W912DW23R0001- Attachment 1- Preliminary Layout of the Major Features of Work.pdf

PDF 284 KB Posted

Attached to
Albeni Falls Dam Fish Passage
Solicitation number
W912DW23R0001
Issued by

View the file

Other files

File Type Posted
W912DW23R0001- AFD Fish Passage Sources Sought_Attachment 2.pdf.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Layout of the Major Features of Work

Above is a preliminary layout of the major features of work. The construction of this project will have constraints which include but are not limited to: Seasonal work windows, blasting requirements and construction work taking place alongside an active Hydroelectric dam while the dam continues to operate normally. Construction of the fish passage will be required to be in coordination with the terms of the Biological Opinion which can be found at the following link:

https://ecos.fws.gov/tails/pub/document/9799287

Attachment 1

File details come from the government source that posted it. Updated .