W912DW25Q0034 Solicitation AFD Motor Brake.pdf

PDF 16 MB Posted

Attached to
Albeni Falls Dam (AFD) MOTOR, BRAKE, ENCODER, AND COUPLING FOR ALBENI FALLS SPILLWAY CRANE
Solicitation number
W912DW25Q0034
Issued by

About this file

This is a Solicitation/Contract/Order for Commercial Items (Standard Form 1449) for the U.S. Army Corps of Engineers, specifically for the Albeni Falls Dam Project. The solicitation (W912DW25Q0034) seeks the procurement of a motor, brake, encoder, and coupling for a spillway crane, with a total quantity of 1 unit. The contract is set aside for small businesses, with a solicitation issue date of 05-Jun-2025 and quotes due by 10:00 am PST on 19 June 2025.

The detailed technical requirements specify a 60 HP, 1200 RPM, 460 volt AC, 3-phase, 60 Hz inverter-duty motor with a constant-torque speed range of 1000:1. The motor must have a stub shaft, C-face connection, and be totally enclosed with Class B temperature rise insulation. Additional specifications include precise requirements for the motor's bearings, encoder, brake, and coupling, with detailed performance, testing, and environmental parameters. The delivery location is the Albeni Falls Dam Project Office in Oldtown, Idaho, with a warranty covering all parts, labor, and workmanship for a minimum of one year.

View the file

Other files

File Type Posted
W912DW25Q0034 Amd 2.pdf PDF
W912DW25Q0034 Amd 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spillway Gantry Crane Operation & Maintenance

Brake Torque to be Factory set at 400 ft. lbs.

File details come from the government source that posted it. Updated .