This Statement of Work (SOW) outlines requirements for removing and replacing two wall-mounted AC/Heating units at the USACE Red River Resident Office in Bossier City, Louisiana. The contractor must provide all materials, equipment, and labor for installation of two 208-230V single-phase units, each rated at 36,000 BTU (3-ton) with 10 KW heat strips. Units must be USA-manufactured, AHRI certified, use R410A refrigerant (or current EPA-approved alternative), have minimum 9.0 EER rating, and include both disposable and permanent washable filters.
The work includes installing two digital non-programmable thermostats, checking/replacing electrical components to meet code, and completing all necessary retrofit work within 180 days of award. The contractor must provide a minimum 5-year warranty on compressor, coil, and parts. The Department of the Army Corps of Engineers Vicksburg District is managing this procurement under solicitation W912EE25Q0012. Site visits are available by contacting Mr. Rodney Nordby. Work must be performed during normal business hours Monday-Friday while the building remains occupied.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation W912EE25Q0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Provide all materials, equipment, and labor to remove and replace two (2) wall mounted Air Conditioning/Heating Units at the USACE Red River Resident Office located at 276 Miller Road, Bossier City, Louisiana. Each new unit will be 208-230 volts, 1 Phase, 36,000 BTU (3 ton) units with 10 KW heat strips. Units shall utilize R410A refrigerant or currently approved refrigerant as per EPA regulated requirements and shall be manufactured in the USA and AHRI certified. Units will have a minimum Energy Efficiency Rating (EER) of 9.0. Units shall utilize replaceable disposable 1-inch return air filters. Each unit shall also have an adjustable barometric damper and a permanent washable filter. Compressors shall be the scroll type. A minimum five (5) year warranty shall be provided on the compressor, coil, and parts. Two (2) new digital nonprogrammable thermostats will be furnished and installed. Existing electrical wiring and circuit breakers for the units shall be checked for proper sizing and replaced as necessary to comply with National Electrical Code. Contractors are encouraged to visit the site prior to submitting an offer to ensure proposed equipment will fit existing openings with minimal retrofit. To schedule a site visit, please contact Mr. Rodney Nordby via email at, Rodney.R.Nordby@usace.army.mil,with the subject titled “Request for Site Visit”. The work includes any associated electrical, mechanical, trim, and other retrofit/incidental work necessary to provide fully operational units. All work shall be performed in a skillful and workmanlike manner in accordance with manufacturer instructions, industry standards, and any applicable building codes. All equipment, materials, and articles incorporated into the work shall be new and of the most suitable grade for the intended purpose. Work shall be performed during normal work hours Monday–Friday. The building will remain occupied during installation. Contractor shall properly dispose of the old units.
Period of Performance HVAC units shall be installed within 180 days from date of award.