BID ABSTRACT

For Bids Under Solicitation, W912EE-16-B-0005

Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg

District, other Districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District"

INLAND DREDGING COMPANY, LLC

DYERSBURG, TN

LINE

ITEM

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0001AA FIRST 724 HOURS 724 HR $ NO BID

0001AB OVER 724 HOURS 724 HR $ NO BID

0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0002AA FIRST 629 HOURS 629 HR $ NO BID

0002AB OVER 629 HOURS 629 HR $ NO BID

0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0003AA FIRST 579 HOURS 579 HR $ NO BID

0003AB OVER 579 HOURS 579 HR $ NO BID

0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0004AA FIRST 609 HOURS 609 HR $ NO BID

0004AB OVER 609 HOURS 609 HR $ NO BID

0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0005AA FIRST 529 HOURS 529 HR $2,000.00 $1,058,000.00

0005AB OVER 529 HOURS 529 HR $2,000.00 $1,058,000.00

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0006AA FIRST 487 HOURS 487 HR NO BID

0006AB OVER 487 HOURS 487 HR NO BID

0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0007AA FIRST 481 HOURS 481 HR $ NO BID

0007AB OVER 481 HOURS 481 HR $ NO BID

0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0008AA FIRST 418 HOURS 418 HR $ NO BID

0008AB OVER 418 HOURS 418 HR $ NO BID

0009 MOBILIZATION 1 JOB FOR $900,000.00

0010 DEMOBILIZATION 1 JOB FOR $39,499.00

0011 REMOBILIZATION 1 EA $1.00 $1.00

0012 TOWING SERVICE UPSTREAM 300 MI $325.00 $97,500.00

0013 TOWING SERVICE DOWNSTREAM 300 MI $200.00 $60,000.00

0014 SHORELINE 3000 LF $1.00 $3,000.00

$3,216,000.00TOTAL

LINE

ITEM

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0015AA FIRST 805 HOURS 805 HR $ NO BID

0015AB OVER 805 HOURS 805 HR $ NO BID

0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0016AA FIRST 700 HOURS 700 HR $ NO BID

0016AB OVER 700 HOURS 700 HR $ NO BID

0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0017AA FIRST 644 HOURS 644 HR $ NO BID

0017AB OVER 644 HOURS 644 HR $ NO BID

0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0018AA FIRST 677 HOURS 677 HR $ NO BID

0018AB OVER 677 HOURS 677 HR $ NO BID

0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0019AA FIRST 589 HOURS 589 HR $1,800.00 $1,060,200.00

0019AB OVER 589 HOURS 589 HR $1,800.00 $1,060,200.00

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0020AA FIRST 541 HOURS 541 HR NO BID

0020AB OVER 541 HOURS 541 HR NO BID

0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0021AA FIRST 535 HOURS 535 HR $ NO BID

0021AB OVER 535 HOURS 535 HR $ NO BID

0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0022AA FIRST 465 HOURS 465 HR $ NO BID

0022AB OVER 465 HOURS 465 HR $ NO BID

$2,120,400.00

BIDDING SCHEDULE- OPTION 1 - RED RIVER

TOTAL OPTION 1

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0023 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0023AA FIRST 566 HOURS 566 HR $ NO BID

0023AB OVER 566 HOURS 566 HR $ NO BID

0024 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0024AA FIRST 492 HOURS 492 HR $ NO BID

0024AB OVER 492 HOURS 492 HR $ NO BID

0025 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0025AA FIRST 453 HOURS 453 HR $ NO BID

0025AB OVER 453 HOURS 453 HR $ NO BID

0026 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0026AA FIRST 476 HOURS 476 HR $ NO BID

0026AB OVER 476 HOURS 476 HR $ NO BID

0027 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0027AA FIRST 414 HOURS 414 HR $1,800.00 $745,200.00

0027AB OVER 414 HOURS 414 HR $1,600.00 $662,400.00

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0028AA FIRST 381 HOURS 381 HR NO BID

0028AB OVER 381 HOURS 381 HR NO BID

0029 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0029AA FIRST 376 HOURS 376 HR $ NO BID

0029AB OVER 376 HOURS 376 HR $ NO BID

0030 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0030AA FIRST 327 HOURS 327 HR $ NO BID

0030AB OVER 327 HOURS 327 HR $ NO BID

$1,407,600.00

$6,744,000.00TOTAL BASE PLUS OPTION 1 AND OPTION 2

TOTAL OPTION 2

BIDDING SCHEDULE- OPTION 2 - OUACHITA AND BLACK RIVERS

Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg

District, other Districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District"

CROSBY DREDGING, LLC

GALLIANO, LA

LINE

ITEM

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0001AA FIRST 724 HOURS 724 HR $ NO BID

0001AB OVER 724 HOURS 724 HR $ NO BID

0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0002AA FIRST 629 HOURS 629 HR NO BID

0002AB OVER 629 HOURS 629 HR NO BID

0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0003AA FIRST 579 HOURS 579 HR $ NO BID

0003AB OVER 579 HOURS 579 HR $ NO BID

0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0004AA FIRST 609 HOURS 609 HR $ NO BID

0004AB OVER 609 HOURS 609 HR $ NO BID

0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0005AA FIRST 529 HOURS 529 HR $5,000.00 $2,645,000.00

0005AB OVER 529 HOURS 529 HR $5,000.00 $2,645,000.00

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0006AA FIRST 487 HOURS 487 HR NO BID

0006AB OVER 487 HOURS 487 HR NO BID

0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0007AA FIRST 481 HOURS 481 HR $ NO BID

0007AB OVER 481 HOURS 481 HR $ NO BID

0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0008AA FIRST 418 HOURS 418 HR $ NO BID

0008AB OVER 418 HOURS 418 HR $ NO BID

0009 MOBILIZATION 1 JOB FOR $450,000.00

0010 DEMOBILIZATION 1 JOB FOR $400,000.00

0011 REMOBILIZATION 1 EA $400,000.00 $400,000.00

0012 TOWING SERVICE UPSTREAM 300 MI $500.00 $150,000.00

0013 TOWING SERVICE DOWNSTREAM 300 MI $300.00 $90,000.00

0014 SHORELINE 3000 LF $2.50 $7,500.00

TOTAL $6,787,500.00

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0015AA FIRST 805 HOURS 805 HR $ NO BID

0015AB OVER 805 HOURS 805 HR $ NO BID

0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0016AA FIRST 700 HOURS 700 HR NO BID

0016AB OVER 700 HOURS 700 HR NO BID

0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0017AA FIRST 644 HOURS 644 HR $ NO BID

0017AB OVER 644 HOURS 644 HR $ NO BID

0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0018AA FIRST 677 HOURS 677 HR $ NO BID

0018AB OVER 677 HOURS 677 HR $ NO BID

0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0019AA FIRST 589 HOURS 589 HR $2,500.00 $1,472,500.00

0019AB OVER 589 HOURS 589 HR $2,500.00 $1,472,500.00

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0020AA FIRST 541 HOURS 541 HR NO BID

0020AB OVER 541 HOURS 541 HR NO BID

0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0021AA FIRST 535 HOURS 535 HR $ NO BID

0021AB OVER 535 HOURS 535 HR $ NO BID

0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0022AA FIRST 465 HOURS 465 HR $ NO BID

0022AB OVER 465 HOURS 465 HR $ NO BID

$2,945,000.00TOTAL OPTION 1

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0023 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0023AA FIRST 566 HOURS 566 HR $ NO BID

0023AB OVER 566 HOURS 566 HR $ NO BID

0024 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0024AA FIRST 492 HOURS 492 HR NO BID

0024AB OVER 492 HOURS 492 HR NO BID

0025 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0025AA FIRST 453 HOURS 453 HR $ NO BID

0025AB OVER 453 HOURS 453 HR $ NO BID

0026 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0026AA FIRST 476 HOURS 476 HR $ NO BID

0026AB OVER 476 HOURS 476 HR $ NO BID

0027 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0027AA FIRST 414 HOURS 414 HR $2,500.00 $1,035,000.00

0027AB OVER 414 HOURS 414 HR $2,500.00 $1,035,000.00

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0028AA FIRST 381 HOURS 381 HR NO BID

0028AB OVER 381 HOURS 381 HR NO BID

0029 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0029AA FIRST 376 HOURS 376 HR $ NO BID

0029AB OVER 376 HOURS 376 HR $ NO BID

0030 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0030AA FIRST 327 HOURS 327 HR $ NO BID

0030AB OVER 327 HOURS 327 HR $ NO BID

$2,070,000.00

$11,802,500.00

BIDDING SCHEDULE- OPTION 2 - OUACHITA AND BLACK RIVERS

TOTAL BASE PLUS OPTION 1 AND OPTION 2

Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg

District, other Districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District"

GREAT LAKES DREDGE & DOCK COMPANY, LLC

OAK BROOK, IL

LINE

ITEM

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0001AA FIRST 724 HOURS 724 HR $ NO BID

0001AB OVER 724 HOURS 724 HR $ NO BID

0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0002AA FIRST 629 HOURS 629 HR $2,040.00 $1,283,160.00

0002AB OVER 629 HOURS 629 HR $1,620.00 $1,018,980.00

0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0003AA FIRST 579 HOURS 579 HR $ NO BID

0003AB OVER 579 HOURS 579 HR $ NO BID

0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0004AA FIRST 609 HOURS 609 HR $ NO BID

0004AB OVER 609 HOURS 609 HR $ NO BID

0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0005AA FIRST 529 HOURS 529 HR NO BID

0005AB OVER 529 HOURS 529 HR NO BID

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0006AA FIRST 487 HOURS 487 HR NO BID

0006AB OVER 487 HOURS 487 HR NO BID

0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0007AA FIRST 481 HOURS 481 HR $ NO BID

0007AB OVER 481 HOURS 481 HR $ NO BID

0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0008AA FIRST 418 HOURS 418 HR $ NO BID

0008AB OVER 418 HOURS 418 HR $ NO BID

0009 MOBILIZATION 1 JOB FOR $650,000.00

0010 DEMOBILIZATION 1 JOB FOR $288,000.00

0011 REMOBILIZATION 1 EA $130,000.00 $130,000.00

0012 TOWING SERVICE UPSTREAM 300 MI $180.00 $54,000.00

0013 TOWING SERVICE DOWNSTREAM 300 MI $110.00 $33,000.00

0014 SHORELINE 3000 LF $1.00 $3,000.00

TOTAL $3,460,140.00

LINE DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0015AA FIRST 805 HOURS 805 HR $ NO BID

0015AB OVER 805 HOURS 805 HR $ NO BID

0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0016AA FIRST 700 HOURS 700 HR $1,950.00 $1,365,000.00

0016AB OVER 700 HOURS 700 HR $1,645.00 $1,151,500.00

0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0017AA FIRST 644 HOURS 644 HR $ NO BID

0017AB OVER 644 HOURS 644 HR $ NO BID

0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0018AA FIRST 677 HOURS 677 HR $ NO BID

0018AB OVER 677 HOURS 677 HR $ NO BID

0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0019AA FIRST 589 HOURS 589 HR $ NO BID

0019AB OVER 589 HOURS 589 HR $ NO BID

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0020AA FIRST 541 HOURS 541 HR NO BID

0020AB OVER 541 HOURS 541 HR NO BID

0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0021AA FIRST 535 HOURS 535 HR $ NO BID

0021AB OVER 535 HOURS 535 HR $ NO BID

0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0022AA FIRST 465 HOURS 465 HR $ NO BID

0022AB OVER 465 HOURS 465 HR $ NO BID

$2,516,500.00

LINE DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0023 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0023AA FIRST 566 HOURS 566 HR $ NO BID

0023AB OVER 566 HOURS 566 HR $ NO BID

0024 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0024AA FIRST 492 HOURS 492 HR $2,275.00 $1,119,300.00

0024AB OVER 492 HOURS 492 HR $1,690.00 $831,480.00

0025 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0025AA FIRST 453 HOURS 453 HR $ NO BID

0025AB OVER 453 HOURS 453 HR $ NO BID

0026 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0026AA FIRST 476 HOURS 476 HR $ NO BID

0026AB OVER 476 HOURS 476 HR $ NO BID

0027 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0027AA FIRST 414 HOURS 414 HR NO BID

0027AB OVER 414 HOURS 414 HR NO BID

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0028AA FIRST 381 HOURS 381 HR NO BID

0028AB OVER 381 HOURS 381 HR NO BID

0029 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0029AA FIRST 376 HOURS 376 HR $ NO BID

0029AB OVER 376 HOURS 376 HR $ NO BID

0030 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0030AA FIRST 327 HOURS 327 HR $ NO BID

0030AB OVER 327 HOURS 327 HR $ NO BID

$1,950,780.00

$7,927,420.00

TOTAL OPTION 2

TOTAL BASE PLUS OPTION 1 AND OPTION 2

Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less than 22-Inch Diameter) Fully Operated with Attendant Plant and Personnel with a Draft not to Exceed 9 Feet For Construction and Maintenance Dredging within the Vicksburg

District, other Districts within the Mississippi Valley Division, or Districts adjacent to the Vicksburg District"

INDEPENDENT GOVERNMENT ESTIMATE

LINE

ITEM

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0001 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0001AA FIRST 724 HOURS 724 HR $ NO BID

0001AB OVER 724 HOURS 724 HR $ NO BID

0002 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0002AA FIRST 629 HOURS 629 HR $ NO BID

0002AB OVER 629 HOURS 629 HR $ NO BID

0003 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0003AA FIRST 579 HOURS 579 HR $ NO BID

0003AB OVER 579 HOURS 579 HR $ NO BID

0004 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0004AA FIRST 609 HOURS 609 HR $1,850.00 $1,126,650.00

0004AB OVER 609 HOURS 609 HR $1,850.00 $1,126,650.00

0005 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0005AA FIRST 529 HOURS 529 HR $ NO BID

0005AB OVER 529 HOURS 529 HR $ NO BID

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0006AA FIRST 487 HOURS 487 HR NO BID

0006AB OVER 487 HOURS 487 HR NO BID

0007 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0007AA FIRST 481 HOURS 481 HR $ NO BID

0007AB OVER 481 HOURS 481 HR $ NO BID

0008 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0008AA FIRST 418 HOURS 418 HR $ NO BID

0008AB OVER 418 HOURS 418 HR $ NO BID

0009 MOBILIZATION 1 JOB FOR $346,700.00

0010 DEMOBILIZATION 1 JOB FOR $356,900.00

0011 REMOBILIZATION 1 EA $16,500.00 $16,500.00

0012 TOWING SERVICE UPSTREAM 300 MI $225.00 $67,500.00

0013 TOWING SERVICE DOWNSTREAM 300 MI $170.00 $51,000.00

0014 SHORELINE 3000 LF $1.52 $4,560.00

TOTAL $3,096,460.00

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0015 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0015AA FIRST 805 HOURS 805 HR $ NO BID

0015AB OVER 805 HOURS 805 HR $ NO BID

0016 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0016AA FIRST 700 HOURS 700 HR $ NO BID

0016AB OVER 700 HOURS 700 HR $ NO BID

0017 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0017AA FIRST 644 HOURS 644 HR $ NO BID

0017AB OVER 644 HOURS 644 HR $ NO BID

0018 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0018AA FIRST 677 HOURS 677 HR $1,850.00 $1,252,450.00

0018AB OVER 677 HOURS 677 HR $1,850.00 $1,252,450.00

0019 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0019AA FIRST 589 HOURS 589 HR $ NO BID

0019AB OVER 589 HOURS 589 HR $ NO BID

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0020AA FIRST 541 HOURS 541 HR NO BID

0020AB OVER 541 HOURS 541 HR NO BID

0021 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0021AA FIRST 535 HOURS 535 HR $ NO BID

0021AB OVER 535 HOURS 535 HR $ NO BID

0022 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0022AA FIRST 465 HOURS 465 HR $ NO BID

0022AB OVER 465 HOURS 465 HR $ NO BID

$2,504,900.00

NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT

0023 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0023AA FIRST 566 HOURS 566 HR $ NO BID

0023AB OVER 566 HOURS 566 HR $ NO BID

0024 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 22-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0024AA FIRST 492 HOURS 492 HR $ NO BID

0024AB OVER 492 HOURS 492 HR $ NO BID

0025 HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 22-INCH DIAMETER,

WITH ATTENDANT PLANT, AND WITH A DRAFT NOT TO EXCEED 9FEET,

AND WITH TRAVELING SPUD CARRIAGE, PLUS UNDERWATER PUMP

OVER 700 HORSEPOWER

0025AA FIRST 453 HOURS 453 HR $ NO BID

0025AB OVER 453 HOURS 453 HR $ NO BID

0026 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0026AA FIRST 476 HOURS 476 HR $1,850.00 $880,600.00

0026AB OVER 476 HOURS 476 HR $1,850.00 $880,600.00

0027 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0027AA FIRST 414 HOURS 414 HR $ NO BID

0027AB OVER 414 HOURS 414 HR $ NO BID

LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 24-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE, PLUS UNDERWATER PUMP OVER 750 HORSEPOWER

0028AA FIRST 381 HOURS 381 HR NO BID

0028AB OVER 381 HOURS 381 HR NO BID

0029 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET

0029AA FIRST 376 HOURS 376 HR $ NO BID

0029AB OVER 376 HOURS 376 HR $ NO BID

0030 LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT

LESS THAN 27-INCH DIAMETER, WITH ATTENDANT PLANT, AND WITH A

DRAFT NOT TO EXCEED 9 FEET, AND WITH TRAVELING SPUD

CARRIAGE

0030AA FIRST 327 HOURS 327 HR $ NO BID

0030AB OVER 327 HOURS 327 HR $ NO BID

$1,761,200.00

$7,362,560.00

I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT,

ALL OFFERS RECEIVED IN RESPONSE TO THE SOLICITATION.

SIGNATURE AND DATE

TOTAL BASE PLUS OPTION 1 AND OPTION 2

Sheet1

2016-11-04T09:08:02-0500
CARLOCK.JASON.M.1384151228

File details come from the government source that posted it. Updated .