where the re-installment of pipe tee and vacuum gauge goes
SJ101 WATER TREATMENT FACILITY KEY PLAN – SOUTH BANK – OPTIONAL
Added guard rail callouts
SJ301 HEADER SUPPORT LONGITUDINAL BRACE – SOUTH BANK - OPTIONAL
Added guard rail callouts
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
DWORSHAK FISH HATCHERY VACUUM DEGASSING
TOWERS PHASE 2
GENERAL
DWG-1-0-1/434 G-001 COVER SHEET AND LOCATION MAPS
DWG-1-0-1/435 G-002 INDEX TO DRAWINGS
DWH-1-0-1/151 G-101
GENERAL - WATER TREATMENT FACILITY -
NEW WORK KEY PLAN
STRUCTURAL
DWH-1-5-3/6 S-101
STRUCTURAL - WATER TREATMENT FACILITY
- KEY PLAN
DWH-1-5-3/7 S-102
PACKED COLUMN / GRATING - SUPPORT
SYSTEM - NEW AND EXISTING PLANS
Rev A 23 Jan
DWH-1-5-3/8 S-103
GRATING SUPPORT SYSTEM - SECTIONS AND
DETAILS
DWH-1-5-3/9 S-301 STRUCTURAL - HEADER SUPPORTS - SECTIONS
DWH-1-5-3/10 S-302
STRUCTURAL - WALKWAY SUPPORTS -
SECTIONS AND DETAILS
DWH-1-5-3/11 S-303
STRUCTURAL - HEADER SUPPORT ASSEMBLY
'C' - SECTIONS AND DETAILS
DWH-1-5-3/12 S-304
WALKWAY BEAM HANGER ASS'Y 'B' - &
ROTATED PIPE SADDLE ASS'Y 'B'
Rev A 23 Jan
DWH-1-5-3/13 S-305
HEADER PIPE SUPPORT TYPE 'C' - & PIPE
SADDLE ASS'YS 'A' & 'B' - SECTIONS AND
DWH-1-5-3/14 S-306
HEADER PIPE SUPPORT - ASSEMBLIES 'A' & 'B' -
AND MOUNTING TUBES
DWH-1-5-3/15 S-307 WALKWAY BEAM HANGER - ASSEMBLIES 'A' Rev A 23 Jan
AND 'B' 2015
DWH-1-5-3/16 S-308
HEADER SUPPORT LONGITUDINAL - BRACE -
NORTH BANK
DWH-1-5-3/17 S-309
GRATING JOINT UPGRADE - PLAN, SECTION
AND DETAIL - NORTH BANK
DWH-1-5-3/18 S-501 LADDER AND HANDRAIL - DETAILS
DWH-1-5-3/19 S-502
PIPE SUPPORT SADDLE - AND HOLD DOWN
STRAP
DWH-1-5-3/20 S-901
STRUCTURAL - BOLT TOUCH UP PAINT -
PHOTOS
DWH-1-5-3/21 S-902 STRUCTURAL - HANDRAILS - PHOTOS
DWH-1-5-3/22 SD101
PACKED COLUMN / GRATING - SUPPORT
SYSTEM - NEW AND EXISTING PLANS
Rev A 23 Jan
DWH-1-5-3/23 SJ101
STRUCTURAL SEISMIC UPGRADE - WATER
TREATMENT FACILITY KEY - PLAN - SOUTH
BANK - OPTIONAL
Rev A 23 Jan
DWH-1-5-3/24 SJ301
HEADER SUPPORT LONGITUDINAL - BRACE -
SOUTH BANK - OPTIONAL
Rev A 23 Jan
DWH-1-5-3/25 SJ302
STRUCTURAL SEISMIC UPGRADE - HEADER
SUPPORT ASSEMBLY 'C' - SOUTH BANK -
OPTIONAL
DWH-1-5-3/26 SJ303
GRATING JOINT UPGRADE - PLAN, SECTION
AND DETAIL - SOUTH BANK - OPTIONAL
DWH-1-5-3/27 SJ501
PIPE SUPPORT SADDLE - AND HOLD DOWN
STRAP UPGRADE - OPTIONAL
MECHANICAL
DWH-1-3-3/17 M-101
MECHANICAL - WATER TREATMENT FACILITY
- NEW WORK PLAN
Rev A 23 Jan
DWH-1-3-23/2 M-102 MECHANICAL - F&M PUMP HOUSE - PLAN
DWH-1-3-23/3 M-201
MECHANICAL - F&M PUMP HOUSE -
ELEVATIONS
DWH-1-3-3/18 M-301
- NEW WORK SECTIONS
Rev A 23 Jan
DWH-1-3-3/19 M-501
MECHANICAL - WATER TREATMENT FACILITY
- PARTS
Rev A 23 Jan
DWH-1-3-23/4 M-601
MECHANICAL - F&M PUMP HOUSE - VACUUM
PIPING - SCHEMATIC
DWH-1-3-3/20 MD101
- DEMOLITION PLAN
DWH-1-3-3/21 MD301
- DEMOLITION SECTIONS
Rev A 23 Jan
ELECTRICAL
DWH-1-6-23/2 E-101
ELECTRICAL - FIRE & MAINTENANCE PUMP
HOUSE - PLAN VIEW
DWH-1-6-3/11 E-201 VACUUM PUMP - DRAIN VALVE - ELEVATION
DWH-1-6-3/12 E-401 HQ11 PANEL FACE
DWH-1-6-23/3 E-601
ELECTRICAL - FIRE & MAINTENANCE PUMP
HOUSE - HQ11 ONELINE & CONTROL DIAGRAM
DWH-1-6-23/4 E-602 ELECTRICAL - FIRE & MAINTENANCE PUMP
HOUSE - CONTROL DIAGRAMS
DWH-1-6-23/5 E-603
FIRE & MAINTENANCE PUMP HOUSE - CABLE
& CONDUIT SCHEDULE - PANEL SCHEDULE
FOR INFORMATION ONLY
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
DWH-1-3-3/6 I-001
ENERGY RECOVERY PROGRAM - WATER
TREATMENT MODIFICATION - WATER
TREATMENT PIPING PLAN
DWH-1-3-3/7 I-002
DWORSHAK HATCHERY - WATER TREATMENT
MODIFICATION - WATER TREATMENT PIPING
PLAN
DWH-1-2-3/1 I-003
FISH HATCHERY - WATER TREATMENT
FACILITY - PLAN AT EL. 1009.5 AND DETAILS
DWH-1-2-3/2 I-004
FACILITY - PLAN AT ELEVATION 1007.5
DWH-1-4-3/10 I-005
INITIAL FISH HATCHERY - COMPLETION
CONTRACT - WATER TREATMENT FACILITY
MODIFICATIONS
DWH-1-5-3/4 I-006
DWORSHAK HATCHERY - PACKED COLUMN
SUPPORT REPAIR - SUPPORT FRAMING
DWH-1-5-3/5 I-007
DWORSHAK HATCHERY - PACKED COLUMN
SUPPORT REPAIR - PACKED COLUMN DETAILS
DWH-1-15-3/1 I-008
ENERGY RECOVERY PROGRAM - WATER
TREATMENT MODIFICATIONS - PACKED
COLUNM SUPPORT SYSTEM
DWH-1-5-3/3 I-009
FISH HATCHERY - AERATOR INSTALLATION -
AERATOR PLATFORM SUPPORT COLUMNS
DWH-1-5-3/1 I-010
FACILITY - AERATOR PLATFORM DETAILS
DWH-1-4-3/3 I-011
FACILITY - STAIRS AND HAND RAILS
DWH-1-0-1/37 I-012
MAIN PUMP STATION - NEW DIESEL FUEL
STORAGE AND DELIVERY SYSTEM - PLAN
AND SECTIONS
DWH-1-15-3/8 I-013
HEADER PIPE SUPPORT TYPE 'C' & PIPE
SADDLE ASSY'S 'A' & 'B' - SECTIONS AND
DWH-1-15-3/9 I-014
HEADER PIPE SUPPORT ASSEMBLIES 'A' AND
'B' AND MOUNTING TUBES
DWH-1-15-3/10 I-015
WALKWAY BEAM HANGER ASSEMBLIES 'A'
AND 'B'
DWH-1-3-23/1 I-016
FISH HATCHERY - FIRE AND MAINTENANCE
PUMP HOUSE - MECHANICAL - PLANS AND
SECTIONS
DWH-1-7-23/1 I-017
PUMP HOUSE - PLAN, ELEVATIONS AND
SECTIONS
DWH-1-7-23/2 I-018
PUMP HOUSE - PLANS, SECTIONS AND
DWH-1-3-3/9 I-019
VACUUM DEGASSING TOWER - SUPPLY -
MECHANICAL - PARTS
DWH-1-3-6/28 I-020
DEGASSING TOWERS PHASE 2 - SUPPLY -
MECHANICAL - VAC. DEGASSER TANK &
DIFFUSER
DWH-1-3-6/29 I-021
DEGASSING TOWERS PHASE 2 - SUPPLY -
MECHANICAL - PHOTOS
DWH-1-6-3/6 I-022
VACUUM DEGASSING TOWER - ELECTRICAL -
FIRE & MAINTENANCE PUMP HOUSE -
ELEVATION VIEW
DWH-1-6-3/9 I-023
FIRE & MAINTENANCE PUMP HOUSE -
CONTROL DIAGRAMS
DWH-1-6-3/10 I-024
FIRE & MAINTENANCE PUMP HOUSE - PHOTOS
DWH-1-6-3/1.1 I-025
POWER, LIGHTING AND CONTROL - POWER
CENTER HCQ3 - CONNECTION DIAGRAM
DWH-1-6-3/1.2 I-026
POWER, LIGHTING AND CONTROL - POWER
CENTER HCQ8 - CONNECTION DIAGRAM
DWH-1-6-25/10 I-027
SWITCHGEAR - ELECTRICAL - CONTROL
CENTER HCQ3 - ARRANGEMENT AND WIRING
DIAGRAMS
DWH-1-6-25/13 I-028
SWITCHGEAR - ELECTRICAL - CONTROL
CENTER HCQ7 AND HCQ8 - ARRANGEMENT
AND WIRING DIAGRAMS
(End of drawing list)
(End of Clause)
Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.
(End of Summary of Changes)
Dworshak Fish Hatchery Vacuum Degassing Towers Phase 2 W912EF-15-B-0004 amend 0002
SECTION TABLE OF CONTENTS
DIVISION 40 - PROCESS INTEGRATION
SECTION 40 05 13.00 28
PIPELINES, LIQUID PROCESS PIPING
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 Above Grade Piping Systems
1.3 SUBMITTALS
1.4 QUALIFICATIONS PROCESS PIPING
1.4.1 Contractor
1.5 Detailed Drawings
1.6 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 PROHIBITED MATERIALS
2.2 LOCATION OF EXISTING PIPING
2.3 PIPING SYSTEM
2.3.1 Existing 24" Header Pipes
2.3.1.1 Existing Pipe Spouts
2.3.2 24" Header Pipe
2.3.2.1 Intermediate 24" Header Pipes
2.3.2.2 24" Header Pipe Extensions
2.3.3 12" Pipe Elbows
2.3.4 Mechanical Couplings
2.3.5 Pipe Flanges
2.3.5.1 24" Flanges
2.3.5.2 12" Flanges
2.3.6 Butterfly Valves
2.3.7 Hardware
2.3.7.1 Gaskets
2.4 VACUUM DEGASSING TANKS
2.4.1 Vacuum Degassing Tank Diffusors
2.4.2 Vacuum Gauges
2.4.3 Ball Valves, Vacuum Degassing Tanks
2.4.4 Tank Straps
2.4.5 Band Pads
2.5 MISCELLANEOUS PIPING COMPONENTS
2.5.1 Vacuum Degassing Tank Fittings
2.5.2 Air Relief Valves
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.2.1 Protection
3.2.2 System Preparation
3.2.2.1 Pipe and Fittings
SECTION 40 05 13.00 28 Page 1
3.2.2.2 Damaged Coatings
3.2.2.3 Field Fabrication
3.3 PIPE FLANGES
3.4 PIPE TAP CONNECTIONS
3.5 EXTERNAL CORROSION PROTECTION
3.6 EQUIPMENT TO BE REMOVED
3.6.1 Remove Packed Columns
3.6.2 Removal of Pipe Spouts
3.6.3 Removal of Header Pipe Ball Valves
3.7 RAISE EXISTING HEADERS
3.7.1 Installation of Intermediate Header Pipe Section
3.7.1.1 Section Length
3.7.1.2 Cement Mortar Line
3.7.1.2.1 Intermediate Header Pipe Lining
3.7.1.2.2 Cement Mortar Line Repair
3.7.1.3 Installation of Mechanical Couplings
3.8 INSTALLATION OF HEADER EXTENSIONS
3.8.1 Re-installation of Pipe Spouts
3.9 BUTTERFLY VALVE INSTALLATION
3.9.1 Valve Locations
3.9.2 Valve Orientation
3.10 AIR RELEASE, DRAINS AND SAMPLE PORTS
3.11 PAINTING LIQUID PROCESS PIPE
3.12 INSTALLATION OF VACUUM DEGASSING TANKS
3.12.1 Intall Vacuum Degassing Tank Diffusors
3.12.2 Install Vacuum Gauges
3.12.3 Install Ball Valves
3.12.4 Install Tank Strap
3.12.5 Band Pads
3.13 BALL VALVE REINSTALLATION
3.14 FIELD QUALITY CONTROL
3.14.1 Hydrostatic Tests
3.14.1.1 Exposed Piping
3.14.1.2 Time for Making Test
3.14.2 Pipe Leakage Tests
3.14.3 Valve Testing
3.15 FINAL CLEANING
3.15.1 Interim Cleaning
3.15.2 Flushing
-- End of Section Table of Contents --
SECTION 40 05 13.00 28 Page 2
SECTION 40 05 13.00 28
PIPELINES, LIQUID PROCESS PIPING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C205 (2012) Cement-Mortar Protective Lining and Coating for Steel Water Pipe - 4 In. (100
mm) and Larger - Shop Applied
AWWA C227 (2011) Bolted, Split-Sleeve Restrained and Nonrestrained Couplings for Plain-End Pipe
AWWA C602 (2011) Cement–Mortar Lining of Water Pipelines in Place—4 In. (100 mm) and Larger
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2010; Errata 2010) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.5 (2009) Pipe Flanges and Flanged Fittings:
NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2012) Standard for Factory-Made Wrought Steel Buttwelding Fittings
ASME B31.3 (2010) Process Piping
ASTM INTERNATIONAL (ASTM)
ASTM A193/A193M (2012a) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A194/A194M (2012) Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
SECTION 40 05 13.00 28 Page 3
ASTM A307 (2012) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM D2240 (2005; R 2010) Standard Test Method for Rubber Property - Durometer Hardness
ASTM D3892 (1993; R 2009) Packaging/Packing of Plastics
ASTM F402 (2005; R 2012) Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-72 (2010a) Ball Valves with Flanged or Butt-Welding Ends for General Service
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 704 (2012) Standard System for the Identification of the Hazards of Materials for Emergency Response
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J429 (2013) Mechanical and Material Requirements for Externally Threaded Fasteners
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
1.2 SYSTEM DESCRIPTION
The Liquid process piping pipelines shall consist of the above ground pipe, fittings, assemblies, equipment and accessories for raising the main water header pipes, installing intermediate pipe sections, modifying piping, and installing vacuum degassing tanks for the hatchery's main water supply and vacuum degassing system.
1.2.1 Above Grade Piping Systems
Piping systems shall be suitable for design conditions, considering the piping both with and without internal pressure, and installation factors such as insulation, support spans, and ambient temperatures. Consideration shall be given to all operating and service conditions both internal and external to the piping systems.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
SECTION 40 05 13.00 28 Page 4 submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications Process Piping; I ME
SD-02 Shop Drawings
Detailed Drawings; G, ME
Submit this submittal on the same 4025R transmittal with the following detail drawing submittals from Section 43 11 00.10 28 Regenerative Blowers/Vacuum Pumps and 40 18 00.00 28 Vacuum Sytstems Process Piping.
One set of drawings showing the requested elements will satisify the requirement for all 3 submittals.
SD-03 Product Data
For non-GFP materials submit manufacturer's catalog data for the following items:
Pipe Material; G ME Air Relief Valves; G ME Pipe Flanges; I ME 12" Pipe Elbows; I ME
SD-06 Test Reports
Pipe Leakage Tests; I ME Hydrostatic Tests; I ME Valve Testing; I ME
1.4 QUALIFICATIONS PROCESS PIPING
1.4.1 Contractor
Submit a statement certifying that the Contractor has the specified experience. Contractor shall have successfully completed at least 3 projects of the same scope and size or larger within the last 6 years.
Contractor shall demonstrate specific experience in regard to the system installation to be performed.
1.5 Detailed Drawings
Submit detailed drawings including location of components, layout and anchorage of equipment and appurtenances, equipment relationship to other parts of the work, clearances for maintenance and operation of the liquid process pipng and subsystems refered to in this specification. Drawings shall be to the approved scale.
1.6 DELIVERY, STORAGE, AND HANDLING
Materials delivered and placed in storage shall be stored with protection from the weather, excessive humidity variation, excessive temperature variation, dirt, dust and/or other contaminants. Proper protection and care of material before, during and after installation is the Contractor's
SECTION 40 05 13.00 28 Page 5 responsibility. Any material found to be damaged shall be replaced at the Contractor's expense. During installation, piping shall be capped to keep out dirt and other foreign matter. A material safety data sheet in conformance with 29 CFR 1910 Section 1200(g) shall accompany each chemical delivered for use in pipe installation. At a minimum, this includes all solvents, solvent cements, glues and other materials that may contain hazardous compounds. Handling shall be in accordance with ASTM F402.
Storage facilities shall be classified and marked in accordance with NFPA 704. Materials shall be stored with protection from puncture, dirt, grease, moisture, mechanical abrasions, excessive heat, ultraviolet (UV) radiation damage, or other damage. Pipe and fittings shall be handled and stored in accordance with the manufacturer's recommendation. Plastic pipe shall be packed, packaged and marked in accordance with ASTM D3892.
PART 2 PRODUCTS
2.1 PROHIBITED MATERIALS
The toxicity of the following materials presents a lethal hazard to fish and shall be prohibited from use in any part of the equipment or piping that comes in contact with the process water for fish:
Zinc, Copper, Brass, Bronze, Lead, Cadmium, Mercury, Asbestos, Petroleum Lubricants, Coal Tar Products, Asphaltic Compounds, Phenolic Compounds, Organohalogens (not polymerized), or known Carcinogens, Mutagens, or Teratogens.
Galvanized materials shall not be used in, above, or around water sources that will come in contact with fish.
2.2 LOCATION OF EXISTING PIPING
Locations of existing piping shown should be considered approximate.
Contractor is responsible for determining exact location of existing piping in the field.
2.3 PIPING SYSTEM
2.3.1 Existing 24" Header Pipes
Existing 24" header pipes conforms to ASTM A53/A53M and are cement mortar lined per AWWA C205.
2.3.1.1 Existing Pipe Spouts
Existing 24" header pipes have a pipe spout connected to their end. Each pipe spout consists of a 24" class 25 blind flange, a 12" steel pipe, approximately seven (7) feet in length, with a down spout, and a 12" butterfly valve.
2.3.2 24" Header Pipe
Header pipe material shall be 24" black steel, schedule 20, pipe conforming to ASTM A53/A53M.
The Government will supply the following quanities of 24" header pipe:
24" Pipe Length Quantity 40 feet 1
SECTION 40 05 13.00 28 Page 6
36 feet 1 15 feet 1 3 feet 3
The Contractor is required to supply any additional 24" header pipe for construction of 3 (three) Intermediate 24" Header Pipes and 3 (three) 24" Header Pipe Extensions described below. After construction all excess 24" header pipe shall become property of the contractor.
2.3.2.1 Intermediate 24" Header Pipes
Each Intermediate 24" Header Pipe sections consists of cut to length piece of 24" black steel pipe as shown on drawing M-301.
2.3.2.2 24" Header Pipe Extensions
Each header pipe extension consists of 24" black steel pipe, approximately twenty five (25) feet in length, one (1) 24" RF class 150 slip on weld flange on west end and one (1) 24" RF class 25 slip on weld flange on the east end, six (6) fittings consisting of 12" long radius elbows, 12" pipe nipples, and 12" RF class 150 slip on weld flanges as indicated on drawing M-501. Contractor shall provide all hardware and gaskets associated with installing header pipe extensions.
2.3.3 12" Pipe Elbows
12" pipe elbows shall be in accordance with ASME B16.9. The Government will provide eighteen (18) 12" pipe elbows. The Contractor is required to supply any additional 12" pipe elbows for construction of the 24" Header Pipe Extensions desciribed above and shown on drawings M-301 and M-501.
2.3.4 Mechanical Couplings
The Government will provide six (6) Victaulic, style 233, flexible mechanical couplings that shall be used to connect the intermediate header pipe sections to the existing header pipe as shown on drawing M-301.
Mechanical couplings are flexible type with joint restraint and limit ring for steel pipe. Restraint is provided by a welded ring on the each end of the connecting pipes and sealed with Nitrile or neoprene O-ring seals.
Maximum operating pressure is 150 psi, maximum allowable deflection is two
(2) degrees, and maximum permissible end loading is 67858 lbf. Mechanical couplings satisfy the requirements set forth by AWWA C227.
2.3.5 Pipe Flanges
The Government will provide thirty eight (38) 12" RF class 150 slip on weld flanges. The Contractor is required to supply any additional flanges for the flange types below.
2.3.5.1 24" Flanges
24" raised face class 150 slip on weld flanges are to be used on the 24" Header Pipe Extensions as shown on drawings M-301 and M-501. Flanges shall be forged steel and dimensioned in accordance with ASME B16.5.
2.3.5.2 12" Flanges
12" raised face class 150 slip on weld flanges are to be used on the on the existing header pipe elbows and new header extension pipe elbows as shown
SECTION 40 05 13.00 28 Page 7 g4edddca Line on drawings M-301 and M-501. Flanges shall be forged steel and dimensioned in accordance with ASME B16.5.
2.3.6 Butterfly Valves
The Government will provide forty two (42) manual operated 12" butterfly valves to be used on the existing header pipe and the header pipe extension as shown on drawing M-301. Butterfly valves are threaded lug style that matches class 150 style flange with twelve (12) 7/8 inch bolt holes.
Valves have integral neoprene gasket for connecting to flanges. Valve body is cast iron with a 316 stainless steel disc/stem.
2.3.7 Hardware
The contractor shall provide fasteners and other hardware required for assembly unless otherwise specified. When bolting header sections together flange bolts shall be alloy-steel ASTM A193/A193M Grade B7 hex head bolts and ASTM A194/A194M Grade 2H hex head nuts. When mating flange on 12" butterfly valves or equipment is cast iron, ASTM A193/A193M Grade B8 Class 1 or Grade B7, ASTM A307 Grade B8, or SAE J429 Grade 2 bolts shall be used.
2.3.7.1 Gaskets
Gaskets shall meet the requirements of ASME B16.5. Nonmetallic gaskets shall conform to ASME B16.21 and be a maximum 0.125 inch thick chloroprene rubber, durometer hardness No.80, 1,500 psi minimum tensile strength, 125 percent minimum elongation, flat ring type for use with raised face flanges and full face type for use with flat face flanges.
2.4 VACUUM DEGASSING TANKS
The Government will provide forty two (42) vacuum degassing tanks. Vacuum degassing tanks consists of 0.1875 inch thick 5052 aluminum plate rolled to a 38 inch diameter tank that is eight (8) feet long and seam welded. The bottom of the vacuum degassing tank is open ended. The top plate of the vacuum degasser is 0.25 inch thick 6061 Aluminum and has an 11 inch hole in the center with 3 alignment grooved edges for placement of a diffuser. A 12 inch diameter neck piece that is 6 inches long connects the top plate to the 6061 aluminum 150# welded RF that is 0.5 inch thick. There are three
(3) 1 inch welded couplers on the tank. One on the top plate for degassing and two on the side, one on the upper end for placement of a vacuum gauge and one near the middle for placement of a valve.
2.4.1 Vacuum Degassing Tank Diffusors
The Government will provide forty two (42) vacuum degassing tank diffusors. Diffusors consist of an 10.5 inch aluminum cone with vanes mounted to a 11.75 inch diameter ring.
2.4.2 Vacuum Gauges
The Government will provide forty three (43) vacuum gauges for installation on the vacuum degassing tanks and vacuum header. Contractor shall provide necessary materials/fittings to install vacuum gauges. Vacuum gauges shall be installed on the upper side coupling of the vacuum degassing tanks and oriented to be read horizontally on the outboard side of the tank as shown on drawing M-301.
SECTION 40 05 13.00 28 Page 8 g4edddca
2.4.3 Ball Valves, Vacuum Degassing Tanks
The Contractor shall provide forty two (42) 1 inch ball valves for use on the vacuum degassing tanks as shown on drawing M-301. Contractor shall also provide necessary materials/fittings to install ball valves. Ball valves must conform to MSS SP-72. Valves shall be pressure rated for not less than 175 psi at 200 degrees F; and certified suitable for leaktight service under a vacuum of 2 millimeters of mercury absolute. Valves shall be screwed-end-connection type constructed of Class A copper alloy. Balls and stems of valves must be manufacturer's standard Class A copper alloy with 900 Brinell hard chrome-plating finish or Class C corrosion-resistant steel alloy with hard chrome-plating. Valves must be suitable for flow from either direction and sealed tightly in either direction. Valves must have full pipe size flow areas. Valves with ball seats kept in place by spring washers are not acceptable. Seats and seals must be filled tetrafluoroethylene or manufacturer's standard material for the specified service.
2.4.4 Tank Straps
The Contractor shall furnish and install polyester webbed tie-down straps for use with the spreader bars as shown in the contract drawings. The straps shall be 2" to 4" wide, weather resistant, UV-protected, be dark color if possible otherwise yellow is acceptable, be tightened by turnbuckle or ratchet, and have both ends be capable of being mated together. Where possible, the strap shall not be spliced using two straps.
2.4.5 Band Pads
The band pads used between the 3" wide bands and the vacuum tanks shall be rubber and conform to ASTM D2240, 50 Shore A Durometer.
2.5 MISCELLANEOUS PIPING COMPONENTS
2.5.1 Vacuum Degassing Tank Fittings
Fittings for the 1" ball valves, vacuum gauges, and flexible tubing may be UV resistent PVC or mild or low alloy steel to minimize possible galvanic corrosion. If PVC fittings are used paint fittings with a plastic bonding paint such as Krylon paint for plastic or other suitable equivalent;
otherwise paint fittings in accordance with Section 09 97 02.00 28 Paniting: Hydraulic Steel Structures.
2.5.2 Air Relief Valves
Provide air release valve at the end of all six (6) 24" headers pipes as shown on drawing M-301. Air valves will have intergral check valve or a check valve installed on the air release line to prevent air from being pulled into the 24" headers.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
SECTION 40 05 13.00 28 Page 9
3.2 PREPARATION
3.2.1 Protection
Pipe and equipment openings shall be closed with caps or plugs during installation. Equipment shall be protected from dirt, water, and chemical or mechanical damage.
3.2.2 System Preparation
3.2.2.1 Pipe and Fittings
Pipe and fittings shall be inspected before exposed piping is installed.
Clean the ends of pipes thoroughly, remove foreign matter and dirt from inside of pipes, and keep piping clean during and after laying.
3.2.2.2 Damaged Coatings
Repair damaged coating areas in the field with material equal to the original coating. Do not install damaged piping materials.
3.2.2.3 Field Fabrication
Notify the Contracting Officer at least 1 weeks prior to the field fabrication of pipe or fittings and at least 3 days prior to the start of any surface preparation or coating application work. Field welding shall be performed in accordance with Section 40 05 13.00 28.96 WELDING PROCESS PIPING. Welding electrodes shall be provided in accordance with Table 3.1 of AWS D1.1/D1.1M as required for the applicable base metals and welding process. Fabrication of fittings shall be performed in accordance with the manufacturer's instructions.
3.3 PIPE FLANGES
Pipe flanges shall be set level, plumb, and aligned. Flanged fittings shall be installed true and perpendicular to the axis of the pipe. The bolt holes shall be concentric to the centerline of the pipe. See paragraph "Installation of Header Extensions" below for alignment of 24" RF class 25 & 150 weld flanges. For the 12" RF class 150 weld flanges align in accordance with ASME B16.5; so that pairs of bolt holes straddle the connecting 12" elbow's centerline for proper alignment of the vacuum degasser tanks.
3.4 PIPE TAP CONNECTIONS
Taps to pipe barrels are unacceptable. Taps to steel piping shall be made only with a welded threadolet connection.
3.5 EXTERNAL CORROSION PROTECTION
See SECTION 09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES for protection requirements.
3.6 EQUIPMENT TO BE REMOVED
3.6.1 Remove Packed Columns
The Contractor shall remove twenty four (24) of the existing packed columns and media as shown on drawings MD-101 and MD-301. The packed columns and
SECTION 40 05 13.00 28 Page 10 media shall become property of the Contractor and shall be disposed of in a legal manner. Packed column media consists of plastic 3.5 inch pall rings that are randomly packed inside the packed columns.
3.6.2 Removal of Pipe Spouts
The Contractor shall remove three (3) of the pipe spouts as described in section "Existing Pipe Spouts" of this specification. In additon to removing the pipe spouts, the class 25 flange on the existing 24" header shall be removed. The pipe spouts and class 25 flanges shall be retained and stored on site until such time as to reinstall the pipe spouts and flanges on the 24" Header Pipe Extensions. Hardware and existing seals shall become property of the Contractor and shall be disposed of in a legal manner.
3.6.3 Removal of Header Pipe Ball Valves
The Contractor shall remove three (3) 2 inch ball valves (flow meter hot tap valves) on the existing header pipes, as shown on drawing MD-101. Ball valves shall be removed proir to modifications of existing header pipes and retained and stored on site for later reinstallation. The Contractor shall provide measures to ensure that threads on the ball valves and pipe nipple connections are protected from damage during construciton.
3.7 RAISE EXISTING HEADERS
The Contractor shall raise three (3) of the existing 24" header pipes on the north bank of the hatchery's main aeration chamber by 3.25 feet as shown on drawing M-301. The existing 24" header pipes shall be cut on their vertical run of pipe at the existing weld seam closest to the ground. The existing 24" head shall also be cut 2 feet from the existing ball valves and 24" class 150 flanges installed as shown on drawings M-30, MD101, and MD102. The 24" header pipes shall be cut straight and flush and any burrs removed from ends and cement mortar lining repairs be made according to paragraph "Cement Mortar Line Repair" as described below.
3.7.1 Installation of Intermediate Header Pipe Section
3.7.1.1 Section Length
The Contractor shall cut the 24" header pipe stock to length needed to create three (3) intermediate 24" header pipe sections to raise the existing 24" header pipes. Cuts shall be straight and flush and any burrs removed from ends.
3.7.1.2 Cement Mortar Line
3.7.1.2.1 Intermediate Header Pipe Lining
The Contractor shall cement mortar line the three (3) intermediate 24" header pipe sections by hand in accordance with AWWA C602.
3.7.1.2.2 Cement Mortar Line Repair
The Contractor shall repair the cement mortar lining by hand, up to six (6) inches on both sides of the cut, on the existing 24" header pipes in accordance with AWWA C602.
SECTION 40 05 13.00 28 Page 11
3.7.1.3 Installation of Mechanical Couplings
The Contractor shall use the GFP mechanical couplings to install the intermediate 24" header pipe section. The restraint rings shall be welded to both the existing 24" header pipe and the intermediate 24" header pipe on top and on bottom, and the mechanical couplings installed as per manufacturer's recommendations.
3.8 INSTALLATION OF HEADER EXTENSIONS
The Contractor shall install three (3) 24" Header Pipe Extensions as shown on drawing M-301, The Contractor shall use 24" RF class 150 weld flanges to weld flanges on the ends of the 24" header pipe extensions. The Contractor shall ensure that the 24" header pipe extensions line up with the existing 24" header pipe so that the elbows on the 24" header pipe extensions are level and in the same orientation as the existing 24" header pipe elbows. For welding of flanges see section 40 05 13.00 28.96 Welding Process Piping.
3.8.1 Re-installation of Pipe Spouts
Once the 24" header pipe extensions are installed, the contractor shall re-install the pipe spouts and class 25 flanges onto the 24" header pipe extensions that were removed from the existing 24" header pipes. The Contractor shall use new gasket seals and hardware.
3.9 BUTTERFLY VALVE INSTALLATION
Butterfly vValves shall be bolted to the 12" steel flanges from the top and vacuum degassing tanks shall be bolted to the bottom of the valves as shown on drawing M-301. Use seperate bolts for top and bottom bolting ensuring that bolts have a minimum effective thread engagement length of 0.5 inch and do not interfere with each other. Valve handles shall be installed onto the body of the valves. Flanged faces shall be cleaned prior to installing valve with bolts, and then the bolts shall be tightened progressively and uniformly. Threaded ends shall have the threads cleaned by wire brushing or swabbing prior to installation.
3.9.1 Valve Locations
Valves shall be located in accordance with the contract drawings as shown on drawing M-301. Valves shall be located and oriented to permit easy access to the valve handle, and to avoid interferences.
3.9.2 Valve Orientation
The operator of GFP manual valves shall be oriented toward the outboard side of the vacuum degassing tanks. Ensure that the valve operator does not interfere with the flexible vacuum tubbing when operated.
3.10 AIR RELEASE, DRAINS AND SAMPLE PORTS
Air release vents shall be located, and vented, such that a hazardous atmosphere will not be created upon operation.
3.11 PAINTING LIQUID PROCESS PIPE
Color and coating requirements for exposed piping shall be in accordance with Section 09 97 02.00 28 Painting: Hydraulic Structures. The Contractor
SECTION 40 05 13.00 28 Page 12 shall paint liquid process piping to include: intermediate pipe sections, existing 24" header pipes to be raised, outter surface of 24" header pipe extensions, fittings, elbows, flanges, hardware, mechanical couplings to include restraint rings, and existing pipe spouts."
3.12 INSTALLATION OF VACUUM DEGASSING TANKS
The Contractor shall install vacuum degassing tanks as shown on drawing M-301. Tanks shall be installed so that 1 inch couplings on the side and top of tank are oriented outboard and all tanks positioned uniformly in an identical pattern.
3.12.1 Intall Vacuum Degassing Tank Diffusors
The Contractor shall insert GFP vacuum degassing tank diffusors into vacuum degassing tanks prior to installation of tanks. Disffusors are to inserted into the the top of the degassing tanks so that the diffusor's connecting rods line up with the slots in the top plate of the tank and the diffusor ring rest on the lip inside the neck.
3.12.2 Install Vacuum Gauges
The Contractor shall install GFP vacuum gauges on each of the vacuum degassing tanks. Vacuum gauges shall be installed on the upper side coupling and shall be oriented to face outboard and be read horizontally.
3.12.3 Install Ball Valves
The Contractor shall install 1 inch ball valves on each of the vacuum degassing tank's lower side coupling. The valves shall be oriented vertically and the handle facing outboard.
3.12.4 Install Tank Strap
The tank straps shall be installed to a snug fit against the vacuum tanks.
There shall be no contact between the metal from the straps and the metal tanks.
3.12.5 Band Pads
The band pads shall be glued/taped to the side of the canisters using a product capable of affixing the two materials together. The temperature range for this shall be -20 degrees fahrenheit (F) to 100 degrees F.
3.13 BALL VALVE REINSTALLATION
The Contractor shall reinstall three (3) 2 inch ball valves as shown on drawing M-101. Reinstallation of ball valves shall be done after existing header pipes have been raised and extended, and vacuum system and vacuum degassing tanks installed.
3.14 FIELD QUALITY CONTROL
3.14.1 Hydrostatic Tests
3.14.1.1 Exposed Piping
Hydrostatic testing shall be conducted in accordance with ASME B31.3.
Piping systems shall be tested under normal service conditions to
SECTION 40 05 13.00 28 Page 13 demonstrate compliance. The test pressure shall not be less than 1.5 times the design pressure. Water shall be used as the hydrostatic test fluid.
Provide clean test water of such quality to prevent corrosion of the piping system materials. Air release vents shall be opened at all high points of the piping system in order to purge air pockets while the piping system is filling.
a. For rigid piping hydrostatic testing, the maximum test pressure shall be calculated according to ASME B31.3, but shall not exceed the yield strength of the piping system. The maximum velocity during filling shall be 0.25 fps applied over full area of pipe. Test all parts of the piping system. The hydrostatic test pressure shall be maintained continuously for 30 minutes minimum and for such additional time as necessary to conduct examinations for leakage. All joints and connections shall be examined for leakage. The piping system, exclusive of possible localized instances at pump or valve packing, shall show no visual evidence of leaking. Correct visible leakage and retest. Unless otherwise directed by the Contracting Officer, the piping system shall be emptied of water after leaks are repaired.
b. For metallic piping with a non-metallic liner hydrostatic testing, the maximum test pressure shall be calculated according to ASME B31.3, but shall not exceed 1.5 times the maximum pressure rating of the lowest rated component in the piping system. The maximum velocity during filling shall be 0.25 fps applied over full area of pipe. The system shall be initially pressurized to 50 percent of the normal service conditions and inspected. Any leaks shall be repaired by the Contractor. The system shall then be pressurized to the test pressure. Small amounts of water shall be added as required on a hourly basis for a maximum of 3 hours in order to maintain the test pressure. After 4 hours, the test pressure shall be lowered by 10.2 psi. If the hydrostatic pressure remains steady for 1 hour, then no leakage is indicated. Inspect for leaks, repair and retest if necessary. The piping system shall be allowed to relax for 8 hours before retesting.
3.14.1.2 Time for Making Test
Tests for above ground pressure piping shall be conducted after the piping has been completely installed, including all supports, hangers, and anchors, and inspected for proper installation.
3.14.2 Pipe Leakage Tests
Unless approved by the Contracting Officer, leakage testing shall be conducted after the pressure tests have been satisfactorily completed. The duration of each leakage test shall be at least 2 hours, and during the test the piping shall be subjected to not less than the pressure required by ASME B31.3. Leakage is defined as the quantity of the test liquid, water, that is supplied to the piping system, or any valved or approved section thereof, in order to maintain pressure within 5 psi of the specified leakage test pressure after the piping has been filled with the test liquid and all air is expelled. No piping installation will be accepted if leakage exceeds the allowable leakage determined by the following formula:
L = Cf x N x D x P0.5 Cf = conversion factor = 0.0001351 L = allowable leakage, gallons per hour
SECTION 40 05 13.00 28 Page 14
N = number of joints in the length of piping tested D = nominal pipe diameter, inches P = average test pressure during the test, psig.
Should any test disclose leakage greater than that allowed, the leaks shall be located and repaired until the leakage is within the specified allowance, without additional cost.
3.14.3 Valve Testing
Submit copies of all field test reports within 24 hours of the completion of the test. Valves may either be tested while testing pipelines, or as a separate step. It shall be demonstrated that valves open and close smoothly with operating pressure on one side and atmospheric pressure on the other, and in both directions for two-way valve applications.
3.15 FINAL CLEANING
3.15.1 Interim Cleaning
Prevent the accumulation of weld rod, weld spatter, pipe cuttings and filings, gravel, cleaning rags, and other foreign material within piping sections during fabrication. The piping shall be examined to assure removal of these and other foreign objects prior to assembly and installation.
3.15.2 Flushing
Following assembly and testing, and prior to final acceptance, piping systems shall be flushed with water to remove accumulated construction debris and other foreign matter. The piping shall be flushed until all foreign matter is removed from the pipeline. Provide all hoses, temporary pipes, and other items as required to properly dispose of flushing water without damage to adjacent properties. The minimum flushing velocity shall be 2.5 fps. For large diameter pipe where it is impractical to flush the pipe at the minimum flushing velocity, the pipeline shall be cleaned in-place from the inside by brushing and sweeping, then flushing the pipeline at a lower velocity. Cone strainers shall be installed in the flushing connections of attached equipment and left in place until cleaning is completed. Accumulated debris shall be removed through drains, or by removing spools or valves.
-- End of Section --
SECTION 40 05 13.00 28 Page 15
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 29.10 28 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 57 20.10 28 ENVIRONMENT PROTECTION
01 57 20.20 28 ENVIRONMENT PROTECTION - WASTE MANAGEMENT
01 78 00.00 28 CLOSEOUT SUBMITTALS
DIVISION 05 - METALS
05 50 03.01 28 METALWORK FABRICATION AND MACHINE WORK
DIVISION 09 - FINISHES
09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES
DIVISION 26 - ELECTRICAL
26 05 00.00 28 COMMON WORK RESULTS FOR ELECTRICAL
DIVISION 40 - PROCESS INTEGRATION
40 05 13.00 28 PIPELINES, LIQUID PROCESS PIPING
40 05 13.96 28 WELDING PROCESS PIPING
40 18 00.00 28 VACUUM SYSTEMS PROCESS PIPING
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 11 00.10 28 REGENERATIVE BLOWERS/VACUUM PUMPS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 40 - PROCESS INTEGRATION
SECTION 40 18 00.00 28
VACUUM SYSTEMS PROCESS PIPING
PART 1 GENERAL
1.1 SYSTEM DESCRIPTION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.4.1 Detailed Drawings
1.5 WELDING
1.6 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Standard products
2.1.2 Identification
2.1.3 Prohibited Materials
2.2 ABOVEGROUND VACUUM PIPING MATERIALS
2.2.1 Vacuum Systems To 29.5 Inches Of Mercury Vacuum
2.2.2 Grooved Pipe Couplings And Fittings
2.3 FLEXIBLE TUBING
2.4 VALVES
2.4.1 Ball Valves, Vacuum (BAVV)
2.4.2 Solenoid Valves
2.5 MISCELLANEOUS MATERIALS
2.5.1 Bolting
2.5.2 Elastomer Caulk
2.5.3 Flange Gaskets
2.5.4 Pipe Thread Compounds
2.6 SUPPORTING ELEMENTS
2.6.1 Supports
2.6.2 Building Structure Attachments
2.6.3 Horizontal Pipe Attachments
2.6.4 Vertical Pipe Attachments
2.6.5 Hanger Rods And Fixtures
2.6.6 Supplementary Steel
2.7 MODULAR CROSSOVER PLATFORM
2.8 Drain Tanks
PART 3 EXECUTION
3.1 EXAMINATION
3.2 CONDENSATE CONTROL
3.3 ABOVEGROUND PIPING SYSTEMS INSTALLATION
3.3.1 Piping Systems
3.3.2 Joints
3.3.3 Valve Installation
SECTION 40 18 00.00 28 Page 1
3.3.3.1 Installing Solenoid Valves
3.3.4 Installing Drain Tanks
3.3.5 Installing Flexible Tubing
3.3.6 Painting Vacuum Systems Process Piping
3.3.7 Supporting Elements Installation
3.3.8 Sound Stopping
3.3.9 Sleeves
3.3.10 Flashings
3.4 MODULAR CROSSOVER PLATFORM
3.5 VACUUM SYSTEMS TESTING
3.5.1 Vacuum Systems
3.5.2 Test Gages
3.5.3 Acceptance Pressure Testing
-- End of Section Table of Contents --
SECTION 40 18 00.00 28 Page 2
SECTION 40 18 00.00 28
VACUUM SYSTEMS PROCESS PIPING
PART 1 GENERAL
1.1 SYSTEM DESCRIPTION
The vacuum system process piping shall consist of above ground pipe, pipe supports, fittings, equipment and accessories for installing vacuum piping for the vacuum degassing system.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360 (2010) Specification for Structural Steel Buildings
AMERICAN WELDING SOCIETY (AWS)
AWS WHB-2.9 (2004) Welding Handbook; Volume 2, Welding Processes, Part 1
ASME INTERNATIONAL (ASME)
ASME B1.20.1 (1983; R 2006) Pipe Threads, General Purpose (Inch)
ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.39 (2009) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
ASME B16.5 (2009) Pipe Flanges and Flanged Fittings:
NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings
ASME B18.2.2 (2010) Standard for Square and Hex Nuts
ASME B31.1 (2012) Power Piping
ASME B40.100 (2005; R 2010) Pressure Gauges and Gauge Attachments
ASTM INTERNATIONAL (ASTM)
ASTM A183 (2003; R 2009) Standard Specification for
SECTION 40 18 00.00 28 Page 3
Carbon Steel Track Bolts and Nuts
ASTM A197/A197M (2000; R 2011) Standard Specification for Cupola Malleable Iron
ASTM A234/A234M (2011a) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM A307 (2010) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A694/A694M (2008) Standard Specification for Carbon and Alloy Steel Forgings for Pipe Flanges, Fittings, Valves, and Parts for High-Pressure Transmission Service
ASTM C592 (2012) Standard Specification for Mineral Fiber Blanket Insulation and Blanket-Type Pipe Insulation (Metal-Mesh Covered) (Industrial Type)
ASTM C920 (2011) Standard Specification for Elastomeric Joint Sealants
ASTM D2000 (2012) Standard Classification System for Rubber Products in Automotive Applications
ASTM D3308 (2006) PTFE Resin…