W912DW23R0001- Attachment 1- Preliminary Layout of the Major Features of Work.pdf
PDF 284 KB Posted
- Attached to
- Albeni Falls Dam Fish Passage
- Solicitation number
- W912DW23R0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DW23R0001- AFD Fish Passage Sources Sought_Attachment 2.pdf.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preliminary Layout of the Major Features of Work
Above is a preliminary layout of the major features of work. The construction of this project will have constraints which include but are not limited to: Seasonal work windows, blasting requirements and construction work taking place alongside an active Hydroelectric dam while the dam continues to operate normally. Construction of the fish passage will be required to be in coordination with the terms of the Biological Opinion which can be found at the following link: