Statement of Work.pdf
PDF 159 KB Posted
- Attached to
- Enid Lake Generator
- Solicitation number
- W912EE26QA035
About this file
This is a Performance Work Statement/Statement of Work for the Enid Lake Project requiring the supply and installation of one (1) 150kW diesel generator with automatic transfer switch.
The contractor must provide all labor, tools, equipment, transportation, parts, materials, and incidentals necessary to supply and install a Generac Industrial 150kW stationary emergency-standby rated generator with a 300A automatic transfer switch (TX Series). The generator specification includes a turbocharged/aftercooled 6-cylinder 6.7L diesel engine rated at 150kW, wired for 277/480 VAC three-phase at 60Hz, with permanent magnet excitation and EPA certification. Equipment features include a 24-inch 322-gallon double-wall UL142 basetank providing 28 hours of run time at 100% load, DSE G8601 digital genset controller, 21-light remote annunciator, battery charger, dual-paralleled 110 AH batteries, engine coolant heater, and a 5-year comprehensive warranty. The automatic transfer switch includes 300 Amp, 3-pole capacity, IBC seismic certification, NEMA 3R enclosure, and UL Listed 1008 certification. Delivery must be completed within 18 weeks of purchase order receipt to Enid Lake Field Office, 264 County Rd 39, Enid, MS 38927. The contractor shall provide 30 days' advance notice to POC David Sparks (662-561-5441) for delivery coordination and must deliver between 0700-1630 hours Monday through Thursday, excluding federal holidays. A one-year limited warranty covering material compliance with specifications is required. The U.S. Army Corps of Engineers is the contracting agency, and contractor personnel must comply with security requirements including E-Verify employment eligibility verification, FPCON/HPCON measures, suspicious activity reporting training, and access control procedures for federal installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Brand Name Justification_Redacted.pdf | ||
| Solicitation - W912EE26QA035.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement / Statement of Work
For ENID LAKE PROJECT
EQUIPMENT PURCHASE – SUPPLY & INSTALL
(1) GENERATOR
Scope of Work. The Enid Lake Project is in need of replacement generator due to age. The current is not operational and needs to be returned to operational status to maintain mission readiness. The contractor will be escorted to the generator location that is located inside a locked gate outside of the Enid lake maintenance shop upon delivery by USACE POC personnel. The contractor will notify the Facility Operations Specialist 30 days prior to delivery to arrange delivery and supervision while on USACE property.
POC: DAVID SPARKS (662-561-5441) TO MAKE DELIVERY ARRANGEMENTS
APPROXIMATELY 30 DAYS PRIOR TO DELIVERY DATE
General Specifications:
The contractor shall provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary to SUPPLY & INSTALL:
QTY UNITS TO PURCHASE_______________________________________
1 150kW Generator / 300A ATS
Unit Breakdown includes:
Quantity 1 - Generac Industrial diesel engine-driven generator set with turbocharged/aftercooled 6-cylinder 6.7L engine, consisting of the following features and accessories:
• Stationary Emergency-Standby rated • 150 kW Rating, wired for 277/480 VAC Three Phase, 60 Hz
• Permanent Magnet Excitation
• ANSI/CAN/UL/ULC 2200
• EPA Certified
• SCAQMD
• Standard Weather Protective Enclosure, Steel o Baked-On Powder Coat Finish
• 24" 322 Gallon Double-Wall UL142 Basetank o 28 hour run time at 100% load o Mechanical fuel level indicator gauge o Electronic fuel level sender • DSE G8601 Digital Genset Controller o Meets NFPA 99 and 110 requirements o DSENet (I/O Expansion Module Support) o 2 and 3-wire start controls for any industrial grade transfer switch
• 21 Light Remote Annunciator, flush Mount
• Remote Emergency Stop Switch, Break-Glass, shipped loose
• Primary MLCB, 80% rated thermal-magnetic o 250 amp
• Battery Charger, 10 Amp, NFPA 110 compliant, installed
• 110 AH, 925 CCA Group 31 Batteries, dual-paralleled, with rack, installed
• Engine Coolant Heater, 1500W
• Engine Run Relay, 10A
• 120V GFCI and 240V Outlet
• Optional Fan and Belt Guards
• 3 Owner's Manuals
• 1 Hour factory load testing at reactive (0.8) power factor
• 5-Year Comprehensive Warranty – Upgrade from standard 2-year warranty provided on behalf of ESSE & Generac Quantity 1 - TX Series Automatic Transfer Switch consisting of the following features and accessories:
• 300 Amp, 3 pole, 277/480 VAC three phase, 60 Hz, with 2 or 3-Wire Start Circuit • Double Set of Form C Aux Cont
• IBC Seismic Certified
• Withstand and Close-On Rating - 65kA Specific Breaker
• Enclosure Heater
• IO Board - 4 Inputs, 4 Outputs
• UL Listed 1008 by ETL
• Controller and Circuit Breaker Covers, Padlockable, Black
• NEMA 3R Enclosure
• Service Entrance Rated
• In Phase Only Transfer
• Standard two year basic warranty
• TX301NS0300K3CM
DELIVERY: SHALL BE MADE WITHIN 18 WEEKS OF RECEIPT OF PURCHASE ORDER.
U.S. ARMY CORPS OF ENGINEERS
Enid Lake Field Office, U.S. Army Corps of Engineers 264 County Rd 39, ENID MS 38927
POC: DAVID SPARKS (662-561-5441) TO MAKE DELIVERY ARRANGEMENTS
APPROXIMATELY 30 DAYS PRIOR TO DELIVERY DATE
Arrangement of Delivery & Install will be made to ENID Lake Field Office at said address no later than 18 weeks after award.
The contractor shall use extreme caution around the building and work area to ensure utility lines or structures aren’t damaged. Contractor shall deliver all equipment in a professional manner based on product specifications to ensure structure is safe for employee utilization.
GUARANTEE
LIMITED WARRANTY AND WARRANTY DISCLAIMER for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with specifications.
ADDITIONAL UNKNOWN NEEDS:
Hours of Operation: The contractor shall DELIVER between the hours of 0700 and 1630 Monday through Thursday (except federally observed holidays) AND give verbal notification to the POC DAVID SPARKS no less than 48 hours prior to scheduled delivery. During the process of service - the site will be kept clean of debris and trash.
Refuse Removal: Inspection and Acceptance of completed service will be done by the
P.O.C. DAVID SPARKS – 662-561-5441
SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS:General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements.
Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures, to include identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something):
All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award.
Note: When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
Non-U.S. Citizens working on Government Contracts: Government Approval MUST be obtained PRIOR to any non-U.S. Citizen being permitted to work on a government contract. The Contractor must submit a letter requesting approval via the Contracting Officer/Contracting Officer Representative to the Vicksburg District Security Officer. The letter must include the contract number, period of performance, location(s) of work performance and attach a copy of the individual’s passport and visa/work authorization documents.
DELIVERY INFORMATION:
Enid Lake Field Office, U.S. Army Corps of Engineers 264 County Rd 39, ENID MS 38927
EMAIL A COPY OF ALL INVOICES TO:
USACE
ATTN: AMY MCADAMS
amy.r.mcadams@usace.army.mil https://www.e-verify.gov/ mailto:amy.r.mcadams@usace.army.mil
File details come from the government source that posted it. Updated .