AM0006.Solicitation.W912EE26BA001.pdf
PDF 4 MB Posted
- Attached to
- Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01
- Solicitation number
- W912EE26BA001
About this file
This is Standard Form 30 (Amendment 0006) to solicitation W912EE26BA001 for the Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01. The amendment was issued by the U.S. Army Corps of Engineers (W07D ENDIST VICKSBURG, located in Vicksburg, Mississippi) on January 26, 2026, with an effective date of January 26, 2026. The amendment is not extending the deadline for offer receipt.
The primary change involves revision to Specifications Section 31 23 03.00 09 (Excavation and Backfill). A new specification document (0007_AM0006.Solicitation.Specifications.26BA001, dated January 26, 2026) containing 6 pages has been added to the solicitation. The amendment updates the List of Drawing Sheets in Section 00 01 15 to reflect the addition of this new specification document. The revised Excavation and Backfill section specifies requirements for backfill materials, excavation procedures, foundation preparation, and placement standards, including compaction density requirements equal to adjoining undisturbed materials, layer thickness specifications (6 inches for the first layer, 12 inches for subsequent layers), and material suitability standards that exclude organic matter, frozen materials, and excessive wood content. All other terms and conditions of the original solicitation remain unchanged. Contractors must acknowledge receipt of this amendment prior to the offer submission deadline through one of the specified methods outlined in the amendment.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Reference Solicitation No. Block 14 (Description of Amendment/Modification):
W912EE26BA001, for Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01, is amended as follows:
Specifications Section 31 23 03.00 09 is revised.
Specifications revised by this amendment have the notation "Revised by Amendment 0006" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
All other terms and conditions remain unchanged.
Section 00 01 15 - List of Drawing Sheets
The attachments table has changed from:
Identifi er
Document Name
Document Description Reference Identifier
Date Line Item
Page N umbers
Docum ent Type
Provid ed Under Separa te Cover
0001 0001_Solicitati on.
Attachments.
26BA001
Supporting Technical Documentation
0001 16 Dec
15 Attach ment
No
0002 0002_Solicitati on.
Specifications.
26BA001
Specification 0002 16 Dec
151 Attach ment
No
0003 0003_Solicitati on.Drawings.
26BA001
Drawings 0003 16 Dec
24 Attach ment
No
0004 0004_AM0002.
Solicitation.
Specifications.
26BA001
Specification AM0002 12 Jan
86 Attach ment
No
0005 0005_AM0003.
Solicitation.
Drawings.
26BA001
Drawings AM0003 14 Jan
5 Attach ment
No
W912EE26BA0010006
0006 0006_AM0004.
Solicitation.
Specs.
26BA001
Specification AM0004 20 Jan
16 Attach ment
No
To:
Identifi er
Document Name
Document Description Reference Identifier
Date Line Item
Page N umbers
Docum ent Type
Provid ed Under Separa te Cover
0001 0001_Solicitati on.
Attachments.
26BA001
Supporting Technical Documentation
0001 16 Dec
15 Attach ment
No
0002 0002_Solicitati on.
Specifications.
26BA001
Specification 0002 16 Dec
151 Attach ment
No
0003 0003_Solicitati on.Drawings.
26BA001
Drawings 0003 16 Dec
24 Attach ment
No
0004 0004_AM0002.
Solicitation.
Specifications.
26BA001
Specification AM0002 12 Jan
86 Attach ment
No
0005 0005_AM0003.
Solicitation.
Drawings.
26BA001
Drawings AM0003 14 Jan
5 Attach ment
No
0006 0006_AM0004.
Solicitation.
Specs.
26BA001
Specification AM0004 20 Jan
16 Attach ment
No
0007 0007_AM0006.
Solicitation.
Specifications.
26BA001
Specification AM0006 26 Jan
6 Attach ment
No
The following contract documents were added:
0007_AM0006.Solicitation.Specifications.26BA001
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
0007_AM0006.Solicitation.Specifications.26BA001 none 6
W912EE26BA001
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS
01 22 00.00 09 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 09 QUALITY CONTROL
01 45 00.15 09 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 20.00 09 ENVIRONMENTAL PROTECTION
01 57 23.00 09 STORM WATER POLLUTION PREVENTION PLAN
DIVISION 31 - EARTHWORK
31 11 00.00 09 CLEARING AND GRUBBING FOR BANK STABILIZATION
31 23 03.00 09 EXCAVATION AND BACKFILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 04.00 09 EROSION CONTROL
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19.00 09 STONE - BANK STABILIZATION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 Revised by Amendment 0006
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 23 03.00 09
EXCAVATION AND BACKFILL
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Backfill
2.1.1.1 General
2.1.1.2 Unsuitable Materials
2.1.1.3 Frozen Materials
PART 3 EXECUTION
3.1 EXCAVATION
3.1.1 General
3.1.2 Excavation For Stone
3.1.3 Disposal of Excavated Materials
3.1.3.1 Disposal of Discarded Materials
3.1.4 Stockpiling of Material
3.2 FOUNDATION PREPARATION
3.3 PLACEMENT
3.3.1 General
3.3.2 Backfill
-- End of Section Table of Contents --
SECTION 31 23 03.00 09 Page 1
SECTION 31 23 03.00 09
EXCAVATION AND BACKFILL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D698 (2012; E 2014) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))
1.2 SUBMITTALS
Government approval is required for all submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-04 Samples
The Contractor shall take at least one representative sample of each type of material that will be used for backfill and embankment at each site to determine soil classification, the maximum dry density and optimum moisture content for each representative sample.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Backfill
2.1.1.1 General
SECTION 31 23 03.00 09 Page 2
The backfill shall be constructed of earth obtained from the required excavation that is free from unsuitable and frozen materials as defined in paragraphs UNSUITABLE MATERIALS and FROZEN MATERIALS. suitable and obtained from required excavations and/or furnished by the Contractor from off-site sources at no additional cost to the Government . Excavation of materials for use in the construction of backfill shall be conducted so as to segregate materials of different character in accordance with suitability of placement in the various parts of the work as described and as shown.
2.1.1.2 Unsuitable Materials
Materials which are classified as unsuitable for backfill are defined as masses of organic matter, sticks, branches, roots, and other debris.
Isolated pieces of wood will not be considered objectionable in the backfill provided their length does not exceed 1 foot, their cross-sectional area is less than 4 square inches, and they are distributed throughout the fill. However, not more than one half of 1 percent (by volume) of wood smaller than objectionable size may be contained in each in-place cubic yard of the closure section. Pockets and/or zones of wood shall not be placed in the backfill.
2.1.1.3 Frozen Materials
Under no circumstances shall frozen earth, snow, or ice be placed in any required embankment.
PART 3 EXECUTION
3.1 EXCAVATION
3.1.1 General
Excavation shall consist of removal of material in preparing the foundation to the lines and grade shown on the drawings. Backfill shall be placed as specified in paragraph PLACEMENT, subparagraph BACKFILL.
Excavated materials shall be disposed of as specified in paragraph
DISPOSAL OF EXCAVATED MATERIALS.
3.1.2 Excavation For Stone
Where indicated on the drawings, the natural ground shall be excavated to provide for placement of stone. The finished grade shall conform to the prescribed grade within the limits of plus or minus 6 inches, and shall present a neat, smooth surface, free from all obstructions.
3.1.3 Disposal of Excavated Materials
Excavated materials in excess of that required for backfill shall be disposed of at the Contractors option, by placing on adjacent levees located behind top bank, spreading out evenly in low lying areas and sloped to drain, or hauled off to a commercial disposal source. If excess excavated material is placed on adjacent property, the Contractor shall obtain additional rights-of-way for such purposes, without cost to the Government and in accordance with Section 01 00 00.00 09 GENERAL CONTRACT REQUIRMENTS, paragraph RIGHTS-OF-WAY. Such material shall be placed as not to interfere with roads, drainage, project design, and in such a manner to eliminate the possibility of its entering into channels, ditches, or
SECTION 31 23 03.00 09 Page 3 streams. Material shall be compacted to a density at least equal to that of the adjoining undisturbed materials. Not less than 7 days before removing excess excavated materials, the Contractor shall notify, in writing, the Contracting Officer of all proposed disposal methods and /or the proposed commercial disposal source. The Contracting Officer has the right to approve or disapprove the disposal methods and/or the proposed commercial disposal source. No separate payment will be made for a commercial disposal source.
3.1.3.1 Disposal of Discarded Materials
Discarded material other than those which can be included in the solid waste category shall be disposed of as specified in paragraph EXCAVATION, subparagraph DISPOSAL OF EXCAVATED MATERIALS, above.
3.1.4 Stockpiling of Material
Stockpiles of materials temporarily stored for later use shall be located in approved areas. Stockpiled material shall have a maximum height not to exceed 10 feet, shall have end and side slopes not steeper than 1V on 2H.
The surfaces of all stockpiles shall be sloped to readily drain and sealed by compacting. Excavation from stockpiles shall be made so as to maintain drainage at all times. No stockpiled material shall be placed within 50 feet of top bank of channel excavation or structure excavation. Excavated materials used as backfill shall either be placed directly therein or stockpiled and subsequently used in the backfill.
3.2 FOUNDATION PREPARATION
Immediately prior to the placement of backfill the entire surface on or against which backfill is to be placed shall be thoroughly broken to a depth of 6 inches. If for any cause this broken surface or other surface that is to receive backfill becomes compacted in such a manner that a plane of seepage or weakness might be induced, it shall again be thoroughly broken before the depositing of material thereon, at no additional cost to the Government. The foundation receiving backfill and all partially completed backfill shall be kept thoroughly drained. No backfill shall be placed on any part of the foundation until such areas have been inspected and approved.
3.3 PLACEMENT
3.3.1 General
Backfill shall consist of the placement of material in channel side slopes and any other area where filling is required to obtain the lines and grades as shown on the drawings.
3.3.2 Backfill
Backfill shall consist of the refill of approved suitable material of material from required excavation. The materials shall be placed or spread in layers, the first layer not more than 6 inches in thickness and the succeeding layers not more than 12 inches in thickness prior to compaction. Each layer shall be compacted to a density at least equal to that of the adjoining undisturbed materials. Layers shall slope to provide satisfactory drainage during construction.
SECTION 31 23 03.00 09 Page 4
-- End of Section --
SECTION 31 23 03.00 09 Page 5
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0006 |
| EffDate: 26 JAN 2026 |
| ReqNo: |
| ProjNo: PANMVD-26-P-0000 026988 |
| IssCode: W912EE |
| AdmCode: |
| IssuedBy: W07V ENDIST VICKSBURG |
KO CONTRACTING DIVISION, 4155 CLAY STREET
VICKSBURG, MS 39183-3435
UNITED STATES
FRETESHIA JOHNSON, EMAIL: FRETESHIA.L.JOHNSON@USACE.ARMY.MIL TELEPHONE: 601-631-5219 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912EE26BA001 |
| SolDate: 16 DEC 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: ROBERT E. SCREWS |
| ContDate: |
| CODate: 26 JAN 2026 |