AM0006.Solicitation.W912EE26BA001.pdf

PDF 4 MB Posted

Attached to
Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01
Solicitation number
W912EE26BA001
Issued by

About this file

This is Standard Form 30 (Amendment 0006) to solicitation W912EE26BA001 for the Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01. The amendment was issued by the U.S. Army Corps of Engineers (W07D ENDIST VICKSBURG, located in Vicksburg, Mississippi) on January 26, 2026, with an effective date of January 26, 2026. The amendment is not extending the deadline for offer receipt.

The primary change involves revision to Specifications Section 31 23 03.00 09 (Excavation and Backfill). A new specification document (0007_AM0006.Solicitation.Specifications.26BA001, dated January 26, 2026) containing 6 pages has been added to the solicitation. The amendment updates the List of Drawing Sheets in Section 00 01 15 to reflect the addition of this new specification document. The revised Excavation and Backfill section specifies requirements for backfill materials, excavation procedures, foundation preparation, and placement standards, including compaction density requirements equal to adjoining undisturbed materials, layer thickness specifications (6 inches for the first layer, 12 inches for subsequent layers), and material suitability standards that exclude organic matter, frozen materials, and excessive wood content. All other terms and conditions of the original solicitation remain unchanged. Contractors must acknowledge receipt of this amendment prior to the offer submission deadline through one of the specified methods outlined in the amendment.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Reference Solicitation No. Block 14 (Description of Amendment/Modification):

W912EE26BA001, for Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01, is amended as follows:

Specifications Section 31 23 03.00 09 is revised.

Specifications revised by this amendment have the notation "Revised by Amendment 0006" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.

All other terms and conditions remain unchanged.

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

Identifi er

Document Name

Document Description Reference Identifier

Date Line Item

Page N umbers

Docum ent Type

Provid ed Under Separa te Cover

0001 0001_Solicitati on.

Attachments.

26BA001

Supporting Technical Documentation

0001 16 Dec

15 Attach ment

No

0002 0002_Solicitati on.

Specifications.

26BA001

Specification 0002 16 Dec

151 Attach ment

No

0003 0003_Solicitati on.Drawings.

26BA001

Drawings 0003 16 Dec

24 Attach ment

No

0004 0004_AM0002.

Solicitation.

Specifications.

26BA001

Specification AM0002 12 Jan

86 Attach ment

No

0005 0005_AM0003.

Solicitation.

Drawings.

26BA001

Drawings AM0003 14 Jan

5 Attach ment

No

W912EE26BA0010006

0006 0006_AM0004.

Solicitation.

Specs.

26BA001

Specification AM0004 20 Jan

16 Attach ment

No

To:

Identifi er

Document Name

Document Description Reference Identifier

Date Line Item

Page N umbers

Docum ent Type

Provid ed Under Separa te Cover

0001 0001_Solicitati on.

Attachments.

26BA001

Supporting Technical Documentation

0001 16 Dec

15 Attach ment

No

0002 0002_Solicitati on.

Specifications.

26BA001

Specification 0002 16 Dec

151 Attach ment

No

0003 0003_Solicitati on.Drawings.

26BA001

Drawings 0003 16 Dec

24 Attach ment

No

0004 0004_AM0002.

Solicitation.

Specifications.

26BA001

Specification AM0002 12 Jan

86 Attach ment

No

0005 0005_AM0003.

Solicitation.

Drawings.

26BA001

Drawings AM0003 14 Jan

5 Attach ment

No

0006 0006_AM0004.

Solicitation.

Specs.

26BA001

Specification AM0004 20 Jan

16 Attach ment

No

0007 0007_AM0006.

Solicitation.

Specifications.

26BA001

Specification AM0006 26 Jan

6 Attach ment

No

The following contract documents were added:

0007_AM0006.Solicitation.Specifications.26BA001

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

0007_AM0006.Solicitation.Specifications.26BA001 none 6

W912EE26BA001

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS

01 22 00.00 09 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 09 QUALITY CONTROL

01 45 00.15 09 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 20.00 09 ENVIRONMENTAL PROTECTION

01 57 23.00 09 STORM WATER POLLUTION PREVENTION PLAN

DIVISION 31 - EARTHWORK

31 11 00.00 09 CLEARING AND GRUBBING FOR BANK STABILIZATION

31 23 03.00 09 EXCAVATION AND BACKFILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 04.00 09 EROSION CONTROL

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 31 19.00 09 STONE - BANK STABILIZATION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 Revised by Amendment 0006

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 23 03.00 09

EXCAVATION AND BACKFILL

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Backfill

2.1.1.1 General

2.1.1.2 Unsuitable Materials

2.1.1.3 Frozen Materials

PART 3 EXECUTION

3.1 EXCAVATION

3.1.1 General

3.1.2 Excavation For Stone

3.1.3 Disposal of Excavated Materials

3.1.3.1 Disposal of Discarded Materials

3.1.4 Stockpiling of Material

3.2 FOUNDATION PREPARATION

3.3 PLACEMENT

3.3.1 General

3.3.2 Backfill

-- End of Section Table of Contents --

SECTION 31 23 03.00 09 Page 1

SECTION 31 23 03.00 09

EXCAVATION AND BACKFILL

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method

ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method

ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

ASTM D698 (2012; E 2014) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

1.2 SUBMITTALS

Government approval is required for all submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-04 Samples

The Contractor shall take at least one representative sample of each type of material that will be used for backfill and embankment at each site to determine soil classification, the maximum dry density and optimum moisture content for each representative sample.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Backfill

2.1.1.1 General

SECTION 31 23 03.00 09 Page 2

The backfill shall be constructed of earth obtained from the required excavation that is free from unsuitable and frozen materials as defined in paragraphs UNSUITABLE MATERIALS and FROZEN MATERIALS. suitable and obtained from required excavations and/or furnished by the Contractor from off-site sources at no additional cost to the Government . Excavation of materials for use in the construction of backfill shall be conducted so as to segregate materials of different character in accordance with suitability of placement in the various parts of the work as described and as shown.

2.1.1.2 Unsuitable Materials

Materials which are classified as unsuitable for backfill are defined as masses of organic matter, sticks, branches, roots, and other debris.

Isolated pieces of wood will not be considered objectionable in the backfill provided their length does not exceed 1 foot, their cross-sectional area is less than 4 square inches, and they are distributed throughout the fill. However, not more than one half of 1 percent (by volume) of wood smaller than objectionable size may be contained in each in-place cubic yard of the closure section. Pockets and/or zones of wood shall not be placed in the backfill.

2.1.1.3 Frozen Materials

Under no circumstances shall frozen earth, snow, or ice be placed in any required embankment.

PART 3 EXECUTION

3.1 EXCAVATION

3.1.1 General

Excavation shall consist of removal of material in preparing the foundation to the lines and grade shown on the drawings. Backfill shall be placed as specified in paragraph PLACEMENT, subparagraph BACKFILL.

Excavated materials shall be disposed of as specified in paragraph

DISPOSAL OF EXCAVATED MATERIALS.

3.1.2 Excavation For Stone

Where indicated on the drawings, the natural ground shall be excavated to provide for placement of stone. The finished grade shall conform to the prescribed grade within the limits of plus or minus 6 inches, and shall present a neat, smooth surface, free from all obstructions.

3.1.3 Disposal of Excavated Materials

Excavated materials in excess of that required for backfill shall be disposed of at the Contractors option, by placing on adjacent levees located behind top bank, spreading out evenly in low lying areas and sloped to drain, or hauled off to a commercial disposal source. If excess excavated material is placed on adjacent property, the Contractor shall obtain additional rights-of-way for such purposes, without cost to the Government and in accordance with Section 01 00 00.00 09 GENERAL CONTRACT REQUIRMENTS, paragraph RIGHTS-OF-WAY. Such material shall be placed as not to interfere with roads, drainage, project design, and in such a manner to eliminate the possibility of its entering into channels, ditches, or

SECTION 31 23 03.00 09 Page 3 streams. Material shall be compacted to a density at least equal to that of the adjoining undisturbed materials. Not less than 7 days before removing excess excavated materials, the Contractor shall notify, in writing, the Contracting Officer of all proposed disposal methods and /or the proposed commercial disposal source. The Contracting Officer has the right to approve or disapprove the disposal methods and/or the proposed commercial disposal source. No separate payment will be made for a commercial disposal source.

3.1.3.1 Disposal of Discarded Materials

Discarded material other than those which can be included in the solid waste category shall be disposed of as specified in paragraph EXCAVATION, subparagraph DISPOSAL OF EXCAVATED MATERIALS, above.

3.1.4 Stockpiling of Material

Stockpiles of materials temporarily stored for later use shall be located in approved areas. Stockpiled material shall have a maximum height not to exceed 10 feet, shall have end and side slopes not steeper than 1V on 2H.

The surfaces of all stockpiles shall be sloped to readily drain and sealed by compacting. Excavation from stockpiles shall be made so as to maintain drainage at all times. No stockpiled material shall be placed within 50 feet of top bank of channel excavation or structure excavation. Excavated materials used as backfill shall either be placed directly therein or stockpiled and subsequently used in the backfill.

3.2 FOUNDATION PREPARATION

Immediately prior to the placement of backfill the entire surface on or against which backfill is to be placed shall be thoroughly broken to a depth of 6 inches. If for any cause this broken surface or other surface that is to receive backfill becomes compacted in such a manner that a plane of seepage or weakness might be induced, it shall again be thoroughly broken before the depositing of material thereon, at no additional cost to the Government. The foundation receiving backfill and all partially completed backfill shall be kept thoroughly drained. No backfill shall be placed on any part of the foundation until such areas have been inspected and approved.

3.3 PLACEMENT

3.3.1 General

Backfill shall consist of the placement of material in channel side slopes and any other area where filling is required to obtain the lines and grades as shown on the drawings.

3.3.2 Backfill

Backfill shall consist of the refill of approved suitable material of material from required excavation. The materials shall be placed or spread in layers, the first layer not more than 6 inches in thickness and the succeeding layers not more than 12 inches in thickness prior to compaction. Each layer shall be compacted to a density at least equal to that of the adjoining undisturbed materials. Layers shall slope to provide satisfactory drainage during construction.

SECTION 31 23 03.00 09 Page 4

-- End of Section --

SECTION 31 23 03.00 09 Page 5

IDCode: J
Page: 1
Pages: 4
AmendNo: 0006
EffDate: 26 JAN 2026
ReqNo:
ProjNo: PANMVD-26-P-0000 026988
IssCode: W912EE
AdmCode:
IssuedBy: W07V ENDIST VICKSBURG

KO CONTRACTING DIVISION, 4155 CLAY STREET

VICKSBURG, MS 39183-3435

UNITED STATES

FRETESHIA JOHNSON, EMAIL: FRETESHIA.L.JOHNSON@USACE.ARMY.MIL TELEPHONE: 601-631-5219 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912EE26BA001
SolDate: 16 DEC 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: ROBERT E. SCREWS
ContDate:
CODate: 26 JAN 2026

File details come from the government source that posted it. Updated .