This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a U.S. Army Corps of Engineers (USACE) contract located in Vicksburg, Mississippi. The solicitation (W912EE26RA005) is a 100% small business set-aside for Mississippi River Levees construction, with a small business size standard of $45 million. The amendment primarily updates the Bidder Key for Project 615-L from an incorrect key to a new key (6RKCX6-55J8IQ), and requires potential contractors to reenter any previous inquiries using the new key.

The solicitation includes several key requirements: all work must follow the Corps of Engineers Safety and Health Requirements Manual, contractors must promote veteran employment, and subcontracting is limited to specific percentages depending on the type of work. Technical inquiries must be submitted via ProjNet using the new bidder key, and proposals should be sent electronically to specified USACE contacts. The contract involves construction of levee enlargements and berms, and is restricted to MATOC (Multiple Award Task Order Contract) holders for this specific project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 13

0001 13 JAN 2026 MRL 615-L

W912EE

W07V ENDIST VICKSBURG

KO CONTRACTING DIVISION, 4155 CLAY STREET

VICKSBURG, MS 39183-3435

UNITED STATES

LAWREN BOOLOS, EMAIL: LAWREN.BOOLOS@USACE.ARMY.MIL TELEPHONE: 601-

631-5211

SCD: PAS:

W912EE26RA005

08 JAN 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

The Bidder Key for Project 615-L is incorrect. The new Bidder Key for this project is: 6RKCX6-55J8IQ. If any inquiries have been entered under the previous bidder key, please reenter under the new key.

ROBERT E. SCREWS

13 JAN 2026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 21 00 - Instructions

Miscellaneous text in this section has been modified to:

NOTES:

(A) In accordance with DFARS 204.7304 the following provisions and clauses are required in all solicitations except for solicitations/contracts solely for the acquisition of commercially available off-the-shelf (COTS) items:

In the case of solicitation W912EE26RA005, implementation of a NIST SP 800-171 assessment is not a requirement since there is no covered defense information provided by the Government in the release of the solicitation, and the solicitation contains no controlled technical information. All information related to this project has been posted for full public view at www.sam.gov.

(B) Reference Limitations on Subcontracting FAR 52.219-14. This procurement is 100% Set-aside under NACIS Code 237990- Other Heavy and Civil Engineering Construction, for Total Small Business. The small business size standard is $45,000,000. THIS PROCUREMENT IS

SET-ASIDE FOR THE MISSISSIPPI RIVER LEVEES, CONSTRUCTION OF LEVEE

ENLARGEMENTS AND BERMS, MATOC CONTRACT HOLDERS. NO OTHER OFFERS

WILL BE CONSIDERED. The awardee of this contract shall comply with all requirements up to and including the following:

Services (except construction): Contractor will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.

Supplies (other than procurement from a nonmanufacturer of such supplies): Contractor will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract.

General construction: Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded.

Construction by special trade contractors: Contractor will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

Upon the Contracting Officer's request, the Contractor shall submit a report to the Contracting Officer documenting compliance with FAR 52.2l9-l4. If the Contractor is using Similarly Situated Entities, it must be clearly identifiable in the submitted reports. If the required percentage is not being met the Contractor shall also include, with the semiannual report, a plan to meet the required percentage before the contract end date.

The below calculation for FAR 52.219-14 is for example only and not representative of this solicitation or any contract that may be awarded as a result of this solicitation.

1. Total value of contract award = $5,000,000.00

2. Cost of materials = $3,000,000.00

3. Adjusted amount (contract award value less cost of materials): $2,000,000.00 ($5,000,000.00 - $3,000,000.00)

4. 85% of $2,000,000.00 may be paid to non-similarly situated entities ($1,700,000.00)

5. 15% of $2,000,000.00 must be paid to a similarity situated entity ($300,000.00) What is similarly situated and what does it mean for the prime?

i. 1st tier subcontractor that has the same small business program status of the qualified prime contractor (i.e. HUBZone prime contractor, any HUBZone subcontractor is similarly situated).

ii. Any 1st tier subcontracts to similarly situated entities can count towards the prime contractor's self-performance requirements.

iii. Example: HUBZone Set-Aside Contract, 1st Tier is a HUBZone Small Business subcontractor. This meets the similarly situated requirement and the work performed by the

HUBZone subcontractor will count towards the HUBZone prime contractor's self-performance requirement.

iv. Example: SDVOSB Set Aside Contract, 1st Tier is a WOSB subcontractor only, this does not meet the "similarly situated" requirement and the WOSB subcontractor performance does not count towards the SDVOSB prime contractor's self-performance requirement.

Partnering With Us, https://www.usace.army.mil/Business-With-Us/Partnering/, in all solicitation notices posted at the Governmentwide point of entry for construction contracts anticipated to be awarded to a small business pursuant to FAR Part 19 to be in compliance with FAR 36.211(b).

(C) All technical inquiries and questions relating to this solicitation are to be submitted via bidder inquiry in ProjNet at https://www.projnet.org/project. See special notices to bidder's page entitled "Technical Inquiries and Questions"

(D) Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT

PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY ITEM, THE BID WILL BE

DECLARED NONRESPONSIVE.

(E) All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "job" or "each".

(F) If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.

(G) All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

(H) Award will be made, as a whole to the lowest responsive, responsible bidder as may be in the best interest of the Government.

(I) The contractor should be aware of the additional surveying requirements for this contract.

See Section 01 00 00.00 09 for more information.

(J) THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF1442.

The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) calendar days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittals process with the Administrative Contracting Officer (ACO), or the Contracting Officer's Representative (COR), or their authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted. The contract performance duration has been determined as stated in the specifications and includes sufficient time for the preparation, submittal and approval of all pre-work documents and all Pre- Construction conferences required prior to commencement of work on site.

(K) Lack of registration in the WWW.SAM.gov database will make an offeror ineligible for award. See contract clause 52.204-7 entitled, "system for award management".

(L) The SF-1442, Bidding Schedule, and Bidder Representations and Certifications must be accurately completed and returned with your bid, or it may be rejected as nonresponsive. An offeror may also submit, in lieu of the completed FAR Clause 52.204-8 Representations and Certifications, certifications with their bid package that their online Representations and Certifications from www.sam.gov. See FAR Clauses 52.204-7 is available.

(M) All work under these specifications shall be performed in accordance with the most recent provisions of EM 385-1-1 "Corps of Engineers Safety and Health Requirements Manual", dated 15-March-2024.

(N) The government reserves the right, as the interests of the government may require, to postpone or delay the date and/or time set for opening bids. Revisions or amendments to the bid opening date and/or time, if any, will be announced by amendment or amendments to this invitation for bids.

GENERAL NOTICES:

1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA

AUTHORITY: Flood Control Acts of 1928, 1936, 1941, 1944, 1946, 1950, 1954, 1962, 1965, 1968, River Basin Monetary Authorization Act of 1971, WRDA 1992, Sec 103, WRDA 2000, Section 508

APPROPRIATION: P.L. 117-43 EXTENDING GOVERNMENT FUNDING AND DELIVERING

EMERGENCY ASSISTANCE ACT, 2022

FUNDING CITATION: 96 X 3112

2. BID, PERFORMANCE AND PAYMENT BONDS.

A bid guarantee is NOT required for this procurement. Performance and payment bonds will be required after award. See Section 00700, Contract Clause 52.228-15, PERFORMANCE AND

PAYMENT BONDS -- CONSTRUCTION

3. AMENDMENTS PRIOR TO DATE SET FOR PROPOSAL DUE DATE.

The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or SUBMITTAL REQUIREMENTS prior to the date set for proposals due.

Such revisions or amendments, if any, will be announced by amendment or amendments to this RFP. Copies of such amendments as may be issued will be furnished to all prospective offerors. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the proposal due date may be postponed by such number of days as in the opinion of the District Engineer will enable offerors to revise their proposals. In such case, the amendments will include an announcement of the new proposal due date.

4. BUSINESS INTEGRITY.

Successful offerors as a condition for award of any contract resulting from this RFP may be required to execute a certificate related to Business Integrity.

5. CONDITIONS AFFECTING THE WORK.

Offerors or Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work.

The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the RFP, the specifications, or related documents.

6. SITE OF THE WORK.

Offerors or Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed. The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.

7. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE, AND BONDS.

a. Specifications, Bidding Schedule, Pre-award Information/Description of Work/Bid Evaluation, Equipment Schedule, Construction Contract Clauses, and Wage Determination Decisions of the Secretary of Labor, are parts of this Request for Proposals.

b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and financial institution through whom the bonds or the guarantees are held, together with the address and telephone number of the persons and/or financial institution authorized to commit the surety.

(2) Offerors or bidders should note that some individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government. Offerors or bidders are responsible for ascertaining the current status of their sureties.

(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).

8. DEFINITIONS

(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.

(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of 1978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041- 3208.

(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.

9. Size Standards for Construction and Special Trades.

(a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $45 million.

SPECIAL NOTICES:

1. Proposals shall only be sent Electronically to Lawren Boolos at Lawren.Boolos@usace.army.

mil and copy Robert Ellis Screws at Ellis. Screws@usace.army.mil. Proposals must be received prior to the exact time set for Proposals Due Time.

Offerors must provide full, accurate, and complete information as required by the solicitation and its attachments. The penalty for making false statements in proposals is prescribed in 18 U.

S.C. 1001. (FAR 52.214- 4 APR 1984)

2. Proposals for the work described herein will be received until date and time of the proposal due date.

3. Your attention is directed to section 00100-bid schedule/instructions to bidders' clause 52.214-5 entitled "submission of proposals". It is the offeror's or bidder's responsibility to ensure that proposals sent electronically clearly identified as containing a proposal in the subject line.

4. Note the affirmative action requirement of the equal opportunity clause which may apply to the contract resulting from this solicitation.

5. See section 00 80 00.00 09, special contract requirements, clause entitled "commencement, prosecution, and completion of work".

6. See section 01 00 00.00 09, general contract requirements clause, entitled, "payment invoices" which will apply to the contract resulting from this solicitation. The federal acquisition regulation requires that the "remit to" address of the invoice match the "remit to" address on the contract or a proper notice of assignment.

7. In accordance with FAR 42.1502(e), Past performance evaluations shall be prepared for each construction contract of $750,000 or more, and for each construction contract terminated for default regardless of contract value. Past performance evaluations may also be prepared for construction contracts below $750,000. Past performance evaluations will be prepared by the MVK at least annually and at the time the work under a contract or order is completed and will be entered into the Contractor Performance Assessment Reporting System (CPARS), the Governmentwide evaluation reporting tool for all past performance reports on contracts located at http://www.cpars.gov/

8. Electronic Funds Transfer (EFT)

All vendor direct deposit and Electronic Funds Transfer (EFT) information must be entered /maintained in the System for Award Management (SAM) located at www.SAM.gov. UFC Form 23, previously required for direct deposits/EFT payments by the Vicksburg District (MVK) is obsolete. To receive direct deposits/EFT payments, routing and banking information must be entered and maintained in the SAM. Failure to update/maintain this information in the SAM will result in vendors receiving payments via Treasury checks distributed by U.S. mail. The below links are provided for your information.

How do I update the banking information on my Sam.gov entity registration? https://www.fsd.gov /gsafsd_sp?id=gsafsd_kb_articles&sys_id=003e5979dbe1259494439f95f39619cd What is an Electronic Funds Transfer (EFT) indicator and how do I create one? https://www.fsd.gov /gsafsd_sp?id=gsafsd_kb_articles&sys_id=83629ecadb69e99494439f95f3961958 If you have further questions, please visit the Federal Service Desk (FSD) at www.FSD.gov.

9. Proposals will not be accepted, nor shall proposals be withdrawn electronically or by telephone.

Prior to proposal due date, in accordance with federal acquisition regulation part 15.208 (e) modification or withdrawal of bids, "Proposals may be withdrawn by written notice at any time before award."

10. All Technical inquiries and questions related to this solicitation shall be submitted via ProjNet.

Technical inquiries and questions relating to this solicitation are to be submitted via bidder inquiry in ProjNet at (https://www. projnet.org). Offerors or Bidders are encouraged to submit questions 5 days prior to proposal due date to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. To submit and review inquiry items, prospective vendors will need to use the bidder inquiry key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet. The solicitation number is: W912EE26RA005

The bidder inquiry key is: 6RKCX6-55J8IQ

Specific instructions for ProjNet bid inquiry access:

1. From the ProjNet home page linked above, click on quick add on the upper right side of the screen.

2. Identify the agency. This should be marked as USACE.

3. Key. Enter the bidder inquiry key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your first name, last name, company, city, state, phone, email, secret question, secret answer, and time zone. Make sure to remember your secret question and answer as they will be used from this point on to access the ProjNet system.

7. Click add user. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific instructions for future ProjNet bid inquiry access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your secret question and secret answer to log in.

2. From the ProjNet home page linked above, click on quick add on the upper right side of the screen.

3. Identify the agency. This should be marked as USACE.

4. Key. Enter the bidder inquiry key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click continue. A page will then open asking you to enter the answer to your secret question.

7. Enter your secret answer and click login. Once this is completed you are now logged into the system.

11. Tax on Foreign Purchases FAR provision 52.229-11 and FAR clause 52.229-12

FAR provision 52.229-11 and FAR clause 52.229-12 are included in this solicitation. This provision and clause concern the imposition of a 2 percent Federal excise tax withholding on any resultant contract award or payment request. This rule applies to Federal Government contracts for goods or services that are awarded to foreign persons - such as foreign contractors. It implements the Department of the Treasury's final regulations published in the Federal Register at 81 FR 55133 on August 18, 2016, under section 5000C of the Internal Revenue Code relating to the 2 percent tax on payments made by the U.S. Government to foreign persons pursuant to certain contracts. Pursuant to the FAR 52.229-3 Federal, State, and Local Taxes, taxes imposed under 26 U.S.C. 5000 C may not be included in the contract price or reimbursed.

Exemptions from this excise tax must be claimed by an Offeror when it submits, with its offer, a U.S. Department of Treasury Internal Revenue Service (IRS) Form W-14, Certificate of Foreign Contracting Party Receiving Federal Procurement Payments, available via the internet at www.

irs.gov/W14. If not submitted with the offer, exemptions will not be applied to any resulting contract and the Government will withhold a full 2 percent on each contract payment. Failure to submit an IRS Form W-14 with each payment request will also result in an automatic withholding of 2 percent from the payment request.

When filling out the IRS Form W-14 the following information may be used to complete Part I, Lines 6 and 7.

Line 6 Contract/reference number: [W912EE26RA005]

Line 7 "Name and address of the acquiring agency": [USACE, Vicksburg District, 4155 Clay Street, Vicksburg MS. 39183]

Any exemption claimed and self-certified is subject to audit by the IRS. Any disputes concerning this tax are adjudicated by the IRS because the Section 5000C tax is a tax matter not a contract issue. Offerors are encouraged to seek guidance from their own tax professionals for advice concerning the provision, clause, and exclusions exclusion /submission of IRS Form W-14.

Additional information is also available at:

Notwithstanding the above, the USACE does not have a means of withholding this excise tax at this time. As a result, contractors are expected to comply with the instructions above and to properly complete and return the W- 14 at proposal submission, and with each pay application.

Whether the contractor sets the money aside for future payment to the IRS, or makes payment to the IRS, is the contractor's discretion, based on its analysis of the regulations regarding the excise tax. In the event that USACE is able to withhold during contract performance, it will notify the contractor and make such a withholding (including any catch up withholdings); no advance notice is required to the contractor prior to the withholding. Under no circumstances is USACE liable for any tax not paid by the contractor. The contractor is liable for the tax, to the extent required by law, regardless of whether USACE makes a withholding.

FAR 29.204 expressly states that "[a]gencies merely withhold the tax (section 5000C tax) for the Internal Revenue Service (IRS). All substantive issues regarding the underlying section 5000C tax, e.g., the imposition of, and exemption from the tax, are matters under the jurisdiction of the IRS." Therefore, we cannot help you determine how the tax law applies to you. We strongly recommend that you contact the IRS and/or a tax professional should you have any questions of this nature. To be clear, this information does not constitute tax advice or a representation of your tax liability. Furnishing this information does not create liability for the USACE for any Federal, state, or local taxes applicable to the above-referenced contract or any other contract.

For submission requirements and basis of evaluation:

Executed FAR Provision 52.229-11.

Completed IRS Form W-14, Certificate of Foreign Contracting Party Receiving Federal Procurement Payments, if applicable. If not submitted with the offer, exemptions will not be applied to any resulting contract and the Government will withhold a full 2 percent on each payment.

Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts:

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222- 37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans' Employment and Training Service (VETS): https://www.

dol.gov/vets/

- Federal Veteran Employment Information: https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index: https://wct.army.mil/modules /employers/index.html

- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes

Army Contract Writing System (ACWS) Transition Information for Contractors.

a. The Department of the Army is in the process of deploying a new solicitation and contract writing software application to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software application will replace most existing Army contract writing systems, including the system used to create and release this Contract.

b. During this transition period, Contractors are hereby advised:

1. The Contracting Office may use any combination of contract writing systems to generate distributable copies of this contract during its period of performance, as well as any subsequent modifications or orders (if applicable). As a result:

i. Subsequent documents you receive may appear noticeably different than the original award or previous contractual documents from the same Contracting Office.

ii. A change between contract writing systems may cause important information concerning contract terms and conditions to take on different formatting or appear in different parts of later documents issued.

iii. Contractors shall ensure Customer Relationship Management (CRM) systems and personnel interacting with this contract are prepared to identify and respond appropriately to differences between document versions

2. The Government does not intend to use the shift between contract writing systems to effect any changes to Contract terms and conditions. Therefore:

i. Contractors should view changes to terms or conditions between document versions as system-generated and potentially erroneous unless accompanied by narrative(s) designating such changes as deliberate and desired.

ii. Contractors shall inform the Contracting Officer listed on the first page of the most recent document issued for guidance regarding any suspected or observed inadvertent or system-generated changes (i.e., noticing something missing in a new conformed copy).

iii. The Government will correct any inadvertent or system-generated changes, additions, or omissions discovered by either party, via bilateral modification, at no cost to the Contractor.

iv. The terms and conditions contained in the latest document reflecting deliberate action by the Contracting Officer (i.e., the last conformed copy of the award not affected by the observed issue) will take precedence until the problems are corrected.

3. In the unlikely event award information is corrupted or mutilated during system migration and replacement or reissuance of this contract is necessary for continued contract administration, the Contracting Officer will:

i. Issue a continuation contract in accordance with DFARS 204.1601(c) and DFARS PGI 204.1601(c), carrying over all terms and conditions from the last-known version of this contract to accurately reflect mutual agreement of the parties.

ii. Incorporate the last-known version of this contract to accurately reflect mutual agreement of the parties as an attachment to the replacement or continuation contract for future reference.

iii. Ensure any such reissuance or continuance is properly reported to preserve the integrity of Contractor performance measurement data, if any (i.e., FAPIIS, CPARS).

File details come from the government source that posted it. Updated .