DRAFT_ATTACHMENT_3.pdf

PDF 1 MB Posted

Attached to
Utility Monitoring and Control Systems (UMCS)
Solicitation number
W912DY-17-R-0014
Issued by

About this file

This sources sought notice requests capability statements from small businesses for a Utility Monitoring and Control Systems indefinite delivery/indefinite quantity multiple award contract to be awarded by the U.S. Army Corps of Engineers Huntsville Engineering and Support Center. The anticipated $2.75 billion program capacity will be shared across all awarded contracts over a four-year base period and three one-year options. Interested small businesses are asked to describe relevant experience from the past three to five years in areas such as HVAC, building automation, SCADA, fire alarm, security, and utility metering systems. Capability statements are due by February 13, 2017 and should not exceed ten pages. The notice provides a capabilities questionnaire to structure responses around experience, staff qualifications, quality control, safety programs, and geographic reach.

Open for comments and questions - No proposals

View the file

Other files

File Type Posted
DRAFT_ATTACHMENT_1.pdf PDF
DRAFT_ATTACHMENT_2.pdf PDF
DRAFT_ATTACHMENT_5.pdf PDF
DRAFT_ATTACHMENT_4.pdf PDF
DRAFT_ATTACHMENT_6.pdf PDF
DRAFT_ATTACHMENT_3.pdf PDF
DRAFT_ATTACHMENT_7.pdf PDF
RFI_Draft_RFP.pdf PDF
DRAFT_ATTACHMENT_5.pdf PDF
DRAFT_ATTACHMENT_2.pdf PDF
DRAFT_ATTACHMENT_4.pdf PDF
DRAFT_ATTACHMENT_7.pdf PDF
DRAFT_ATTACHMENT_1.pdf PDF
RFI_Draft_RFP.pdf PDF
DRAFT_ATTACHMENT_6.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

ATTACHMENT 3

SAMPLE TASK ORDER

Revision 0.a 6-November-2018

Offerors shall submit a technical approach to the Sample Task Order to include, but not limited to, all equipment selections, interconnection details, point’s lists, sequence of operations, and hardware/software for each control system type (as appropriate per building – see below).

Offerors shall provide System Security Engineering Process information to identify and mitigate system security vulnerabilities. This process shall include a means to ensure the completion of all implementation and acceptance testing required of each control system type with respect to meeting DoD requirements for accreditation and connection to Government networks. Offerors shall clearly state all assumptions where building detail provided is deemed insufficient to provide a complete technical solution. The Government’s intent is to discern the Offerors’s breadth and depth of knowledge in proposing these technical solutions.

1.0 General Assumptions:

1.1 General: The Sample Task Order consists of repair/replacement upgrades in five buildings (100-500) as follows:

B100 Central Plant B200 Marine Reserve Training Facility B300 Child Development Center B400 Electrical Substation B500 Information Systems Facility

1.2 These buildings are located on a fictitious U.S. Army garrison in a region that experiences the temperature variations of al four seasons. Each building is delivered hot/chilled water from the Central Plant; and each, except Building 200, is connected to the post-wide LAN via fiber optic cable. Building 200 is remote and has no LAN communication infrastructure installed.

1.3 Project duration is 24 months to include: surveys, safety plans, engineering, design, submittals, Government submittal review and comments, mobilization, procure and install, Government acceptance testing, demobilization, submittal of As-Built documentation and contract close-out.

1.4 This is a design-build project requiring only a single 100% design package submittal (no interim reviews).

1.5 Air Handling Units (AHU) are equipped with ductwork, actuators and modulating dampers to execute programmed Economizer Cycles (use of outside air for free cooling).

1.6 Work shall be done in accordance with Army construction standards, the National Electrical Code, and American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) standards.

1.7 Work shall be in compliance with latest version of Corps of Engineers, Safety and Health Requirements Manual EM 385-1-1 and Occupational, Safety and Health Agency (OSHA) safety standards.

1.8 All work shall be compliant with Americans with Disabilities Act (ADA) guidelines.

1.9 Offeror shall provide all wiring and conduit required to attach the new DDC system to the facility point of connection in each building which, in turn, will transmit data to the post-wide front-end software/hardware, via Government networks (as appropriate for the individual Sample Task Order building).

1.10 Where available, the Government will provide the network connectivity infrastructure to the local building network switch (IP drop). For building-to-building interconnection, the Offeror’s responsibility to provide communication infrastructure includes the facility point of connection but terminates at the network switch port on each end of the Government owned network segment.

1.11 No upgrades to domestic water heating equipment and systems are required.

1.12 Modify or augment existing equipment if the functionality does not exist to fulfill the requirements of the technical solution.

1.13 There are no hazardous materials.

1.14 Unless otherwise stated, each building has one service entrance for electrical power and one Natural Gas service.

2.0 BUILDING 100 - CENTRAL PLANT:

2.1 Building Specific Assumptions:

2.1.1 Major Equipment:

Two gas fired, water boilers (2,500 MBTUH each)

Two gas fired, low pressure steam boilers (26,800 MBTUH each) One water cooled, centrifugal, 2500-ton chiller One water cooled, centrifugal, 1000 ton chiller One water cooled, centrifugal, 650 ton chiller Three cooling towers with connected basins; each tower to have variable speed fans One 600 ton plate frame heat exchanger (not commissioned) All system pumps required to circulate and deliver hot/chilled and condenser water

2.1.2 Each boiler and chiller has a factory installed control system that includes all internal operational safeties. None of the boilers has inherent UMCS/EMCS communication capability, all chillers have BACnet communication capability.

2.1.3 Equipment is operated seasonally as the heating-cooling load demands. The cooling load modulates from 500 tons to 3200 tons. The heating load modulates from 10,000 to 1,000 MBTUH. There is a two-pipe (supply and return) distribution system that serves the buildings; it delivers chilled water in the cooling season; during the heating season, heat is distributed through either a direct-buried hot water distribution system or a direct-buried steam distribution system.

No simultaneous cooling and heating (manual switchover).

2.1.4 The Central Plant has a 600 ton plate-frame heat exchanger intended to provide free cooling when cooling tower basin water temperatures allow. There are no pumps, pipes or valves present; the heat exchanger is not installed or commissioned. The cooling tower basin water either serves the chillers or the flat-plate heat exchanger but not both simultaneously.

2.1.5 Chiller condenser water system feeds three cooling tower cells over connected basins.

Each cooling tower cell has one fan with variable speed control capability.

2.1.6 The Central Plant hosts the post wide UMCS Main Operator Work Station; the server resides in Building 500.

2.1.6 Central Plant contains Uninterruptible Power Supply (UPS) system and Backup Generator/Automatic Transfer Switch (ATS) which provides a dedicated power source for the data center in Building 500, Information System Facility.

2.1.7 The ATS contains a factory installed communication interface card employing MODBUS RTU protocol whereby status information may be extracted by the UMCS/SCADA/Building Automation System (BAS). This data system is read-only and no control of the ATS or attached Generator is possible.

2.2 Technical Solution:

2.2.1 Provide a UMCS/SCADA technical solution to instrument, control, monitor, and optimize the operation of the Central Plant, to wit:

2.2.2 Design pump, piping and valve layout associated with the flat-plate heat exchanger.

Include complete installation, commissioning, and control requirements for proper operation of the heat exchanger. Assume sufficient water flow and pump/pipe sizing to meet the capacity of the heat exchanger when environmental conditions for free cooling are present.

2.2.3 Sequence the chillers to include the use of free cooling when available; provide piping, valves, balancers, actuators, and all ancillary components to affect the optimized sequence.

2.2.4Sequence the boilers to optimize their performance throughout the heating season. Assume all boilers are at peak efficiencies when load is 90% of capacity.

2.2.5 Provide a narrative justifying the equipment selection and control configuration with respect to industry engineering principles of first cost, life cycle cost, efficiencies, performance, reliability, and maintainability. Provide complete sequences of operations for all systems and seasons, control system architecture diagrams, and simplified control drawings with necessary instrumentation (inputs and outputs) for a fully complete and operational monitoring and control system for the Central Plant.

2.2.6 Offeror shall provide metering of all utilities: electricity, gas, steam, and water.

3.0 BUILDING 200 – MARINE RESERVE TRAINING CENTER:

3.1 Building Specific Assumptions:

3.1.1 Major Equipment:

Two (2) Air Handling Unit with variable frequency drive on fan motor; hot water heating coil; chilled water cooling coil.

12 Variable Air Volume (VAV) boxes with hot water re-heat (no fans) 2 Fan Powered, Variable Air Volume (VAV) boxes with hot water re-heat Three (3) high efficiency, gas-fired water boilers Two heating water circulation pumps Two chilled water circulation pumps

3.1.2 Total building size is 3860 square feet in a “L” shape

3.1.3 Building contains four (4) offices, three (3) classrooms, mechanical/electrical space, restrooms and break area and drill hall. Each individual room is a unique zone, including a ventilated and heated drill hall.

Figure 1 Building 200 – Marine Reserve Training Facility

3.1.4 This is a single story, Marine reserve training center that operates five days a week from 0730 until 1730.

3.1.5 There is no radiation (fin-tube) heating in the training center.

3.1.6 There is no requirement for Fire Alarm/Fire Protection design or control of the domestic water heating systems for this building.

3.2 Technical Solution:

3.2.1 Provide an open implementation of a LonWorks® technology control system for all the systems, compliant with the following Unified Facility Guide Specifications (UFGS) and Unified Facility Criteria (UFC):

UFGS 23 09 23.01, Lonworks Direct Digital Control for HVAC and Other Building Control Systems

UFGS 25 10 10, Utility Monitoring and Control System (UMCS) Front End and Integration

UFC 3-470-01, Utility Monitoring and Control System (UMCS) Front End and Integration,

3.2.2 Control the temperature and humidity in the training facility; optimize efficiencies.

Temperature is to be maintained at 72 degrees F. with local zone control input to vary plus or minus 3 degrees. Relative humidity must be maintained between 40% and 60%.

3.2.3 Provide a narrative justifying the equipment selection and control configuration with respect to industry engineering principles of first cost, life cycle cost, medical safety, efficiencies, performance, reliability, and maintainability. Provide complete sequences of operations for all systems, control system architecture diagrams, and simplified control drawings with necessary instrumentation (inputs and outputs) for a fully complete and operational monitoring and control system for Building 200, Marine Reserve Training Center.

3.2.4 Provide a local Front-End Server/Operator Work Station (OWS) with a dynamic graphical display of monitoring and control points in Building 200. Integrate this server/work station and the associated data from the marine reserve training center to the main server located in Building 500, Information Systems Facility. Assume this main server is established and compliant with the requirements of UFGS 25 10 10. Either describe in narrative format/bulletized list or provide no more than three simplified graphics pages depicting typical front-end graphic elements for the DDC systems located in this building.

3.2.5 Provide advanced metering for all utilities and transmit real time data to the local server.

4.0 BUILDING 300 – CHILD DEVELOPMENT CENTER:

4.1 Building Specific Assumptions:

4.1.1 Major Equipment

Two - 8000 CFM Air Handling Units 24 fan-powered VAV boxes with hot water re-heat One air-cooled chiller with factory installed BACnet communication interface device Two high efficiency, gas-fired water heaters Three motor driven hot water pumps Hot water radiant floor heating (Activity Room) Kitchen exhaust fans Kitchen Makeup air unit

4.1.2 Child Development Center shall provide care for children of ages 6 weeks to 5 years old.

Mass Notification is required. Total building size is approximately 15,600 square feet in a rectangular shape (71 feet by 220 feet). Ignore dimensions on the attached drawings; drawings are for layout reference only. See Figure 2, Child Care Center Floor Plan.

Figure 2 Child Care Center Floor Plan

4.1.3 Building contains active play area, mechanical/electrical spaces, kitchen, administration offices, staff training and lounge space, infant/pre-toddler rooms, preschool/pre-K kindergarten rooms, outreach/transitional care spaces and rest rooms. Hours of operation are 0530 till 1900, Monday through Friday. Closed on holidays and weekends.

4.1.4 No requirement for Fire Protection (except detection of water flow and tamper switches in the single building fire protection water riser located in mechanical space). No requirement for control or monitoring of domestic water heating systems.

4.1.5 Child Development Center (CDC) contains 20 exterior doors (mix of single and double hung) and 41 interior doors.

4.1.6 No additional exterior lighting is required.

4.1.7 Fire Alarm System (FAS) shall sustain full operation under battery backup power (no commercial power) for 72 hours with 15 minutes of whole building general alarm. Batteries shall recharge to full charge in less than 24 hours.

4.1.8 There exists a tested, fully commissioned, and Government approved one-way radio alarm reporting system ready for interconnection to the new building level Fire Alarm Control Panel

(FACP).

4.2 Technical Solution:

4.2.1 Provide an open implementation of a BACnet® technology control system for all the systems (except kitchen), compliant with the following Unified Facility Guide Specifications (UFGS) and Unified Facility Criteria (UFC):

UFGS 25 10 10 (Utility Monitoring and Control System (UMCS) Front End and Integration, November 2012)

23 09 23.02 BACnet Direct Digital Control For HVAC And Other Building Control Systems

4.2.2 Control the temperature in the Child Development Center; optimize efficiencies.

Temperature is to be maintained at 75 degrees F. with local zone control input to vary plus or minus 3 degrees. Zone design is a variable and may be assumed with justification.

4.2.3 Provide a narrative justifying the equipment selection and control configuration with respect to industry engineering principles of first cost, life cycle cost, safety, efficiencies, performance, reliability, and maintainability. Provide complete sequences of operations for all systems, control system architecture diagrams, and simplified control drawings with necessary instrumentation (inputs and outputs) for a fully complete and operational monitoring and control system for Building 300, Child Development Center.

4.2.4 Provide a UMCS server compliant with the requirements of UFGS 25 10 10 and compatible with the control solution in the Child Development Center. Server will reside in Building 500, Information Systems Facility, and be maintained by the Network Enterprise Center staff. Server and software must meet all Information Assurance (IA) requirements for approval to connect and operate on a U.S. Army Internet Protocol (IP) network. Either describe in narrative format/bulletized list or provide no more than three simplified graphics pages depicting typical front-end graphic elements for the local controls in the Child Development Center.

4.2.5 Provide a narrative justifying the equipment selection and control configuration with respect to industry engineering principles of life cycle cost, safety, detection, performance, reliability, and maintainability. Provide security system architecture diagrams and simplified security control drawings with necessary equipment layouts for a fully integrated, complete and operational electronic security system for Building 300, Child Development Center.

4.3 Provide a complete Fire Alarm and Detection system (FAS) configured as Class X, addressable and compliant with:

NFPA 72-2013 National Fire Protection Association, Fire Alarm Code NFPA 101 National Fire Protection Association, Life Safety Code UFC 3-600-02 Operation and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems UFC 4-021-01, Design and O&M: Mass Notification Systems, with Change 1

4.3.1 The local Fire Control Panel (FACP) shall report general alarm, trouble and supervisory alarms via one-way, narrow band radio link to the garrison fire station. Provide a short narrative describing the equipment selection and outline the engineering trade-offs with respect to cost and NFPA code compliance. Include the test procedures to meet the requirements of NFPA 72 acceptance testing.

5.0 BUILDING 400 – ELECTRICAL SUBSTATION:

5.1 Substation Specific Assumptions:

5.1.1 Substation houses miscellaneous medium voltage bus work, low voltage bus work, switches, transformers, current and voltage monitoring devices, and lightning arrestors to provide commercial power to Buildings 100, 200 and 300.

5.1.2 Building 100, Central Plant, contains a UPS system and Emergency Backup Generator / ATS providing uninterruptable power to Building 500.

5.1.3 Substation provides branch feeder circuits at 4160 Volts A/C, three-phase, “Wye” to each building via underground wiring to a pad mounted transformer located just outside each building.

The building transformers step-down voltage to 480 VAC, three-phase, “Wye” power and feed main switchgear at each building’s service entrance.

5.1.4 Substation houses two step-down transformers from 12,470 VAC to 4160 VAC, each having the following monitored connection points:

Current Transformers, Hi-side (3 each) Potential Transformers Hi-Side (3 each) Transformer Nitrogen Cap Pressure Port (1 each) Fan Status (2 each) Oil Temperature Thermowell (3/4 Inch NPT Female x 12 inches deep) (1 each)

5.1.5 The Substation main building houses switch gear and three branch circuits: one to each of the three buildings noted above. Each building is fed from a branch circuit breaker. Each breaker has a factory installed interconnection point for a future Supervisory Control and Data Acquisition (SCADA) system.

5.1.6 The Substation main building has adequate floor and wall space for the addition of a new SCADA system.

5.1.7 Conduit paths exist from the substation main building to each substation 12470/4160 VAC transformers for the purposes of SCADA development and installation. Each of the transformers is located approximately 100 linear conduit feet from the main building. Empty conduit “stub-outs” were roughed in at installation of the substation for future SCADA system installation and enter the main building from underground in one corner of the 20 foot by 20 foot x 9 foot building. One entrance door is located diagonal across the building from the conduit stubs.

5.1.8 Government (IP) network conductivity exists on dedicated fiber optic (FO) cable routed from the main substation to Building 500, Information Systems Facility, including fiber network switches, patch panels, and fiber to copper converters on each end. The network infrastructure between the Electrical Substation and Information Systems Facility is owned and operated by the local Network Enterprise Center (NEC) and has been incorporated into the garrison’s DIACAP.

5.1.9 The Offeror’s demarcation is a network switch port on both ends of the FO Data Transmission System (DTS) supplied by the Government.

5.2 Technical Solution:

5.2.1 Provide a new SCADA system to monitor the substation.

5.2.2 The SCADA system shall capture breaker trips with time and date stamps to meet 2 millisecond resolution requirements for forensic analysis of outage root causes.

5.2.3 The SCADA system shall provide all power and transformer “health” status data on front-end software loaded and housed on server equipment located in Building 500, Information Systems Facility. Server exists and is currently in compliance with IA requirements. Software and SCADA controls must meet all Information Assurance (IA) requirements before approval is granted to connect and operate on a DoD Internet Protocol (IP) network. Either describe in narrative format/bulletized list or provide no more than three simplified graphics pages depicting typical front-end graphic elements for the SCADA in the Electrical Substation.

5.2.4 Provide a narrative justifying the equipment selection and control configuration with respect to industry engineering principles of first cost, life cycle cost, safety, efficiencies, performance, reliability, and maintainability. Provide complete sequences of operations for all systems, control system architecture diagrams, and simplified control drawings with necessary instrumentation (inputs and outputs) for a fully complete and operational SCADA system for Building 400, Electrical Substation.

6.0 BUILDING 500 – INFORMATION SYSTEMS FACILITY:

6.1 Building Specific Assumptions:

6.1.1 Information Systems Facility is a 30,000 square foot building housing a data center.

6.1.2 This facility receives electrical power from an uninterruptable, dedicated circuit fed from Building 100, Central Plant, via a single underground path.

6.1.3 Offeror shall assume that sufficient spare rack space, hardware server equipment, server operating software, power and environmental systems exist to support the new UMCS Front-End software systems.

6.2 Technical Solution:

6.2.1 Provide software solutions integrated to the servers per the requirements of the buildings described above in paragraphs 2-5.

6.2.2 Provide advanced metering for all utilities and transmit real time data to the local server.

Provide for separate metering of the HVAC energy use to maintain the environmental conditions required for the servers and communication devices.