This document is an amendment to Solicitation W912DW-24-Q-0044 for the procurement of a Standby Emergency Diesel Generator for the U.S. Army Corps of Engineers (USACE) Seattle District at the Chief Joseph Dam in Bridgeport, Washington. The amendment provides answers to questions received during the solicitation process, which cover requirements for the load bank, generator size, exhaust silencer, and circuit breakers. The solicitation specifies a 650-750 kW standby-rated generator that must meet Tier 2, Tier 3, or Tier 4 EPA emission standards, be fully enclosed for sound and weather, have an integral fuel tank base and integrated load bank, and be mounted on a step-deck trailer. The generator must be delivered to the Chief Joseph Dam. All offerors must be registered in the System for Award Management (SAM) to be eligible for award. This is a firm-fixed-price commercial supply contract for USACE.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

Provide answ ers to questions received during the solicitation. Please see the follow ing page for Q&A.

No further changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Oct-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW24Q0044

X 9B. DATED (SEE ITEM 11)

30-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Oct-2024

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW24Q0044

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

NOTES R0001

Q&A Question: Kindly confirm Load Bank size requirement for this project.

Answer: The load bank needs to be sized to the full load capacity of the generator. This is required for testing and verifying the standby status of the generator.

Question: Regarding the load bank: What is the Load Percentage Rating?

Answer: 100%

Question: Regarding the load bank: Single Step or Multi Step?

Answer: Multi Step

Question: Regarding the load bank: Automatic or Manual?

Answer: Manual

NOTES R0003

Q&A

Question: Is the load bank to be on a trailer or pad mount, are they wanting cables provided, if so how long?”

Answer: The load bank needs to be integrated into the gen-set and not a stand-alone unit.

Question: A single towable (slightly less that requested kW) or twin-pack?

Answer: No to the twin pack, takes up too much space and weight may be an issue as well.

Question: 650 – 750 KW Standby Rating – Will customer accept 625KW standby rated towable?

Answer: No, we will not accept a 625KW unit. The spec is for a gen-set range of 650KW to 750KW.

Question: Exhaust silencer – on Tier 4 engines, the SCR catalyst typically also acts as the exhaust silencer/muffler. Would a separate silencer still be required?

Answer: No on the Tier 4 rating, this is a standby generator and not a prime power unit and so not subject to Tier 4 compliance.

Question: 3-pole 100 percent UL rated circuit breakers – We typically do not use 100% rated breakers, we use 80% rated. Will they accept this?

Answer: No, we will not accept 3-pole breakers that are not 100% rated.