This document is a solicitation amendment for salvage services related to the Motor Vessel Sanderford. The amendment extends the quote due date to August 13, 2020 at 5:00 PM CST. It clarifies that the term "salvage" is interchangeable with "recovery." Additional requirements include mobilizing a US Coast Guard approved oil spill removal organization and having a registered professional engineer sign off on the salvage plan. The scope of work outlines recovering the sunken vessel from the Mississippi River and returning it to the designated location. The solicitation seeks quotes for a firm fixed price contract to be awarded as a 100% small business set-aside by the Department of the Army Corps of Engineers Vicksburg District.

View the file

Other files for this federal contract opportunity

Other files attached to Motor Vessel Sanderford Salvage, newest first.
File Type Posted
Conformed W912EE20Q0064.pdf PDF
W912EE20Q0064.pdf PDF
Attachment 0001 - Bid Schedule.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W807PM01217806

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation Amendment W912EE20Q0064-0001 extends the offer due date to 13 August 2020 at 5:00 PM CST and makes various other changes. Refer to the continuation page for complete details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EE20Q0064

X 9B. DATED (SEE ITEM 11)

04-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2020

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE20Q0064

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT W912EE20Q0064-0001

Solicitation Amendment W912EE20Q0064-0001 makes the following changes and clarifications:

1. The offeror due date is extended to 13 August 2020 at 5:00 PM CST.

2. This requirement is a recovery effort for the Motor Vessel Sanderford. The term salvage as used throughout this solicitation is interchangeable with recovery.

3. Clarification is provided for the statement of work requirement to have the salvage plan approved and signed by a registered professional engineer. This is a post award requirement that shall be completed after a contract award has been issued.

4. The following requirement has been added to the statement of work. The Contractor shall mobilize a United States Coast Guard (USCG) approved Oil Spill Removal Organization (OSRO) with necessary personnel, equipment and material to be able to respond to any release or discharge of oil to the environment or a release or discharge that threatens the environment, as a result of the salvage operation. The OSRO shall be approved by the USCG to operate in the area of the salvage operation. When directed by the Contracting Officer or their designee, the Contractor shall direct the OSRO to standby during the salvage operation and be prepared to deploy necessary personnel, equipment and materials immediately once a release or discharge of oil to the environment occurs or a release or discharge threatens the environment.

5. A notice to proceed must be issued by the contracting officer prior to any work being completed.

6. FAR Clauses 52.249-2, Termination for Convenience of the Government, and 52.249-8, Default – Fixed Priced Supply and Service, have been added to section I.

7. The past performance evaluation criteria as listed in FAR Provision 52.212-1, Instructions to Offerors – Commercial Items, and FAR Provision 52.212-2, Evaluation Commercial Items, has been updated. The past performance will be evaluated as acceptable or unaccepteable. Refer to the provisions 52.212-1 or 52.212-2 for complete details.

8. The evaluation criteria listed in FAR Provision 52.212-2 has been updated to state “All quotes submitted will be evaluated for (1) Technical Capability, (2) Price, and (3) Past Performance.

The technical capability factor is significantly more important than the price factor. Past performance will be evaluated as acceptable or unacceptable. The government will issue an award to the offeror whose quote is the best value of those that have acceptable Past Performance.”

All other terms and conditions remain the same.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 11-Aug-2020 05:00 PM to 13-Aug-2020 05:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

The Dredging Section of the Vicksburg District requires a contractor to provide the salvage of the M/V Sanderford. The M/V Sanderford’s tow struck the Huey P Long – OK Allen Bridge causing the Sanderford to sink to the bottom of the Mississippi River. A salvage crew is required to provide salvage equipment and labor as needed to retrieve the vessel from the bottom of the Mississippi River and return the vessel back to the Vicksburg Harbor or as directed by the Contracting Officer’s Representative (COR).

Requirements

- Perform salvage and refloat of M/V Sanderson – 51’ x 19’ 730 HP twin screw towboat

- Located near of Huey P Long – OK Allen Bridge, approximately LMR mile 234

- Provide all equipment and personnel as needed to perform safe salvage in accordance with USCG requirements to include

- Towboats

- Cranes/Derricks

- Barges

- Crewboats

- All other equipment necessary for salvage operations

- Divers

- Crane Operators

- Salvage Crew

- Divers shall be properly certified

- Contractor shall provide a salvage plan detailing equipment/rigging to be used and procedure to be followed for salvage operation

- Plan shall be approved and signed off on by a registered professional engineer. This is a post award requirement that shall be completed after a contract award has been issued.

- Contractor shall be responsible for re-floating the vessel and delivering the vessel back to the Vicksburg harbor and USACE stringout

- Contractor shall provide daily updates detailing salvage operations, including equipment and personnel being used, via emails with COR and other government representatives.

The United States Coast Guard (USCG) must approve the contractor’s salvage plan prior to the commencement of operations. The USCG will be onsite during the salvage operations and will have authority over the contractor’s operations. Salvage operations may be halted at any point if determined necessary by the USCG.

The Contractor shall mobilize a USCG approved Oil Spill Removal Organization (OSRO) with necessary personnel, equipment and material to be able to respond to any release or discharge of oil to the environment or a release or discharge that threatens the environment, as a result of the salvage operation. The OSRO shall be approved by the USCG to operate in the area of the salvage operation. When directed by the Contracting Officer or their designee, the Contractor shall direct the OSRO to standby during the salvage operation and be prepared to deploy necessary personnel, equipment and materials immediately once a release or discharge of oil to the environment occurs or a release or discharge threatens the environment.

A notice to proceed must be issued by the contracting officer prior to any work being completed.

Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans’ Employment and Training Service (VETS):

https://www.dol.gov/vets/

- Federal Veteran Employment Information: https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/index.html

- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

The following have been added by full text:

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

(a)(1) The Government may, subject to paragraphs (c) and (d) of this clause, by written notice of default to the Contractor, terminate this contract in whole or in part if the Contractor fails to--

(i) Deliver the supplies or to perform the services within the time specified in this contract or any extension;

(ii) Make progress, so as to endanger performance of this contract (but see subparagraph (a)(2) of this clause); or

(iii) Perform any of the other provisions of this contract (but see subparagraph (a)(2) below).

(2) The Government's right to terminate this contract under subdivisions (a)(1)(ii) and (1)(iii) of this clause, may be exercised if the Contractor does not cure such failure within 10 days (or more if authorized in writing by the Contracting Officer) after receipt of the notice from the Contracting Officer specifying the failure.

(b) If the Government terminates this contract in whole or in part, it may acquire, under the terms and in the manner the Contracting Officer considers appropriate, supplies or services similar to those terminated, and the Contractor will be liable to the Government for any excess costs for those supplies or services. However, the Contractor shall continue the work not terminated.

(c) Except for defaults of subcontractors at any tier, the Contractor shall not be liable for any excess costs if the failure to perform the contract arises from causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include (1) acts of God or of the public enemy, (2) acts of the Government in either its sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes,

(8) freight embargoes, and (9) unusually severe weather. In each instance the failure to perform must be beyond the control and without the fault or negligence of the Contractor.

(d) If the failure to perform is caused by the default of a subcontractor at any tier, and if the cause of the default is beyond the control of both the Contractor and subcontractor, and without the fault or negligence of either, the Contractor shall not be liable for any excess costs for failure to perform, unless the subcontracted supplies or services were obtainable from other sources in sufficient time for the Contractor to meet the required delivery schedule.

(e) If this contract is terminated for default, the Government may require the Contractor to transfer title and deliver to the Government, as directed by the Contracting Officer, any (1) completed supplies, and (2) partially completed supplies and materials, parts, tools, dies, jigs, fixtures, plans, drawings, information, and contract rights (collectively referred to as "manufacturing materials" in this clause) that the Contractor has specifically produced or acquired for the terminated portion of this contract. Upon direction of the Contracting Officer, the Contractor shall also protect and preserve property in its possession in which the Government has an interest.

(f) The Government shall pay contract price for completed supplies delivered and accepted. The Contractor and Contracting Officer shall agree on the amount of payment for manufacturing materials delivered and accepted and for the protection and preservation of the property. Failure to agree will be a dispute under the Disputes clause. The Government may withhold from these amounts any sum the Contracting Officer determines to be necessary to protect the Government against loss because of outstanding liens or claims of former lien holders.

(g) If, after termination, it is determined that the Contractor was not in default, or that the default was excusable, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of the Government.

(h) The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JUN 2020)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation. However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Quote submittal instructions. Offerors submitting quotes for this solicitation are required to submit the following:

(1) Offerors shall complete the solicitation and acknowledge all solicitation amendments. Offerors shall quote pricing by completing Atachment 0001 – Bid Schedule.

(2) Technical Capability: Technical capability shall be submitted as a separate document(s) from the pricing quote.

The technical capability submittal shall document the offeror’s capability to provide all of the services required to perform this requirement. This includes all submittal requirements identified in the scope of work – salvage plan and certifications. Technical capability submittal shall not exceed 15 pages in the following format: 1 page = 8.5" x 11", font shall be Times New Roman Size 12, and margins shall be 1". The salvage plan and certification documents will not count towards the 15 page limitation.

(3) Past Performance: The offeror’s quote shall provide documentation of acceptable performance on up to three past or current contracts of a similar type, size, scope and complexity, performed within the last 5 years, as well as, provide references, including names and contact information of references who can verify their past performance.

The Government’s approach to evaluating past performance is to check the references provided by the contractor to verify satisfactory past performance as well as data obtained from other sources available i.e. government database, past contract files, etc. The offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating acceptable past performance rests with the offeror. Acceptable past performance is defined as completion of the required work in accordance with terms and conditions of the applicable contract.

(4) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically).

(5) Quotes shall be submitted via email to Richard.B.Hester@usace.army.mil with the subject “Quote W912EE20Q0064”. Quotes must be submitted at or before the exact time specified in this solicitation and shall be valid for 30 calendar days and must include the name, address, and telephone number of the offeror.

(c) Late submissions, modifications, revisions, and withdrawals of offers:

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. The designated submittal location is via email to richard.b.hester@usace.army.mil.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.

Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.

(d) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.

(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.

(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.

Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (https://assist.dla.mil/online/start/).

(ii) Quick Search (http://quicksearch.dla.mil/).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--

(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone

(215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Unique entity identifier. (Applies to all offers that exceed the micro-purchase threshold, and offers at or below the micro-purchase threshold if the solicitation requires the Contractor to be registered in the System for Award Management (SAM).) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see FAR subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.

(k) Reserved.

(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(4) A summary of the rationale for award;

(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

SECTION M - EVALUATION FACTORS FOR AWARD

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation is determined to be the best value to the Government. The following factors shall be used to evaluate offers:

All quotes submitted will be evaluated for (1) Technical Capability, (2) Price, and (3) Past Performance. The technical capability factor is significantly more important than the price factor. Past Performance will be evaluated as acceptable or unacceptable. The government will issue an award to the offeror whose quote is the best value of those that have acceptable Past Performance.

(1) Technical Capability - The technical capability submittal shall document the offeror’s capability to provide all of the services required to perform this requirement. This includes all submittal requirements identified in the scope of work – salvage plan and certifications. The Technical Capability will be assigned a rating in accordance with the following table:

Table 1: Technical Capability Evaluation Ratings Color Rating

Adjectival Rating Description

Blue Outstanding Quote meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses.

Risk of unsuccessful performance is very low.

Purple Good Quote meets requirements and indicates a thorough approach and understanding of the requirements. Quote contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Green Acceptable Quote meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Quote does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements.

The quote has one or more weaknesses which are not offset by strengths.

Risk of unsuccessful performance is high.

Red Unacceptable Quote does not meet requirements and contains one or more deficiencies. Quote is not awardable.

(2) Price - Price quotes will be examined to determine the extent to which quotes are comparable with the Government estimates, previous procurements, and a determination made of Price Reasonableness. The Government may reject any quote that is determined to be Not Fair and Reasonable, unrealistically high or low in price when compared to Government estimates, or are unbalanced, such that the quote is deemed to reflect an inherent lack of competence or failure to comprehend the requirements.

(c) Past Performance: The offeror shall provide documentation of acceptable past performance on up to three past or current contracts of a similar type, size, scope and complexity, performed within the last 5 years, as well as, provide references, including names and contact information of references who can verify their past performance. The Government’s approach to evaluating past performance is to check the references provided by the contractor to verify acceptable past performance as well as data obtained from other sources available i.e. government database, past contract files, etc. The offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating acceptable past performance rests with the offeror. Acceptable past performance is defined as completion of the required work in accordance with terms and conditions of the applicable contract.

A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)